This document is an amendment to a solicitation for a boiler burner replacement project at the VA Southern Nevada Healthcare System. The amendment responds to requests for information from offerors by providing additional specifications for the new burners to be sized to deliver 25,200,000 BTU/hr capacity to match the existing boilers. It also clarifies that offerors must rely on standard manufacturer information for the existing economizer sizing without detailed as-built data. The amendment maintains the proposal due date of April 30, 2019 by 2:00 PM PST. The Department of Veterans Affairs Office of Construction and Facilities Management will administer the contract for the project located at the VA Southern Nevada Healthcare System campus in North Las Vegas, Nevada.
36C10F18R0679 A00009 S06-SOLICITATION AMENDMENT_36C10F18R0679 A00009.pdf
View the file
Other files
Show 40 more
Latest 50 of 129 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
A00009 04-23-2019
593-CA-2202
36C10F
Department of Veterans Affairs
Office of Construction and
Facilities Management (003C4E)
400 Mare Island Way Suite 100
Vallejo CA 94590
36C10F
Department of Veterans Affairs
Office of Construction and
Facilities Management (003C4E)
400 Mare Island Way Suite 100
Vallejo CA 94590
To all Offerors/Bidders
36C10F18R0679
02-01-2019
X
X x
Subject: Solicitation Number: 36C10F18R0679 Amendment Number: A00009, the purpose of this amendment is to respond to request for information as a result of the site visit held on 02/19/2019 at VA Southern Nevada Healthcare System, 6900 Pecos Rd, North Las Vegas, NV 89086.
1. Please see Government's response to Request for Information questions 53 (revision) and 69. No further RFIs will be accepted.
2. Please review all RFIs responses and the RFP in detail before submitting final proposal.
3. The due date and time shall remain the 4/30/2019 2:00 PM PST.
Ronald Ferrer
Contracting Officer
Continuation Page of Block 14 SF-30
AMENDMENT OF SOLICITATION (continued)
Boiler Burner Replacement
VA Southern Nevada Healthcare System
Project No. 593-CA-2202
Solicitation No. 36C10F18R0679 Amendment A00009.
53. The existing burner engineering data sheets state that the existing burner is designed to deliver 21,000 pph of steam at high fire. The solicitation also states the high load of the plant is 21000 pph of steam. Should the new burners be sized to deliver the same steam load of 21000 pph.
Government Response: The new burners shall be sized to deliver 25,875 pounds per hour.
Government Response Revision : The burner must be rated for the
25,200,000 btu/hr existing capacity.
69. The existing boiler flue gas economizer doesn’t have any published sizing engineering data. We will need to know the design gas mass flow rate and the pressure drop wc” at that rate. Do you have any as-builts that states this request? This information is critical for sizing a new burner.
Government Response: Offeror’s must rely on the standard manufacturer’s information for the economizer.