This document package includes construction drawings and specifications for the Jefferson Barracks National Cemetery Expansion Phase 5C project in St. Louis, Missouri. The Department of Veterans Affairs Office of Construction and Facilities Management will award a firm fixed-price contract to expand the cemetery, including construction of over 5,000 pre-placed crypts and in-ground cremains sites across multiple sections. The drawings depict the construction sequencing and phasing plan, layout of the new sections, and details for signage and construction fencing. John Gallup & Associates prepared the drawings dated October 28, 2020. Amendment 005 to solicitation 36C10F22R0027 seeks proposals from contractors due by an unspecified date to complete the cemetery expansion work in accordance with the specifications.

View the file

Other files

File Type Posted
36C10F22R0027 0005.docx DOCX document
Wage Determination MO20220001 06.03.2022.pdf PDF
Additional Government Responses to RFI Questions 6.9.2022.docx DOCX document
Wage Determination MO20220001 05.27.2022.pdf PDF
Additional Government Responses to RFI Questions 5.31.2022.pdf PDF
36C10F22R0027 0004.docx DOCX document
Wage Determination MO20220001 05.06.2022.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
36C10F22R0027 Solicitation JBNC Phase 5C.docx DOCX document
Government Responses to RFI Questions 36C10F22R0027 5.24.2022.pdf PDF
657PC2313.23M JBNC BD Drawings 28 October 2020 pg 45 to 68.pdf PDF
JBNC Phase 5C Add Alternate 1 Drawings.pdf PDF
JBNC Pre-Proposal Conference and Site Visit Walk-through .pptx PPTX presentation
657PC2313.23M JBNC BD Drawings 28 October 2020 pg 1 to 44.pdf PDF
Photos of Alternate 1.pdf PDF
657PC2313.23M JBNC Phase 5C Expansion Specifications 28 Oct 2020pdf.pdf PDF
36C10F22R0027 0003.docx DOCX document
36C10F22R0027 0001.docx DOCX document
36C10F22R0027 0002.docx DOCX document
36C10F22R0027 0001.docx DOCX document
JBNC Pre-Proposal Conference and Site Visit Walk-through .pptx PPTX presentation
657PC2313.23M JBNC Phase 5C Expansion Specifications 28 Oct 2020pdf.pdf PDF
Wage Determination MO20220001 04.08.2022.pdf PDF
657PC2313.23M JBNC BD Drawings 28 October 2020 pg 1 to 44.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE 4.28.2022.docx DOCX document
JBNC Phase 5C Add Alternate 1 Drawings.pdf PDF
657PC2313.23M JBNC BD Drawings 28 October 2020 pg 45 to 68.pdf PDF
36C10F22R0027 Solicitation JBNC Phase 5C.docx DOCX document
Pre-Proposal Inquiry (PPI) Form.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

John Gallup & Associates, LLC 3225 Shallowford Road NE Suite 830 Marietta, GA 30062 770.321.4040

JG&A

Corp. License FL001428603

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseA/E OF RECORD STAMP

321 4 5 6 7 8 9 10

JEFFERSON BARRACKS NATIONAL

CEMETERY EXPANSION

PHASE 5C

2900 Sheridan Rd, St. Louis, MO, 63125 Project Director

October 28, 2020Revisions: Date:

CONSULTANTCONSULTANTCONSULTANTCONSULTANT

N/A

Environment & Infrastructure Solutions, Inc.

1075 Big Shanty Road, NW, Suite 100 Kennesaw, Georgia 30144

(770) 421-3400

Aqua Engineering Inc.

375 E. Horsetooth Road, Building 2-202 Fort Collins, CO 80525-3196

657PC2313.23M

ofDwg.

Atriax Pllc 102 3rd Avenue N.E.

Hickory, NC 28601 828-315-9962 Corp. License - 2019014628

BID DOCUMENTS

MSD PROJECT NUMBER: 20MSD-00298

MSD BASEMAP: 30H2

SIGN SIGN TYPE SIGN TEXT DETAIL

NUMBER REFERENCE

SIGN SCHEDULE

CONSTRUCTION SEQUENCING &

PHASING PLAN

14 68

SEC 1R

2,022

PRE-PLACED

CRYPTS

SEC 1ZZ

IN-GROUND

CREMAINS

ROAD 'B'

LT. BLASSIE DRIVE

ROAD 'B'

GR

AV

ES

D

RI

VE

SEC 1S

2,216

PRE-PLACED

CRYPTS

SEC 1YY

1,981

PRE-PLACED

CRYPTS

SEC 1XX

2,316

PRE-PLACED

CRYPTS

PW FD

ROAD 'A'

Patrick West Polygon

Patrick West Polygon

Patrick West Ellipse

AutoCAD SHX Text 10' Sanitary Sewer Easement Book 14869, Page 0558/0566

AutoCAD SHX Text 10' Sanitary Sewer Easement Book 14869, Page 0558/0566

AutoCAD SHX Text

PHASE 5C

AutoCAD SHX Text

PHASE 5B

AutoCAD SHX Text

PHASE 5C

AutoCAD SHX Text

EARLY TURNOVER AREA 275 DAY CONSTRUCTION DURATION

AutoCAD SHX Text

CONTRACTOR TRAILER AND STAGING AREA

AutoCAD SHX Text

EARLY TURNOVER AREA 275 DAY CONSTRUCTION DURATION

AutoCAD SHX Text 60'

AutoCAD SHX Text

AutoCAD SHX Text 1"=60'-0"

AutoCAD SHX Text 120'

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text LIMIT OF WORK EARLY TURN OVER AREA TEMPORARY CONSTRUCTION FENCE TEMPORARY INFORMATION SIGN CONSTRUCTION ROUTE

AutoCAD SHX Text CONSTRUCTION SEQUENCING NOTES: 1. CONTRACTOR TO WORK IN ACCORDANCE WITH SPECIFICATIONS SEC. 01 CONTRACTOR TO WORK IN ACCORDANCE WITH SPECIFICATIONS SEC. 01 - GENERAL REQUIREMENTS. 2. CONTRACTOR SHALL FURNISH THE RE/COR WITH A SCHEDULE OF CONTRACTOR SHALL FURNISH THE RE/COR WITH A SCHEDULE OF DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH AREA OF THE SITE, BUILDING, OR PORTION THEREOF. SEQUENCE OF WORK SHALL ACCORD WITH THE REQUIREMENTS DESCRIBED, AND AS MUTUALLY AGREEABLE TO THE CEMETERY DIRECTOR, RE/COR AND CONTRACTOR. 3. CONTRACTOR SHALL NOTIFY THE RE/COR TWO WEEKS IN ADVANCE, IN CONTRACTOR SHALL NOTIFY THE RE/COR TWO WEEKS IN ADVANCE, IN WRITING, OF THE PROPOSED DATE OF STARTING WORK IN EACH AREA OF THE SITE. 4. CONTRACTOR SHALL MAINTAIN UTILITY SERVICES AND ACCESS TO STAFF CONTRACTOR SHALL MAINTAIN UTILITY SERVICES AND ACCESS TO STAFF & VISITOR PARKING AREAS AT ALL TIMES DURING BUSINESS HOURS. 5. NO CONTRACTOR VEHICLES ARE TO BE PARKED ON SITE OR ALONG NO CONTRACTOR VEHICLES ARE TO BE PARKED ON SITE OR ALONG THE CEMETERY ENTRANCE. CONTRACTOR SHALL PROVIDE OFF SITE PARKING. 6. CONTRACTOR IS PROHIBITED FROM ACCESSING OR FROM STORING CONTRACTOR IS PROHIBITED FROM ACCESSING OR FROM STORING MATERIALS ON BURIAL AREAS. 7. CONTRACTOR WILL MINIMIZE ANY DISRUPTION TO FUNERAL CONTRACTOR WILL MINIMIZE ANY DISRUPTION TO FUNERAL PROCESSIONS. 8. CONTRACTOR TO PROTECT EXISTING CEMETERY ROADWAYS DURING CONTRACTOR TO PROTECT EXISTING CEMETERY ROADWAYS DURING CONSTRUCTION AND RESTORE ANY DAMAGES AS NOTED IN 01 00 00 -GENERAL REQUIREMENTS, 1.10-RESTORATION

AutoCAD SHX Text

CONSTRUCTION HAUL ROUTE

AutoCAD SHX Text

AutoCAD SHX Text Temporary Construction Sign

AutoCAD SHX Text See Detail

AutoCAD SHX Text

AutoCAD SHX Text Safety Sign

AutoCAD SHX Text See Detail

AutoCAD SHX Text

AutoCAD SHX Text L-501

AutoCAD SHX Text

AutoCAD SHX Text L-501

AutoCAD SHX Text

CS103

AutoCAD SHX Text

AutoCAD SHX Text L-501

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GATE ACCESS AT SMITH AVE. AND N. RIVER RD.

Patrick West Callout Temporary Turn around for Section 1XX ETO. (Binder Course)

Patrick West Line

Patrick West Ellipse

Patrick West Callout Temporary Turn around Section 1ZZ for ETO. (Binder Course).

Patrick West Callout Road B Construction for ETO.

Patrick West Callout Road B Construction for ETO.