36C10F20R0017-026.pdf
PDF Posted
- Solicitation number
- 36C10F20R0017
About this file
This document provides details for a federal construction contract opportunity for the Cape Canaveral National Cemetery Phase 2 Expansion project. The Department of Veterans Affairs Office of Construction and Facilities Management will solicit proposals for the design and construction of approximately 30 acres of new burial sections and infrastructure to increase the cemetery's burial capacity by 32,200 gravesites. Services required include interment areas, roads, parking, grading, drainage, landscaping, signage, irrigation, habitat preservation, and GIS integration. The estimated contract value is between $20-50 million. The project duration is 1,100 calendar days from notice to proceed. The solicitation number is 36C10F20R0017 and will be 100% set aside for Service-Disabled Veteran Owned Small Businesses. Proposals are due in March 2020. Offerors may or may not include a Project Labor Agreement with their submission.
36C10F20R0017 CP- Sheets.pdf
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BT BT
BT
O
O
O
O
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O O
O O
O O
O O
O
O O
O
O
X
X
X
X
SS
SS
SS
SS
SSSSSS
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
ICL
ICL
ICL ICL ICL ICL
ICL
ICL
ICL
ICL
ICL
ICL ICL ICL ICL
ICL
ICL
COM
COM
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
NORTH
VICINITY MAP
NTS
POND 6
POND 5
POND 4
D
I X
I E
W
A
Y
W
A
R
R
I
O
R
V
E
V
A
L
I
A
N
T
B
L V
D
V A
L
I
A
V
D
V
A
L
I
A
V
D
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
N
O
R
T
H
D I X
Y
V
A
L
I A
V
D
W
ARRIO
R A
VE.
V
A
L
I A
V
D
V
A
L
I A
V
D
OF
ROADWAY OVERALL VIEW
JWC KK
CP101
39 145
LEGEND
BE
BE
BE
BE
BE
BE
BE
BE BE
BE BE
BE
BE
BE
W
W
W
W
W
W
W
W W W
W
W
W
I
I
I
Δ
Δ
Δ
Δ
CURB CURVE TABLE
I
I
I
I
I
I
I
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
NORTH
VICINITY MAP
NTS
POND 6
POND 5
POND 4
D
I X
Y
W
A
R
R
I
E
V
A
L
I
A
V
D
V A
L
I
A
V
D
V
A
L
I
A
V
D
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
N
O
R
T
H
VALIANT BLVD.
W
A
R
R
I
E
SECTION 31
SECTION 32
SECTION 33
SECTION 30
SECTION 29
SEC. 28
SECTION 17
SECTION 16
SECTION 15
SECTION 20
COLUMBARIUM C
V
A
L
I A
V
D
SECTION 19
SECTION 18
COORDINATE TABLE
V
A
L
I
A
V
D
S
S
H
E
C
P
OF
VALIANT BLVD.
PLAN & PROFILE
JWC KK
CP102
40 145
BE
BE
BE
BE
BE
BE
BE
W W
W W
W W
W W
W
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Δ
CURB CURVE TABLE
BE
BE
BE
BE BE
BE
W
W
W W W
I
I
I
I
I
I
I
Δ
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
NORTH
VICINITY MAP
NTS
POND 6
POND 5
POND 4
D
I X
Y
W
A
R
R
I
E
V
A
L
I
A
V
D
V A
L
I
A
V
D
V
A
L
I
A
V
D
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
N O
R T
H
VALIANT BLVD.
SECTION 27
V
A
L I A
V
D
COORDINATE TABLE
W
A R
R I O
R
A
V E
SECTION 21
SECTION 22
SECTION 23
SECTION 24
SECTION 25
SECTION 26
FLOWER WATER STATION
CURB TRANSITIONS
OF
VALIANT BLVD. (CONT.)
PLAN & PROFILE
JWC KK
CP103
41 145
LEGEND
N
O
R
T
H
W A
R R
IO
R
A V
E
SEC.
SECTION 20
C/L WARRIOR AVE.
NORTH CURB SOUTH CURB
V
A
L
I A
V
D
X
X
X
X
X
X
BE BE
BE
BE
BE
BE
BE
BE
W W W W
W
I
I
I
E
B
W
I
I
I
I
I
I
I
ICL
ICL
ICL
ICL
ICL
I
Δ
Δ
Δ
Δ
Δ
Δ
Δ
CURB CURVE TABLE
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
NORTH
VICINITY MAP
NTS
POND 6
POND 5
POND 4
D
I X
Y
W
A
R
R
I
E
V
A
L
I
A
V
D
V A
L
I
A
V
D
V
A
L
I
A
V
D
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
NORTH
WARRIOR AVENUE - ROUND-ABOUT
WARRIOR AVE.
SEE DETAIL THIS SHEET
ROUND-ABOUT DETAIL
COLUMBARIUM
B
D
I X
Y
COORDINATE TABLE
NORTH
ROUND-ABOUT - NORTH ROUND-ABOUT - SOUTH
S
O
U
T
H
NORTH
OF
WARRIOR AVENUE
PLAN & PROFILE
JWC KK
CP104
42 145
CENTERLINE PROFILE FLOWLINE PROFILE FLOWLINE PROFILE
CURB CURVE TABLE
CURB CURVE TABLE
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
NORTH
VICINITY MAP
NTS
POND 6
POND 5
POND 4
D
I X
Y
W
A
R
R
I
E
V
A
L
I
A
V
D
V A
L
I
A
V
D
V
A
L
I
A
V
D
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
N O
R T
H
N
O
R
T
H
COLUMBARIUM C PARKING
COLUMBARIUM B PARKING
VALIANT BLVD.
W A
R R
IO
R
A V
E N
U E
OF
MISC. PAVEMENT
DIMENSION PLAN
JWC KK
CP105
43 145
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
SECTION B
TYPICAL PAVING SECTION (VALIANT BLVD.)
SECTION C
CUL-DE-SAC TYPICAL SECTION (VALIANT BLVD.)
OF
PAVING TYPICAL SECTION
JWC KK
CP301
44 145
SECTION D
ROUND-ABOUT TYPICAL SECTION (WARRIOR AVE.)
SECTION A
TYPICAL PAVING SECTION (VALIANT BLVD. & WARRIOR AVE.)
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
SECTION E
COLUMBARIUM C PARKING SECTION (VALIANT BLVD.)
SECTION H
COLUMBARIUM B PARKING SECTION (WARRIOR AVE.)
OF
PAVING TYPICAL SECTION
JWC KK
CP302
45 145
SECTION G
COLUMBARIUM C SECTION (VALIANT BLVD.)
SECTION J
CURB REMOVAL AND REPLACEMENT
SECTION I
COLUMBARIUM B SECTION (WARRIOR AVE.)
SECTION F
COLUMBARIUM C PARKING SECTION (VALIANT BLVD.)
MIAMI CURB & GUTTER
(ROLL OVER CURB)
STANDARD CURB AND GUTTER
PLAN
CAST-IN-PLACE GRAVESITE
CONTROL MONUMENTS
MONUMENT MARKER - PLAN
TYPE B CLEANOUT
TYPE A CLEANOUT
DROP CURB
Surveying & Hydraulics:
Fabre Engineering & Surveying
Frank Fabre
(850) 433-6438
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of
Construction and Facilities
Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
MIMS, FLORIDA
934CM2003
CAPE CANAVERAL
NATIONAL CEMETERY
Calibre
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
MKEC Engineering
Ken Kallenbach
(316) 684-9600
Irrigation:
Aqua Engineering
Bob Beccard
(970) 372-6104
Commissioning:
CTS, LLC
Kris Linster
(904) 588-3057
Cost Estimating:
MOCA Cost Engineering
Todd Waddle
(850) 389-8131
Geotechnical Engineering:
Terracon Consultants
Jay Casper
(720) 545-5807
PHASE TWO DEVELOPMENT
Landscape Architect:
Foster Conant
Matt Allen
(407) 648-2225
MEP:
Spur Design
Ben Noe
(913) 369-7264
10-25-2019
BID DOCUMENTS
VALLEY GUTTER
HANDICAP PAVEMENT MARKINGS
OF
MISC. DETAILS
JWC KK
CP501
46 145
ADA DOME PAVER DETAIL