36C10B24Q0251-amd 1.docx
DOCX document 462 KB Posted
- Solicitation number
- 36C10B24Q0251
About this file
This document is a Performance Work Statement (PWS) for a Department of Veterans Affairs (VA) solicitation to procure a cloud-based Event Management Software as a Service (EMSS) solution. The PWS outlines the background, applicable documents, scope of work, performance details, and specific tasks and deliverables for the EMSS solution.
The key details are:
- The EMSS solution must be customizable, user-friendly, mobile-ready, and web-based to support planning, management, and execution of VA national, regional, and local events for up to 5,000 simultaneous users.
- The solution must be FedRAMP Authorized and meet specific security and privacy requirements, with options for VA authorization if not already FedRAMP Authorized.
- The contractor must provide remote technical support, on-site support for major events, and ongoing EMSS enhancements.
- The base period is 12 months, with four 12-month option periods and three optional tasks.
- Pricing is structured as firm-fixed price with line items for project management, EMSS services, integration, training, technical support, operations and maintenance, and optional enhancements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B24Q0251 0002.docx | DOCX document | |
| 36C10B24Q0251 Q_A.docx | DOCX document | |
| Attachment G - Service Model Questions.docx | DOCX document | |
| 36C10B24Q0251 0001_1.docx | DOCX document | |
| Attachment A - Required Capabilities Summary.docx | DOCX document | |
| Synopsis - EMSS 36C10B24Q0251.docx | DOCX document | |
| Attachment C - 36C10B24Q0251 - Business Rules.xlsx | XLSX spreadsheet | |
| Attachment D - 36C10B24Q0251 - EMSS Reports.xlsx | XLSX spreadsheet | |
| 36C10B24Q0251_2.docx | DOCX document | |
| 36C10B24Q0251-FINAL.docx | DOCX document | |
| Attachment E - 36C10B24Q0251 -EMSS Role and Permissions.docx | DOCX document | |
| Attachment B - 36C10B24Q0251 - User Profiles.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10B24Q0251Ammendment 0001
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified in block 8 of the SF1449.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
23 Christopher Way
To all Offerors/Bidders
36C10B24Q0251
X x
The reason for this amendment is to revise the verbiage in the PWS related to FedRAMP, to add a volume to the submission instructions, add Kyle Maccia as a contact, and to extend the deadline.
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C10B24Q0251 4/4/2024 Michael Gruen, michael.gruen@va.gov 848-377-5251 05-02-2024
10:00 AM
EDT
Department of Veterans Affairs Technology Acquisition Center
541519 $34 Million
N/A
See Delivery Schedule
Financial Services Center PO Box 149971 Austin TX 78714-8971
Event Management System Software as a Service
(VA-24-00045626)
CO:Debra Clayton, debra.clayton2@va.gov
CS:Michael Gruen, michael.gruen@va.gov CS: Kyle Maccia, kyle.maccia@va.gov
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Xx
Debra Clayton
Table of Contents
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 6 | |
| B.1 CONTRACT ADMINISTRATION DATA | 6 | |
| B.2 GOVERNING LAW | 7 | |
| B.3 SOFTWARE LICENSE, SOFTWARE MAINTENANCE AND SOFTWARE TECHNICAL SUPPORT | 7 | |
| B.4 PRICE SCHEDULE | 10 | |
| B.5 PERFORMANCE WORK STATEMENT | 59 | |
| 1.0 | BACKGROUND | 60 |
| 2.0 | APPLICABLE DOCUMENTS | 60 |
| 3.0 | SCOPE OF WORK | 63 |
| 4.0 | PERFORMANCE DETAILS | 63 |
| 4.1 | PERFORMANCE PERIOD | 63 |
| 4.2 | PLACE OF PERFORMANCE | 64 |
| 4.3 | TRAVEL | 64 |
| 5.0 | SPECIFIC TASKS AND DELIVERABLES | 65 |
| 5.1 | PROJECT MANAGEMENT | 65 |
| 5.1.1 | REPORTING REQUIREMENTS | 65 |
| 5.1.2 | TECHNICAL KICKOFF MEETING | 65 |
| 5.1.3 | ONBOARDING | 66 |
| 5.2 | EVENT MANAGEMENT SOFTWARE AS A SERVICE (EMSS) | 67 |
| 5.2.1 | FedRAMP Requirements | 67 |
| 5.2.1.1 | SOLUTION is Not FedRAMP AUTHORIZED | 67 |
| 5.2.1.2 | SOLUTION is FedRAMP AUTHORIZED BUT NOT VA AUTHORIZED | 69 |
| 5.2.1.3 | IF THE SOLUTION is FedRAMP AUTHORIZED AND VA AUTHORIZED: | 71 |
| 5.2.1.4 | CLOUD-SPECIFIC SECURITY AND PRIVACY ACQUISITION REQUIREMENTS | 72 |
| 5.2.2 | EMSS CORE CAPABILITIES | 73 |
| 5.2.3 | INTEGRATION | 75 |
| 5.2.4 | EMSS TRAINING | 75 |
| 5.2.5 | REMOTE TECHNICAL SUPPORT/HELP DESK | 76 |
| 5.2.5.1 | REMOTE TECHNICAL MAJOR EVENT SUPPORT | 78 |
| 5.2.6 | ON-SITE TECHNICAL SUPPORT/HELP DESK | 78 |
| 5.2.7 | OPERATIONS AND MAINTENANCE SUPPORT | 79 |
| 5.3 | EMSS ENHANCEMENTS | 80 |
| 5.3.1 | SECURITY | 81 |
| 5.4 | OPTIONAL TASK 1 - PHASE-OUT TRANSITION SUPPORT | 81 |
| 5.5 | OPTIONAL TASK 2 – REMOTE TECHNICAL SUPPORT SURGE | 82 |
| 5.6 | OPTIONAL TASK 3 – ADDITIONAL EMSS ENHANCEMENTS | 83 |
| 6.0 | GENERAL REQUIREMENTS | 84 |
| 6.1 | ENTERPRISE AND IT FRAMEWORK | 84 |
| 6.1.1 | VA TECHNICAL REFERENCE MODEL | 84 |
| 6.1.2 | FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM) | 84 |
| 6.1.3 | INTERNET PROTOCOL VERSION 6 (IPV6) | 85 |
| 6.1.4 | TRUSTED INTERNET CONNECTION (TIC) | 86 |
| 6.1.5 | STANDARD COMPUTER CONFIGURATION | 86 |
| 6.1.6 | VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM) | 86 |
| 6.1.7 | PROCESS ASSET LIBRARY (PAL) | 87 |
| 6.1.8 | AUTHORITATIVE DATA SOURCES | 87 |
| 6.1.9 | SOCIAL SECURITY NUMBER (SSN) REDUCTION | 88 |
| 6.2 | SECURITY AND PRIVACY REQUIREMENTS | 88 |
| 6.2.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 88 |
| 6.2.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 89 |
| 6.3 | METHOD AND DISTRIBUTION OF DELIVERABLES | 90 |
| 6.4 PERFORMANCE METRICS | 91 | |
| 6.5 | FACILITY/RESOURCE PROVISIONS | 92 |
| 6.6 | GOVERNMENT FURNISHED PROPERTY | 93 |
| 6.7 SHIPMENT OF HARDWARE OR EQUIPMENT | 94 | |
| ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED | 94 | |
| ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE | 97 | |
| SECTION C - CONTRACT CLAUSES | 109 | |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 109 | |
| C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024) | 110 | |
| C.3 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) | 122 | |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 123 | |
| C.5 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023) | 123 | |
| C.6 VAAR 852.211-76 LIQUIDATED DAMAGES - REIMBURSEMENT FOR DATA BREACH COSTS (FEB 2023) | 133 | |
| C.7 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 134 | |
| C.8 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 138 | |
| C.9 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023) | 140 | |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 141 | |
| SECTION E - SOLICITATION PROVISIONS | 142 | |
| E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 142 | |
| E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 143 | |
| E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024) | 146 | |
| E.4 52.216-1 TYPE OF CONTRACT (APR 1984) | 167 | |
| E.5 52.233-2 SERVICE OF PROTEST (SEP 2006) | 167 | |
| E.6 BASIS FOR AWARD | 167 | |
| E.7 PROPOSAL SUBMISSION INSTRUCTIONS | 169 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT:
Contracting Officer 36C10B Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [x] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [x] Upon acceptance of deliverables |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
| 0001 |
| 4/11/2024 |
36C10B24Q0251 Amendment 0001
Page 1 of Page 1 of
B.2 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrink-wrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. §3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this Clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this Clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. § 516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be effected by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.3 SOFTWARE LICENSE, SOFTWARE MAINTENANCE AND SOFTWARE TECHNICAL SUPPORT
(1). Definitions.
a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
b) Licensor. The term “licensor” shall mean the Contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “Contractor” is the party identified in Block 17a on the SF1449. If the Contractor is a reseller and not the Licensor, the Contractor remains responsible for performance under this Contract/Order.
c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements, or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).
(2). Software License.
a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software.
b) The Government may use the software in a networked environment.
c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
d) All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.
(3). Software Maintenance and/or Technical Support.
a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this Contract/Order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received, the Contractor is neither authorized nor permitted to renew any of the previously furnished services.
b) The Contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the Contractor to its commercial customers to cause the software to perform according to its specifications, documentation or demonstrated claims.
c) Any telephone support provided by Contractor shall be at no additional cost.
d) The Contractor shall provide all maintenance services in a timely manner in accordance with the Contractor’s customary practice or as defined in the Performance Work Statement or Product Description. However, prolonged delay (exceeding two business days) in resolving software problems will be noted in the Government’s various past performance records on the Contractor (e.g., www.cpars.gov).
e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.
(4). Disabling Software Code.
The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out, or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the Contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the Contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5). Manuals and Publications.
Upon Government request, the Contractor shall furnish the most current version of the user manual and publications for all products/services provided under this Contract/Order at no cost.
B.4 PRICE SCHEDULE
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
BASE PERIOD
Period of Performance – 12 months from date of award
| CLIN/ SLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.2 |
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.2 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from date of award.
| 12 |
| MO |
| $ |
| $ |
| 0001AA |
| Monthly Progress Report IAW PWS paragraph 5.1.1 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 0001AB |
| Kickoff Agenda IAW PWS paragraph 5.1.2 |
Due to all attendees at least one calendar days prior to the meeting.
| 1 |
| EA |
| NSP |
| NSP |
| 0001AC |
| Kickoff Meeting Minutes IAW PWS 5.1.2. |
Due to all attendees within three calendar days after the meeting.
| 1 |
| EA |
| NSP |
| NSP |
| 0001AD |
| Kickoff Meeting Package IAW PWS 5.1.2. |
Due three days after the kickoff meeting.
| 1 |
| EA |
| NSP |
| NSP |
| 0001AE |
| Monthly Onboarding Status Report IAW PWS paragraph 5.1.3 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 0001AF |
| Contractor Staff Roster IAW PWS paragraph 6.2.2 |
Due 3 days after contract award and updated throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
| 0002 |
| Event Management Software as a Service - shall be provided IAW PWS paragraph 5.2. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.1 and 5.2.2 and all subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Due within 90 days of award and shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| $ |
| 0002AA |
| User Documentation for Web API IAW PWS paragraph 5.2 |
Due 30 days after contract award and updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AB |
| Solution is not FedRAMP Authorized FedRAMP System Security Plan (SSP) and supporting documentation IAW PWS paragraph 5.2.1.1 |
Due within 75 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AC |
| Solution is not FedRAMP Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.1 |
Due within 10 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AD |
| Solution is not FedRAMP Authorized Third-Party Assessment Organization (3PAO) Security Assessment Plan IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AE |
| Solution is not FedRAMP Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AF |
| Solution is not FedRAMP Authorized IPR Scenario IAW PWS paragraph 5.2.1.1 |
Due within 30 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AG |
| Solution is FedRAMP Authorized but not VA Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AH |
| Solution is FedRAMP Authorized but not VA Authorized FedRAMP System Security Plan and supporting documentation IAW PWS paragraph 5.2.1.2 |
Due within 5 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AI |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Plan IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AJ |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of the SSP being accepted by the VA.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AK |
| Solution is FedRAMP Authorized but not VA Authorized IPR Scenario IAW PWS paragraph 5.2.1.2 |
Due within 30 calendar days of the VA gaining access to the SSP.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AL |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring security artifacts IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AM |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring scans IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 | |
| LT | |
| NSP | |
| NSP |
| LT |
| NSP |
| NSP |
| 0002AN |
| Solution is FedRAMP Authorized and VA Authorized Plan of action and milestones reports IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AO |
| Cloud-Specific Security and Privacy Acquisition Requirements FedRAMP ATO Package IAW PWS 5.2.1.4 |
| 1 |
| LT |
| NSP |
| NSP |
| 0002AP |
| Hosted Non-Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 0002AQ |
| Hosted Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 0003 |
| Integration IAW PWS paragraph 5.2.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.3.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Due within 90 days of award and shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| 0004 |
| EMSS Training IAW PWS paragraph 5.2.4 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.4.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Due within 90 days of award and shall be available for use throughout the PoP.
| 1 |
| LT |
| $ |
| $ |
| 0004AA |
| EMSS Training Super User/Admin Training Package IAW PWS paragraph 5.2.4 |
Due seven (7) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 0004AB |
| EMSS Training End User Training Packages IAW PWS paragraph 5.2.4 |
Due seven (7) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 0004AC |
| EMSS Training Online User Guides/Videos IAW PWS paragraph 5.2.4 |
Due seven (7) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 0005 |
| Remote Technical Support/Help Desk IAW PWS paragraph 5.2.5 and Remote Technical Major Event Support IAW PWS 5.2.5.1 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.5 and 5.2.5.1.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The PoP shall be 12 months from date of award.
| 12 |
| MO |
| $ |
| $ |
| 0006 |
| On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.6 |
The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 3 events.
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.6.
| 3 |
| EA |
| $ |
| $ |
| 0007 |
| Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.7 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.7.
The PoP shall be 12 months from date of award.
| 12 |
| MO |
| $ |
| $ |
| 0008 |
| EMSS enhancements IAW PWS paragraph 5.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.3 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The PoP shall be 12 months from date of award.
| 12 |
| MO |
| $ |
| $ |
| 0008AA |
| Plan of Action and Milestones IAW PWS paragraph 5.3.1 |
Due 30 days after contract award and updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| BASE PERIOD TOTAL |
| $ |
BASE PERIOD OPTIONAL TASK TWO
The following optional task may be exercised at any time during the Base Period IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 0010 |
| Remote Technical Support Surge IAW PWS paragraph 5.5 for up to three events. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.
The POP shall be from registration open to event end.
| 3 |
| EA |
| $ |
| $ |
| BASE PERIOD OPTIONAL TASK TWO TOTAL |
| $ |
BASE PERIOD OPTIONAL TASK THREE
The following optional task may be exercised at any time during the Base Period IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 0011 |
| Additional EMSS Enhancements IAW PWS paragraph 5.6 |
| 1 |
| LT |
| NSP |
| NSP |
| 0011AA |
| Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than two weeks after exercise of the optional task.
| 4 |
| EA |
| $ |
| $ |
| 0011AB |
| Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than four weeks after exercise of the optional task.
| 1 |
| EA |
| $ |
| $ |
| BASE PERIOD OPTIONAL TASK THREE TOTAL |
| $ |
| BASE PERIOD PLUS ALL BASE PERIOD OPTIONAL TASKS TOTAL |
| $ |
Option Period 1 This 12-month option period may be exercised in the sole discretion of the Government in accordance with (IAW) FAR 52.217-9 Option to Extend the Term of the Contract. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
Period of Performance – 12 months from end of base period
| CLIN/ SLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.2 |
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.2 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from end of base period.
| 12 |
| MO |
| $ |
| $ |
| 1001AA |
| Monthly Progress Report IAW PWS paragraph 5.1.1 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 1001AB |
| Monthly Onboarding Status Report IAW PWS paragraph 5.1.3 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 1001AC |
| Contractor Staff Roster IAW PWS paragraph 6.2.2 |
Due 3 days after option period 1 start and updated throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
| 1002 |
| Event Management Software as a Service - shall be provided IAW PWS paragraph 5.2. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.1 and 5.2.2 and all subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| $ |
| 1002AA |
| User Documentation for Web API IAW PWS paragraph 5.2 |
Due 30 days after contract award and updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AB |
| Solution is not FedRAMP Authorized FedRAMP System Security Plan (SSP) and supporting documentation IAW PWS paragraph 5.2.1.1 |
Due within 75 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AC |
| Solution is not FedRAMP Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.1 |
Due within 10 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AD |
| Solution is not FedRAMP Authorized Third-Party Assessment Organization (3PAO) Security Assessment Plan IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AE |
| Solution is not FedRAMP Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AF |
| Solution is not FedRAMP Authorized IPR Scenario IAW PWS paragraph 5.2.1.1 |
Due within 30 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AG |
| Solution is FedRAMP Authorized but not VA Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AH |
| Solution is FedRAMP Authorized but not VA Authorized FedRAMP System Security Plan and supporting documentation IAW PWS paragraph 5.2.1.2 |
Due within 5 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 10002AI |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Plan IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AJ |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of the SSP being accepted by the VA.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AK |
| Solution is FedRAMP Authorized but not VA Authorized IPR Scenario IAW PWS paragraph 5.2.1.2 |
Due within 30 calendar days of the VA gaining access to the SSP.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AL |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring security artifacts IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AM |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring scans IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AN |
| Solution is FedRAMP Authorized and VA Authorized Plan of action and milestones reports IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AO |
| Cloud-Specific Security and Privacy Acquisition Requirements FedRAMP ATO Package IAW PWS 5.2.1.4 |
| 1 |
| LT |
| NSP |
| NSP |
| 1002AP |
| Hosted Non-Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 1002AQ |
| Hosted Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 1003 |
| Integration IAW PWS paragraph 5.2.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.3.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| 1004 |
| EMSS Training IAW PWS paragraph 5.2.4 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.4.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 1 |
| LT |
| $ |
| $ |
| 1004AA |
| EMSS Training Super User/Admin Training Package IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 1004AB |
| EMSS Training End User Training Packages IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 1004AC |
| EMSS Training Online User Guides/Videos IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 1005 |
| Remote Technical Support/Help Desk IAW PWS paragraph 5.2.5 and Remote Technical Major Event Support IAW PWS 5.2.5.1 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.5 and 5.2.5.1.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The PoP shall be 12 months from the end of the base period.
| 12 |
| MO |
| $ |
| $ |
| 1006 |
| On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.6 |
The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 3 events.
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.6.
| 3 |
| EA |
| $ |
| $ |
| 1007 |
| Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.7 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.7.
The PoP shall be 12 months from the end of the base period.
| 12 |
| MO |
| $ |
| $ |
| 1008 |
| EMSS enhancements IAW PWS paragraph 5.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.3 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The PoP shall be 12 months from the end of the base period.
| 12 |
| MO |
| $ |
| $ |
| 1008AA |
| Plan of Action and Milestones IAW PWS paragraph 5.3.1 |
Updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| OPTION PERIOD 1 TOTAL |
| $ |
OPTION PERIOD 1 OPTIONAL TASK TWO
The following optional task may be exercised at any time during the Option Period 1 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 1010 |
| Remote Technical Support Surge IAW PWS paragraph 5.5 for up to three events. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.
The POP shall be from registration open to event end.
| 3 |
| EA |
| $ |
| $ |
| OPTION PERIOD 1 OPTIONAL TASK TWO TOTAL |
| $ |
OPTION PERIOD 1 OPTIONAL TASK THREE
The following optional task may be exercised at any time during the Option Period 1 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 1011 |
| Additional EMSS Enhancements IAW PWS paragraph 5.6 |
| 1 |
| LT |
| NSP |
| NSP |
| 1011AA |
| Additional EMSS Enhancements – LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than two weeks after exercise of the optional task.
| 4 |
| EA |
| $ |
| $ |
| 1011AB |
| Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than four weeks after exercise of the optional task.
| 4 |
| EA |
| $ |
| $ |
| 1011AC |
| Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than eight weeks after exercise of the optional task.
| 2 |
| EA |
| $ |
| $ |
| OPTION PERIOD 1 OPTIONAL TASK THREE TOTAL |
| $ |
| OPTION PERIOD 1 PLUS ALL OPTION PERIOD 1 OPTIONAL TASKS TOTAL |
| $ |
OPTION PERIOD 2
This 12-month option period may be exercised in the sole discretion of the Government in accordance with (IAW) FAR 52.217-9 Option to Extend the Term of the Contract. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
Period of Performance – 12 months from end of Option Period 1
| CLIN/ SLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.2 |
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.2 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from the end of option period 1.
| 12 |
| MO |
| $ |
| $ |
| 2001AA |
| Monthly Progress Report IAW PWS paragraph 5.1.1 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 2001AB |
| Monthly Onboarding Status Report IAW PWS paragraph 5.1.3 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 2001AC |
| Contractor Staff Roster IAW PWS paragraph 6.2.2 |
Due 3 days after contract award and updated throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
| 2002 |
| Event Management Software as a Service - shall be provided IAW PWS paragraph 5.2. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.1 and 5.2.2 and all subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| $ |
| 2002AA |
| User Documentation for Web API IAW PWS paragraph 5.2 |
Due 30 days after contract award and updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AB |
| Solution is not FedRAMP Authorized FedRAMP System Security Plan (SSP) and supporting documentation IAW PWS paragraph 5.2.1.1 |
Due within 75 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AC |
| Solution is not FedRAMP Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.1 |
Due within 10 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AD |
| Solution is not FedRAMP Authorized Third-Party Assessment Organization (3PAO) Security Assessment Plan IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days of award.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AE |
| Solution is not FedRAMP Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.1 |
Due within 90 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AF |
| Solution is not FedRAMP Authorized IPR Scenario IAW PWS paragraph 5.2.1.1 |
Due within 30 calendar days after the SSP is accepted by VA.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AG |
| Solution is FedRAMP Authorized but not VA Authorized VA Implementation Diagram IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AH |
| Solution is FedRAMP Authorized but not VA Authorized FedRAMP System Security Plan and supporting documentation IAW PWS paragraph 5.2.1.2 |
Due within 5 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 20002AI |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Plan IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of contract award.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AJ |
| Solution is FedRAMP Authorized but not VA Authorized 3PAO Security Assessment Report IAW PWS paragraph 5.2.1.2 |
Due within 10 calendar days of the SSP being accepted by the VA.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AK |
| Solution is FedRAMP Authorized but not VA Authorized IPR Scenario IAW PWS paragraph 5.2.1.2 |
Due within 30 calendar days of the VA gaining access to the SSP.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AL |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring security artifacts IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AM |
| Solution is FedRAMP Authorized and VA Authorized Continuous monitoring scans IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AN |
| Solution is FedRAMP Authorized and VA Authorized Plan of action and milestones reports IAW PWS paragraph 5.2.1.3 |
Due as outlined by FedRAMP requirements.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AO |
| Cloud-Specific Security and Privacy Acquisition Requirements FedRAMP ATO Package IAW PWS 5.2.1.4 |
| 1 |
| LT |
| NSP |
| NSP |
| 2002AP |
| Hosted Non-Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 2002AQ |
| Hosted Production Environment IAW PWS paragraph 5.2.2 |
Maintained throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| 2003 |
| Integration IAW PWS paragraph 5.2.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.3.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 12 |
| MO |
| $ |
| 2004 |
| EMSS Training IAW PWS paragraph 5.2.4 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.4.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
Shall be available for use throughout the PoP.
| 1 |
| LT |
| $ |
| $ |
| 2004AA |
| EMSS Training Super User/Admin Training Package IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 2004AB |
| EMSS Training End User Training Packages IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 2004AC |
| EMSS Training Online User Guides/Videos IAW PWS paragraph 5.2.4 |
Updated throughout the PoP to reflect systems updates, modification, or enhancements.
| 1 |
| LT |
| NSP |
| NSP |
| 2005 |
| Remote Technical Support/Help Desk IAW PWS paragraph 5.2.5 and Remote Technical Major Event Support IAW PWS 5.2.5.1 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.5 and 5.2.5.1.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from the end of option period 1.
| 12 |
| MO |
| $ |
| $ |
| 2006 |
| On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.6 |
The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 3 events.
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.6.
| 3 |
| EA |
| $ |
| $ |
| 2007 |
| Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.7 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2.7.
The period of performance (PoP) shall be 12 months from the end of option period 1.
| 12 |
| MO |
| $ |
| $ |
| 2008 |
| EMSS enhancements IAW PWS paragraph 5.3 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.3 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from the end of option period 1.
| 12 |
| MO |
| $ |
| $ |
| 2008AA |
| Plan of Action and Milestones IAW PWS paragraph 5.3.1 |
Updated throughout the PoP.
| 1 |
| LT |
| NSP |
| NSP |
| OPTION PERIOD 2 TOTAL |
| $ |
OPTION PERIOD 2 OPTIONAL TASK TWO
The following optional task may be exercised at any time during the Option Period 2 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 2010 |
| Remote Technical Support Surge IAW PWS paragraph 5.5 |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.
The POP shall be from registration open to event end.
| 3 |
| EA |
| $ |
| $ |
| OPTION PERIOD 2 OPTIONAL TASK TWO TOTAL |
| $ |
OPTION PERIOD 2 OPTIONAL TASK THREE
The following optional task may be exercised at any time during the Option Period 2 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.
| 2011 |
| Additional EMSS Enhancements IAW PWS paragraph 5.6 |
| 1 |
| LT |
| NSP |
| NSP |
| 2011AA |
| Additional EMSS Enhancements – Low LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than two weeks after exercise of the optional task.
| 4 |
| EA |
| $ |
| $ |
| 2011AB |
| Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than four weeks after exercise of the optional task.
| 4 |
| EA |
| $ |
| $ |
| 2011AC |
| Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.6 |
This FFP SLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.6.
The solution shall be implemented no more than eight weeks after exercise of the optional task.
| 2 |
| EA |
| $ |
| $ |
| OPTION PERIOD 2 OPTIONAL TASK THREE TOTAL |
| $ |
| OPTION PERIOD 2 PLUS ALL OPTION PERIOD 2 OPTIONAL TASKS TOTAL |
| $ |
OPTION PERIOD 3
This 12-month option period may be exercised in the sole discretion of the Government in accordance with (IAW) FAR 52.217-9 Option to Extend the Term of the Contract. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
Period of Performance – 12 months from end of Option Period 2
| CLIN/ SLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.2 |
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.2 and all its subparagraphs.
Government approval of invoices for payment shall be subject to contractor’s successful completion of task requirements and associated deliverables required by the
PWS.
The period of performance (PoP) shall be 12 months from the end of option period 2.
| 12 |
| MO |
| $ |
| $ |
| 3001AA |
| Monthly Progress Report IAW PWS paragraph 5.1.1 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 3001AB |
| Monthly Onboarding Status Report IAW PWS paragraph 5.1.3 |
Due the fifth day of each month throughout the PoP.
| 12 |
| EA |
| NSP |
| NSP |
| 3001AC |
| Contractor Staff Roster IAW PWS paragraph 6.2.2 |
Due 3 days after start of option period 3 and updated throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
| 3002 |
| Event Management Software as a Service - shall be provided IAW PWS paragraph 5.2. |
This FFP CLIN includes all labor, material, travel, and other costs required for the successful completion of the services detailed in PWS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .