Port St Lucie FL OPC OpEx cost details 8 31 2026.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- 36C10F25R0035
About this file
This is a pricing template for Operating Expenses (OpEx) costs related to the Port St. Lucie, Florida Outpatient Clinic (OPC) facility, prepared as of August 31, 2026. The spreadsheet provides a detailed cost breakdown structure for the Department of Veterans Affairs' facility operations at this location, organized by major expense categories and supporting detail worksheets.
The template is structured in two main sections: Section I contains operational costs broken down into seven primary categories—Cleaning/Janitorial Services, Heating, Electrical, Plumbing, Air Conditioning, Elevators, and Miscellaneous expenses—each with designated line items for salaries, supplies, and system maintenance. Section II includes indirect costs comprising Real Estate Taxes, Insurance, Building Maintenance and Reserves for Replacement, Lease Commission, and Management fees. Each category includes detailed worksheets with columns for material costs (quantity, unit cost, and total) and labor costs (hours, labor rate, and total). All line items currently show zero dollar values, indicating this is a blank template awaiting population with actual cost data. This pricing template supports the solicitation 36C10F25R0035 for the Port St. Lucie OPC facility amendment and is intended to capture the complete annual operating cost structure for the lessor's facility management obligations.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPEX Summary
| Port St. Lucie, FL Operating Costs Details 8.31.2026 | ||
| Item | Lessor's Annual Cost (from 1217) ($) | Additional narrative |
| A. Cleaning, Janitor and Char Service | ||
| 5. Salaries | ||
| 6. Supplies (wax, cleaners, cloth | ||
| 7. Contract Services | ||
| B. Heating | ||
| 8. Salaries | ||
| 9. Fuel | ||
| 10. System Maintenance and Repair | ||
| C. Electrical | ||
| 11. Current for Light and Power | ||
| 12. Replacement of Bulbs, Tires, Starters | ||
| 13. Power for Special Equipment | ||
| 14. System Maintenance and Repair | ||
| D. Plumbing | ||
| 15. Water | ||
| 16. Supplies | ||
| 17. System Maintenance and Repair | ||
| E. Air Conditioning | ||
| 18. Utilities | ||
| 19. System Maintenance and Repair | ||
| F. Elevators | ||
| 20. Salaries | ||
| 21. System Maintenance and Repair | ||
| G. Miscellaneous | ||
| 22. Building Engineer and Manager | ||
| 23. Security | ||
| 24. Social Security Tax and Workperson's Comp Insurance | ||
| 25. Lawn and Landscaping | ||
| 26. Other |
| 27. Total | |
| Section II | |
| 28. Real Estate Taxes | |
| 29. Insurance | |
| 30. Building Maintenance and Reserves for Replacement | |
| 31. Lease Commission | N/A |
| 32. Management | |
| 33. Total |
A. Cleaning
| DATE PREPARED | |
| A. Cleaning, Janitor and Char Service |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
B. Heating
| DATE PREPARED | |
| B. Heating |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
C. Electrical
| DATE PREPARED | |
| C. Electrical |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
D. Plumbing
| DATE PREPARED | |
| D. Plumbing |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
E. Air Conditioning
| DATE PREPARED | |
| E. Air Conditioning |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
F. Elevators
| DATE PREPARED | |
| F. Elevators |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
G. Miscellaneous
| DATE PREPARED | |
| G. Miscellaneous |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
Line 26 - Other details
| DATE PREPARED | |
| Line 26 - Other |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
Line 28 - RE Taxes
| DATE PREPARED | |
| Line 28 - Real Estate Taxes |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
Line 29 - Insurance
| DATE PREPARED | |
| Line 29 - Insurance |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
Line 30 - Maintenance & Reserve
| DATE PREPARED | |
| Line 30 - Building Maintenance and Reserve |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
Line 32 - Management
| DATE PREPARED | |
| Line 32 - Management |
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 |
File details come from the government source that posted it. Updated .