36C10F19R0010-0004077.pdf
PDF 4 MB Posted
- Attached to
- Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 Federal contract opportunity
- Solicitation number
- 36C10F19R0010
About this file
36C10F19R0010 0004 GLNC Phase II Development - 923PC2006 - BID - Final Specs Volume 1.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCA MASTER
SPECIFICATIONS
Volume 1
GREAT LAKES NATIONAL CEMETERY
HOLLY, OAKLAND COUNTY, MICHIGAN
PROJECT NO. 923-004
PHASE 2 DEVELOPMENT
Prepared for:
United States Department of Veterans Affairs
Prepared By:
GORDON
148 S. Queen St. Suite 201 Martinsburg, WV 25401
May 10, 2019
THIS PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE SIDED PRINTING
GREAT LAKES NATIONAL CEMETERY PROJECT NO. 935-004
PHASE 2 DEVELOPMENT MAY 10, 2019
TABLE OF CONTENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
NCA MASTER SPECIFICATIONS
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 00 Table of Contents 03-18 00 01 15 List of Drawing Sheets 05-10
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 General Requirements 06-14 01 32 16.13 Network Analysis Schedules 05-12 01 33 23 Shop Drawings, Product Data, and Samples 06-14 01 35 26 Safety Requirements 01 42 19 Reference Standards 06-14 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 06-14 01 57 19 Temporary Environmental Controls 06-14 01 74 19 Construction Waste Management 06-14 01 81 13 Sustainable Construction Requirements 08-16 01 91 00 General Commissioning Requirements 12-15
DIVISION 02 – EXISTING CONDITIONS
02 41 10 Demolition and Site Clearing 06-14
DIVISION 03 – CONCRETE
03 08 00 Commissioning of Pre-Cast Crypts 03 30 53 Cast-in-Place Concrete 06-14 03 48 21 Precast Concrete Burial Crypts (Double Depth Lawn Crypts) 06-14 03 48 24 Precast Concrete Columbarium Units 06-14
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 06-14 04 05 16 Masonry Grouting 06-14 04 20 00 Unit Masonry 06-14 04 40 10 Cut Stone Assemblies 04 70 00 Manufactured Stone 04 72 00 Cast Stone Masonry 06-14 04 73 00 Columbarium Niche Covers 06-14
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 06-14 05 21 00 Steel Joist Framing 06-14 05 31 00 Steel Decking 06-14 05 50 00 Metal Fabrications 06-14 05 51 00 Metal Stairs 06-14
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 12-15 06 17 53 Shop-Fabricated Wood Trusses 06 20 00 Finish Carpentry 06-14
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 Facility Exterior Closure Commissioning 12-15 07 11 13 Bituminous Dampproofing 06-14 07 13 52 Modified Bituminous Sheet Waterproofing 06-14 07 21 13 Thermal Insulation 12-15 07 22 00 Roof and Deck Insulation 06-14 07 27 26 Fluid-Applied Membrane Air Barriers, Vapor Permeable 07 40 00 Roofing and Siding Panels 06-14 07 41 13 Standing Seam Metal Roof 06-14 07 60 00 Flashing and Sheet Metal 06-14 07 84 00 Fire Stopping 06-14 07 92 00 Joint Sealants 06-14
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 06-14 08 14 00 Interior Wood Doors 12-15 08 52 00 Aluminum Clad Wood Windows 08 71 00 Door Hardware 06-14 08 90 00 Louvers and Vents 06-14
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 06-14 09 29 00 Gypsum Board 06-14 09 30 13 Tiling 06-14 09 91 00 Painting 06-14
00 01 10-3
DIVISION 10 – SPECIALTIES
10 14 00 Exterior Signage 06-14 10 14 05 Interior Signage 06-14 10 21 13 Toilet Compartments 06-14 10 28 00 Toilet and Bath Accessories 06-14
DIVISION 11 - EQUIPMENT
11 08 00 Commissioning of GNSS, GPS, and GIS Systems 11 83 00 Global Navigation Satellite System (GNSS) Reference System 01-18 11 83 02 GNSS & GIS Mapping and Geodata 01-18
DIVISION 12 - FURNISHINGS
12 36 61.16 Solid Surfacing Countertops
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 11-16 22 05 23 General-Duty Valves for Plumbing Piping 11-16 22 07 11 Plumbing Insulation 22 11 00 Facility Water Distribution 11-16 22 13 00 Facility Sanitary Sewerage 11-16 22 40 00 Plumbing Fixtures 11-16
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
CIVIL
3. VL100 OVERALL EXISTING CONDITIONS PLAN
4. BI100 SUBSURFACE BORING LOCATION PLAN
5. WL100 WETLAND CROSSING
6. GI100 OVERALL SITE DEVELOPMENT PLAN (BASE BID)
7. GI150 OVERALL SITE DEVELOPMENT PLAN (ADD ALTERNATES)
8. GI200 CONSTRUCTION SEQUENCING PLAN
9. CD100 OVERALL SITE DEMOLITION PLAN
10. CD101 SITE DEMOLITION PLAN
11. CD102 SITE DEMOLITION PLAN
12. GC011 TEMPORARY CONSTRUCTION FENCING PLAN AREA 1
13. GC012 TEMPORARY CONSTRUCTION FENCING PLAN AREA 2
14. GC100 OVERALL EROSION AND SEDIMENT CONTROL PLAN
15. GC101 EROSION AND SEDIMENT CONTROL PLAN AREA 1
16. GC102 EROSION AND SEDIMENT CONTROL PLAN AREA 2
17. GC103 EROSION AND SEDIMENT CONTROL PLAN AREA 3
18. GC104 EROSION AND SEDIMENT CONTROL PLAN AREA 4
19. GC105 EROSION AND SEDIMENT CONTROL PLAN AREA 5
20. GC500 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
21. GC501 EROSION AND SEDIMENT CONTROL DETAILS
22. CS100 OVERALL SITE LAYOUT AND UTILITY PLAN
23. CS101 SITE LAYOUT AND UTILITY PLAN AREA 1
24. CS102 SITE LAYOUT AND UTILITY PLAN AREA 2
25. CS103 SITE LAYOUT AND UTILITY PLAN AREA 3
26. CS104 SITE LAYOUT AND UTILITY PLAN AREA 4
27. CS105 SITE LAYOUT AND UTILITY PLAN AREA 5
28. CS106 SITE LAYOUT AND UTILITY PLAN AREA 6
29. CS107 SITE LAYOUT AND UTILITY PLAN AREA 7
30. CS108 SITE LAYOUT AND UTILITY PLAN AREA 8
31. CS109 BURIAL SECTION NUMBERING PLAN SECTION 19
32. CS110 BURIAL SECTION NUMBERING PLAN SECTION 20
33. CS111 BURIAL SECTION NUMBERING PLAN SECTION 21, 33, & 34
34. CS112 BURIAL SECTION NUMBERING PLAN SECTION 22
35. CS113 BURIAL SECTION NUMBERING PLAN SECTION 23
36. CS114 BURIAL SECTION NUMBERING PLAN SECTION 24
37. CS115 BURIAL SECTION NUMBERING PLAN SECTION 25, 26, AND 27
38. CS116 BURIAL SECTION NUMBERING PLAN SECTION 28 AND 29
39. CS117 BURIAL SECTION NUMBERING PLAN SECTION 30 AND 31
40. CS118 BURIAL SECTION NUMBERING PLAN SECTION 32
41. CS150 SITE LAYOUT AND UTILITY PLAN - ADD ALTERNATES 1 & 2
42. CS151 SITE LAYOUT AND UTILITY PLAN - ADD ALTERNATES 3 & 4
43. CG100 OVERALL GRADING AND DRAINAGE PLAN
44. CG101 GRADING AND DRAINAGE PLAN AREA 1
45. CG102 GRADING AND DRAINAGE PLAN AREA 2
46. CG103 GRADING AND DRAINAGE PLAN AREA 3
00 01 15 - 2
47. CG104 GRADING AND DRAINAGE PLAN AREA 4
48. CG105 GRADING AND DRAINAGE PLAN AREA 5
49. CG106 GRADING AND DRAINAGE PLAN AREA 6
50. CG107 GRADING AND DRAINAGE PLAN AREA 7
51. CG108 GRADING AND DRAINAGE PLAN AREA 8
52. CG109 BURIAL SECTION GRADING ENLARGEMENT SECTION 19
53. CG110 BURIAL SECTION GRADING ENLARGEMENT SECTION 20
54. CG111 BURIAL SECTION GRADING ENLARGEMENT SECTION 21, 33, & 34
55. CG112 BURIAL SECTION GRADING ENLARGEMENT SECTION 22
56. CG113 BURIAL SECTION GRADING ENLARGEMENT SECTION 23
57. CG114 BURIAL SECTION GRADING ENLARGEMENT SECTION 24
58. CG115 BURIAL SECTION GRADING ENLARGEMENT SECTION 25, 26, AND 27
59. CG116 BURIAL SECTION GRADING ENLARGEMENT SECTION 28 AND 29
60. CG117 BURIAL SECTION GRADING ENLARGEMENT SECTION 30 AND 31
61. CG118 BURIAL SECTION GRADING ENLARGEMENT SECTION 32
62. CG150 GRADING AND DRAINAGE PLAN - ADD ALTERNATES 1 & 2
63. CG151 GRADING AND DRAINAGE PLAN - ADD ALTERNATES 3 & 4
64. DT101 FLOWER WATERING STATION PLAN
65. DT102 FLOWER WATERING STATION PLAN
66. CT101 CURB AND SIDEWALK REPAIR & REPLACEMENT PLAN
67. CT102 CURB AND SIDEWALK REPAIR & REPLACEMENT PLAN
68. CT103 CURB AND SIDEWALK REPAIR & REPLACEMENT PLAN
69. CP100 GENERATOR PAD TYPICAL LAYOUT AND DETAILS
70. CU261 STORM PROFILES
71. CU262 STORM PROFILES
72. CU263 STORM PROFILES
73. CU264 STORM PROFILES AND COMPUTATIONS
74. CU265 STORM COMPUTATIONS
75. CT201 NEW ROAD CENTERLINE PROFILES
76. CT202 NEW ROAD CENTERLINE PROFILES
77. CT501 TYPICAL ROAD CROSS SECTIONS
78. DT500 CRYPT AND BURIAL SECTION DETAILS
79. DT501 CRYPT AND BURIAL SECTION DETAILS
80. DT502 SITE DETAILS
81. DT503 SITE DETAILS
82. DT504 SITE DETAILS
83. DT505 SITE DETAILS
84. DT506 SITE DETAILS
85. DT507 SITE DETAILS
86. DT508 COMMITTAL SERVICE SHELTER SITE DETAILS (ADD ALT. NO. 1)
87. DT509 COMMITTAL SERVICE SHELTER SITE DETAILS (ADD ALT. NO. 1)
88. CI101 SITE SIGNAGE EXISTING INVENTORY
89. CI102 EXISTING SITE SIGNAGE PHOTOS
90. CI103 EXISTING SITE SIGNAGE PHOTOS
91. CI201 SITE SIGNAGE PLAN
92. CI501 PROPOSED SIGN DETAILS
93. CI502 PROPOSED SIGN DETAILS
SECURITY
94. SE101 SITE SECURITY PLAN
95. SE102 SECURITY FLOOR PLANS
96. SE103 SECURITY FLOOR PLANS
SEPTIC SYSTEM
97. CU101 SEPTIC SYSTEM DESIGN
00 01 15 - 3
COLUMBARIUM/ASSEMBLY/SERVICE SHIELDS
98. CS401 COLUMBARIUM SITE PLAN ENLARGEMENT 1
99. CS402 COLUMBARIUM SITE PLAN ENLARGEMENT 2
100. CG401 COLUMBARIUM GRADING PLAN ENLARGEMENT 1
101. CG402 COLUMBARIUM GRADING PLAN ENLARGEMENT 2
102. CG403 COLUMBARIUM DRAINAGE PLAN ENLARGEMENT 1
103. CG404 COLUMBARIUM DRAINAGE PLAN ENLARGEMENT 2
104. CI700 COLUMBARIUM NUMBERING PLAN
105. CI701 SINGLE-SIDED COLUMBARIUM FRONT ELEVATIONS
106. CI702 SINGLE-SIDED COLUMBARIUM REAR ELEVATIONS
107. CI703 COLUMBARIUM DETAIL ELEVATIONS
108. CI704 SINGLE-SIDED COLUMBARIUM DETAILS 1
109. CI705 SINGLE-SIDED COLUMBARIUM DETAILS 2
110. CI706 DOUBLE-SIDED COLUMBARIUM DETAILS
111. CI707 COLUMBARIUM NICHE DETAILS
112. CI708 COLUMBARIUM CAP SETTING DETAILS
113. CI709 BASE STONE LOCATION PLAN 1
114. CI710 BASE STONE LOCATION PLAN 2
115. CI711 COLUMBARIUM BASE STONE DETAILS
116. CI712 CAPSTONE LOCATION PLAN 1
117. CI713 CAPSTONE LOCATION PLAN 2
118. CI714 CAPSTONE DETAILS 1
119. CI715 CAPSTONE DETAILS 2
120. CI750 COMMITTAL SERVICE SHELTER SERVICE EMBLEM DETAILS 1
121. CI751 COMMITTAL SERVICE SHELTER SERVICE EMBLEM DETAILS 2
122. CI760 ASSEMBLY AREA WALL CAP REPLACEMENT DETAILS
LANDSCAPE
123. L-100 OVERALL PLANTING PLAN
124. L-101 PLANTING PLAN AREA 1
125. L-102 PLANTING PLAN AREA 2
126. L-103 PLANTING PLAN AREA 3
127. L-104 PLANTING PLAN AREA 4
128. L-105 PLANTING PLAN AREA 5
129. L-106 PLANTING PLAN AREA 6
130. L-107 PLANTING PLAN AREA 7
131. L-108 PLANTING PLAN ENLARGEMENTS
132. L-109 PLANTING PLAN ENLARGEMENTS - ADD ALTERNATES 1,2,& 3
133. L-501 PLANTING SCHEDULE AND DETAILS
134. L-502 SITE AMENITY DETAILS
IRRIGATION
135. I-001 IRRIGATION NOTES AND LEGEND
136. I-100 OVERALL IRRIGATION PLAN
137. I-101 IRRIGATION PLAN
138. I-102 IRRIGATION PLAN
139. I-103 IRRIGATION PLAN
140. I-104 IRRIGATION PLAN
141. I-105 IRRIGATION PLAN
142. I-106 IRRIGATION PLAN
143. I-107 IRRIGATION PLAN
144. I-108 IRRIGATION PLAN
145. I-109 IRRIGATION PLAN
146. I-110 IRRIGATION PLAN
147. I-501 IRRIGATION DETAILS
148. I-502 IRRIGATION DETAILS
00 01 15 - 4
149. I-503 IRRIGATION DETAILS
ARCHITECTURAL
150. A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
151. A-002 LIFE SAFETY PLAN
152. AA101 PIC/ADMIN BLDG - DEMOLITION PLAN
153. AA102 PIC/ADMIN BLDG - DEMOLITION RCP
154. AA103 PIC/ADMIN BLDG - DEMOLITION ROOF PLAN
155. AA104 PIC/ADMIN BLDG - FLOOR PLAN
156. AA105 PIC/ADMIN BLDG - REFLECTED CEILING PLAN
157. AA106 PIC/ADMIN BLDG - ROOF PLAN
158. AA201 PIC/ADMIN BLDG - BLDG ELEVATIONS
159. AA301 PIC/ADMIN BLDG - BLDG SECTIONS
160. AA401 PIC/ADMIN BLDG - BLDG DETAILS
161. AA402 PIC/ADMIN BLDG - MEN'S & FAMILY RESTROOM
162. AA403 PIC/ADMIN BLDG - WOMEN'S RESTROOM
163. AA404 PIC/ADMIN BLDG - FIXTURE HEIGHTS & SCHEDULE
164. AA405 PIC/ADMIN BLDG - INTERIOR ELEVATIONS
165. AA501 PIC/ADMIN BLDG - DETAILS
166. AA502 PIC/ADMIN BLDG - WALL DETAILS
167. AA601 PIC/ADMIN BLDG - DOOR AND WINDOW SCHEDULE
168. AA602 PIC/ADMIN PARTITION TYPES
169. AA603 PIC/ADMIN BLDG - INTERIOR FINISH PLAN
170. AA604 PIC/ADMIN BLDG - FIXTURE SCHEDULE
171. AB101 BULK STORAGE BLDG - FLOOR PLAN & ROOF PLAN
172. AB201 BULK STORAGE BLDG - BLDG ELEVATIONS & SECTION
173. AB501 BULK STORAGE BLDG - DETAILS
174. AC101 COMMITTAL SHELTER - FLOOR PLAN (ADD ALTERNATE NO. 1)
175. AC102 COMMITTAL SHELTER - REFLECTED CEILING PLAN & ROOF PLAN (ADD
ALTERNATE NO. 1)
176. AC201 COMMITTAL SHELTER - BLDG ELEVATIONS & SECTIONS (ADD ALTERNATE NO. 1)
177. AC401 COMMITTAL SHELTER - DETAILS (ADD ALTERNATE NO. 1)
178. AE101 EQUIPMENT VEHICLE STORAGE - DEMOLITION PLAN
179. AE102 EQUIPMENT VEHICLE STORAGE - FLOOR PLAN
180. AE103 EQUIPMENT VEHICLE STORAGE - MEZZANINE FLOOR PLAN
181. AE104 EQUIPMENT VEHICLE STORAGE - ROOF PLAN
182. AE105 EQUIPMENT VEHICLE STORAGE - REFLECTED CEILING PLANS
183. AE301 MEZZANINE - SECTIONS
184. AE501 MEZZANINE - DETAILS
185. AF101 COVERED STORAGE - PLANS (ADD ALTERNATE NO. 4)
186. AF102 COVERED STORAGE - SECTIONS & DETAILS (ADD ALTERNATE NO. 4)
187. AG101 MAINTENANCE GARAGE - TRENCH REPLACEMENT
188. AT101 PROPOSED TEMPORARY TRAILER & RESTROOM LAYOUT
PLUMBING
189. P-001 PLUMBING LEGEND, NOTES AND ABBREVIATIONS
190. PD101 PLUMBING DEMOLITION PLAN PIC ADMIN BLDG
191. PP100 PLUMBING SITE UTILITIES PLAN PIC ADMIN BLDG
192. PP101 PLUMBING PLAN PIC ADMIN BLDG
193. PP501 PLUMBING PIPING PLAN MAINTENANCE GARAGE BLDG
194. P-601 PLUMBING RISER AND FLOW DIAGRAMS
195. P-701 PLUMBING SCHEDULES AND DETAILS
MECHANICAL
196. M-001 MECHANICAL ABBREVIATIONS, NOTES, & SYMBOLS
197. MD101 MECHANICAL DEMOLITION PLAN PIC ADMIN BLDG
00 01 15 - 5
198. M-101 MECHANICAL NEW WORK PLAN PIC ADMIN BLDG
199. M-501 MECHANICAL DETAILS
200. M-701 MECHANICAL SCHEDULES
ELECTRICAL/TELECOMMUNICATION
201. E-001 ELECTRICAL ABBREVIATIONS & SYMBOLS
202. E-002 ELECTRICAL NOTES
203. ED101 ELECTRICAL DEMOLITION PLAN PIC ADMIN BLDG
204. ES001 ELECTRICAL/TELECOMMUNICATION SITE PLAN
205. EL101 ELECTRICAL LIGHTING PLAN PIC ADMIN BLDG
206. EL102 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - PIC BUILDING
207. EL103 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - ADMIN BUILDING
208. EP101 ELECTRICAL POWER PLAN PIC ADMIN BLDG
209. EY101 SECURITY/TEL/DAT PLAN PIC ADMIN BLDG
210. EL201 ELECTRICAL LIGHTING PLAN COMMITTAL SHELTER #4 (ADD ALTERNATE NO. 1)
211. EP201 ELECTRICAL POWER PLAN COMMITTAL SHELTER #4 (ADD ALTERNATE NO. 1)
212. EL301 ELECTRICAL LIGHTING PLAN MEZZANINE
213. EL302 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - MAINTENANCE OFFICE
214. EL303 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - MAINTENANCE GARAGE
215. EL304 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - MAINT. BAYS &
CONTRACTOR STORAGE GARAGE
216. EP301 ELECTRICAL POWER PLAN MEZZANINE
217. EY301 SECURITY/TEL/DATA PLAN MAINTENANCE BLDG
218. EL401 ELECTRICAL EXISTING CONDITIONS LIGHTING PLAN - HONOR GUARD
219. E-501 ELECTRICAL DETAILS
220. E-502 ELECTRICAL/MECHANICAL GENERATOR DETAIL
221. E-601 ELECTRICAL SINGLE LINE DIAGRAM
222. E-602 ELECTRICAL SINGLE LINE DIAGRAM
223. E-701 ELECTRICAL LIGHTING FIXTURE SCHEDULE
224. E-702 ELECTRICAL - HONOR GUARD LIGHTING FIXTURE SCHEDULE
STRUCTURAL
225. S-001 STRUCTURAL ABBREVIATIONS AND NOTES
226. SF101 STRUCTURAL - PIC/ADMIN BLDG FOUNDATION & ROOF FRAMING
227. SF111 STRUCTURAL - MEZZANINE FOUNDATION & FRAMING
228. SF112 STRUCTURAL - COVERED STORAGE FDN & FRAMING - ADD ALT #4
229. SF121 STRUCTURAL - COMMITTAL SHELTER #4 FDN & FRAMING - ADD ALT #1
230. SF131 STRUCTURAL - BULK STORAGE SHELTER FOUNDATION & FRAMING
231. S-501 STRUCTURAL TYPICAL SECTIONS AND DETAILS
232. S-502 STRUCTURAL PIC/ADMIN. SECTIONS AND DETAILS
233. S-503 STRUCTURAL MEZZANINE SECTIONS AND DETAILS
234. S-504 COMMITTAL SHELTER #4 SECTIONS & DETAILS - ADD ALT #1
235. S-505 STRUCTURAL BULK STORAGE SECTIONS AND DETAILS
236. S-506 STRUCTURAL COVERED STORAGE SECTIONS & DETAILS - ADD ALT #4
237. SS301 SITE STRUCTURES SECTIONS AND DETAILS
238. SS302 SITE STRUCTURES SECTIONS AND DETAILS
- - - END - - -
GENERAL REQUIREMENTS
01 00 01 - 1
SECTION 01 00 01
1.1 GENERAL INTENTION
A. Completely prepare site for construction operations, including any clearing and demolition, and furnish all labor, materials equipment and supervision necessary to perform all required work for the Great Lakes National Cemetery Phase 2 Development project as required by the contract documents.
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer.
C. Offices of William H Gordon, as Architect-Engineers of record for the Government, will render certain technical services to the Government during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Resident Engineer/Contracting Officer’s
Representative (RE/COR).
D. All Testing Laboratory services will be retained and paid for by the Contractor (see Section 01 45
29 TESTING LABORATORY SERVICES). However, the Department of Veterans Affairs may elect to retain its own Testing Laboratory for any purpose. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the notify the RE/COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall not be less than three working days unless otherwise designated by the RE/COR.
E. All employees of General Contractor and Subcontractors shall comply with VA security management program.
F. Prior to commencing work, General Contractor shall provide proof that an OSHA certified
“Competent Person” (CP) as defined in 29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the General Contractor or Subcontractors are present.
G. Training:
1. All employees of General Contractor or Subcontractors having supervisory responsibilities shall have the 30-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by VA CP.
2. All other employees of General Contractor or Subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training. Relevant competency training shall be as determined acceptable by the VA CP.
3. Submit training records of all such employees for approval before the start of work.
1.2 STATEMENT OF BID ITEM(S)
A. CLIN 001, GENERAL CONSTRUCTION: Work of the Contract includes general conditions, general construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, 01 00 01 - 2 utility systems, water storage facilities, necessary removal of existing structures and construction and certain of other items and all other work necessary to construct the project.
B. CLIN 002: Work includes furnishing and delivery of pre-placed crypts.
C. CLIN 003, BID ALTERNATE NO.1: Work includes general construction, roads, walks, grading, drainage, mechanical and electrical work of Committal Shelter 4.
D. CLIN 004, BID ALTERNATE NO.2: Work includes general construction of the Honor Guard
Parking Lot addition at Committal Shelter 1 and the Honor Guard Parking Lot addition at
Committal Shelter 2.
E. CLIN 005, BID ALTERNATE NO.3: Work includes general construction of the Parking Lot addition at the Assembly Area.
F. CLIN 006, BID ALTERNATE NO.4: Work includes general construction, alterations, mechanical and electrical work of the Covered Storage Building within the Maintenance Yard.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, 3 full-sized, 4 half-sized drawing sets and 3 sets of specifications will be furnished as well as an electronic set of plans and specifications. These drawings and specifications will be new or from stock of prospective bidder returned documents, or a combination thereof.
B. Additional sets of drawings may be made by the Contractor, at Contractor's expense.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. Assure that all Subcontractors working on the project and their employees also comply with these regulations. Dismissal of violators may be directed by the RE/COR.
B. Security Procedures:
1. All employees of the General Contractor and their subcontractors shall be identified on staffing lists delivered to the RE/COR prior to arriving at the site.
2. For working outside the “regular hours” as defined in the contract, give 3 days' notice to the
RE/COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the RE/COR.
4. VA reserves the right to close down or shut down the project site and order Contractor’s employees off the premises in the event of a national emergency. Return to the site only with the written approval of the RE/COR.
C. Guards:
1. The Cemetery currently employs unarmed guards to protect the Cemetery grounds.
01 00 01 - 3
2. The General Contractor shall provide additional unarmed guards at the project site if deemed necessary to prevent vandalism or theft within the contract work areas and to secure the project site, work in progress, materials, tools, equipment and other materials within the project site that are not under operational control of the Cemetery staff.
D. Key Control:
1. Provide duplicate keys and lock combinations to the RE/COR for the purpose of security inspections of every area of project including tool boxes and parked machines and to take any emergency action(s).
2. Turn over all permanent lock cylinders to the VA locksmith for permanent installation.
Coordinate the lock cylinder and key system work and shall provide the devices required to comply with the facility security system. See Section 08 71 00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, submit an electronic security memorandum, from the Contractor and each Subcontractor describing the actions to be performed to achieve the goals of maintaining confidentiality of “sensitive information”.
2. Perform safekeeping procedures for all drawings, project manual and other project information. This information from these shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law
Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the RE/COR upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of the RE/COR.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify RE/COR immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in a specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
01 00 01 - 4
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
1.5 FIRE SAFETY
A. Applicable Publications: Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.
1. American Society for Testing and Materials (ASTM):
E84-2013 Surface Burning Characteristics of Building Materials
2. National Fire Protection Association (NFPA):
10-2013 Standard for Portable Fire Extinguishers
30-2012 Flammable and Combustible Liquids Code
51B-2014 Standard for Fire Prevention During Welding, Cutting and Other
Hot Work
70-2011 National Electrical Code
241-2013 Standard for Safeguarding Construction, Alteration, and
Demolition Operations
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926 Safety and Health Regulations for Construction
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR
1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to RE/COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND
SAMPLES. Prior to any worker for the Contractor or Subcontractor’s beginning work, they shall undergo a safety briefing provided by the Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of NCA equipment, etc.
Documentation shall be provided to the RE/COR that individuals have undergone the
Contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 20 feet exposing overall length, separate by 10 feet.
E. Temporary Construction Partitions:
01 00 01 - 5
1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, 3/4-hour fire/smoke rated doors with self-closing devices.
2. Install temporary construction partitions as shown on drawings to maintain integrity of existing exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, and opening enclosures.
F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29
CFR 1926, NFPA 241 and NFPA 70.
G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads.
Minimize disruptions and coordinate with RE/COR.
H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily.
Report findings and corrective actions weekly to RE/COR.
I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR
1926, NFPA 241 and NFPA 30.
K. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Request interruptions in accordance with Article 1.6, OPERATIONS AND
STORAGE AREAS, and coordinate with RE/COR. All existing or temporary fire protection systems (fire alarms) located in construction areas shall be tested as coordinated with the
RE/COR. Parameters for the testing and results of any tests performed shall be recorded by the
Contractor and copies provided to the RE/COR.
L. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with RE/COR.
M. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA
51B. Coordinate with RE/COR. Obtain permits from RE/COR at least 24 hours in advance.
Designate the Contractor's responsible project-site fire prevention program manager to permit hot work.
N. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly.
Coordinate with, and report findings and corrective actions weekly to RE/COR.
O. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.
01 00 01 - 6
P. Dispose of waste and debris in accordance with NFPA 241 and Construction Waste Management
Plan required under Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT. Remove from buildings daily.
Q. Perform other construction, alteration and demolition operations in accordance with 29 CFR
1926.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the RE/COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage trailers, office trailers) and utilities may be erected by the
Contractor only with the approval of the RE/COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the RE/COR, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the RE/COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the RE/COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. Paragraphs 1.6.A thru 1.6.C are from
(FAR 52.236-10). Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
D. Working space and space available for storing materials shall be as determined by the RE/COR.
E. Workmen are subject to rules of the Cemetery regarding their conduct and dress code.
F. Execute work so as to interfere as little as possible with normal functioning of Cemetery as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by the Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access, for the Cemetery personnel, to areas that are required to remain in operation during the construction of the project.
01 00 01 - 7
3. Where access by Cemetery personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements. All such actions shall be coordinated with the Utility Company involved and the
RE/COR.
4. Work may be subject to curtailment during funeral services. The Contractor will be required to coordinate all work activities with the RE/COR office to avoid impact to visitors.
G. Phasing
1. Early Turn Over (ETO) Work and Work Sequencing Requirements: There are specific work activities and elements within this Contract that are of a time sensitive nature to the operation of the Cemetery. These requirements are as follows:
a. Early Turnover (ETO) Work - these activities will need to be completed and turned over to the Owner earlier than the final project completion date. This work is indicated in the
Contract documents as Early Turnover (ETO) work. There is a separate time period for completion of the ETO work, identified in the Contract Documents as a specified number of days following the "Notice to Proceed" for the overall project. The general description of the project work to be completed as ETO work is described as follows with more details being included in the relevant specifications and on the drawings:
i. ETO 1: To be completed within 120 days of Notice to Proceed. New Burial Sections
33 and 34 (360 and 600 burial sites respectively) each containing in ground cremains. This work is to construct and make ready for use by the Cemetery operations the in ground cremain fields, and adjacent sidewalk with all appurtenances.
2. Work Sequencing Requirements - All of the work for this project must be completed on or before the Contract Completion Date identified in the documents. The ETO work is required to be completed well before the overall Contract completion date, on or before the ETO completion date (based upon the specified number of days following the "Notice to Proceed").
There are some timing and coordination requirements for completion of the project work that is not identified as part of the ETO work. These timing and coordination requirements are also referred to as "critical work sequence" activities. They have been developed and described to accommodate concerns raised by Cemetery Operations. The critical work sequence activities are identified in the Contract Drawings. The work sequencing identified in the Contract Documents is the best information available at the time of the issuance of the documents for bidding. The Contractor shall factor into his bid that there may be adjustments in the Work Sequencing after Contract Award due to unforeseen Cemetery Operational issues. The Contractor, before the start of any work, is required to submit a detailed work sequencing plan to the RE/COR for review, modification (until acceptable) and approval. The general requirements for the Contractor work sequencing plan are as indicated below:
01 00 01 - 8
a. To insure such executions, the Contractor shall furnish the RE/COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, the Contractor shall notify the
RE/COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in specified sequences mutually agreeable to the RE/COR who will liaise with the Cemetery Director.
H. All buildings will be occupied during performance of work.
1. Take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Cemetery’s operations will not be hindered. Permit access to
Department of Veterans Affairs personnel through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Cemetery operations will continue during the construction period.
2. Immediate areas of alterations not mentioned above will be temporarily vacated while alterations are performed.
I. Construction Fence: Before construction operations begin, the Contractor shall provide a chain link construction fence, seven feet minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 15 inches. Bottom of fences shall extend to one inch above grade. Remove the fence when directed by RE/COR.
J. When a building or site is turned over to Contractor, it is accepted in entirety and responsibility therefore includes, but is not limited to the following:
1. Maintain a minimum temperature of 40 degrees F at all times, except as otherwise specified.
2. Maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, make arrangements for pre-inspection of the site with Fire
Department required to respond to an alarm from the Contractor's employee.
K. Utilities Services: Maintain existing utility services for the Cemetery at all times. Meet with the
RE/COR and appropriate Cemetery operations staff to walk the proposed work areas and discuss any known or potential underground systems that are indicated or not shown on the construction drawings, prior to starting the work.
1. Provide an underground utility locating service to locate any existing underground lines or other underground facilities within his work area that are to remain in service. Any new information, not clearly indicated on the bid documents shall be passed on to the Contractor's underground locating service staff. Any new information discovered by the underground
01 00 01 - 9 locating service staff shall be turned over to the RE/COR for dissemination to the Cemetery
Staff.
L. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the RE/COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the RE/COR.
a. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the RE/COR, and Cemetery Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS for additional requirements.
b. Water service to the PIC/Administration Building and the Honor Guard Building shall not be disrupted during normal business hours without written consent of the RE/COR and the Cemetery Director.
2. Submit a request to interrupt any such services to RE/COR, and Cemetery Director, in writing, 72 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. All outages shall be proposed for weekends.
3. The Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Cemetery.
Interruption time approved by the Cemetery may occur at other than Contractor's normal working hours at no additional cost to the Government.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the RE/COR, which may require the work to be performed off hours which shall be done at no additional cost to the
Government.
5. In case of a contract construction emergency, service will be interrupted on approval of
RE/COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, 01 00 01 - 10 shall be sealed, capped or plugged. The lines shall not be capped in finished areas but shall be removed and sealed. Lines shall be capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Cemetery traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the RE/COR.
O. Coordinate the work for this contract with other construction operations as directed by RE/COR.
P. Coordination of Construction with Cemetery Director through the RE/COR: The burial activities at a National Cemetery shall take precedence over construction activities. Cooperation and coordination with the Cemetery Director, through the RE/COR, in arranging construction schedule to cause the least possible interference with Cemetery activities in actual burial areas is required.
Construction noise during the interment services shall not disturb the service. Coordination of work may require that equipment that is heard from the service location be shut-off, or moved out of the area prior to the service, as acceptable to the Cemetery Director through the RE/COR.
Trucks and workmen shall not pass through the service area during this period:
1. Discontinue work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, and clean up all areas of operation adjacent to functioning areas of the Cemetery, including existing burial sections and any other areas identified by the RE/COR before these dates.
2. Clean-up activities shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, make a thorough survey with the RE/COR of areas of buildings in which alterations are to occur and areas which are anticipated routes of access.
Create and furnish a written report to the RE/COR. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
01 00 01 - 11
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and
RE/COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of RE/COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by the Contractor with new items in accordance with specifications which will be furnished by the Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and
RE/COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by the Contractor to such flooring and other surfaces, despite protection measures; and, will form the basis for determining extent of repair work required of the Contractor to restore damage caused by the Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protect the interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 ENVIRONMENTAL CONTROLS
A. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.
1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by RE/COR. Block off ducts and diffusers to prevent circulation of dust into occupied areas during construction.
B. Vacuum and wet mop all transition areas from construction to the occupied Cemetery buildings at the end of each workday.
C. Final Cleanup:
01 00 01 - 12
1. Perform HEPA vacuum cleaning of all surfaces in the construction area as well as any adjoining areas that remained in service and were contaminated by dust from the work area.
This included walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
2. Upon completion of the project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
3. All new air ducts shall be cleaned prior to final inspection.
1.9 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by RE/COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from the National Cemetery.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the
Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the
Environmental Protection Agency (EPA) and the Department of Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively. The EPA's Toxic
Substance Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste Manifest (EPA Form 8700-22), along with the Uniform
Hazardous Waste Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the RE/COR who will annotate the contract file and transmit the Manifest to the Cemetery
Director.
a. Copies of the following listed CFR titles may be obtained from the Government Printing
Office:
40 CFR 261 Identification and Listing of Hazardous Waste
01 00 01 - 13
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 761 PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions
49 CFR 172 Hazardous Material tables and Hazardous Material
Communications Regulations
49 CFR 173 Shippers - General Requirements for Shipments and Packaging
49 CRR 173 Subpart A General
49 CFR 173 Subpart B Preparation of Hazardous Material for Transportation
49 CFR 173 Subpart J Other Regulated Material; Definitions and Preparation
TSCA Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7
1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. Preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. Remove trees only when specifically authorized to do so, avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, then trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the RE/COR.
B. Protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. Repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the RE/COR may have the necessary work performed and charge the cost to the Contractor. Paragraphs 1.10.A and 1.10.B are from (FAR 52.236-9).
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.