This document is a Notice of Intent to Award from the Oregon Department of Transportation (ODOT) for a Personal Services contract. ODOT has selected KPFF Consulting Engineers as the top-ranked firm for negotiations to provide the specified services. The notice outlines the schedule and process for finalizing the Statement of Work, Breakdown of Costs, negotiations, and contract execution. It also includes instructions for any competing proposers to submit a written selection protest by September 24, 2024.

The related state and local contract opportunity is for a planning study to evaluate the feasibility of a future bicycle and pedestrian overcrossing across US26 near Cornelius Pass Road in Washington County, Oregon. The goal is to provide a safe and comfortable alternative to the existing interchange, which is not easily navigable for pedestrians and bicyclists.

View the file

Other files

File Type Posted
35585_Att_A_Sample Contract.docx DOCX document
35585_QA 1-10_Final.pdf PDF
35585 Att_C_Cover Sheet.docx DOCX document
35585 ATT D_Project Samples and References.docx DOCX document
35585_Amendment 2.pdf PDF
35585_Amendment 1.pdf PDF
35585_Final.docx DOCX document
Turkey Products~5.docx DOCX document
35585_ScoreMatrix.pdf PDF
35585_QA 2_Final.pdf PDF
35585_ScoreMatrix_WC.pdf PDF
35585_Amendment 3~2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Transportation Procurement Office

355 Capitol St NE, MS#5-1 Salem, OR, 97301

Phone: (503) 986-2710 Fax: (503) 986-5790

OREGON DEPARTMENT OF TRANSPORTATION

Notice of Intent to Award

DATE: 9/17/2024

TO:

SUBJECT:

KPFF Consulting Engineers is the top ranked firm selected for negotiations of a contract to provide Personal Services as specified in the above referenced RFP. The scores and rankings of all Proposers are shown in the score matrix accompanying this notice. The award submittal requirements stated in the RFP are summarized on Attachment 1 of this notice.

Katie Gillespie will be the ODOT Project Manager (PM) for this Project. ODOT’s PM will initiate contact with Consultant and will be the primary contact for negotiation of the statement of work (SOW), schedule of performance and costs under the Contract. Following discussion and agreement on the SOW, a Breakdown of Costs (BOC) must be completed (using the BOC, BOC-CPFF or BOC-NBR as applicable) and submitted to ODOT’s PM. A BOC must demonstrate subcontractor utilization to meet the Disadvantaged Business Enterprise (DBE) goal set forth in the RFP. To set expectations for the contracting phase, listed below is a schedule for completing the SOW, preparing a BOC, completing negotiations, and securing approvals for both the Consultant and ODOT to follow:

Activity Responsible Party Business Days

N eg ot ia tio ns

Establish work session to discuss the SOW with Consultant

ODOT PM Within 5-10 days of this notice (days depend on size and complexity of the project) Respond to work session with comments/edits to SOW Consultant Within 5 days of work session Respond to SOW comments/edits ODOT PM Within 3 days of receipt of Consultant comments/edits

Submission of BOC Consultant Within 5-10 days of final ODOT scope (days depend on size and complexity of the project) Respond to BOC negotiate, and

Submit for legal sufficiency

ODOT PM

OPO

Within 5-10 days of Consultant submission of the BOC (days depend on the size and complexity of the project) Legal Sufficiency OPO, ODOT PM, and DOJ Within 15 (Mini- Solicitation) & 20 (Formal) days of submission by ODOT PM Signature routing and execution OPO, Consultant, and ODOT Expenditure Authority (if required)

Within 6-8 days from initial routing

Issue Notice to Proceed (NTP) ODOT PM 1 day after execution

Negotiations are anticipated to be completed (ready to submit to for legal sufficiency) within the schedule set forth in this notice.

If the schedule for negotiations cannot be met and the Consultant and ODOT are negotiating in good faith, additional time may be mutually agreed upon.

If agreement on costs, tasks, or other WOC requirements cannot be reached within this time frame, ODOT may terminate the negotiations and begin negotiations with the next highest ranked firm as provided in the solicitation and governing Oregon Administrative Rules (OARs).

Note that no work is authorized until the Contract is executed and Consultant has received a written NTP from the ODOT PM.

Because this notice is being emailed, the date of this notice will start the protest period for competing proposers to submit a written selection protest (REF Section 1.3.2 of the RFP). Any proposer who claims to have been adversely affected or aggrieved by the selection of a higher ranked proposer must deliver a written selection protest to my attention and received at the email address below no later than 4:00 p.m. on September 24, 2024. ODOT shall not consider a selection protest submitted after the deadline established herein. To be adversely affected or aggrieved, a protestor must demonstrate that the protester was ranked higher than other selected proposers and that higher ranked proposers are ineligible for selection.

ODOT would like to thank each Proposer for your time and efforts in preparing a response to this solicitation.

Sincerely, Andrew Afranji

Contract Coordinator

ODOT Procurement Office

Andrew.Afranji@odot.oregon.gov

Attachment 1 – Award Submittal Requirements

Please email to me, the Contract Coordinator, the following items if marked as “REQUIRED” in the RFP (see detailed requirements and due date for each item in Section 3.0 CONTRACR AWARD REQUIREMENTS of the RFP).

• Billing Rate Information

• Cost Disclosure Questionnaire

• Breakdown of Costs

• Certificates of Insurance

• COI Disclosure

• List of Subconsultants

• Responsibility Inquiry form

• Business Registry Number

• Quality Plan

• Committed DBE Breakdown & Cert. Form(s)

• W-9 Form

Direct Deposit via Automated Clearing House (ACH). For Consultants that receive ongoing monthly payments from Agency on one or more contracts or work orders, Agency prefers making Consultant payments via ACH direct deposit. While not required, if Consultant has not previously authorized ACH direct deposit and would prefer ACH to expedite transfer of payments after invoices are approved, Consultant must complete a Vendor ACH Authorization form and submit to Agency per the instructions on the form. To expedite Consultant’s payments to its subcontractors, if applicable, Consultant should make reasonable efforts to offer ACH direct deposit payments.

https://www.irs.gov/pub/irs-pdf/fw9.pdf https://www.oregon.gov/ODOT/Forms/2ODOT/7310781.pdf https://www.oregon.gov/ODOT/Forms/2ODOT/7310781.pdf

OREGON DEPARTMENT OF TRANSPORTATION
Committed DBE Breakdown & Cert. Form(s)
W-9 Form