CS 103 657PC2313.23M JBNC BD Drawings 28 October 2020 r2 27 May 2022.pdf
PDF 749 KB Posted
- Solicitation number
- 36C10F22R0027
About this file
This document package includes construction drawings and specifications for the Jefferson Barracks National Cemetery Expansion Phase 5C project in St. Louis, Missouri. The Department of Veterans Affairs Office of Construction and Facilities Management will award a firm fixed-price contract to expand the cemetery, including construction of over 5,000 pre-placed crypts and in-ground cremains sites across multiple sections. The drawings depict the construction sequencing and phasing plan, layout of the new sections, and details for signage and construction fencing. John Gallup & Associates prepared the drawings dated October 28, 2020. Amendment 005 to solicitation 36C10F22R0027 seeks proposals from contractors due by an unspecified date to complete the cemetery expansion work in accordance with the specifications.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
John Gallup & Associates, LLC 3225 Shallowford Road NE Suite 830 Marietta, GA 30062 770.321.4040
JG&A
Corp. License FL001428603
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseA/E OF RECORD STAMP
321 4 5 6 7 8 9 10
JEFFERSON BARRACKS NATIONAL
CEMETERY EXPANSION
PHASE 5C
2900 Sheridan Rd, St. Louis, MO, 63125 Project Director
October 28, 2020Revisions: Date:
CONSULTANTCONSULTANTCONSULTANTCONSULTANT
N/A
Environment & Infrastructure Solutions, Inc.
1075 Big Shanty Road, NW, Suite 100 Kennesaw, Georgia 30144
(770) 421-3400
Aqua Engineering Inc.
375 E. Horsetooth Road, Building 2-202 Fort Collins, CO 80525-3196
657PC2313.23M
ofDwg.
Atriax Pllc 102 3rd Avenue N.E.
Hickory, NC 28601 828-315-9962 Corp. License - 2019014628
BID DOCUMENTS
MSD PROJECT NUMBER: 20MSD-00298
MSD BASEMAP: 30H2
SIGN SIGN TYPE SIGN TEXT DETAIL
NUMBER REFERENCE
SIGN SCHEDULE
CONSTRUCTION SEQUENCING &
PHASING PLAN
14 68
SEC 1R
2,022
PRE-PLACED
CRYPTS
SEC 1ZZ
IN-GROUND
CREMAINS
ROAD 'B'
LT. BLASSIE DRIVE
ROAD 'B'
GR
AV
ES
D
RI
VE
SEC 1S
2,216
PRE-PLACED
CRYPTS
SEC 1YY
1,981
PRE-PLACED
CRYPTS
SEC 1XX
2,316
PRE-PLACED
CRYPTS
PW FD
ROAD 'A'
Patrick West Polygon
Patrick West Polygon
Patrick West Ellipse
AutoCAD SHX Text 10' Sanitary Sewer Easement Book 14869, Page 0558/0566
AutoCAD SHX Text 10' Sanitary Sewer Easement Book 14869, Page 0558/0566
AutoCAD SHX Text
PHASE 5C
AutoCAD SHX Text
PHASE 5B
AutoCAD SHX Text
PHASE 5C
AutoCAD SHX Text
EARLY TURNOVER AREA 275 DAY CONSTRUCTION DURATION
AutoCAD SHX Text
CONTRACTOR TRAILER AND STAGING AREA
AutoCAD SHX Text
EARLY TURNOVER AREA 275 DAY CONSTRUCTION DURATION
AutoCAD SHX Text 60'
AutoCAD SHX Text
AutoCAD SHX Text 1"=60'-0"
AutoCAD SHX Text 120'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text LIMIT OF WORK EARLY TURN OVER AREA TEMPORARY CONSTRUCTION FENCE TEMPORARY INFORMATION SIGN CONSTRUCTION ROUTE
AutoCAD SHX Text CONSTRUCTION SEQUENCING NOTES: 1. CONTRACTOR TO WORK IN ACCORDANCE WITH SPECIFICATIONS SEC. 01 CONTRACTOR TO WORK IN ACCORDANCE WITH SPECIFICATIONS SEC. 01 - GENERAL REQUIREMENTS. 2. CONTRACTOR SHALL FURNISH THE RE/COR WITH A SCHEDULE OF CONTRACTOR SHALL FURNISH THE RE/COR WITH A SCHEDULE OF DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH AREA OF THE SITE, BUILDING, OR PORTION THEREOF. SEQUENCE OF WORK SHALL ACCORD WITH THE REQUIREMENTS DESCRIBED, AND AS MUTUALLY AGREEABLE TO THE CEMETERY DIRECTOR, RE/COR AND CONTRACTOR. 3. CONTRACTOR SHALL NOTIFY THE RE/COR TWO WEEKS IN ADVANCE, IN CONTRACTOR SHALL NOTIFY THE RE/COR TWO WEEKS IN ADVANCE, IN WRITING, OF THE PROPOSED DATE OF STARTING WORK IN EACH AREA OF THE SITE. 4. CONTRACTOR SHALL MAINTAIN UTILITY SERVICES AND ACCESS TO STAFF CONTRACTOR SHALL MAINTAIN UTILITY SERVICES AND ACCESS TO STAFF & VISITOR PARKING AREAS AT ALL TIMES DURING BUSINESS HOURS. 5. NO CONTRACTOR VEHICLES ARE TO BE PARKED ON SITE OR ALONG NO CONTRACTOR VEHICLES ARE TO BE PARKED ON SITE OR ALONG THE CEMETERY ENTRANCE. CONTRACTOR SHALL PROVIDE OFF SITE PARKING. 6. CONTRACTOR IS PROHIBITED FROM ACCESSING OR FROM STORING CONTRACTOR IS PROHIBITED FROM ACCESSING OR FROM STORING MATERIALS ON BURIAL AREAS. 7. CONTRACTOR WILL MINIMIZE ANY DISRUPTION TO FUNERAL CONTRACTOR WILL MINIMIZE ANY DISRUPTION TO FUNERAL PROCESSIONS. 8. CONTRACTOR TO PROTECT EXISTING CEMETERY ROADWAYS DURING CONTRACTOR TO PROTECT EXISTING CEMETERY ROADWAYS DURING CONSTRUCTION AND RESTORE ANY DAMAGES AS NOTED IN 01 00 00 -GENERAL REQUIREMENTS, 1.10-RESTORATION
AutoCAD SHX Text
CONSTRUCTION HAUL ROUTE
AutoCAD SHX Text
AutoCAD SHX Text Temporary Construction Sign
AutoCAD SHX Text See Detail
AutoCAD SHX Text
AutoCAD SHX Text Safety Sign
AutoCAD SHX Text See Detail
AutoCAD SHX Text
AutoCAD SHX Text L-501
AutoCAD SHX Text
AutoCAD SHX Text L-501
AutoCAD SHX Text
CS103
AutoCAD SHX Text
AutoCAD SHX Text L-501
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATE ACCESS AT SMITH AVE. AND N. RIVER RD.
Patrick West Callout Temporary Turn around for Section 1XX ETO. (Binder Course)
Patrick West Line
Patrick West Ellipse
Patrick West Callout Temporary Turn around Section 1ZZ for ETO. (Binder Course).
Patrick West Callout Road B Construction for ETO.
Patrick West Callout Road B Construction for ETO.
File details come from the government source that posted it. Updated .