36C10F20R0017-024.pdf

PDF Posted

Attached to
Y1PZ--Cape Canaveral National Cemetery Phase 2 Expansion Construction
Solicitation number
36C10F20R0017
Issued by

About this file

This document is a pre-solicitation notice for a construction project to expand Cape Canaveral National Cemetery. The Department of Veterans Affairs Office of Construction and Facilities Management will issue a request for proposals for a design-build-build project to develop approximately 30 acres for Phase 2 of the cemetery expansion. The project scope includes over 7,400 pre-placed crypt full casket gravesites, 12,300 pre-placed urn crypts, 12,200 columbarium niches, access roads, parking, grading, drainage, landscaping, signage, site furnishings, irrigation of new burial sections, protected habitat preservation and wetlands mitigation. The estimated value is between $20-50 million and the project duration is 1,100 calendar days from notice to proceed. The solicitation will be 100% set aside for service-disabled veteran owned small businesses and issued in March 2020.

36C10F20R0017 CG- Sheets 1 of 2.pdf

View the file

Other files

File Type Posted
36C10F20R0017 0003.docx DOCX document
LJS CAN.NAT.CEM. SOIL EVALUATION AND BLEND RECOMMENDATION WORKSHEET.8-10-15.pdf PDF
UESDOCS 1253034 v2 COR_CSD_CCNC_Opinon_Letter_on_Native_Soil_as_Topsoil.pdf PDF
GEO-H1125068-Phase1DD-2.21.13.pdf PDF
V-01 through V12 20180605CCNC Phase 1_As Builts_06-05-2018.pdf PDF
Cape Canaveral National Cemetery Phase 2.pdf PDF
36C10F20R0017 0002.docx DOCX document
V-01 through V12 2018.06.05.CCNC Phase 1_As Builts_06-05-2018.pdf PDF
RFI responses.pdf PDF
36C10F20R0017-0001019.pdf PDF
36C10F20R0017-0001016.docx DOCX document
36C10F20R0017-0001018.pdf PDF
36C10F20R0017-0001017.pptx PPTX presentation
36C10F20R0017-038.pdf PDF
36C10F20R0017-022.pdf PDF
36C10F20R0017-037.pdf PDF
36C10F20R0017-035.pdf PDF
36C10F20R0017-017.pdf PDF
36C10F20R0017-041.pdf PDF
36C10F20R0017-023.pdf PDF
36C10F20R0017-019.docx DOCX document
36C10F20R0017-027.pdf PDF
36C10F20R0017-029.pdf PDF
36C10F20R0017-016.docx DOCX document
36C10F20R0017-034.pdf PDF
36C10F20R0017-020.docx DOCX document
36C10F20R0017-040.pdf PDF
36C10F20R0017-025.pdf PDF
36C10F20R0017-042.pdf PDF
36C10F20R0017-028.pdf PDF
36C10F20R0017-021.pdf PDF
36C10F20R0017-026.pdf PDF
36C10F20R0017-018.pdf PDF
36C10F20R0017-039.pdf PDF
36C10F20R0017-030.pdf PDF
36C10F20R0017-036.pdf PDF
36C10F20R0017-031.pdf PDF
36C10F20R0017-032.pdf PDF
36C10F20R0017-033.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X

X X

X X

X X

X X

X X

X X

X X

X X

D

O

O

O

O

O

O

O

O

O

O

O

O

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

O

O

O

O

O

O

O

O

O

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

POND 6

POND 5

W

A

R

R

I

O

R

A

V

E

D I X

I E

W

Y

V A

L I A

N T

B

L V

D

V A

L I A

V

D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

BID DOCUMENTS

OVERALL GRADING MAP

CFS JDS

CG101

N

O

R

T

H

1-800-432-4770

S

H

E

C

G

SHEET CG103

S

H

E

S

H

E

S

H

E

SHEET CG105

SHEET CG104

S

H

E

S H

E E

T

C

G

SHEET CG102

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V D

LEGEND

ICL

W 12''

I 8''

BE

ENGINEER NOTES:

R

R

I

E

II

I

I

I

I

I

I

I

I

WM

I

I

I

I

I

I

I

I

I

I 6''

I 6''

I 6

I

I

I

I

I

I

I

I

I

I

I

I

I 3''

I

I 8

D

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST ST ST ST

ST

ST ST ST ST

ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE BE BE BE BE

BE

BE

BE

W 12''

W 12''

W 12''

W 12

ST

W

W 12

W

2''

W

2''

W

2''

W

2''

W

2''

W

2'

W

2'

W

2'

W

2''

W

2''

W

2''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12'' W 12'' W 12'' W 12'' W 12''

W 12'' W 12''

W 12''

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

BID DOCUMENTS

DETAILED GRADING 1

CFS JDS

CG102

N

O

R

T

H

1-800-432-4770

M A

T C

H L

I N

E

S

S

H E

MATCHLINE SEE SHEET CG103

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I 8''

POND 5

NWL= 7.0

V A

L I A

V

D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 2

CG103

N

O

R

T

H

1-800-432-4770

M A

T C

H L

I N

E

S

E

MATCHLINE SEE SHEET CG102

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

POND 6

A

L I A

V

D

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 3

CG104

N

O

R

T

H

1-800-432-4770

MATCHLINE SEE SHEET CG105

M A

T C

H L

I N

E

S

E

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I

I

I I

I

W

W

I

I

I

I

I

I

I

I

I

I

I

I

II

I

I

I

I

E

B

W

I

I

I

I

I

I

I

I

I

I

II

I

I

I

I

I

I

I

I

X X

X X

I

I

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

I

I 8

I

I

I

I

I

I 8''

I 8

I 8''

I 8''

I 8''

I 8''

I 8''

I 8''

I 8''

I 8''

I 8''

I

I 4''

I 4

I 4''

I 4

I 4''

I 4

I 4

I

D

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST ST ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

BT BT BT BT

ST

ST

ST

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SS SS SS

SSSSSSSSSSSS

SS

CB

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE BE BE BE BE BE

BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

ELP

ELP

ST

W

W

SS

SS

SS

ST ST ST

W 12'' W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

T S B

TSB

BT

BT

BT

BT

W 12''

W 12''

BE

BE

BE

BE

BE

BE

BE

I 1

I 1

I 1

I 1

I 1

I 1

I 1

I 1

I

I

I

I

ICL ICL ICL ICL ICL ICL ICL ICL ICL

ICL

ICL

ICL ICL ICL ICL ICL ICL ICL ICL ICL

ICL

ICL

E T

W 12''

W 12''

W 12''

W 12''

W 12''

E T

E T

E T

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

W 12

W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12''

W 12''

W 12

ICL

ICL

ICL

ICL

ICL

ICL

C

O

C

O

C

O

C

O

C

O

I

I

I

I

I

I

WS

COM

COM

COM

COM

POND 6

W

A

R

R

I

E

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 4

CG105

N

O

R

T

H

1-800-432-4770

MATCHLINE SEE SHEET CG104

M A

T C

H L

I N

E

S

E

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I

I

I

I

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

BEBE

BE

BE

BE

BE

BE

BE

BE

W 12''

W

2''

W

2''

W

2''

W

2''

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

W

A

R

R

I

E

V

A

L

I A

V

D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 5

CG106

N

O

R

T

H

1-800-432-4770

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I 8''

ENGINEER NOTE:

WM

I

I

I

I

I

I

I 4'' I 4'' I 4''

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST ST ST

ST

ST

ST

ST

ST

BE

BE

BE

BE

BE

BE

BE

BE BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

W 12''

W 12''

W 12''

W 12''

W 12''

W 12'' W 12'' W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12'' W 12'' W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W

A

R

R

I

E

V

A

L

I

A

N

V

D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 6

CG107

1-800-432-4770

N

O

R

T

H

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I 8''

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I

WM

I

I

I

I

I

I

I

I 6

I

I

I

I

I

I

I

I 4

I 4''

I 4''

D

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST ST ST

ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE BE BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

ST

ST

W

2''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12'' W 12'' W 12''

W 12'' W 12''

W 12'' W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W 12''

W

A

R

R

I

E

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 7

CG108

N

O

R

T

H

1-800-432-4770

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I 8''

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

D

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

W

2''

V A

L

IA

N T

B L V

D

W

A

R

R

I

E

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 8

CG109

N

O

R

T

H

1-800-432-4770

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

W 12''

I 8''

VALIANT BLVD

A

L

I A

V

D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 9

CG110

N

O

R

T

H

1-800-432-4770

LEGEND

ICL

W 12''

I 8''

BE

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

ENGINEER'S NOTE:

1. ALL TOP OF FOOTING

ELEVATIONS ON

COLUMBARIUM C ARE: 20.60 FT

R R

IO

R

A V

E

I

I

I

ST

ST

ST

ST

ST

ST

ST ST

BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12''

W 12'' W 12''

W 12'' W 12''

W 12'' W 12''

W 12''

W 12''

W 12''

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

ICL

W 12''

W 12''

W 12''

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

MIMS, FLORIDA

934CM2003

CAPE CANAVERAL

NATIONAL CEMETERY

Calibre

9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering

Ken Kallenbach

(316) 684-9600

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

Commissioning:

CTS, LLC

Kris Linster

(904) 588-3057

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying & Hydraulics:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jay Casper

(720) 545-5807

PHASE TWO DEVELOPMENT

Landscape Architect:

Foster Conant

Matt Allen

(407) 648-2225

MEP:

Spur Design

Ben Noe

(913) 369-7264

10-25-2019

OF 145

DETAILED GRADING 10

CG111

N O

R T

H

1-800-432-4770

LEGEND

ICL

W 12''

I 8''

BE

NORTH

VICINITY MAP

NTS

POND 6

POND 5

POND 4

D

I X

Y

W

A

R

R

I

E

V

A

L

I

A

V

D

V A

L

I

A

V

D

V

A

L

I

A

V

ENGINEER'S NOTE:

1. ALL TOP OF FOOTING

ELEVATIONS ON

COLUMBARIUM B ARE: 16.14 FT

File details come from the government source that posted it. Updated .