36C10F20R0017-0001017.pptx
PPTX presentation Posted
- Solicitation number
- 36C10F20R0017
About this file
This document provides details for a federal contract solicitation to expand Cape Canaveral National Cemetery. The solicitation will be issued by the Department of Veterans Affairs Office of Construction and Facilities Management and is set aside 100% for Service-Disabled Veteran Owned Small Businesses. The purpose of the project is to develop approximately 30 acres for Phase 2 of the cemetery expansion, adding over 32,000 burial sites including casketed remains and urn crypts. The project scope includes burial sections, access roads, parking, grading, drainage, landscaping, signage, site furnishings, irrigation, habitat preservation and GIS integration. The estimated value is between $20-50 million and the contract duration is approximately 1,100 calendar days. The solicitation is expected to be issued in March 2020.
36C10F20R0017 0001 Pre-Proposal Site Visit Agenda CCNC PH 2 May 15 2020.pptx
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IAS
CAPE CANAVERAL
NATIONAL CEMETERY
PHASE 2 CEMETERY EXPANSION
NORTH MIMS, FLORIDA
SOLICITATION 36C10F20R0017
PROJECT # 934CM2003
PRE-PROPOSAL CONFERENCE
MAY 15, 2020
Office of Construction and Facilities Management 4/21/2020
Please be sure that everyone has signed-in
Hold all questions to the end
Agenda Opening Remarks New Acquisition: RFP No: 36C10F20R0017 Submission Requirements Milestones Project Scope and Overview Site walkthrough
I would like to make clear that anything said should not be interpreted as a change to the solicitation/contract documents as posted. If a statement is made that is inconsistent with the solicitation requirements, you should not submit your proposal based on the statements, only submit based on the posted solicitation and all amendments.
4/21/2020
Opening Remarks Introductions VA Representatives
VA CFM: Elizabeth Monohan, Contracting Officer
VA CFM: Kevin Dix, Project Manager
Cape Canaveral Cemetery Director: Don Murphy
NCA Mission The National Cemetery Administration honors Veterans and their families with final resting places in national shrines and lasting tributes that commemorate their service and sacrifice to our Nation.
President Abraham Lincoln pledged the nation:
“To care for him who shall have borne the battle and for his widow and his orphan.”
That remains VA’s motto today.
National Shrine
To meet this National Shrine standard, VA is using Source Selection with Trade Offs as an Acquisition Strategy
The RFP specifies the selection criteria used to select the Best Value for the Government
Acquisition Requirements
Solicitation is set aside for Service Disabled Veteran Owned Small Business (SDVOSB) in accordance with 38 U.S.C. 8127(d).
Federal , State, and Local Tax (FAR Clause 52.229-3) Is the Responsibility of the Contractor
OSHA & VA Requirement (Construction Safety Course) Competent Person (supervisor) 30 Hours All other employees 10 Hours
All Proposal documents are posted and will be posted at www.fbo.gov under the RFP #
Acquisition Requirements
Contract Line Item Numbers (CLINs 001-009) Base Award CLIN 001A – CLIN 001B To provide maximum flexibility with scope award, the project has been broken into a Base bid and six Options titled A, B, C, D, E & F. The Base bid, Option A and Option F are of greatest importance to the Government. Please note that Option B must be constructed with any of the following options: C, D, E or F.
Cost Magnitude Between $20,000,000 - $50,000,000
RFP Due Date June 8, 2020, at 4:00 P.M. Eastern Time; Washington, DC
1. RFP due date see Block 8 of the SF 1442 for the location 4/22/2020
Acquisition Requirements Bid Bond/Bid Guarantee (SF 24) 20% of the offer price but shall not exceed $3,000,000
NAME OF PRINCIPAL MUST BE IDENTICAL WITH NAME ON CONTRACT OR BID
Make sure you are in compliance with Far Part 28 Annual Representation and Certification Vendor Information Pages (VIP) https://www.sam.gov/SAM/ https://www.vip.vetbiz.va.gov/ Must be registered in SAM and VIP prior to submission Construction Wage Rate Requirements (Davis Bacon Act) Applies Buy American Act Applies
Must be registered in SAM and VetBiz prior to Award 4/21/2020
Acquisition Requirements Completion Time Will range depending on the Options awarded, the Base Bid is 548 days after the Notice to Proceed. If the Base and all Options are awarded, then the time is 1,068 days.
Bonds (within 10 calendar days after award) Performance Bond 100% Payment Bond 100%
NAME OF PRINCIPAL MUST BE IDENTICAL WITH NAME ON CONTRACT OR BID
For this solicitation only, ensure that electronic copies of all pages of the bonds, front and back, are transmitted with your package. The paper copies of all bonds should also be included in your hard copy proposal delivery documents.
Acquisition Requirements
Liquidated Damages $1,338.00 for each calendar day of delay
Insurance Certificate of Insurance required prior to commencing work Worker’s compensation and employers liability General Liability Automobile Liability
Acquisition Requirements Requests for Information (RFI’S) Questions Due: May 20, 2020, at 4:00 PM EST Email to:
Elizabeth.Monohan@va.gov Kevin.Dix@va.gov and Crystal.Cole2@va.gov
The subject line to read “Cape Canaveral National Cemetery, RFP #: 36C10F20R0017”
Answers posted on or about: May 27, 2020
Service-Disabled Veteran-Owned Small Business Office of Small and Disadvantaged Business Utilization (OSDBU) Washington, D.C.
http://www4.va.gov/osdbu/
Contact OSDBU for information on Joint Ventures Teaming Agreement Mentor Protégée (See VAAR 819-71) CVE verification
JV for VA is a SDVOSB joining with another SB JV/TA/MPP must be submitted w/proposal 4/23/2020
Submission Requirements
| 1 | SF 1442 (pages 1 - 4) |
| 2 | Signed Amendments |
| 3 | Bid Guarantee/Bid Bond |
| 4 | Volume I – Technical Proposal |
No cost information in Technical proposal Spiral bound Technical proposal (no 3 ring binders) Organize your proposal in accordance with the criteria listed under Instructions, Conditions And Other Statements To Bidders/Offerors, Part II Proposal Information of the RFP
Submission Requirements One (1) Sealed Original and Three (3) copies
1) Past Performance 2) Relevant Experience
3) Technical Approach 4) Construction/Project Management
DO NOT PUT ANY PRICING INFORMATION IN VOLUME I
5 Volume II – Price Proposal Only one original copy Include any JV, Agreements, Reps and Certs and Bonds Submit Volumes I & II on a Compact Disc (excel, pdf and word format only) 6 Others Documents Representations and Certification completed in SAM Joint Venture (registered in Vetbiz prior to proposal submission); approved Teaming Agreement; approved Mentor-Protégé Program
Milestones
1 Solicitation May 1, 2020
2 RFP Due Date June 8, 2020 Items 4 thru 7 are only tentative dates. All communications will be done electronically. Awardee information will be posted, therefore, do not call for status.
| 3 | Technical & Cost Proposal | |
| Evaluation | June 10 2020 – June 24, 2020 |
4 Contract Award July 30, 2020
5 Notice To Proceed (estimate) August 17, 2020
6 Construction Completion August 21, 2023
VAAR 809-406-2
Cause for Debarment
(a) In addition to the causes listed in FAR 9.406-2, the SDO may debar contractors, based upon a preponderance of the evidence, for
(1) Misrepresentation of Veteran-owned small business (VOSB) or service- disabled, Veteran-owned small business (SDVOSB) status; or
(2) Any deliberate violation of the limitation on subcontracting clause requirements for acquisitions under subpart 819.70.
(b) The SDO shall debar for a period of not less than five years, pursuant to 38 U.S.C. 8127(g), Enforcement Penalties for Misrepresentation, any business concern that has willfully and intentionally misrepresented the status of that concern as a small business concern owned and controlled by Veterans or as a small business concern owned and controlled by service-disabled Veterans pursuant to this subsection.
(1) “Willful and intentional” misrepresentations, for the purpose of debarment actions taken pursuant to subsection (b), are defined as misrepresentations concerning the status of the concern as a small business concern owned and controlled by Veterans or as a small business concern owned and controlled by service-disabled Veterans resulting in an admission, criminal conviction, civil judgment, or administrative decision related to fraud or other criminal acts.
(2) Debarment of a business concern pursuant to subsection (b) shall include the debarment of all principals in the business concern. Debarment shall be for a period of not less than five years.
(a) In addition to the causes listed in FAR 9.406-2, the SDO may debar contractors, based upon a preponderance of the evidence, for
(1) Misrepresentation of Veteran-owned small business (VOSB) or service- disabled, Veteran-owned small business (SDVOSB) status; or
(2) Any deliberate violation of the limitation on subcontracting clause requirements for acquisitions under subpart 819.70.
(b) The SDO shall debar for a period of not less than five years, pursuant to 38 U.S.C. 8127(g), Enforcement Penalties for Misrepresentation, any business concern that has willfully and intentionally misrepresented the status of that concern as a small business concern owned and controlled by Veterans or as a small business concern owned and controlled by service-disabled Veterans pursuant to this subsection.
(1) “Willful and intentional” misrepresentations, for the purpose of debarment actions taken pursuant to subsection (b), are defined as misrepresentations concerning the status of the concern as a small business concern owned and controlled by Veterans or as a small business concern owned and controlled by service-disabled Veterans resulting in an admission, criminal conviction, civil judgment, or administrative decision related to fraud or other criminal acts.
(2) Debarment of a business concern pursuant to subsection (b) shall include the debarment of all principals in the business concern. Debarment shall be for a period of not less than five years.
Project Overview
VA Office of Construction & Facilities Management
Kevin Dix, Project Manager
Project Overview
Scope and Elements
Pre-Placed Crypt full casket gravesites, Oversized casket gravesites, pre-placed urn crypts with integral headstone support boxes, garden niche or terrace sites, Columbarium Niches and Memorial wall markers. Bid Options will be included.
Access roads and parking, irrigation of new burial sections, landscaping, grading, drainage, signage, site furnishings, protected habitat preservation, wetlands, and mitigation; and geographic information system (GIS) site integration extension into the Phase 2 area.
Aerial View of Cemetery
Phase 2 project site access road Aerial View of Project Area
BID OPTIONS
To provide maximum flexibility with scope award, the project has been broken into a Base bid and six Options titled A, B, C, D, E & F. The Base bid, Option A and Option F are of greatest importance to the Government. Please note that Option B must be constructed with any of the following options: C, D, E or F.
Reference drawing of the Bid Options on the next slide.
4/22/2020
Contractor Considerations GC responsible for:
Best value award (not low price) Construction Wage Rate Requirements & Payroll reports Safety Plan, including dedicated Safety Officer Phasing: cemetery operations take precedence over construction activities P6 cost-loaded schedule with monthly updates with requisitions Contract Quality Control (CQC) USACE CQM is a plus – National Shrine
Contractor Considerations GC responsible for:
Three phase inspections per USACE standards VA Project Management System (TRIRIGA). We provide license/training Environmental – SWPPP, NPDES Utility coordination Testing – soils, concrete, etc.
Record Drawings (as-builts)
No questions will be answered during the pre-proposal site visit.
Submit all Requests for Information in writing per the solicitation.
Questions
Identify yourself & company
Site Walkthrough
Cape Canaveral National Cemetery
5525 US-1
North Mims, FL 32754
Site Walkthrough image2.png image3.png image4.jpg image5.jpg image1.jpeg