This is a Request for Proposal (RFP) from the Department of Veterans Affairs for a construction project to expand Jefferson Barracks National Cemetery Phase 5C located in St. Louis, Missouri. The project includes site development work, general construction, roads, walks, grading, drainage, utilities, landscaping, and construction of pre-placed crypts and in-ground cremains sections. The contract is a firm-fixed price contract estimated between $20-50 million with a performance period of 548 calendar days from the notice to proceed. The RFP is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by May 30, 2022 at 4:00 PM Eastern Time. Award is estimated for July 24, 2022. The RFP includes evaluation criteria, submission instructions, contract terms and conditions, and specifications for the construction work.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10F22R0027 Attachments
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 of 36C10F22R0027 X 04- -2022
657CA2313Z
003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington DC 20001 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington DC 20001 Isabell Coad 708-940-3568 The Department of Veterans Affairs, Office of Construction & Facilities Management, anticipates awarding a Firm Fixed Priced contract to expand Jefferson Barracks National Cemetery Phase 5C, Project No. 657PC2313.23M, located in St. Louis, MO. In accordance with the master plan and phase 5C drawings and specifications.
Phase 5C will develop approximately 8.5 acres of undeveloped land. The Contractor shall provide all labor, materials, equipment and supervision for the construction as shown on the plans and specifications (attached).
This procurement is 100% set aside for Service Disabled Veteran Owned Small Businesses (SDVOSB).
The applicable North American Industry Classification System NAICS CODE: 237990 (size standard $39.5M).
The magnitude of construction cost for this project is between $20,000,000 and $50,000,000.
Pre-proposal site visit schedule - see clause 52.236-27 in the solicitation
Please submit all questions regarding the solicitation in writing using the PPI Pre-Proposal Inquiry (PPI) Form
Proposals are due May 30, 2022, 4:00 p.m. Eastern Time
All Offerors are responsible for monitoring this solicitation and any subsequent amendments at www.sam.gov.
X X 52.211-10 X 16:00
EDT
05-30-2022 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
101F Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 425 I Street, NW Washington DC 20001 Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971 Isabell Coad
| CLIN # |
| CLIN DESCRIPTION |
| EXPRESSED AMOUNT ($) |
| WRITTEN AMOUNT |
| 0001 – Base Bid, Construction |
| All construction work in accordance with the Scope of Work, including (but not limited to) site development work, general conditions, general construction, alterations, roads, walks, grading, drainage, electrical work, utility systems, irrigation, landscaping and construction and certain of other items. Preparation and completion of pre-placed concrete crypt sections, in-ground cremains sections, niche cover installation and all other work necessary to construct the project consisting of in ground cremains and pre-placed crypts. |
| 0002 – Base Bid, Pre-Placed Crypts |
| Furnish and deliver to the site all pre-placed crypts. |
| 0003 – Add Alternate #1 |
| Add/Alternate 1: Improve paving grades at two locations on the Jefferson Barracks Division Campus where existing grading anomalies present challenges to pedestrian transit. The locations are at the intersection of the cemetery road and the facility between buildings 1 and 25 as well as near the stair at building 55. At the crosswalk from B1 to B25, rework grading and paving to provide an accessible crosswalk. At the building 55 connector, rework and regrade the existing sidewalk at the approach to the building 55 connector and repair stones at stair as indicated. Reference drawing sheets See Add Alternate 1 Drawings: G001, AE100, C-100, C-101, and C-102. |
TOTAL BASE BID CLIN 0001, CLIN 0002, CLIN 0003:
Table of Contents
| PART I - THE SCHEDULE | 1 | |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 | |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 | |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 | |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 6 | |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 7 | |
| PART I - GENERAL | 7 | |
| PART II – PROPOSAL INFORMATION | 9 | |
| 1. | PROJECT DESCRIPTION | 9 |
| 2. | ACQUISITION STRATEGY/CONTRACT STRUCTURE | 10 |
| 3. | EVALUATION FACTORS FOR AWARD | 10 |
| 4. | EVALUATION FACTOR WEIGHTINGS AND IMPORTANCE | 10 |
| 5. | DEFINITIONS | 11 |
| 6. | OFFEROR SUBMISSION INSTRUCTIONS | 11 |
| VOLUME I - TECHNICAL PROPOSAL | 14 | |
| a. | FACTOR 1 - RELEVANT EXPERIENCE | 14 |
| b. | FACTOR 2 - TECHNICAL APPROACH | 17 |
| c. | FACTOR 3 - CONSTRUCTION/PROJECT MANAGEMENT | 17 |
| VOLUME II - PAST PERFORMANCE | 18 | |
| VOLUME III - PRICE PROPOSAL FACTOR | 21 | |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 21 | |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 22 | |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 22 | |
| 2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014) AND ALTERNATE II (JUN 2009) | 23 | |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 24 | |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 25 | |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 25 | |
| 2.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 26 | |
| 2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 26 | |
| 2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 27 | |
| REPRESENTATIONS AND CERTIFICATIONS | 28 | |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) | 28 | |
| 3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 31 | |
| 3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 33 | |
| GENERAL CONDITIONS | 36 | |
| 4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 36 | |
| 4.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000) | 36 | |
| 4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 36 | |
| 4.4 52.223-21 FOAMS (JUN 2016) | 39 | |
| 4.5 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2021) | 40 | |
| 4.6 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 45 | |
| 4.7 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 46 | |
| 4.8 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 48 | |
| 4.9 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 48 | |
| 4.10 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 50 | |
| 4.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 50 | |
| 4.12 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS–CPM) (NOV 2018) (ALTERNATE I) | 50 | |
| 4.13 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 54 | |
| 4.14 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 55 | |
| 4.15 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 56 | |
| 4.16 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 56 | |
| 4.17 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 56 | |
| 4.18 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 58 | |
| 4.19 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 58 | |
| 4.20 SUPPLEMENTAL INSURANCE REQUIREMENTS | 59 | |
| 4.21 MANDATORY WRITTEN DISCLOSURES | 60 | |
| KEY PERSONNEL | 60 | |
| 4.22 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 61 |
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
(a) Hard copies of bidding documents will not be provided. The solicitation, all bidding documents, subsequent solicitation amendments, award notification, and all other solicitation related information will be posted to the website www.SAM.gov under the Contracting Opportunities section.
(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.
(c) The bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25. The penal sum for each bond at the time of award shall be 100% of the original contract price IAW FAR 52.228-15. The awardee shall furnish performance & payment bonds to the Contracting officer. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.
(d) An original, hard copy, executed Bid Guarantee (on form SF-24) must be mailed to the address below and received by the Contracting Officer within 5 business days of the proposal due date and time shown in Box 13a of solicitation form SF 1442 (or as subsequently amended).
(e) Volume III, Tab 2 - Price Proposal must contain a legible, scanned copy of the Executed Bid Guarantee (SF-24). Seals should be shaded with pencil lead to make them legible, prior to being scanned and emailed.
(f) Postal Address/Courier Address for mailing hard copy Bid Guarantee:
Department of Veterans Affairs Office Design & Construction 425 I St NW, 6th floor (003C4B) Washington, DC 20001 Attn: David Bullerwell, OFA NRO Director
(g) All bond transmittal envelopes or other packaging shall be clearly marked with the solicitation number, offeror(s) name, and return address.
(h) All bonds should be mailed by fastest traceable means (i.e. FedEx, UPS, etc.) to avoid delays.
(i) DESCRIPTION OF WORK: See Block 10 of SF1442, Page 1.
(j) Cost Range: $20,000,000 to $50,000,000.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
PART I - GENERAL
1. Gender: Whenever the masculine gender is used in this solicitation and contract documents, it shall be considered to include feminine.
2. The Government makes no guarantee as to the accuracy of the electronic copies of drawings.
3. Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at www.SAM.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their proposal.
4. Offerors are encouraged to track this solicitation via the Contract Opportunities Section of the www.SAM.gov website.
5. Amendments: Amendments to this solicitation will be posted at www.SAM.gov. Paper copies of the amendments will NOT be individually mailed. Check www.SAM.gov regularly for updates. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered non-responsive.
6. A public bid opening will not occur under this RFP solicitation.
7. VETS 100: Title 38, USC Section 4212(d) and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS 4212 reporting information can be done electronically at: https://www.dol.gov/agencies/vets/programs/vets4212. For procurement awards in excess of $25,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.
8. Required registration with contractor performance assessment reporting system (CPARS)
(a) As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $750,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement, VA uses online databases located at the Contractor Performance Assessment Reporting System (CPARS) website; to include the Construction Contractor Appraisal Support System (CCASS), the Architect-Engineer Contract Administration Support System (ACASS), and the Federal Awardee Performance & Integrity Information Retrieval System (FAPPIS). This site is maintained by the Naval Sea Logistics Center. The CPARS database information is shared with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies.
(b) Each contractor whose contract award is estimated to exceed $750,000 is required to register with the CPARS database at the following web address: https://cpars.cpars.gov/cpars/app/accessrequestverify_input.action?role=SCR (Corporate Senior Management Access Request). Help in registering can be obtained by contacting CPARS Support E-mail (webptsmh@navy.mil) or by calling (207) 438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
(c) For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and reassign the report to the VA contracting officer.
(d) Failure to have a current registration with the CPARS database, or to reassign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
Pre-Proposal Conference & Jobsite Walkthrough (Site Visit):
Interested parties should meet at the Cemetery Administration Building located at the Jefferson Barracks National Cemetery – 2900 Sheridan Rd, St. Louis, MO 63125.
The pre-proposal conference will be held on site and virtually on May 5, 2022, from 10:00am – 10:15am CST (Local - Central Time).
Microsoft Teams meeting: https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2FkMjAyMzctYWVjOS00MWYzLTgyOWItNGFlNTYzMDI3Yzk2%40thread.v2/0?context=%7b%22Tid%22%3a%22e95f1b23-abaf-45ee-821d-b7ab251ab3bf%22%2c%22Oid%22%3a%227e736f48-52ff-4878-8b76-c228a639a826%22%7d
Or call in (audio only) Phone Number: (872) 701-0185 Conference ID: 191 654 355#
A jobsite walkthrough (site visit) is scheduled to take place immediately upon completion of the pre-proposal conference on May 5, 2022 from approximately 10:15am to 12:00pm CST (Local - Central Time).
No questions will be answered at the site visit. All questions must be submitted in writing to the Contracting Officer, as indicated below.
*ALL INTERESTED PARTIES MUST PROVIDE A LIST OF THE NAMES OF PERSONS THAT WILL ATTEND THE SITE VISIT TO THE CONTRACTING OFFICER (ISABELL.COAD@VA.GOV) NO LATER THAN May 3, 2022 BY 3:00 PM EST.
PART II – PROPOSAL INFORMATION
1. PROJECT DESCRIPTION
The purpose of this project is to enable an existing national cemetery to continue to provide burial services for eligible veterans in the St. Louis, MO area. The National Cemetery Administration (NCA) contracted this 8.5-acre cemetery expansion project to increase burial capacity of Jefferson Barracks National Cemetery (JBNC) to serve veterans in the St. Louis area. This cemetery expansion project identified as Phase 5C is expected to be the last expansion at JBNC. The Phase 5C documents are packaged separate due to the schedule of building demolition for the Jefferson Barracks Division of the Veterans Affairs St. Louis Health Care System (abbreviated herein as VAMC) project. Phase 5C will proceed upon VAMC building demolition and property turnover to JBNC. Design elements of Phase 5C is listed below:
Base Requirements:
ITEM I, CLIN 0001 BASE BID: The contractor shall provide all labor, equipment, and materials necessary to complete all work in accordance with the Specifications and Drawings. Work includes general construction, alterations, roads, walks, grading, drainage, site furnishings, landscaping and irrigation necessary removal of existing structures and construction and certain other items. The Base Bid work of this contract includes phased requirements. Phase 5C includes PPC Sections 1XX (2,316 double depth crypts), 1YY (1,981 double depth crypts), 1S (2,216 double depth crypts), 1R (2,022 double depth crypts) and IGC Section 1ZZ (765 In Ground Cremains sites). PPC Sections 1XX and 1ZZ will be turned over to the government within 275 calendar days from Notice to Proceed. These phases are referred to as Early Turn Over (ETO). Completion of the ETO work will follow procedures like those for final completion and acceptance, with the facilities within the ETO being completed and turned over to the Cemetery for use to begin operation of the Cemetery while the remaining work is completed. ETO shall be completed and accepted by NCA for operation within 275 calendar days from Notice to Proceed. While the work of the ETO is being performed, work for the remainder of the project can also be performed.
ITEM II, CLIN 0002 BASE BID: Manufacture, deliver, off-load, and store no fewer than 8,535 pre-placed double-depth crypts.
ITEM III, CLIN 0003 Add Alternate 1: Improve paving grades at two locations on the Jefferson Barracks Division Campus where existing grading anomalies present challenges to pedestrian transit. The locations are at the intersection of the cemetery road and the facility between buildings 1 and 25 as well as near the stair at building 55. At the crosswalk from B1 to B25, rework grading and paving to provide an accessible crosswalk. At the building 55 connector, rework and regrade the existing sidewalk at the approach to the building 55 connector and repair stones at stair as indicated. See Add Alternate 1 drawing sheets G001, AE100, C-100, C-101, and C-102.
The project period of performance shall be 548 calendar days from Notice to Proceed.
An additional 90 calendar days will be added to the period of performance if Add Alternate 1 is elected for award in the contract.
The estimated cost of construction is between $20M and $50M.
The contract is estimated to be awarded on or around July 24, 2022.
2. ACQUISITION STRATEGY/CONTRACT STRUCTURE
In accordance with 38 USC 8127, the contracting officer has determined that this construction acquisition be 100% set-aside for CVE-verified Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns.
The basis for award will be FAR 15 Best Value utilizing Tradeoff Process source selection.
The Government intends to make award without discussions, in accordance with 15.215-1. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if the Contracting Officer determines discussions to be necessary.
This acquisition will result in a firm-fixed price contract. The Government will award a single contract resulting from the solicitation, to the responsible Offeror whose offer conforms to the solicitation requirements and provides the best value to the Government considering both non-price factors and price.
3. EVALUATION FACTORS FOR AWARD
The Government will evaluate each Offeror’s proposal using the following factors and subfactors:
1. Technical Factors
| Factor 1 | Relevant Experience |
| Subfactor 1.1 | Project Experience |
| Subfactor 1.2 | Key Personnel |
| Factor 2 | Technical Approach |
| Factor 3 | Construction/Project Management |
| Subfactor 3.1 | Project Organizational Chart and Narrative |
| Subfactor 3.2 | Capacity to Perform Work |
Subfactor 3.3 Schedule
2. Past Performance Factor
3. Price Factor
4. EVALUATION FACTOR WEIGHTINGS AND IMPORTANCE
Technical factors are Equal in importance and subfactors within factors are equal in importance. Technical factors and Past Performance factor are equal in importance. When combined, non-price factors are approximately equal to Price.
Award may be made to other than the lowest-priced offeror or other than the highest technically rated offeror.
5. DEFINITIONS
For the purposes of this solicitation, Recent, Relevant and Similar are defined as follows:
• Recency: “Recent” is defined as construction project/contract work performed in the last five (5) years (between 2017 to 2022). Projects may be completed or at least 50% complete at time of proposal submission.
• Relevancy: “Relevant” is defined as construction project/contract work of a similar size and comparable level of complexity to this project. Relevant size & complexity aspects may include (in descending order of relevance):
o Very Relevant: Cemetery projects exceeding $20M in construction costs, requiring new precast crypt field development, columbarium construction, roadway or other paving, irrigation systems, dam/spillway/stormwater outfall improvements, vertical construction/renovations, and significant landscaping improvements.
o Relevant: Cemetery projects greater than $10M OR other heavy civil construction projects exceeding $20M, requiring new precast crypt field development, columbarium construction, roadway or other paving, irrigation systems, stormwater management systems, vertical construction/renovations, and/or significant landscaping improvements.
o Somewhat Relevant: Cemetery projects greater than $5M OR other construction projects exceeding $10M in construction costs, requiring new construction/renovations of buildings, pre-cast/cast in place concrete, turf (sod) placement and maintenance, tree and shrub placement and maintenance, irrigation central control systems, stormwater systems, roadways or other paving, wetlands/environmental remediation, or restoration. May include golf courses, regional parks, multiple sport-fields complexes, or multi-phased recreation-oriented land development projects larger than 10 acres.
o Not Relevant: Involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
• Similar: “Similar” is defined as a cemetery construction projects comparable to value project at or over $20M.
6. OFFEROR SUBMISSION INSTRUCTIONS
This solicitation is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). To help determine the eligibility of Prime contractors to participate in this solicitation, the Government will use the Small Business Administration (SBA) small business size standard associated with the NAICS code applicable to this solicitation – see below.
· NAICS Code is 237990
· SBA Small business Size Standard is $39.5M.
Submitted proposals that do not adhere to the following instructions may be deemed unacceptable and ineligible for an award;
a. Proposals will be submitted in THREE (3) separate volumes (files).
i. Volume I shall be the Technical Proposal and shall include the offeror’s responses to Evaluation Factors 1, 2, and 3 as well as the subfactors
See Solicitation section VOLUME I – TECHNICAL PROPOSAL for Technical Proposal formatting instructions and any page limitations; and
ii. Volume II shall be the Past Performance Information and shall include response to Past Performance Factor.
See Solicitation section VOLUME II – PAST PERFORMANCE for Past Performance Information formatting instructions and any page limitations; and
iii. Volume III shall be the Price Proposal and shall include the Offeror’s response to Price Factor. Price Proposal Volume III shall contain VAAR 852.219-77 VA Notice of Limitations on Subcontracting—Certificate of Compliance, bid guarantee, signed copy of SF1449, copy of Reps and Certs, and any signed amendments.
See Solicitation section VOLUME III – PRICE PROPOSAL for Price Proposal formatting Instructions and any page limitations.
b. Method of Submission:
i. Proposal must be submitted via email only.
1. Emailed proposal shall be sent to the Contracting Officer at Isabell.coad@va.gov and must be received by the due date and time established in the solicitation.
2. Emailed files must be no larger than 40MB each
3. If the file size is greater than 40MB, separate document into multiple files and label files logically and sequentially, for example Volume I-part 1, Volume I-part 2, etc.
4. NOTE: While 40MB is the maximum message size, things like encryption can add overhead to a message and increase its size, so there are times when a message may need to be under 40MB to be sent successfully to account for this overhead. Also, ensure no special characters (#@$!&^*+) or slashes (/, \) in the document title.
5. Offerors shall email the following documents to the Contracting Officer by the due date and time shown in Box 13a of solicitation form SF 1442 (or as subsequently amended):
i. one (1) copy of the Technical Proposal (Volume I)
ii. one (1) copy of the Past Performance Information (Volume II)
iii. one (1) copy of the Price Proposal (Volume III).
iv. Late or incomplete Proposals may be considered to be nonresponsive.
c. Electronic Proposal File Format:
i. Adobe PDF is the only file format that will be accepted.
d. Proposals shall be identified with a TITLE PAGE that contains the following information:
· Solicitation Number
· Solicitation Title
· Contractor Name, address, email, and DUNS
· Contractor Authorized Representative information
· Volume Number (I, II, or III)
· Volume Title (Technical Proposal, Past Performance Information, or Price Proposal)
· Index of the sections contained in the volume
i. The proposal shall not exceed the number of pages identified in the solicitation. A page is considered to be the PDF file equivalent of one side of an 8-1/2 inch sheet of paper.
ii. Proposals shall contain all applicable information as required by the evaluation factors.
iii. Bid Guarantee (Bond):
a. Volume III, Tab 2 - Price Proposal must contain a legible, scanned copy of the Executed Bid Guarantee (SF-24). Seals should be shaded with pencil lead to make them legible, prior to being scanned and emailed.
See Solicitation Section VOLUME III – PRICE PROPOSAL for Price Proposal Formatting instructions.
b. An original, hard copy, executed Bid Guarantee (on form SF-24) must be mailed to the address below and received by the Contracting Officer no later than 5 business days after the proposal due date and time shown in Box 13a of solicitation form SF 1442 (or as subsequently amended).
c. Postal Address/Courier Address for mailing hard copy Bid Guarantee:
| Department of Veterans Affairs | |
| Office Design & Construction |
425 I St NW, 6th floor (003C4B) Washington, DC 20001 Attn: David Bullerwell, OFA NRO Director
d. See Solicitation Section titled, INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
VOLUME I - TECHNICAL PROPOSAL
Technical Proposal shall consist of THREE (3) factors: (1) Relevant Experience, (2) Technical Approach, and (3) Construction/Project Management and their subfactors, as identified below.
a. FACTOR 1 - RELEVANT EXPERIENCE
Sub-Factor 1.1, Project Experience
The Offeror shall submit three (3) recent projects, considered to be relevant as defined in the solicitation. The Offeror may submit projects for which they were a Prime contractor and projects of their major subcontractors or other partners for which they would partner with on this project.
For each of the three (3) projects, the offeror shall summarize the following information not to exceed four (4) pages for each project. (Total page limit – 12):
· Describe the project in detail and highlight relevance of the project to this solicitation project scope of work.
· Detail the project team and explain each firm’s role on the project. Specifically identify major partners & subcontractors involved on this project that would be used for the project outlined in this solicitation.
· Describe the original project pricing and schedule, then detail the projects performance and include explanations for any price and/or time growth experienced. Include an explanation of any potential correlation between price and schedule.
· Describe the project’s safety record (i.e. number of lost time accidents/days)
· Describe how sustainable design principles were incorporated into the project; indicate to what extent environmental program goals (e.g., Energy Star, Leadership in Energy and Environmental Design) were achieved and how those achievements were recorded into the final documentation. If a LEED certification was required, provide which elements contributed to the certification.
· Indicate whether or not the project required LEED Silver (or higher) certification, and if so, what elements composed that certificate.
· Provide a customer point of contact for each project including name, title, email and phone number. The Government reserves the right to contact the customer to verify information provided by the Offeror.
Sub-Factor 1.2, Key Personnel
Offerors shall provide one resume for each key person identified below including their relevant experience for being assigned to this project.
Resumes should describe work experience in sufficient detail to demonstrate its relevance to the evaluator. Resumes should also show the number of years the person occupied each position. Proposals that exceed Minimum Qualifications may be rated higher. (Total page limit 21, max 3 pages per resume)
1. Project Executive
Minimum Qualifications:
· Eight (8) years of experience managing construction work considered relevant as defined in this solicitation. (Higher rating may be given for more than fifteen (15) years of experience leading on-site construction projects considered relevant as defined in this solicitation.)
· Bachelor Degree. (Higher rating may be given for Bachelor Degree in Engineering, Construction, Architecture, or Landscape Architecture. Higher rating also may be given for professional licensure in the fields of engineering, architecture, landscape architecture, or construction management)
2. Project Manager
Minimum Qualifications:
· Eight (8) years of experience leading on-site construction projects considered relevant as defined in this solicitation. (Higher rating may be given for more than fifteen (15) years of experience leading on-site construction projects considered relevant as defined in this solicitation.)
· Bachelor Degree in Engineering, Construction, Architecture, or Landscape Architecture. (Higher rating may be given for professional licensure in the field of engineering, architecture, landscape architecture, or construction management)
· Show evidence candidate meets Health & Safety qualifications in the solicitation specifications (Spec 01 35 26 Sec. 1.7-1.8), at the time of proposal.
3. Construction Superintendent
Minimum Qualifications:
· Ten (10) years of field superintendent experience, leading construction work considered relevant as defined in this solicitation. (Higher rating may be given for more than fifteen (15) years of field superintendent experience leading on-site management of construction work considered relevant as defined in this solicitation.)
· Show evidence candidate meets Health & Safety qualifications in the solicitation specifications (Spec 01 35 26 Sec. 1.7-1.8), at the time of proposal.
4. Quality Control Officer/Contractor Quality Control (CQC) System Manager:
CQC System Manager is an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor.
Minimum Qualifications:
· Bachelor’s degree in Engineering, Construction, Architecture, or Landscape Architecture and five (5) years general construction experience in the role of project manager, project engineer, QC manager, or project superintendent.
· Two (2) years quality control experience on projects considered to be relevant as defined in the solicitation.
· Show evidence candidate meets Health & Safety qualifications in the solicitation specifications (Spec 01 35 26 Sec. 1.7-1.8), at the time of proposal.
5. Safety Officer
Minimum Qualifications:
· Must be designated Prime Contractor Safety Officer
· Provide evidence (course completion certificate) that candidate has completed the OSHA 30-hour Construction Safety class within the last two (2) years
· Five (5) years of construction industry safety experience OR three (3) years of construction industry safety experience if he/she possesses a Certified Safety Professional (CSP) or certified Construction Safety and Health Technician (CSHT) certification or have a safety and health degree from an accredited university or college.
· Provide evidence that candidate must meet the Quality Control and Health & Safety qualifications specified in the solicitation specifications.
· Resume should display candidate’s capability (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State and local requirements are met for the project.
6. Independent CPM Consultant
To fulfill all the requirements of this specification section, the Contractor shall engage an independent CPM consultant who is skilled in the time and cost application of scheduling using (PDM) network techniques for projects considered relevant as defined by this solicitation. Provide a brief narrative that describes three (3) to five (5) prior construction projects for which the proposed consultant has performed complete project scheduling services.
Minimum Qualifications:
· Resume should contain sufficient information to show that the proposed consultant has the qualifications to meet the requirements specified in section 01 32 16.13 NETWORK ANALYSIS SCHEDULES MAJOR PROJECTS of the solicitation specifications.
· Resume must indicate scheduling software experience with Primavera P6
7. LEED/Commissioning Coordinator
Provide resume of LEED/Commissioning coordinator to work with the project’s Commissioning Agent and be the contractor’s dedicated Commissioning Team lead.
Minimum Qualifications:
· LEED AP accredited professional OR
· Five (5) years demonstrated experience as commissioning coordinator
b. FACTOR 2 - TECHNICAL APPROACH
The Offeror shall provide a technical approach narrative that clearly indicates how the Offeror would proceed if awarded this contract. The Offeror shall demonstrate their capabilities to use various tools, processes, techniques, personnel, and subcontractors to successfully manage and deliver this project and describe the following:
· Understanding of the project, work requirements and anticipated challenges (construction)
· Plan to manage this project proactively
· Critical construction materials and techniques to ensure timely delivery and installation
· Capability demonstrating the ability to schedule large projects, showing satisfactory completion of construction, using the phases per the plans and specs with minimal interference to daily cemetery operations and visitors (Higher rating may be given for offerors proposing a realistic shortened schedule.)
· Manage project quality control and safety
· Incorporate procedures and plans for managing subcontractor performance
· Incorporate innovative techniques and practices
· Prioritize and address activities
· Understanding of local conditions such as availability of materials, labor, potential impacts or delays due to weather, etc.
· Working in an operational cemetery
· Coordination of temporary and permanent utility services
· Punch List and Final Acceptance
· Training and Project Close Out
· Respond to emergency situations/requirements
· Identify any assumptions, deviations, or exceptions to the RFP.
(Total page limit – 20)
c. FACTOR 3 - CONSTRUCTION/PROJECT MANAGEMENT
1. Sub-Factor 3.1, Project Organizational Chart and Narrative:
The Offeror shall provide an Organization Chart and supporting narrative which includes the Offeror’s key personnel as well as major subcontractors and their key personnel. Offeror shall demonstrate its ability to manage a project considered to be relevant as defined in this solicitation, and that it has the necessary organization, experience, accounting, operational controls, and technical skills to build a National Cemetery. Clearly describe the prime responsible firm and key personnel as well as the roles and responsibilities of major subcontractors including crypt supply and placement, irrigation system installation, earthwork subcontractor, and columbarium niche unit supplier and masonry subcontractor. (Total page limit – 3)
1. Sub-factor 3.2, Capacity to Perform Work:
The Offeror shall demonstrate they and their major subcontractors have the resources and capacity to perform the work as required by the solicitation documents. The Offeror shall display their current projects with dollars values and estimated completion dates, as well as the current projects with dollar values of their major subcontractors. The Offeror shall also identify current utilization of key personnel proposed in Sub-Factor 1.2. The Government has the discretion to determine what would be considered over capacity. (Total page limit – 3)
iii. Subfactor 3.3, Schedule:
The offeror shall describe how they will use the approved schedule to proactively manage the work, avoid delays, and mitigate delays should they occur. The narrative should also discuss any special circumstances the schedule must account for given the scope and location of the project. (Total page limit – 2)
VOLUME I - TECHNICAL PROPOSAL FORMAT
| Section |
| Total Page Limit* |
| Title Page (see instructions) |
| 1 |
Factor 1 – Relevant Experience
| 1.1 - Project Experience |
| 12 |
| 1.2 - Key Personnel |
| 21 |
Factor 2 - Technical Approach
| Technical Approach |
| 20 |
Factor 3 – Construction/Project Management:
| 3.1 - Project Organizational Chart and Narrative |
| 3 |
| 3.2 - Capacity to Perform Work |
| 3 |
| 3.3 - Schedule |
| 2 |
*The Government will not review any information that exceeds the page limitation, including attachments, enclosures, charts, etc. For instance, if the total page limitation for a section is 10 pages, the Government will only review 10 pages. Information submitted on the 11th page and beyond will not be reviewed.
Total page limit for Volume I is 62 pages
VOLUME II - PAST PERFORMANCE
Past Performance evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. It considers each Offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements.
Each Offeror shall provide three (3) summaries for projects on which the Offeror’s firm was the prime contractor, joint venture partner, or a major subcontractor, in accordance with FAR 15.305(a)(2).
These projects do not have to be the same as submitted under the Technical subfactor 1.1 Project Experience.
For each project selected, Offerors shall provide the following information, not to exceed three (3) pages for each project:
1. Project name and Contract Number (If the project is with a Joint Venture (JV) Partner, provide the DUNS/UEI (Unique Entity Identifier) numbers for each entity).
2. Project location (city & state)
3. Detailed description of the overall project and work scope,
4. Contract award and completion date (if not complete, provide target completion date).
5. Describe the project’s relevance to this National Cemetery project.
6. Provide the name of organization that issued the contract
7. Provide an Owner point of contact (POC) that includes:
i. Name & Title,
ii. Current email address,
iii. Current phone number
8. Provide information regarding completed CPARS evaluations (see below)
OR
COMPLETED Past Performance Questionnaires (see below)
CPARS:
For each of the projects identified for Past Performance evaluation, if CPARS evaluations are available, the Offeror shall clearly identify, by contract number, which projects have interim and final CPARS past performance evaluations. There is no requirement to submit the CPARS reports.
Using CPARS.gov, the Contracting Officer (CO) will access Past Performance reports for the Offeror's core team members (Prime General Contractor, Joint Venture teaming partner and/or mentor-protégé partner. The Offeror shall provide DUNS/UEI (Unique Entity Identifier) numbers for itself and each of the Offeror's core team members (Prime General Contractor, Joint Venture, teaming partner and/or mentor-protégé partner) to facilitate the retrieval of recent and relevant CPAR reports for Past Performance evaluation.
Past Performance Questionnaires:
ONLY for projects without CPARS ratings, the Offeror shall initiate Past Performance Questionnaires (PPQs), by completing blocks 1 through 7 on the form (See Solicitation Attachment.) The offeror will obtain from these contacts, responses to the “Past Performance Questionnaire” to be included in VOLUME II - Past Performance Information.
In case PPQs are not received prior to the proposal submission due date, the Offeror shall clearly identify all representatives to whom PPQs were sent. Offerors are responsible for ensuring that the contact information provided for the representative indicated for each project is accurate and that the representative is aware that the Contracting Officer may be contacting them regarding the PPQ and the Offeror’s past performance. If completed PPQs are not received timely by the Contracting Officer from the representative, the Government reserves the right to disregard them, contact the representative directly, or obtain the requested information from any other sources.
In the event, PPQs are received for projects with CPARS ratings, PPQs will not be considered.
Note: Multi-division or regionalized firms should identify projects performed by the division/business segment that would, if selected, perform the construction on this contract. Projects performed by other divisions/business segments may be identified but may be considered less relevant than projects performed by the local division/business segment proposing on this project.
VOLUME II – PAST PERFORMANCE INFORMATION FORMAT
| Section |
| Total Page Limit* |
| Title Page (see instructions) |
| 1 |
| Project #1 Past Performance Information |
| 3 |
| Project #2 Past Performance Information |
| 3 |
| Project #3 Past Performance Information |
| 3 |
*The Government will not review any information that exceeds the page limitation, including attachments, enclosures, charts, etc. For instance, if the total page limitation for a section is 3 pages, the Government will only review 3 pages. Information submitted on the 4th page and beyond will not be reviewed.
Total page limit for Volume II is 10 pages
VOLUME III - PRICE PROPOSAL FACTOR
Volume III, Tab 2 of the electronic proposal must contain a legible, scanned copy of the Executed Bid Guarantee (SF-24). Seals should be shaded with pencil lead to make them legible, prior to being scanned and emailed. See VOLUME III - PRICE PROPOSAL FORMAT below, for Price Proposal Formatting instructions.
The Base Bid items and CLINs are listed on the Offer Schedule located on page 2 of form SF1442 in the solicitation.
Pricing for each CLIN shall be entered onto the Offer Schedule located behind form SF1442.
VOLUME III - PRICE PROPOSAL FORMAT
| Section |
| Total Page Limit* |
| Title Page (see instructions) |
| 1 |
| Tab 1 |
| Executed Solicitation, Offer and Award Form (SF1442) including supplemental pages with CLIN pricing complete on the Offer Schedule (page 6 of solicitation). Offeror shall complete Blocks 14-20C. Signed acknowledgement of all solicitation amendments. |
| N/A |
| Tab 2 |
| Scanned, legible, copy of Executed Bid Guarantee (SF- 24) |
| N/A |
| Tab 3 |
| Printed copy “Representations and Certifications” as submitted on https://sam.gov/SAM/ |
| N/A |
| Tab 4 |
| VAAR 852.219-77 VA Notice of Limitations on Subcontracting—Certificate of Compliance |
| N/A |
SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale.
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 14.7 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals…