36C10F19R0010-0004080.pdf
PDF 6 MB Posted
- Attached to
- Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 Federal contract opportunity
- Solicitation number
- 36C10F19R0010
About this file
36C10F19R0010 0004 GLNC Phase II Development - 923PC2006 - BID - Final Specs Volume 2 - Part 3 Pages 451 to 465.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREAT LAKES NATIONAL CEMETERY PROJECT NO. 935-004
PHASE 2 DEVELOPMENT MAY 10, 2019
FOUNDATION DRAINAGE
33 41 13 - 1
SECTION 33 41 13
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Foundation drainage system complete as indicated and/or described in the specifications and drawings. Furnish all work required including: labor, materials, tools and equipment required to perform the complete installation. Work shall include, but not be limited to: excavation, installation of all drainage system components, backfill, and cleanout extensions.
1.2 RELATED REQUIREMENTS
A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY
SERVICES.
B. Existing utility protection, fire protection services, existing equipment, roads, and pavements:
Section 01 00 01, GENERAL REQUIREMENTS.
C. Subsurface Investigation: Section 01 00 01, GENERAL REQUIREMENTS, Article, PHYSICAL
DATA.
D. Trenching and Excavation: Section 31 20 00, EARTH MOVING.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Association of State Highway and Transportation Officials (AASHTO):
1. M006-13-UL - Fine Aggregate for Hydraulic Cement Concrete.
2. M252-09-UL - Corrugated Polyethylene Drainage Pipe.
3. M288-15-UL - Geotextile Specification for Highway Applications.
C. ASTM International (ASTM):
1. A74-16 - Cast Iron Soil Pipe and Fittings.
2. A746-09 (2014) - Ductile Iron Gravity Sewer Pipe.
3. D448-12 - Sizes of Aggregate for Road and Bridge Construction.
4. D1661-16 - Standard Test Method for Compressive Properties of Rigid Cellular Plastics
5. D1777-96 (2015) - Standard Test Method for Thickness of Textile Materials
6. D2321-14 - Underground Installation of Thermoplastic Pipe for Sewers and Other
Gravity-Flow Applications.
7. D2729-03 - Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings.
8. D2737-12 - Polyethylene (PE) Plastic Tubing.
9. D3034-14 - Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings.
10. D3350-14 – Standard Specification for Polyethylene Plastics Pipe and Fitting Materials
11. D4216-13 - Rigid Poly (Vinyl Chloride) (PVC) and Related PVC and Chlorinated Poly (Vinyl
Chloride) (CPVC) Building Products Compounds.
33 41 13 - 2
12. D4491/D4491M - 17 - Standard Test Methods for Water Permeability of Geotextiles by
Permittivity.
13. D4632/D4632M - 15a - Standard Test Method for Grab Breaking Load and Elongation of
Geotextiles
14. D4716/D4716M - 14 -Standard Test Method for Determining the (In-plane) Flow Rate per
Unit Width and Hydraulic Transmissivity of a Geosynthetic Using a Constant Head
15. D6241-14 - Standard Test Method for Static Puncture Strength of Geotextiles and
Geotextile-Related Products Using a 50-mm Probe
16. F477-14 - Elastomeric Seals (Gaskets) for Joining Plastic Pipe.
17. F758-14 - Smooth-Wall Poly (Vinyl Chloride) (PVC) Plastic Underdrain Systems for
Highway, Airport, and Similar Drainage.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Filter fabric indicating manufacturer recommendation for each application.
3. Installation instructions.
4. Warranty.
C. Samples:
1. Product: long, square, each type and color.
a. Submit quantity required to show full color and texture range.
D. Certificates: Certify products comply with specifications.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
a. Project Experience List: Provide contact names and addresses for completed projects.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Protect products from damage during handling and construction operations.
33 41 13 - 3
1.8 FIELD CONDITIONS
A. Field Measurements: Verify field conditions affecting drainage installation. Show field measurements on Submittal Drawings.
1. Coordinate field measurement and fabrication schedule to avoid delay.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."
PART 2 - PRODUCTS
2.1 MATERIALS
A. Pipes: Type and size indicated. Make transitions, adapters, or joint details for dissimilar materials.
B. Underslab Header:
1. NPS 4 to NPS 15:
a. Pipe and Fittings: PVC, ASTM D3034.
b. Joints: Bell-and-spigot.
c. Seal Gaskets: ASTM F477, elastomeric.
C. Perforated Drainage Pipe:
1. NPS 4 to NPS 6:
a. Pipe and Fittings: HDPE, ASTM D3350.
b. Joints: Bell-and-spigot, loose type.
D. Cleanout Extension: ASTM A74, cast iron pipe or ASTM A746 ductile iron.
1. Gravity Sewer Pipes: Provide neoprene gasket joints and long sweep elbow fittings.
E. Drainage Conduit:
1. Pipe: ASTM D4216 and ASTM D2729, PVC.
a. Size: 6 inches, high minimum flow rate equal NPS 4 pipe.
2. Fittings and Couplings: PVC.
F. Drainage Material:
1. Bedding: Crushed stone, 3/4 inch to No. 4, ASTM D448.
G. Concrete Sand: AASHTO M006.
H. Dimpled Drainage core, with filter fabric foundation water management system:
1. Physical Properties of Core
a. Compressive Strength (ASTM D-1621) 14,000 psf minimum
b. Thickness (ASTM D1777) 0.35 in. minimum
c. Flow (Hydraulic gradient = 1) (ASTM D-4716) 20 G/min/ft minimum
2. Physical Properties of Fabric
a. Flow (ASTM D-4491) 130 gal/min/ft2 minimum
b. CBR Puncture (ASTM D-6241) 240 lbs. minimum
c. AOS 65-70 U.S. Sieve
33 41 13 - 4
d. Grab Tensile (ASTM D-4632) 90-100 lbs. minimum
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation in the presence of Resident
Engineer/Contracting Officer's Representative (RE/COR).
B. Correct substrate deficiencies.
1. Fill.
2. Level.
C. Keep trenches dry during drainage system installation.
D. Clean interior of pipe before installation.
3.2 INSTALLATION - FOUNDATION DRAINAGE
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for
RE/COR consideration.
B. Trenching, Excavation and Backfilling:
1. Perform trenching, excavation and backfilling according to Section 31 20 00 EARTH
MOVING. Make 1/8 bends changes in direction of drain lines. Use wye fittings at intersections.
C. Bedding:
1. Place and compact graded bedding at bottom trench, minimum 6 inches deep. Rest section firmly through entire length, with recesses formed for bell joints. Fully support pipe lower quadrant with bedding, except bell joint recesses.
D. Pipe Laying:
1. Install PE and PVC Pipe according to ASTM D2321 and ASTM F758.
2. Lay drain lines to grades and alignment, with continuous fall in flow direction and as indicated on Drawings.
3. Place bells ends, face upgrade.
4. Lay drain lines and firmly bed in granular material minimum 3 inches below invert to top of pipe true to grades and alignment, and slope uniformly between elevations shown on foundation drainage drawings. Keep trenches dry until pipe is in place and granular material backfill is completed, 1 foot above top of pipe, unless otherwise noted.
5. Lay perforated pipe, perforations down. Lay plain end pipe, closed joints, held in place with two No. 9 spring steel wire clips at joint or standard clay collars.
6. Foundation Subdrainage: Install pipe pitched down in flow direction, minimum slope 0.5 percent, minimum cover 3 feet, unless otherwise indicated.
33 41 13 - 5
7. Underslab subdrainage: Install piping pitched down in flow direction, minimum slope of 0.5 percent.
8. Install gaskets, seals, sleeves, and couplings according to manufacturer's instructions and as follows:
a. PE Joint: ASTM D2737 and AASHTO HB17, Division II, Section 26.4.2.4, “Joint
Properties”.
b. PVC Joint: ASTM D3034 with elastomeric seals gaskets, ASTM D2321.
c. Perforated PVC Joint: ASTM D2729, with loose bell and spigot joints.
9. Install cleanout extensions as indicated on Drawings and as follows:
a. Pre-placed Crypt Field Underdrain Cleanouts: Install as indicated on Drawings and set not to interfere with mowing operations. Provide concrete anchorage for plastic tops. Check drain lines before backfilling. Remove obstructions and recheck lines.
E. Dimpled Drainage Core with filter fabric
1. Furnish and install following the manufacturers recommendations and as indicated.
3.3 FIELD QUALITY CONTROL
A. Field Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING
LABORATORY SERVICES.
3.4 PROTECTION
A. Protect pipe from and aggregate cover from damage and displacement until backfilling operation begins.
- - - E N D - - -
THIS PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE SIDED PRINTING
NATURAL GAS DISTRIBUTION
33 51 00-1
SECTION 33 51 00
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies materials and procedures for the construction of outside underground gas distribution system for liquid propane gas, complete, ready for operation, including cathodic protection if required, all appurtenant structures, and connections to new building structures and to existing gas supply.
1.2 RELATED WORK
A. Excavation, Trench Widths, Pipe Bedding, Backfill, Shoring, Sheeting, Bracing: Section 31 20 00, EARTH MOVING.
B. Submittals: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.
C. General plumbing, protection of Materials and Equipment, and quality assurance: Section 22 05
11, COMMON WORK RESULTS FOR PLUMBING
1.3 DEFINITIONS
A. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
1.4 ABBREVIATIONS
A. HDPE: High-density polyethylene plastic
B. PE: Polyethylene plastic
C. WOG: Water, oil and gas
D. NRTL: National recognized testing laboratory
1.5 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01
33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Information and material submitted under this section shall be marked “SUBMITTED UNDER
SECTION 33 51 00, NATURAL GAS DISTRIBUTION”, with applicable paragraph identification.
C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.
D. Piping:
1. ASTM Compliance.
2. Grade, class or type, schedule number.
3. Manufacturer’s Certification of Compliance with specified standards.
E. Manual Valves:
1. Type and service.
2. Catalog Cuts.
33 51 00-2
3. Pressure and Temperature Ratings.
F. Valve Boxes:
1. Catalog Cuts.
G. Gas Pressure Regulator:
1. UL Listing.
2. Pressure and Temperature Rating.
3. Flow Capacities.
4. Catalog Cuts.
H. Meter:
1. ANSI Compliance.
2. Pressure and Temperature Rating.
3. Certification of Compliance with local utility requirements.
I. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide:
1. Include complete list indicating all components of the systems.
2. Include complete diagrams of the internal wiring for each item of equipment.
3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Remove and dispose of liquids from existing gas piping according to requirements of authorities having jurisdiction.
B. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
C. Store and handle pipes and tubes having factory-applied protective coatings to avoid damaging coating and protect from direct sunlight.
D. Protect stored PE pipes and valves from direct sunlight.
1.7 COORDINATION
A. Coordinate connection to propane-gas main with Utility Company.
B. Coordinate sizes and locations of concrete bases with actual equipment provided.
C. Coordinate exterior utility lines and connections to building services up to the actual extent of building wall.
1.8 QUALITY ASSURANCE:
A. Products Criteria:
1. When two or more units of the same type or class of materials or equipment are required, these units shall be products of one manufacturer.
33 51 00-3
2. A nameplate bearing manufacturer's name or trademark, including model number, shall be securely affixed in a conspicuous place on equipment. In addition, the model number shall be either cast integrally with equipment, stamped, or otherwise permanently marked on each item of equipment.
B. Comply with the rules and regulations of the Utility Company having jurisdiction over the connection to public natural-gas lines and the extension, and/or modifications to public utility systems.
1.9 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred in the text by basic designation only.
B. American National Standards Institute (ANSI):
B31.8-2010 ................................. Gas Transmission and Distribution Piping Systems
C. American Society of Mechanical Engineers (ASME):
B1.20.1-1983 .............................. Pipe Threads, General Purpose, Inch
B1.20.3-2008 .............................. Dryseal Pipe Threads (Inch)
B16.3-2006 ................................. Malleable Iron Threaded Fittings: Classes 150 and 300
B16.9-2007 ................................. Factory-Made Wrought Buttwelding Fittings
B16.11-2009 ............................... Forged Fittings, Socket-Welding and Threaded
B16.39-2009 ............................... Malleable Iron Threaded Pipe Unions: Classes 150, 250, and
B18.2.1-2010 .............................. Square, Hex, Heavy Hex, and Askew Head Bolts and Hex, Heavy Hex, Hex Flange, Lobed Head, and Lag Screws (Inch
Series)
B31.8-2010 ................................. Gas Transmission and Distribution Piping Systems
D. American Society of Safety Engineers (ASSE):
1079-2005 .................................. Dielectric Pipe Unions
E. American Society for Testing and Materials (ASTM):
A53/A53M-10 ............................. Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless
A234/A234M-11 ......................... Piping Fittings of Wrought Carbon Steel and Alloy Steel for
Moderate and High Temperature Service
F. American Water Works Association (AWWA):
C203-08 ..................................... Coal-Tar Protective Coatings and Linings for Steel Water
Pipelines - Enamel and Tape - Hot Applied
G. American Welding Society (AWS):
A5.8/A5.8M:2004 ....................... Filler Metals for Brazing and Braze Welding
D10.12/D10.12M:2000 ............... Guide for Welding Mild Steel Pipe
33 51 00-4
H. National Fire Protection Agency (NFPA):
54-2018 ...................................... National Fuel Gas Code
58-2017 ...................................... Liquefied Petroleum Gas Code
70-2017 ...................................... National Electric Code
1.10 WARRANTY
A. The Contractor shall remedy any defect due to faulty material or workmanship and pay for any damage to other work resulting therefrom within a period of two years from final acceptance.
Further, the Contractor will furnish all manufacturer's and supplier's written guarantees and warranties covering materials and equipment furnished under this contract.
PART 2 - PRODUCTS
2.1 PIPES, TUBES, AND FITTINGS
A. Steel Pipe: Steel pipe shall be as per ASTM A53, black steel, Schedule 40, Type E or Type S, Grade B. Copper tubes are not allowed by code for natural gas distribution in the United States.
B. Fittings:
1. Malleable-Iron Threaded Fittings shall meet ASME B16.3, Class 300, standard pattern.
Threaded joints are not permitted except at valve connections.
2. Butt weld fittings shall be wrought steel, per ASME B16.9.
3. Wrought-Steel Welding Fittings shall meet ASTM A234 for butt welding and socket welding.
4. Unions shall be ASME B16.39, Class 300, malleable iron with brass-to-iron seat, ground joint, and threaded ends.
5. Protective Coating for Underground Piping:
a. Factory-applied, three-layer coating of epoxy, adhesive, and polyethylene PE.
b. Coal Tar Enamel Coating on exterior of pipe and fittings shall be cleaned, primed with
Type B primer and coated with hot-applied coal-tar enamel with bonded layer of felt wrap in accordance with AWWA C203. Asbestos felt shall not be used; felt material shall be fibrous-glass mat as specified in Appendix Sec. A2.1 of AWWA C203.
c. Joint cover kits shall include epoxy paint, adhesive, and heat-shrink PE sleeves.
6. Mechanical Couplings shall include:
a. Stainless-steel flanges and tube with epoxy finish.
b. Buna-nitrile seals.
c. Stainless-steel bolts, washers, and nuts.
d. Couplings shall be capable of joining PE pipe to PE pipe, steel pipe to PE pipe, or steel pipe to steel pipe.
e. Steel body couplings installed underground on plastic pipe shall be factory equipped with anodes.
33 51 00-5
2.2 JOINING MATERIALS
A. Joint Compound and Tape shall be suitable for natural-gas.
B. Welding filler metals shall comply with AWS D10.12 for appropriate wall thickness and chemical analysis of steel pipe being welded.
C. Brazing filler metals shall be alloy with a melting point greater than 1000 deg F complying with
AWS A5.8. Brazing alloys containing more than 0.05 percent phosphorus are prohibited.
2.3 DIELECTRIC FITTINGS
A. Dielectric Unions shall comply with ASSE 1079 and have a pressure rating of 125 psi minimum at
180 deg F.
B. Dielectric Flanges shall comply with ASSE 1079 and have a pressure rating of 125 psi minimum at
180 deg F.
C. Dielectric-Flange insulating kits shall have a pressure rating of 150 psi.
2.4 LABELING AND IDENTIFYING
A. Detectable warning tape shall be acid- and alkali-resistant, PE film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep;
colored yellow.
PART 3 - EXECUTION
3.1 PREPARATION
A. Close equipment shutoff valves before turning off natural-gas to premises or piping section.
B. Inspect gas piping according to NFPA 54, NFPA 58 and the International Fuel Gas Code to determine that natural-gas utilization devices are turned off in piping section affected.
C. Comply with NFPA 54, NFPA 58 and the International Fuel Gas Code requirements for prevention of accidental ignition.
3.2 METALLIC PIPING INSTALLATION
A. Heating trenches, storm and sanitary sewer lines, and water mains shall have right of way.
B. Warning tape shall be continuously placed 12 inches above buried gas lines.
C. Main services and main service shut off valves shall have a 24-inch minimum cover or as recommended by local utility.
D. Service lines shall have an 18-inch minimum cover or as recommended by local utility.
E. Where indicated, the main shall be concrete-encased sleeved.
F. Connections between metallic and plastic piping shall be made only outside, underground, and with approved transition fittings.
33 51 00-6
3.3 NON-METALLIC PIPE INSTALLATION
A. Install pipe in trench in accordance with recommendations of the pipe manufacturer. Provide sufficient slack to allow for expansion and contraction.
B. Joints shall be fusion welds made in accordance with the recommendations of the polyethylene pipe manufacturer. Adhesive joints for fiberglass plastic pipe shall be made in accordance with manufacturer’s recommendations.
C. All offsets in piping shall be made with manufactured fittings. Bending of piping to form offsets shall not be permitted.
D. Connections between plastic pipe and metal pipe shall be made in accordance with recommendations of the pipe manufacturer.
E. Copper Tracer Wire consisting of No. 14 AWG solid, single conductor, insulated copper wire shall be installed in the trench with all piping to permit location of the pipe with electronic detectors. The wire shall not be spiraled around the pipe nor taped to the pipe. Wire connections are to be made by stripping the insulation from the wire and soldering with rosin core solder. Solder joints shall be wrapped with rubber tape and electrical tape. At least every 1000 feet, provide a 5-pound magnesium anode attached to the main tracer wire by solder joint shall be wrapped with rubber tape and with electrical tape. An anode shall be attached at the end of each line.
3.4 OUTDOOR PIPING INSTALLATION
A. Comply with ASTM D2774 for installation and purging of natural-gas piping.
B. Install underground, gas piping buried at least 48 inches below finished grade. Minimum cover depth is 18 inches. Gas piping installed less than 18 inches below finished grade shall be installed in vented containment conduit.
C. Install fittings for changes in direction and branch connections.
D. Install pressure gauge downstream from each service regulator.
3.5 PIPE SLEEVES
A. Pipe shall be continuous through sleeves. Set sleeves in place before concrete is poured. Seal between sleeve/core opening and the pipe with modular mechanical type link seal. All sleeves shall be vented.
B. Provide sleeves where gas lines pass through retaining walls, foundation walls or floors. Split sleeves may be installed where existing lines pass thru new construction.
3.6 CONNECTIONS
A. Connect to utility's gas main according to utility's procedures and requirements.
B. Install gas piping electrically continuous and bonded to gas appliance equipment grounding conductor of the circuit powering the appliance according to NFPA 70.
3.7 LABELING AND IDENTIFYING
A. Install detectable warning tape directly above gas piping, 12 inches below finished grade, except 6 inches below subgrade under pavements and slabs.
33 51 00-7
3.8 PIPE CLEANING
A. All pipe sections shall be blown down with 100 psi air to remove all sand, soil and debris.
B. Blow down procedure shall be done after system is complete, but before valves are installed.
3.9 NATURAL GAS DISTRIBUTION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain earthquake valves.
3.10 TESTS
A. Piping System: Inspection, testing and purging shall be in accordance with NFPA 54, NFPA 58 and
ASME B31.8.
B. Cathodic Protection System:
1. Testing of Anodes: Prior to connecting anode lead wire to the piping, insert a millimeter in the circuit and measure and record current output of each anode. When maximum current outputs, as set below, for the different sizes of anodes are exceeded, insert nickel chromium resistance wire in the circuit to reduce current output to maximum allowable for a given size anode. Resistance wire connections to anode lead wires shall be accomplished with silver solder and soldered joints wrapped with a minimum of three layers of high dielectric strength electrical tape. Cover with rubber all nickel chromium resistance wire. Maximum allowable current outputs for the different size anodes to allow for design life are as follows:
Weight Bare Anodes Allowable Current Output
5 lb. Anode 10 Milliamperes
9 lb. Anode 20 Milliamperes
17 lb. Anode 40 Milliamperes
32 lb. Anode 75 Milliamperes
2. Final Test: Final test of the cathodic protection system shall include measuring pipe-to-soil potentials over the entire system. Make potential measurements with potentiometer voltmeter minimum internal resistance of 50,000 ohms per volt and a copper/copper sulfate reference electrode placed at the finished grade level and directly over the pipe. Adequate number of measurements shall be taken over the extent of piping to ensure that a minimum potential value of -0.85 volts exists over all new gas piping. Upon completion of testing, a report setting forth potential values acquired by location shall be submitted to the Government.
3.11 OUTDOOR PIPING SCHEDULE
A. Underground gas piping shall be one of the following:
1. Steel pipe with wrought-steel fittings and welded joints, or mechanical couplings. Coat pipe and fittings with protective coating for steel piping.
33 51 00-8
B. Containment conduit shall be steel pipe with wrought-steel fittings and welded joints. Coat pipe and fittings with protective coating for steel piping.
--- E N D ---
SWPPP
FACILITY SITE MAP
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
923PC2006
AUGUST 31, 2018 JPG BJS Dwg. of 1
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
SWPPP SUBMISSION
SWPPP SUBMISSION
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
GREAT LAKES NATIONAL
CEMETERY
PHASE II DEVELOPMENT
| 000000CoverPageV2 |
| 000110TOC2 |
| 230511CommonWorkResultsforHVAC |
| SECTION 23 05 11 |
| COMMON WORK RESULTS FOR HVAC |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE AND HANDLING |
| 1.7 AS-BUILT DOCUMENTATION |
| 1.8 JOB CONDITIONS – WORK IN EXISTING BUILDING |
| PART 2 - PRODUCTS |
| 2.1 FACTORY-ASSEMBLED PRODUCTS |
| 2.2 COMPATIBILITY OF RELATED EQUIPMENT |
| 2.3 V-BELT DRIVES |
| 2.4 SYNCHRONOUS BELT DRIVES |
| 2.5 DRIVE GUARDS |
| 2.6 LIFTING ATTACHMENTS |
| 2.7 ELECTRIC MOTORS |
| 2.8 EQUIPMENT AND MATERIALS IDENTIFICATION |
| 2.9 GALVANIZED REPAIR COMPOUND |
| 2.10 HVAC PIPE AND EQUIPMENT SUPPORTS AND RESTRAINTS |
| 2.11 DUCT PENETRATIONS |
| 2.12 SPECIAL TOOLS AND LUBRICANTS |
| 2.13 ASBESTOS |
| PART 3 - EXECUTION |
| 3.1 GENERAL |
| 3.2 ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING |
| 3.3 TEMPORARY PIPING AND EQUIPMENT |
| 3.4 RIGGING |
| 3.5 PIPE AND EQUIPMENT SUPPORTS |
| 3.6 MECHANICAL DEMOLITION |
| 3.7 CLEANING AND PAINTING |
| 3.8 IDENTIFICATION SIGNS |
| 3.9 MOTOR AND DRIVES |
| 3.10 LUBRICATION |
| 3.11 STARTUP, TEMPORARY OPERATION AND TESTING |
| 3.12 OPERATING AND PERFORMANCE TESTS |
| 3.13 DEMONSTRATION AND TRAINING |
| 230512GeneralMotorRequirements |
| SECTION 23 05 12 |
| GENERAL MOTOR REQUIREMENTS FOR HVAC EQUIPMENT |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.1 MOTORS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 FIELD TESTS |
| 3.3 STARTUP AND TESTING |
| 3.4 DEMONSTRATION AND TRAINING |
| 230541VibrationCont |
| SECTION 23 05 41 |
| NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 AS-BUILT DOCUMENTATION |
| PART 2 - PRODUCTS |
| 2.1 GENERAL REQUIREMENTS |
| 2.2 VIBRATION ISOLATORS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 ADJUSTING |
| 3.3 STARTUP AND TESTING |
| 3.4 DEMONSTRATION AND TRAINING |
| SELECTION GUIDE FOR VIBRATION ISOLATORS |
| 230593TAB |
| SECTION 23 05 93 |
| TESTING, ADJUSTING, AND BALANCING FOR HVAC |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 PROJECT CONDITIONS |
| 1.7 COORDINATION |
| PART 2 - PRODUCTS |
| 2.1 PLUGS |
| PART 3 - EXECUTION |
| 3.1 GENERAL |
| 3.2 CONTRACT DOCUMENTS REVIEW REPORT |
| 3.3 EXAMINATION |
| 3.4 SYSTEMS INSPECTION REPORT |
| 3.5 PREPARATION |
| 3.6 DUCT AIR LEAKAGE TEST REPORT |
| 3.7 PRELIMINARY TAB REPORTS |
| 3.8 FINAL TAB REPORT |
| 3.9 TAB PROCEDURES |
| 3.10 VIBRATION TESTING |
| 3.11 MARKING OF SETTINGS |
| 3.12 IDENTIFICATION OF TEST PORTS |
| 230923DDC |
| SECTION 23 09 23 |
| DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 PERFORMANCE |
| 1.7 INSTRUCTIONS |
| 1.8 PROJECT CONDITIONS (ENVIRONMENTAL CONDITIONS OF OPERATION) |
| PART 2 - PRODUCTS |
| 2.1 CONTROLS SYSTEM ARCHITECTURE |
| 2.3 DIRECT DIGITAL CONTROLLER SOFTWARE |
| 2.4 SENSORS (AIR AND WATER) |
| 2.5 CONTROL CABLES |
| 2.6 FINAL CONTROL ELEMENTS AND OPERATORS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 STARTUP AND TESTING |
| 3.3 DEMONSTRATION AND TRAINING |
| 233100HVACDuctsCasings |
| SECTION 23 31 00 |
| HVAC DUCTS AND CASINGS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 AS-BUILT DOCUMENTATION |
| PART 2 - PRODUCTS |
| 2.1 DUCT MATERIALS AND SEALANTS |
| 2.2 DUCT CONSTRUCTION AND INSTALLATION |
| 2.3 DUCT ACCESS DOORS, PANELS AND SECTIONS |
| 2.4 MANUAL VOLUME DAMPERS |
| 2.5 TURNING VANES |
| 2.6 INSTRUMENT TEST FITTINGS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 DUCT LEAKAGE TESTS AND REPAIR |
| 3.3 TESTING, ADJUSTING, AND BALANCING (TAB) |
| 3.4 STARTUP AND TESTING |
| 3.5 DEMONSTRATION AND TRAINING |
| 233400Fans |
| SECTION 23 34 00 |
| HVAC FANS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 AS-BUILT DOCUMENTATION |
| PART 2 - PRODUCTS |
| 2.1 CENTRIFUGAL FANS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 PRE-OPERATION MAINTENANCE |
| 3.3 START-UP AND TESTING |
| 3.4 DEMONSTRATION AND TRAINING |
| 233700AirOutlets |
| SECTION 23 37 00 |
| AIR OUTLETS AND INLETS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 AS-BUILT DOCUMENTATION |
| PART 2 - PRODUCTS |
| 2.1 EQUIPMENT SUPPORTS |
| 2.2 AIR OUTLETS AND INLETS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 TESTING, ADJUSTING, AND BALANCING (TAB) |
| 3.3 STARTUP AND TESTING |
| 3.4 DEMONSTRATION AND TRAINING |
| 238239 UnitHeaters |
| SECTION 23 82 39 |
| UNIT HEATERS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 AS-BUILT DOCUMENTATION |
| PART 2 - PRODUCTS |
| 2.1 CABINET UNIT HEATERS |
| 2.2 PROPELLER UNIT HEATERS |
| 2.3 WALL HEATERS |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| 3.2 INSTALLATION |
| 3.3 CONNECTIONS |
| 3.5 STARTUP AND TESTING |
| 3.6 DEMONSTRATION AND TRAINING |
| 260511ReqForElecInstall |
| PART 1 - GENERAL |
| 1.2 MINIMUM REQUIREMENTS |
| 1.3 TEST STANDARDS |
| 1.4 QUALIFICATIONS (MANUFACTURERs, PRODUCTS AND SERVICES) |
| 1.5 applicable publication |
| 1.6 MANUFACTURED PRODUCTS |
| 1.8 materials and EQUIPMENT PROTECTION |
| 1.9 WORK PERFORMANCE |
| 1.11 EQUIPMENT IDENTIFICATION |
| 1.13 SINGULAR NUMBER |
| 1.14 warranty |
| 1.15 TRAINING |
| 260519LowVoltElecPowerCond |
| PART 1 - GENERAL |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 CONDUCTORS |
| 2.2 SPLICES |
| 2.3 CONTROL WIRING |
| 2.4 WIRE LUBRICATING COMPOUND |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION, GENERAl |
| 3.2 INSTALLATION IN MANHOLES |
| 3.3 SPLICE INSTALLATION |
| 3.4 CONTROL AND SIGNAL WIRING INSTALLATION |
| 3.5 CONTROL AND SIGNAL SYSTEM IDENTIFICATION |
| 3.6 FEEDER IDENTIFICATION |
| 3.7 DIRECT BURIAL Conductor INSTALLATION |
| 3.8 exisitng CONDUCTORS AND cables |
| 260526 GrndBondElecSys |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 GROUNDING AND BONDING CONDUCTORS |
| 2.2 GROUND RODS |
| 2.4 ground connections |
| 2.5 equipment rack and cabinet ground bars |
| 2.6 ground terminal blocks |
| PART 3 - EXECUTION |
| 3.1 GENERAL |
| 3.2 INACCESSIBLE GROUNDING CONNECTIONS |
| 3.3 SECONDARY EQUIPMENT AND CIRCUITS |
| 3.4 corrosion inhibitors |
| 3.5 CONDUCTIVE PIPING |
| 3.6 electrical room grounding |
| 3.7 wireway grounding |
| 3.8 ground resistance |
| 3.9 GROUND ROD INSTALLATION |
| 260533RacBoxElecSys |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 MATERIAL |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 Conduit PENETRATIONS |
| 3.3 conduit INSTALLATION - concealed |
| 3.4 conduit INSTALLATION - exposed |
| 3.5 conduit INSTALLATION – direct burial |
| 3.6 conduit installation – hazardous locations |
| 3.7 conduit installation – wet or damp locations |
| 3.8 conduit installation – motors and vibrating equipment |
| 3.9 conduit installation - EXPANSION JOINTS |
| 3.10 CONDUIT SUPPORTS |
| 3.11 BOX INSTALLATION |
| 260541UndrGrndElecConst |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 3 - EXECUTION |
| 3.1 manhole and pullbox INSTALLATION |
| 3.2 TRENCHING |
| 3.3 DUCT INSTALLATION |
| 260800Commissioning of Electrical Systems |
| 262200LowVoltTransf |
| 262416Panelboard |
| 262726WiringDev |
| 262921EnclosedSwtCircuitBrk |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 FUSed SWITCHES RATED 600 AMPERES AND LESS |
| 2.2 UNFUSED SWITCHES RATED 600 AMPERES AND LESS |
| 2.3 FUSed SWITCHES RATED OVER 600 AMPERES TO 1200 AMPERES |
| 2.4 MOTOR RATED TOGGLE SWITCHES |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.3 SPARE PARTS |
| 263213 EngGen |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 QUALITY ASSURANCE |
| 1.5 SUBMITTALS |
| 1.6 STORAGE AND HANDLING |
| 1.7 JOB CONDITIONS |
| 1.8 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 general requirements |
| 2.2 ENGINE |
| 2.3 GOVERNOR |
| 2.4 LUBRICATION OIL SYSTEM |
| 2.5 FUEL SYSTEM |
| 2.6 cooling system |
| 2.7 AIR INTAKE AND EXHAUST SYSTEMS |
| 2.8 ENGINE STARTING SYSTEM |
| 2.9 lubricating oil heater |
| 2.10 jacket coolant heater |
| 2.11 GENERATOR |
| 2.12 GENERATOR overcurrent and fault protection |
| 2.13 CONTROLs |
| 2.14 remote manual stop station |
| A. For each engine generator: |
| B. For each battery charger: |
| C. For each control panel: |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 acceptance checks and tests |
| 3.3 INSTRUCTIONS AND FINAL INSPECTIONS |
| 263623 ATS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 Quality assurance |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 GENERAL REQUIREMENTS |
| 2.2 sequence of OPERATION |
| 2.3 REMOTE ANNUNCIATOR SYSTEM |
| PART 3 - EXECUTION |
| 3.2 acceptance checks and tests |
| 3.4 instruction |
| 265100InteriorLighting |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION: |
| 1.2 RELATED WORK |
| 1.3 qualITY ASSURANCE |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| 265600ExteriorLighting |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| 1.6 delivery, storage, and handling |
| PART 2 - PRODUCTS |
| 2.1 GENERAL |
| 2.2 LUMINAIRES |
| 2.3 LAMPS |
| 2.5 LIGHTING CONTACTORS |
| 2.6 CONTROLS |
| 2.7 EXISTING LIGHTING SYSTEMS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 GROUNDING |
| 270500CommonWorkResultsComm |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. New state-of-the-art fully functioning communications and electronic safety and security systems installed in VA’s National Cemetery (NCA) to regulate access to restricted buildings AND building areas, |
| 2. General administrative, product, and installation requirements governing Division 27 and Division 28 specifications. |
| B. In Circumstances of a need for additional detail or conflict resolution between drawings, specifications, reference to code or standards, comply with: |
| 1. FAR 42-236-21 (http//www.farmaster.com/farmaster/data/idx/FAR84/5202360021.html), and: |
| 2. VAAR 852.236.91 (http//www.va.gov/oal/library/vaar852.asp). |
| 1.2 DEFINITIONS |
| A. Conduits means any raceway types such as raceways, cable tray and pathway. |
| B. Telecommunications (a.k.a. Telecom) means the science and practice of communications by electromagnet (EMF) and radio frequency (RF) means, as opposed, to merely just the processing information (IT). |
| 1.3 RELATED REQUIREMENTS |
| A. Tests, Operations and Storage Areas, and Instructions: Section 01 00 01, GENERAL REQUIREMENTS. |
| B. Communications System: Section 27 05 26, GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS, Section 27 05 33, CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS. |
| C. Security Systems: Section 28 10 00, ACCESS CONTROL, Section 28 20 00, VIDEO SURVEILLANCE, Section 28 31 00, INTRUSION DETECTION, Section 28 46 00, FIRE DETECTION AND ALARM. |
| 1.4 PREINSTALLATION MEETINGS |
| A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work specified in Division 27 and Division 28. |
| 1. Required Participants: |
| a. Resident Engineer/Contracting Officer's Representative (RE/COR). |
| b. VA AHJ SMCS 07A2, for special communications systems. |
| c. Inspection and Testing Agency. |
| d. Contractor. |
| e. Installer. |
| f. Field representative. |
| g. Other installers responsible for adjacent and intersecting work, including electrical installer. |
| 2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting. |
| a. Installation schedule. |
| b. Installation sequence. |
| c. Preparatory work. |
| d. Protection before, during, and after installation. |
| e. Installation. |
| f. Terminations. |
| g. Transitions and connections to other work. |
| h. Inspecting and testing. |
| i. Other items affecting successful completion. |
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
| 1.5 APPLICABLE PUBLICATIONS |
| A. Comply with references to extent specified in this section. |
| B. American National Standards Institute/Telecommunications Industry Association/Electronics Industries Alliance (ANSI/TIA/EIA): |
| 1. 526-7 - Measurement of Optical Power Loss of Installed Single-mode Fiber Cable Plant. |
| 2. 526-14 - Optimal Power Loss Measurements of Installed Multimode Fiber Cable Plant. |
| 3. 568-D-15 - Generic Telecommunications Cabling for Customer Premises. |
| 4. 568-D.1-15 - Commercial Building Telecommunications Infrastructure Standard. |
| 5. 568-D.2-15 - Balanced Twisted-Pair Telecommunication Cabling and Components Standard. |
| 6. 568-D.3-15 - Optical Fiber Cabling Components Standard. |
| C. Master Painters Institute (MPI): |
| 1. No. 18 - Primer, Zinc Rich, Organic. |
| D. National Fire Protection Association (NFPA): |
| 1. 70-14 - National Electrical Code. |
| E. CFM Telecommunications; and, Special Telecommunications Design Manual. |
| 1. CFM Electrical Design Manual. |
| 2. CFM OI&T Design Guide. |
| 1.6 SUBMITTALS |
| A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. |
| 1. Submittal Drawings and as-Built Drawings: 4 sets paper format Architectural F size. 2 sets electronic format. |
| B. System Operational Description: Submit detailed description of system operation, performance, and interface with other entities, equipment, and systems. |
| C. Submittal Drawings: |
| 1. Show size, configuration, fabrication, and installation details. |
| 2. Cover Sheet: |
| a. Identify each drawing included in submittal. |
| b. Show facility name, building name, floor, and sheet number. |
| c. Include security abbreviations and symbols lists. |
| d. Reference general notes included in submittal. |
| e. Specification and scope of work pages for individual security systems. |
| f. Include detailed device identification table. |
| 3. Floor Plans and Site Plans: |
| a. Show drawing scale in metric and English units. |
| b. Show each device identification and location. |
| c. Show control and power wiring. |
| d. Show pull box and conduit locations, sizes, and fill capacities. |
| e. Include general and drawing specific notes. |
| 4. Riser Diagram: |
| a. Include sequence of operation. |
| b. Show relationship of integrated components on 1 diagram. |
| c. Show number, size, identification, and maximum lengths of interconnecting wires. |
| d. Include wiring schedule showing conductor type, wiring drawing symbol, manufacturer’s name, and part number. |
| e. Identify factory wiring and field wiring. |
| 5. System Drawing for Each Security System: |
| a. Show equipment, including panels and devices, and system layout. |
| b. Show point-to-point wiring. |
| c. Identify wire types. |
| d. Show device locations on floor plans. |
| e. Include general and drawing specific notes. |
| 6. System Equipment Schedule: Show the following: |
| a. Device ID. |
| b. Device Location. |
| c. Mounting type. |
| d. Power supply or circuit breaker and power panel number. |
| e. Door number, door type, locking mechanism and control device. |
7. Detail and Elevation Drawings: Show installation details.
| D. When requesting variations from contract requirements according to Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, coordinate connecting work and related components including additions or revisions to branch circuits, circuit protective... |
| E. Obtain RE/COR approval of equipment and material before delivery to project site. Delivery, storage, and installation of unapproved equipment and material will not be permitted. |
| F. Submit product data, submittal drawings, and other data substantiating proposed equipment and materials comply with specified requirements. Submit legible product data clearly identifying equipment. |
| G. For individual systems and equipment assemblies consisting of more than one item or component, submit complete system or assembly. Partial submittals will not be considered for approval. |
| 1. Mark submittals, " SUBMITTED UNDER SPECIFICATION SECTION __________________" |
| 2. Include specification section and paragraph numbers. |
| 3. Submit each section separately. |
| H. Include the following: |
| 1. Information substantiating compliance with contract requirements. Include manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, photographs, nameplate data and test reports as required. |
| 2. Equipment anchors and supports, including weights, dimensions, center of gravity, standard connections, vibration control, thermal expansion accommodation, and manufacturer's instructions for proposed installation. |
| 3. Elementary and interconnection wiring diagrams for communication and signal systems, control system, and equipment assemblies. Identify terminal points and wiring on wiring diagrams. |
| 4. Parts list, including replacement parts recommended by equipment manufacturer, quantity of parts, current price and availability of each part. |
| I. Manufacturer's Literature and Data: |
| 1. Description of each product. |
| 2. Installation instructions. |
| J. Certificates: Certify products comply with specifications. |
| 1. Show product is OSHA's NRTL (UL) Listed and Labeled for specified application. |
| K. Equipment Lists: As bill of materials. |
| 1. Show quantities for each specified product. |
| 2. Identify products included on GSA Approved Products List and approval status. |
| L. Samples: |
| 1. After approval and before installation, submit one of each of the following for RE/COR approval: |
| 2. 12 inches length of each type and size of wire and cable with tag from reel coils from which samples were taken. |
| 3. Each type of conduit and pathway coupling, bushing and termination fitting. |
| 4. TCO with backbox, outlet (six ports), proper color coded female connectors (four RJ-45), two port plugs, cover plate, 12-inch length of connecting wire and conduit indicating completed installation (Contact SMCS 07A2 for typical detail if not provi... |
| 5. Raceway and pathway, conduit, hangers, clamps and supports. |
| 6. Duct sealing compound. |
| M. Submit manufacture’s certification of UL LLC (UL) listing as specified. |
| N. Qualifications: Substantiate qualifications comply with specifications. |
| 1. System integrator with project experience list. |
| a. Responsible BICSI RDCC Certified Architect/Engineer approved by AHJ SMCS 07A2 on team. |
| 2. Installer with project experience list. |
| a. Factory authorized representative. |
| b. BICSI RDCC Certified Architect/Engineer on team. |
3. Field representative with project experience list.
| O. Design Drawings and Calculations: Each signed, dated, and sealed by RE/COR delegated BICSI RCDD certified responsible design professional. |
| 1. Ensure no deviations from details shown on drawings and specifications. |
| P. Factory Test Reports: Submit 4 certified copies containing test data and results maximum 90 days after test completion, before final inspection. |
| Q. Field conditions report indicating differing conditions. |
| R. Field survey report identifying equipment by manufacturer and model number wherever possible indicating: |
| 1. Non-functioning equipment, proposed replacement equipment, and replacement cost. |
| 2. Existing equipment reuse, removal, and replacement schedule. |
| 3. Existing equipment connection and disconnecting schedule, including times for system interruption. |
| S. Acceptance Test Plan: Submit minimum 30 days before testing. |
| 1. Include individual component and subsystem acceptance testing procedures. |
| 2. Include integrated system test ensuring proper operation. |
| T. Field Representative: |
| 1. Observation reports and supplemental instructions issued. |
| 2. Installation certification. |
| U. Field Quality Control Reports: 4 copies. Submit minimum 15 working days before scheduled acceptance test. |
| 1. System pretest recorded measurements. |
| 2. Certifications system is acceptance test ready. |
| V. Operation and Maintenance Data: 4 sets bound in hardback binders according to Section 01 00 01, GENERAL REQUIREMENTS. Submit one manual minimum 15 working days before scheduled performance tests. Submit remaining manuals before contract completion. |
| 1. Include following identification on cover: |
| a. "MAINTENANCE AND OPERATION MANUAL." |
| b. Name and location of system, equipment, building. |
| c. Contractor's name and contract number. |
| 2. Include in manual: Names, addresses, and telephone numbers of each subcontractor installing system or equipment and local representatives for system or equipment. |
| 3. Provide "Table of Contents" and assemble manual coordinated with table of contents. Include tab sheet separating each subject's instructions. |
| 4. Provide legible instructions with large sheets of drawings folded in. |
| 5. Manuals to include: |
| a. Installation, start up, maintenance, troubleshooting, emergency, and shut down instructions for each operational product. |
| b. Demonstration and training video recordings. |
| c. Internal and interconnecting wiring and control diagrams with data to explain detailed operation and control of equipment. |
| d. Control sequence describing start-up, operation, and shutdown. |
| e. Description of each principal item of equipment's function. |
| f. Safety precautions. |
| g. Diagrams and illustrations. |
| h. Testing methods. |
| i. Performance data. |
| j. Pictorial "exploded" parts list with part numbers. Identify required special tools and instruments. Include recommended spare parts part supply sources, and servicing organization name. |
| k. Appendix: List qualified equipment service organizations, including addresses and qualifications. |
6. Approvals will be based on complete submission of manuals and submittal drawings.
| W. Submit training schedule minimum 30 days before planned training. |
| X. As-Built Drawings: Submit minimum 15 working days before scheduled performance tests. |
| 1. Wiring diagrams showing labels, inputs, outputs, and room locations. |
| 2. Electronic Format: Match NCA specified AutoCAD version. |
| 1.7 QUALITY ASSURANCE |
| A. System Integrator: BICSI RCDD System designer and installer. |
| 1. Regularly integrates communications and electronic safety and security systems and specified products. |
| 2. Employs BICSI RCDD certified licensed design professional responsible for system design. |
| 3. Integrated communications and electronic safety and security systems and specified products with satisfactory service on five similar installations for minimum five years. |
| a. Project Experience List: Provide contact names and addresses for completed projects. |
| B. Manufacturer Qualifications: |
| 1. Regularly manufactures specified products. |
| 2. Manufactured specified products with satisfactory service on five similar installations for minimum five years. |
| a. Project Experience List: Provide contact names and addresses for completed projects. |
| 3. Factory Authorized Representative: As directed by RE/COR. |
| 4. Field Representative: BICSI certified Registered Communications Distribution Designer (RCDD) experienced with specified components and systems. |
| C. Installer Qualifications: BICSI RCDD certified and licensed security Contractor. Manufacturer authorized representative. |
| 1. Regularly installs specified products. |
| 2. Installed specified products with satisfactory service on five similar installations for minimum five years. |
| a. Project Experience List: Provide contact names and addresses for completed projects. |
| D. Product Qualifications: |
| 1. Demonstrated satisfactory operation on three similar size and type projects for approximately 5 years. |
| a. Project Experience List: Provide contact names and addresses for completed projects when requested by RE/COR. |
| E. Service Provider Qualifications: |
| 1. Qualified service organization, manufacturer maintained or trained by manufacturer capable of servicing installation within 4 hours of service request. Submit name and address of service organizations. |
| 1.8 DELIVERY |
| A. Deliver products in manufacturer's original sealed packaging. |
| B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, equipment brand, color, production run number, manufacture date, NRTL (i.e. UL) Label and point of manufacture. |
| C. Before installation, return or dispose of products within distorted, damaged, or opened packaging. |
| D. RE/COR may inventory system equipment at time of delivery and recommend rejecting non-conforming items. |
| 1.9 STORAGE AND HANDLING |
| A. Store products indoors in dry, weathertight conditioned facility. |
| 1. Store products in approved location preventing physical damage, dirt, moisture, cold, rain, snow, and other detrimental exposure. |
B. Protect products from damage during handling and construction operations.
| 1.10 FIELD CONDITIONS |
| A. Environment: |
| 1. Product Temperature: Minimum 70 degrees F for minimum 48 hours before installation. |
| 2. Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until Government occupancy. |
| 3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured. |
| a. Install products outdoors only when rated for exterior wet exposure. |
| B. Existing Conditions: Review drawings and specifications with existing site conditions. |
| 1. Report discrepancies affecting system design and installation and propose solution. |
| 2. Request RE/COR approval for proposed solution. |
| C. Field Measurements: Verify field conditions affecting product fabrication and installation. Show field measurements on Submittal Drawings. |
| 1. Coordinate field measurement and fabrication schedule to avoid delay. |
| 2. Request RE/COR instructions for proposed conflict resolution. |
| 1.11 WARRANTY |
| A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." |
| B. Manufacturer's Warranty: Warrant buried cables, equipment against material and manufacturing defects, and degradation. |
| 1. Warranty Period: 5 years. |
| PART 2 - PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| A. System: Nonproprietary system fully integrated with Section 28 10 00, ACCESS CONTROL, Section 28 20 00, VIDEO SURVEILLANCE and Section 28 31 00, INTRUSION DETECTION. |
| B. Fully compatible components as systems, integrated with associated security subsystems, whether stand alone or computer network. |
| C. Allow future modular expansion with minimal equipment modifications. |
| D. Provide compatible system equipment and materials ensuring specified functional operation. |
| E. Standalone, local access controls connected to remote host facility central station providing system software and access privileges database management for system functions. |
| 1. Protocol: Internet, addressable, and programmable. |
| 2. Interface: Computer, via VA-FTS and Telco Tie Lines or current federal communications media. |
| F. System Capabilities: |
| 1. Locate individual protected asset area and portals. |