36C10F18R0679-A00008002.docx

DOCX document Posted

Attached to
593-CA-2202, Boiler Burner Replacement at VASNHS (VA-18-00139275)
Solicitation number
36C10F18R0679
Issued by

About this file

This document contains an attachment to a solicitation for a boiler burner replacement project at the VA Southern Nevada Healthcare System. The attachment requests bidders to clearly describe and calculate the cost of work to be self-performed, defined as work completed using the prime contractor's own employees, equipment, materials, and job overhead costs. Bidders must show the calculation of self-performed work as a percentage of the total offer price. The related solicitation provides additional details on the project, including the requirement to replace boiler burners at the VA Southern Nevada Healthcare System, identified as Project No. 593-CA-2202 with a contract number of 36C10F18R0679 Amendment A00009. The soliciting agency is the Department of Veterans Affairs Office of Construction and Facilities Management.

36C10F18R0679 A00008 BREAKDOWN -BOILERS.docx

View the file

Other files

File Type Posted
36C10F18R0679-A00009000.docx DOCX document
36C10F18R0679-A00009001.pdf PDF
36C10F18R0679-A00009000.docx DOCX document
36C10F18R0679-A00009001.pdf PDF
36C10F18R0679-A00008001.pdf PDF
36C10F18R0679-A00008003.docx DOCX document
36C10F18R0679-A00008000.docx DOCX document
36C10F18R0679-A00008002.docx DOCX document
36C10F18R0679-A00008000.docx DOCX document
36C10F18R0679-A00008001.pdf PDF
36C10F18R0679-A00008003.docx DOCX document
36C10F18R0679-A00007000.docx DOCX document
36C10F18R0679-A00007001.pdf PDF
36C10F18R0679-A00007001.pdf PDF
36C10F18R0679-A00007000.docx DOCX document
36C10F18R0679-A00006010.pdf PDF
36C10F18R0679-A00006016.pdf PDF
36C10F18R0679-A00006004.pdf PDF
36C10F18R0679-A00006005.pdf PDF
36C10F18R0679-A00006015.pdf PDF
36C10F18R0679-A00006008.pdf PDF
36C10F18R0679-A00006017.pdf PDF
36C10F18R0679-A00006003.pdf PDF
36C10F18R0679-A00006009.pdf PDF
36C10F18R0679-A00006002.pdf PDF
36C10F18R0679-A00006001.pdf PDF
36C10F18R0679-A00006007.pdf PDF
36C10F18R0679-A00006011.pdf PDF
36C10F18R0679-A00006012.pdf PDF
36C10F18R0679-A00006014.pdf PDF
36C10F18R0679-A00006000.docx DOCX document
36C10F18R0679-A00006006.pdf PDF
36C10F18R0679-A00006013.pdf PDF
36C10F18R0679-A00006009.pdf PDF
36C10F18R0679-A00006002.pdf PDF
36C10F18R0679-A00006003.pdf PDF
36C10F18R0679-A00006005.pdf PDF
36C10F18R0679-A00006006.pdf PDF
36C10F18R0679-A00006010.pdf PDF
36C10F18R0679-A00006016.pdf PDF
36C10F18R0679-A00006014.pdf PDF
36C10F18R0679-A00006012.pdf PDF
36C10F18R0679-A00006017.pdf PDF
36C10F18R0679-A00006011.pdf PDF
36C10F18R0679-A00006004.pdf PDF
36C10F18R0679-A00006015.pdf PDF
36C10F18R0679-A00006013.pdf PDF
36C10F18R0679-A00006000.docx DOCX document
36C10F18R0679-A00006008.pdf PDF
36C10F18R0679-A00006001.pdf PDF
Show 40 more

Latest 50 of 129 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A- CALCULATION OF SELF-PERFORMED WORK

PROJECT: 593-CA-2202

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

NOTE: The intention of this set-aside is to have actual work performed by the Contractor’s own forces or the forces of other SDVOSB contractors and not just “contract management”. This contract is not intended for construction contract management firms.

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work: __________________________________

B.1 Total Offer Price:_________________ B.2 If applying for consideration as a General Contractor (multi-discipline projects) subtract Specialty Trades (Unless being self-performed) $_____________ B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. _________ B.4 Remainder is “Total amount of work to be performed under the Contract” = ____________ B.5 “Work to be self-performed”: = ____________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.15 % Self-performed Work = Line B.5 / B.4 X 100% = _____________________

BASE OFFER - COST BREAKDOWN

Project No.:
593-CA-2202

Date:

Project Title:
LAS VEGAS BOILER BURNER REPLACEMENT
Project Location:
VA Southern Nevada Healthcare System

Company Name and Address:

General Item Description

Labor Cost

Material Cost

Total Cost

Division 1 - General Requirements

Division 2 - Existing Conditions

Division 3 - Concrete

Division 4 - Masonry

Division 5 - Metals

Division 6 - Wood and Plastic

Division 7 - Thermal and Moisture Protection

Division 8 - Doors and Windows

Division 9 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Subtotal

Overhead (xx %)

Profit (xx %)

Bond (xx %)

Total Offer