This document contains an attachment to a solicitation for a boiler burner replacement project at the VA Southern Nevada Healthcare System. The attachment requests bidders to clearly describe and calculate the cost of work to be self-performed, defined as work completed using the prime contractor's own employees, equipment, materials, and job overhead costs. Bidders must show the calculation of self-performed work as a percentage of the total offer price. The related solicitation provides additional details on the project, including the requirement to replace boiler burners at the VA Southern Nevada Healthcare System, identified as Project No. 593-CA-2202 with a contract number of 36C10F18R0679 Amendment A00009. The soliciting agency is the Department of Veterans Affairs Office of Construction and Facilities Management.
36C10F18R0679 A00008 BREAKDOWN -BOILERS.docx
View the file
Other files
Show 40 more
Latest 50 of 129 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A- CALCULATION OF SELF-PERFORMED WORK
PROJECT: 593-CA-2202
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
NOTE: The intention of this set-aside is to have actual work performed by the Contractor’s own forces or the forces of other SDVOSB contractors and not just “contract management”. This contract is not intended for construction contract management firms.
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work: __________________________________
B.1 Total Offer Price:_________________ B.2 If applying for consideration as a General Contractor (multi-discipline projects) subtract Specialty Trades (Unless being self-performed) $_____________ B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. _________ B.4 Remainder is “Total amount of work to be performed under the Contract” = ____________ B.5 “Work to be self-performed”: = ____________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.15 % Self-performed Work = Line B.5 / B.4 X 100% = _____________________
BASE OFFER - COST BREAKDOWN
| Project No.: |
| 593-CA-2202 |
Date:
| Project Title: |
| LAS VEGAS BOILER BURNER REPLACEMENT |
| Project Location: |
| VA Southern Nevada Healthcare System |
Company Name and Address:
General Item Description
Labor Cost
Material Cost
Total Cost
Division 1 - General Requirements
Division 2 - Existing Conditions
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood and Plastic
Division 7 - Thermal and Moisture Protection
Division 8 - Doors and Windows
Division 9 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Subtotal
Overhead (xx %)
Profit (xx %)
Bond (xx %)
Total Offer