36C10F19R0010 0004 Amend 0004_RFI Responses.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: RFI NO. 00-001
File No. 001
Schedule Impact: Attachments: None
Cost Impact: N/A
Date Requested: 7/3/2019
Contractor Question:
Architects Response:
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
ARCHITECT: Gordon
N/A
Date Response Needed By: ASAP
1. There is no information provided for the new well expansion tank.
We suggest tagging, scheduling, or specifying this item.
FREEDOM CONTRACTING GROUP, LLC
Date of Response:
GLNC Phase II - RFI 001 Freedom Contracting Group atrexlermeyers Text Box Per drawing PP100 -BOD: Flexcon H2P120 or Equal.
119 Gallon with 127.6 gal acceptance, 50-70psi
Project: RFI NO. 00-002
File No. 002
Schedule Impact: Attachments: None
Cost Impact: N/A
Date Requested: 7/3/2019
Contractor Question:
Architects Response: Date of Response:
1. Please confirm there is no service contract or existing warranty to be voided when the plumbing contractor relocates the water softener unit.
Date Response Needed By: ASAP
FREEDOM CONTRACTING GROUP, LLC
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
ARCHITECT: Gordon
N/A
GLNC Phase II - RFI 002 Freedom Contracting Group atrexlermeyers Text Box Assume there is no existing service contract or warranty.
FREEDOM CONTRACTING GROUP, LLC
Project:
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
RFI NO.
00-003
ARCHITECT:
Gordon
File No.
None
Schedule Impact:
N/A
Attachments:
Cost Impact
N/A
DateRequested:
7/3/2019
Date Response Needed By:
ASAP
Contractor Question:
1. Spec Section 23 09 23 - DDC Controls for HVAC - calls for exhaust fans interlocked by EC and electric heaters have on-board stand-alone controllers.
Please confirm the intention of the specification.
Architects Response:
Date of Response:
07/09/19
The intent of the exhaust fan interlock is to manage emergencies. In the event of a smoke/fire alarm the exhaust fan will Shutdown and all instrumentation will return to failsafe positions. The fan will auto reset after the emergency situation has cleared.
Electric unit heaters will be provided and installed with an on-board thermostat controller. Each heater is a stand-alone unit.
GLNC Phase II - RFI 003 Freedom Contracting Group
Project: RFI NO. 00-004
File No. 004
Schedule Impact: Attachments: None
Cost Impact: N/A
Date Requested: 7/3/2019
Contractor Question:
Architects Response: Date of Response:
1. Spec section 22 13 00 - 2.1 - Sanitary Vent & Piping calls for cast-iron no hub pipe both above and below ground. Please clarify if PVC SCH 40 is acceptable in lieu of CINH where permitted by code.
Date Response Needed By: ASAP
FREEDOM CONTRACTING GROUP, LLC
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
ARCHITECT: Gordon
N/A
GLNC Phase II - RFI 004 Freedom Contracting Group atrexlermeyers Text Box From the VA Design Manual:
“5.1.9 Cast Iron Piping Cast iron is the preferred material for sanitary and vent piping due to noise reduction, durability, fire resistive properties, and it is made of nearly 100 percent recycled content. With written approval from the VA Authorities, PVC meeting VA Master Specifications installed per the Plastic Pipe Institute recommendations can be used in low temperature, horizontal, buried soil and waste pipe in buildings under 1,400 sq. m [15,000 sq. ft.]. Switch to cast iron above grade.”
atrexlermeyers
VA Response - Contractor to provide cast iron as specified
Project: RFI NO. 00-005
File No. 005
Schedule Impact: Attachments: None
Cost Impact: N/A
Date Requested: 7/3/2019
Contractor Question:
Architects Response: Date of Response:
1. No spec found calling for insulation on lavatory piping and drains.
Typically lavatory guards and insulation are called for. Please confirm.
Date Response Needed By: ASAP
FREEDOM CONTRACTING GROUP, LLC
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
ARCHITECT: Gordon
N/A
GLNC Phase II - RFI 005 Freedom Contracting Group atrexlermeyers
Confirm. ADA P-Trap and supply covers: PVC material Class A, ASTM E84.
Project: RFI NO. 00-006
File No. 006
Schedule Impact: Attachments: None
Cost Impact: N/A
Date Requested: 7/3/2019
Contractor Question:
Architects Response: Date of Response:
1. Please provide BOD or Model # for the 304 SS Catch Basin, Fames & Grates required in the Maintenance Building on PP501.
Date Response Needed By: ASAP
FREEDOM CONTRACTING GROUP, LLC
U.S. Dept. of Veterans Affairs - GLNC Phase II - Project No. 923-004
ARCHITECT: Gordon
N/A
GLNC Phase II - RFI 006 Freedom Contracting Group atrexlermeyers Text Box Contractor is permitted to use 12x12x6 sanitary floor sink in lieu of special order stainless steel basket.
Verify with NCA maintenance staff that drain is acceptable to the removable basket.
BOD: Zurn model Z1750-Z-Y-19, 304 SS, sediment bucket and hinged grate.
| RFI 001 - response |
| RFI 002 - response |
| RFI 003 - response |
| RFI 004 - response |
| RFI 005 - response |
| RFI 006 - response |