33330224RF0010040 RFP.pdf

PDF 655 KB Posted

Attached to
333302-24RF-0010040 Tupper Replace and Reinforce Roof for Library Panama, Republic of Panama
Solicitation number
333302-24RF-0010040
Issued by

About this file

This document is a Request for Proposals (RFP) issued by the Smithsonian Institution (SI) for the Replace & Reinforce Roof for the Library located at the Earl S. Tupper Center in the Republic of Panama. The successful contractor shall provide all supervision, labor, materials, and equipment necessary to complete the work, which includes removal of the existing roof, demolition of structural elements, replacement of the roof system, and modification/replacement of HVAC components. The project is estimated to cost between $1,000,000 and $5,000,000.

The RFP requires the prime contractor to comply with SAM.gov registration, be legally licensed to operate as a construction company in Panama, and have performed at least 3 construction projects valued at $2M or more in the past 3 years. A pre-bid conference and site visit are scheduled for August 2024. All questions must be submitted by August 22, 2024, and proposals are due September 23, 2024 at 3:00 PM EST via Dropbox. The contract will be awarded as a firm-fixed price construction contract.

View the file

Other files

File Type Posted
33330224RF0010040 Amendment 2.pdf PDF
33330224RF0010040 Amendment 1.pdf PDF
HVAC Repl. plan.pdf PDF
230417 Reglamento de Seguridad para Contratistas de STRI.pdf PDF
2079202_Final Drawings.pdf PDF
2079202_Final Specs.PDF PDF
2079202 - Tupper Library Roof.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

SMITHSONIAN INSTITUTION

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Christine Grant 202-633-7290

2079202 x

33330224RF0010040

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Solicitation is for Smithsonian Institution's Tropical Research Institute

(STRI) for the Replace & Reinforce Roof for Library, located at Earl S. Tupper

Center, Republic of Panama. The Contractor receiving the award shall provide all supervision, labor, materials, and equipment necessary to perform construction services to complete the work as described herein and, in the Specifications, and

Drawings for SF Project No. 2079202. All work shall be done in accordance with applicable laws, regulations, and decrees of the Republic of Panama.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 322 calendar days and complete it within ________________ ________________ calendar days after receiving

Specifications

NSN 7540-01-155-3212

x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

OCON

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Thomas Dempsey

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

33330224RF0010040

R

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

The Conference is scheduled for Thursday August 08, 2024, at 3:00 p.m. thru Teams Meeting ID:270 974 499 256 Passcode:4nCyxq. The purpose of the conference is to provide an opportunity for SI to explain to all bidders the scope of the project.

The Site tour is schedule for Friday August 09, 2024, at 10:30 a.m. at Earl S. Tupper Center.

The purpose of the site tour is to provide an opportunity for all bidders to review the project site. This project requires special arrangements for access to a non-public area. Access to the site may be restricted at times other than during the scheduled visit. Any comments, information or discussion during the site visit shall not modify the contract documents. For access, please contact Ginella Mascarin, MascarinG@si.edu and Heidee Small SmallHG@si.edu.

Questions/Clarifications

It is desired that all questions/clarifications be sent in, sequentially numbered for example first questions 1,2,3, second set of questions 4, 5, 6, etc. in excel format to contact Ginella Mascarin, MascarinG@si.edu and Heidee Small SmallHG@si.edu. It is requested that all questions be sent in no later than August 22, 2024, COB. Questions received late may not be consider for the bid process.

Proposals are to be submitted to DropBox.com using the below links:

1.https://www.dropbox.com/request/vZCHretV7hybfavfubXj

Cost only 2.https://www.dropbox.com/request/ys4fmNqYLDLot3B49REy

Technical and other documents.

If any pricing information is on the Technical Proposal, you will be disqualified.

ALL DOCUMENTS SHALL BE SUBMITTED IN ENGLISH OR

YOU WILL BE DISQUALIFIED.

THE PROPOSAL DUE DATE IS September 23, 2024, at

3:00PM EST.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

SMITHSONIAN INSTITUTION

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Christine Grant 202-633-7290

2079202 x

33330224RF0010040

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Solicitation is for Smithsonian Institution's Tropical Research Institute

(STRI) for the Replace & Reinforce Roof for Library, located at Earl S. Tupper

Center, Republic of Panama. The Contractor receiving the award shall provide all supervision, labor, materials, and equipment necessary to perform construction services to complete the work as described herein and, in the Specifications, and

Drawings for SF Project No. 2079202. All work shall be done in accordance with applicable laws, regulations, and decrees of the Republic of Panama.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 322 calendar days and complete it within ________________ ________________ calendar days after receiving

Specifications

NSN 7540-01-155-3212

x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

OCON

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Thomas Dempsey

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

33330224RF0010040

R

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

The Conference is scheduled for Thursday August 08, 2024, at 3:00 p.m. thru Teams Meeting ID:270 974 499 256 Passcode:4nCyxq. The purpose of the conference is to provide an opportunity for SI to explain to all bidders the scope of the project.

The Site tour is schedule for Friday August 09, 2024, at 10:30 a.m. at Earl S. Tupper Center.

The purpose of the site tour is to provide an opportunity for all bidders to review the project site. This project requires special arrangements for access to a non-public area. Access to the site may be restricted at times other than during the scheduled visit. Any comments, information or discussion during the site visit shall not modify the contract documents. For access, please contact Ginella Mascarin, MascarinG@si.edu and Heidee Small SmallHG@si.edu.

Questions/Clarifications

It is desired that all questions/clarifications be sent in, sequentially numbered for example first questions 1,2,3, second set of questions 4, 5, 6, etc. in excel format to contact Ginella Mascarin, MascarinG@si.edu and Heidee Small SmallHG@si.edu. It is requested that all questions be sent in no later than August 22, 2024, COB. Questions received late may not be consider for the bid process.

Proposals are to be submitted to DropBox.com using the below links:

1.https://www.dropbox.com/request/vZCHretV7hybfavfubXj

Cost only 2.https://www.dropbox.com/request/ys4fmNqYLDLot3B49REy

Technical and other documents.

If any pricing information is on the Technical Proposal, you will be disqualified.

ALL DOCUMENTS SHALL BE SUBMITTED IN ENGLISH OR

YOU WILL BE DISQUALIFIED.

THE PROPOSAL DUE DATE IS September 23, 2024, at

3:00PM EST.

333302-24RF-0010040 Tupper Replace and Reinforce Roof for Library

Contents Section A - Solicitation/Contract Form

Section B - Supplies or Services/Prices

Section C - Description/Specifications

Section D - Packaging and Marking

Section E - Inspection and Acceptance

Section F - Deliveries or Performance

Section G - Contract Administration Data

Section H - Special Contract Requirements

Section I - Contract Clauses

Section J - List of Documents, Exhibits and Other Attachments

Section K - Representations, Certifications, and Other Statements of Bidders

Section L - Instructions, Conditions, and Notices to Bidder

Section M - Evaluation Factors for Award

Section A - Solicitation/Contract Form (See Standard Form SF 1442)

Background The Smithsonian Tropical Research Institute’s (STRI) Library, located at Earl S. Tupper Center, Ancon, Panama holds the only Smithsonian Directives (SD-600) collection at STRI. This collection is overseen by the newly combined Smithsonian Libraries (SIL) & Archives (SLA).

As two free-standing buildings sharing a wall in a tropical environment, the library (built in 1982) and the library Annex (built in 1995) have unique challenges and frequent facilities issues, including mold problems due to humidity on books and shelves, pest problems, and roof leaks. These facilities’ Heating Ventilation and Air Conditioning (HVAC) and shelving deficiencies have damaged SIL SD-600 materials, required staff time to resolve and have resulted in unhealthy working conditions.

Protecting the collections held in the library and the Annex have been increasingly challenging in the tropical environment and aging facilities. STRI and SLA are collaborating to address STRI archival materials, future accessioning, and housing archival collections in the library facility. This project will benefit future accessioned collections important to the Smithsonian Tropical Research Institute, as well as maintain the legacy library print collections. It is essential that these facilities issues be addressed quickly.

The Smithsonian Institution is seeking offers for the replace and improve the roof structure for the reading area of the Tupper Library Building (ground floor), while improving the environmental and mechanical conditions of this area, as described herein and in the Construction Drawings and Specifications.

All the requirements that the successful Offeror must meet concerning this project are set forth in detail in the Solicitation Documents included with this Request for Proposal. Upon the receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Firm Fixed Price construction contract.

It shall be the responsibility of the contractor to immediately notify the Smithsonian Institution if the target dates and proposed packages of work described herein adversely affect the Contractor’s Critical Path Schedule for the final completion date of this project. Contractors may propose an alternate schedule that illustrates the completion of the project in advance of the completion date.

This Request for Proposal (RFP) is intended to provide all Offerors with sufficient information to enable them to prepare and submit offers for technical and cost review and consideration by the Smithsonian Institution. At their own expense, Offerors may obtain drawings, specifications and the Scope of Work, the cost of which is nonrefundable.

This solicitation neither commits the Smithsonian Institution to pay any proposal preparation costs nor obligates the Smithsonian Institution to procure or contract for construction or any other services. It shall not be construed as authorization to proceed with or be reimbursed for any of the costs for any of the work specified herein.

The Smithsonian Institution may cancel this RFP without prior notice.

The Prime Contractor must comply with SAM.gov and Panama Government's requirements. This is a Federal Funded Contract and the selected contractor must have an Unique Entity ID number and be actively registered and current in SAM System (https://sam.gov ).

The Company or companies must be legally registered and licensed to operate as a Construction Company in the Republic of Panama with DGI – tax entity and the “JTIA” -Junta Technical Board of Engineering and Architecture active and valid certification for at least 5 years from the date of this solicitation, be commercially and legally active at present time in the Republic of Panama, and have performed or is performing at least three (3) construction projects, with a minimum value of 2M, during the past three (3) years.

Section B - Supplies or Services/Prices B.1. The Smithsonian Institution intends to award a firm fixed-price construction contract to the successful Contractor/Offeror.

B.2. Pricing - The successful contractor/offeror shall identify all costs associated with the Tupper Library Roof project, as set forth in the Construction Documents. Offerors are required to provide their price as per the bid schedule attached.

B.3. Base Cost Proposal Submission - Provide a comprehensive Bid Schedule for the Tupper Library Roof project base bid. The format for the Base Cost Proposal Submission shall be the Construction Specifications Institute (CSI) divisions of work. Break down the Base Cost Proposal Submission into the CSI divisions listed in the Attachments (Bid Form).

Section C - Description/Specifications

Statement of Work The successful Contractor shall furnish all supervision, labor, materials, and equipment needed for to complete the following work as the Tupper Library Roof Project as set forth in the following documents:

Drawings for Tupper Library Roof; dated December 22, 2023; Sheets 1 to 65.

Specifications for Tupper Library Roof; dated February 26, 2024; Vol 1, pages 1 through 447.

HVAC Replacement Plan for Annex Building

These drawings and specifications are collectively referred to herein as the “Construction Documents”.

All work shall be performed in strict accordance with the plans and specifications as shown or as may be changed by modification issued by the Contracting Officer. No deviations are permitted unless a change notice is issued and approved by the Smithsonian Institution.

The Work includes all work specified in the drawings, and specifications starting with Division 1 and ending with Division 28 (with some sections omitted).

The Tupper Library Roof project's objective is to replace and improve the roof structure for the reading area of the Tupper Library Building (ground floor), while improving the environmental and mechanical conditions of this area.

Work under this project includes but is not limited to:

Removal of the existing roof.

Demolition of structural elements of the existing roof as indicated in drawings.

Removal of existing ceilings and MEPF systems as indicated in drawings.

Demolition of partitions.

Provide new structural elements for the new roofing system.

Supply and install new ceiling and roofing systems.

Modify and replace MEPF components as indicated in drawings.

New internal partitions and spaces as indicated in drawings.

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use in no more than 322 calendar days. The time stated for completion shall include final cleanup of the premises. The start date and completion date shall be as stated in the Notice to Proceed issued by the Contracting Officer.

Section D - Packaging and Marking

Proposals are to be submitted to DropBox.com using the below links:

1. https://www.dropbox.com/request/vZCHretV7hybfavfubXj Cost only

2. https://www.dropbox.com/request/ys4fmNqYLDLot3B49REy Technical and other documents.

If any pricing information is on the Technical Proposal, you will be disqualified. ALL DOCUMENTS

SHALL BE SUBMITTED IN ENGLISH OR YOU WILL BE DISQUALIFIED.

Section E - Inspection and Acceptance

52.246-S0038 Smithsonian Institution Inspection and Acceptance (Jun 2000) Inspection and acceptance may be made on a daily basis on work performed at the job site, by the Contracting Officers Technical Representative. All work shall be coordinated through the COTR for acceptance of work, payrolls and invoice(s).

52.246-S0039 Final Inspection and Tests (Jun 2000) The requirements of the Inspection of Construction clause prescribed in FAR 52.246-12, are supplemented to provide that the Contractor shall give the Contracting Officer at least 10 calendar days advance written notice of the date the work will be fully completed and ready for final inspection and tests. Final inspection and tests will be started within 10 calendar days from the date specified in the aforesaid notice unless the

Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.

52.246-S0057 Inspection

(a) Upon proper notice and during normal working hours, the Smithsonian Institution reserves the right to perform any inspections and tests as deemed necessary to assure that the Contractor is performing in accordance with the terms and specifications as set forth herein.

(b) Inspection may be at the Contractor's place of business or at any location where work is being performed in conjunction with this contract.

(c) Inspection by the Smithsonian Institution shall not relieve the Contractor of responsibility for any or all quality control aspects during the life of the contract. This shall include quality control for items covered by this contract that may be subcontracted.

52.246-S0058 Acceptance

(a) The supplies and services rendered under this contract will be accepted and approved by the Contracting Officer or a designated representative thereto. Such approval will indicate acceptability to the Smithsonian Institution of performance in accordance with the terms and conditions of this contract, and will be subject to applicable warranties. The Smithsonian Institution reserves the right to reject works not conforming to prescribed contract requirements.

(b) Neither the Smithsonian Institution's reviews, approval, or acceptance of services and/or supplies, nor payment for any of the services or supplies required under this contract shall be construed to operate as a waiver of action arising out of the performance of this contract. Furthermore, the Contractor shall be and remain liable to the Smithsonian Institution in accordance with applicable law for all damages to the Smithsonian Institution caused by the Contractor's negligent performance of any of the supplies or services furnished under this contract.

(c) Acceptance by the Smithsonian Institution does not relieve the Contractor of responsibility for correction of errors or omissions that may arise after such acceptance if the errors and omissions are clearly a fault in Contractor performance.

Section F - Deliveries or Performance

52.211-S0025 Commencement, Prosecution, and Completion of Work (Jun 2000)

(a) Definitions.

(1) The Contract Time is the period of time allotted in the Contract Documents for Final Completion of the Work as defined in this Construction Contract Clause, including authorized extensions thereto. The Contractor shall complete the Work within the Contract Time as stated in the SF 1442, or as modified.

(2) The date of commencement of the Work is the date established in the Notice To Proceed issued by the C.O. Submission by the Contractor of its Performance and Payment Bonds, Preliminary Schedule and all Certificates of Insurance and their approval by the S.I. are conditions precedent to the issuance of the Notice to Proceed. The Contractor shall not commence the Work or store materials or equipment on site until written Notice to Proceed is issued or until the Contractor otherwise receives the written consent of the C.O.

(3) The date of Substantial Completion of the Work or designated portion thereof is the date certified by the COTR when the Work or a designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so the S.I. can fully occupy the Work or designated portion thereof for the use for which it is intended, with all of the Project's parts and systems operable as required by the Contract Documents. Only punch list work and any final cleaning beyond that needed for the S.I.'s full use may remain for Final Completion.

(4) The date of Final Completion of the Work is the date certified by the COTR when the Work is complete, to include punch list work and final clean up, in accordance with the Contract Documents and the S.I. may fully occupy and fully utilize the Work for the use for which it is intended.

(5) If a date or time of completion is included in the Contract, it shall be the Date of Final completion as defined in this Construction Contract Clause, including authorized extensions thereto, unless otherwise provided.

(6) The term Day as used in the Contract Documents shall mean calendar day unless otherwise specifically designated. All dates shall mean midnight of the indicated day unless otherwise stipulated.

(b) Progress and Completion.

(1) All time limits stated in the Contract Documents are of the essence of the Contract.

(2) The Contractor shall prosecute the Work diligently to Final Completion.

(c) Delays and Extensions of Time.

(1) The time during which the Contractor is delayed in the performance of the Work, by the acts or omissions of the S.I., the Architect, or their employees or agents, acts of God, unusually severe and abnormal climatic conditions, fires, floods, epidemics, quarantine restrictions, strikes, riots, civil commotion or freight embargoes, or other conditions beyond the Contractor's control and which the Contractor could not reasonably have foreseen and provided against, shall be added to the Contract Time;

provided, however, that no claim by the Contractor for an extension of time for delays will be considered unless made in compliance with the requirements of this Article and other provisions of the Contract Documents.

(2) Neither the S.I., nor the Architect shall be obligated or liable to the Contractor for, and the Contractor hereby expressly waives any claims against the S.I. and the Architect on account of any indirect or direct damages, costs or expenses of any nature which the Contractor, Subcontractors, of Suppliers or any other person may incur as a result of any delays, interference, changes in sequence or the like, which are reasonable, foreseeable, contemplated, or avoidable by the Contractor, arising from or out of any act or omission of the S.I., of the Architect, or their agents, employees, consultants, separate contractors or any governmental representative, it being understood and agreed that the Contractor's sole and exclusive remedy in any such events shall been extension of the Contract Time, but only as determined in accordance with the provisions of the Contract Documents.

(3) The Contract Time shall be adjusted only for Change Orders pursuant to the Construction Contract Clause entitled "Changes", excusable delays pursuant to Construction Contract Clause entitled "Delays and Extensions of Time" and Construction Contract Clause entitled "Smithsonian Institution's Right to Stop or to Suspend the Work". In the event the Contractor requests an extension of the Contract Time, he shall furnish such justification and supporting evidence as the C.O. may deem necessary for a determination of whether the Contractor is entitled to an extension of time under the provisions of the Contract. The burden of proof to substantiate a claim for an extension of the Contract Time shall rest with the Contractor, including evidence that the cause was beyond his control. The C.O. shall base his findings of fact and decision on such justification and supporting evidence and shall advise the Contractor in writing thereof. If the C.O. finds that the Contractor is entitled to any extension of the Contract Time, the C.O.'s determination of the total number of days' extension shall be based upon the currently approved Progress Schedule and on all data relevant to the extension. Such data will be corporate into the Progress Schedule in the form of a revision thereto, accomplished in a timely manner. The Contractor acknowledges and agrees that actual delays (due to said changes, suspensions of work or excusable delays) in activities which, according to the Progress Schedule, do not affect the Contract Time, do not have any effect upon the Contract Time and therefore will not be the basis for a change therein. The Contractor acknowledges and agrees that time extensions will be granted only to the extent that excusable delays exceed the available float in the Contractor's Progress Schedule.

(4) Subject to other provisions of the Contract, the Contractor may be entitled to an extension of the Contract Time (but no increase in the Contract Price) for delays arising from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, his Subcontractors or Suppliers as follows:

(i) Labor disputes and strikes (including strikes affecting transportation), that do, in fact, directly and critically affect the progress of the Work; however, an extension of Contract time on account of an individual labor strike shall not exceed the number of days of said strike.

(ii) Acts of God, tornado, fire, hurricane, blizzard, earthquake, typhoon, or flood that damage completed work or stored materials.

(iii) Abnormal inclement weather; however, the Contract Time will not be extended due to normal inclement weather. The time for performance of this Contract, as stated in the Contract Documents, includes an allowance for calendar days, which may not be available for construction out-of-doors; for the purposes of the Contract, the Contractor agrees that said number of calendar days per month are to be considered as normal inclement weather. Unless the Contractor can substantiate to the satisfaction of the S.I. that there was greater than normal inclement weather considering the full term of the Contract Time using a ten year average of accumulated record mean values from climatological data compiled by the U.S. Department of Commerce, National Oceanic and Atmospheric Administration for the locale of the Project and that such alleged greater than normal inclement weather actually delayed the Work or portions thereof which had an effect upon the Contract Time, the Contractor shall not be entitled to an extension of time. If the total accumulated number of calendar days lost due to inclement weather, from the start of Work until Final Completion, exceeds the total accumulated number to be expected for the same period from the aforesaid climatological data, time for completion will be extended by the number of calendar days needed to include the excess number of calendar days lost.

(iv) Acts of the public enemy, acts of the state, Federal or local government in its sovereign capacity, and acts of a separate contractor in the performance of its contract with the S.I. relating to the Project.

(5) The Contractor shall not be entitled to and hereby expressly waives any extension of time resulting from any conditions or cause unless said claim for extensions of time is made in writing to the C.O. within seven (7) days of the first instance of delay. Circumstances and activities leading to such claim shall be indicated or referenced in a daily field inspection report for the day(s) affected; otherwise, all such claims are waived by the Contractor. In every such written claim, the Contractor shall provide the following information:

(i) Nature of the delay;

(ii) Date (or anticipated date) of commencement of delay;

(iii) Activities on the Progress Schedule affected by the delay, and/or new activities created by the delay and their relationship with existing activities;

(iv) Identification of person(s) or organizations(s) or event(s) responsible for the delay;(v) Anticipated extent of the delay;

(vi) Recommended action to avoid or minimize the delay.

(d) Responsibility for Completion.

(1) The Contractor shall furnish such manpower, materials, facilities, and equipment and shall work such hours, including night shifts, overtime operations and Sundays and holidays, as may be necessary to insure the progress and completion of the Work in accordance with the approved and currently updated Progress Schedule. If Work actually in place falls behind the currently updated and approved Progress Schedule and it becomes apparent from the current Progress Schedule that the Work will not be completed within the Contract Time, the Contractor agrees that he will, as necessary, take some or all of the following actions at no additional cost to the S.I., as required to eliminate substantially the backlog of the Work:

(i) Increase manpower in quantities and crafts necessary

(ii) Increase the number of work hours per shift, shifts per working day, working days per week, the amount of equipment, or any combination of the foregoing; and/or

(iii) Re-schedule activities to achieve maximum practical concurrence.

(2) The COTR may require the Contractor to submit a Recovery Schedule in accordance with the Supplementary Construction Contract Clause, demonstrating his program and proposed plan to make up the lag in scheduled progress and to ensure completion of the Work within the Contract Time. If the COTR finds the proposed plan not acceptable, he may require the Contractor to submit a new plan. If the actions taken by the Contractor or the second plan proposed are not satisfactory, the COTR may require the contractor to take any of the actions set forth in this Construction Contract Clause without additional costs to the S.I., to make up the lag in scheduled progress.

(3) Failure of the Contractor to comply substantially with the requirements of this Construction Contract Clause may be considered grounds for a determination by the S.I., pursuant to the Construction Contract Clause entitled "Default", that the Contractor is failing to prosecute the Work with the sufficient diligence to ensure its completion with the Contract Time.

52.213-S0094 Application for Payment (STRI Only)

Applying for Payment: Each month, the Contractor shall apply for payment and submit a report of the actual construction progress as follows:

1. The contractor will prepare and send by email a draft of the Application for Payment in Excel format for the COTR revision using the format provided by the Smithsonian. This draft will be reviewed on site in conjunction with Site Inspectors.

2. By the 25th of each month, the Contractor and the COTR shall have inspected the work to determine percentages, complete for each item, projected through the end of the month.

The parties shall attempt to reach agreement on each item, but if they cannot the COTR will determine percent complete. These percentages shall be input into the latest revision of the Progress Schedule, including all revisions approved to date.

By the last day of the month, the Contractor shall submit an Application for Payment based on the determined percentages complete for each item. The application shall be submitted on the Smithsonian standard Application for Payment form. Application for Payment shall be accompanied by the following:

a) DGI Tax Invoice

b) Signed AFP

c) Updated Project Progress Chart

d) Photographic Progress Report

e) Project Staff Payroll

f) Caja de Seguro Social Good Standing Certifícate (Paz y Salvo)

g) Up to date project daily reports

h) Up to date uploaded photographic .jpg files

To process all payments, the Contractor’s Daily Report, Progress Photo and Progress Chart must be up to date.

Note: The Prompt Payment Act (31 U.S.C. Section 3901) is not applicable to the Smithsonian Institution.

The Smithsonian Institution shall take all reasonable measures to ensure that payment for invoice(s) properly documented and submitted shall be paid within thirty (30) days from receipt of an approved proper invoice.

52.228-S0017R Insurance (Jun 2000) Contractors shall submit in ENGLISH proof of Construction All Risk Insurance and Civil Liability Insurance coverage limit up to 25k or the cost of the project, whichever is greater. Projects for a cost greater than

100k there will be Civil Liability with a limit of up to 1M coverage. The requirements of the Insurance are supplemented to provide that the general liability and property insurance policies shall name "the Smithsonian Institution," as an additional insured with respect to operations performed under this contract.

52.228-S0081R Period of Performance-Bonds & Insurance-Construction (June 2000) Projects up to 100k: Civil Liability for a coverage limit up to 25k or the cost of the project, whichever is greater. Bonds only if the price offered exceeds 60k and will be requested with these %. Surety Bond:

50% of the construction cost. Payment bond (surety): 25% of the construction cost.

Projects for a cost greater than 100k: Civil Liability with a limit of up to 1M coverage. Surety bond: 50% of the construction cost. Payment bond (surety): 25% of the construction cost. Performance/Payment Bonds within ten (10) days of contract award.

52.236-S0036 Smithsonian Institution's Right to Stop or to Suspend the Work (Jun 2000)

(a) If the Contractor fails to correct defective Work as required by the Construction Contract Clause entitled "Correction of Work", or fails to carry out the Work or supply labor and material sin accordance with the Contract Documents, the C.O. by a written order may order the Contractor to stop the Work, or any portion thereof, without monetary compensation to the Contractor until the cause for such order has been eliminated.

(b) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the Work for such period of time as he may determine to be appropriate for the convenience of the S.I.

(c) If the performance of all or any part of the Work is, for an unreasonable period of time, suspended, delayed, or interrupted by the S.I. or its authorized representatives in the administration of this Contract, or by failure of any one of them to act within the time specified in this Contract (or if no time is specified, within a reasonable time), an adjustment shall be made for an increase in the actual time required for performance of the Work by the Contractor, due solely to such unreasonable suspension, delay, or interruption and the Contract modified inwriting accordingly. However, no claim for an extension of time shall be made under this Construction Contract Clause for any suspension, delay, or interruption pursuant to this Construction Contract Clause, or for which claim is provided or excluded under any other provision of this Contract. No claim under this Construction Contract Clause shall be allowed for any claim for an extension of time required for performance, unless within twenty (20) days after the act or failure to act involved, the Contractor submits to the COTR a written statement setting forth, as then practicable, the extent of such claimed time extension and unless the claim for an extension of time is asserted in writing as soon as practicable after the termination of such suspension, delay, or interruption. No claim shall be made for direct or indirect costs incurred by Contractor as a result of the events described in this Construction Contract Clause, a time extension being the Contractor's sole remedy.

(d) A claim under this clause shall not be allowed (1) for any costs incurred more than twenty (20) days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(e) In the event of a suspension of work or delay or interruption of work, the Contractor will and will cause his subcontractors to protect carefully his, and their materials and work against damage or injury from the weather and maintain completed and uncompleted portions of the work as required by the Contract Documents. If, in the opinion of the COTR, any work or material shall have been damaged or injured by reason of failure on the part of the Contractor or any of his subcontractors to so protect same, such work and materials shall be removed and replaced at the expense of the Contractor.

(f) No claim by the Contractor for an equitable adjustment under the Construction Contract Clause entitled "Equitable Adjustments", shall be allowed if asserted after Final Payment under this Contract.

52.246-S0041 Additional Warranties and Guarantees (Jun 2000)

(a) The Contractor guarantees and warrants to the S.I. all work as follows:

(1) That all materials and equipment furnished under this Contract will be new and the best of its respective kind unless otherwise specified;

(2) That all Work will be first-class quality and free of omissions and faulty, poor quality, imperfect or defective material or workmanship;

(3) That where no standard is specified for such workmanship or materials, they shall be the best of their respective kinds.

(4) That the Work shall be entirely watertight and leakproof in accordance with all applicable industry customs and practices, and shall be free of shrinkage and settlement, (normal shrinkage inherent in the specified materials is acceptable);

(5) That the Work, including but not limited to, mechanical and electrical machines, devices and equipment shall be fit and fully usable for its intended and specified purpose and shall operate satisfactorily with ordinary care.

(6) That consistent with requirements of the Contract Documents the Work shall be installed and oriented in such a manner as to facilitate unrestricted access for the operation and maintenance of fixed equipment.

(7) That the Work will be free of abnormal or unusual deterioration which occurs because of poor quality materials, workmanship or unsuitable storage.

(b) All work not conforming to guarantees and warranties specified in the Contract Documents, including substitutions not properly approved and authorized, may be considered defective. If required by the COTR, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of the Construction Contract Clauses entitled "Uncovering of Work" and "Correction of Work".

(c) The warranties set forth in this Construction Contract Clause entitled "Additional Warranties and Guarantees" and elsewhere in the Contract Documents shall survive Final Completion of the Work under the Construction Contract Clause entitled "Payments and Completion".

(d) If, within one year after the Date of Final Completion of the Work or designated portion thereof or within one year after acceptance by the S.I. of designated equipment or within such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective, not in accordance with the Contract Documents, or not in accordance with the guarantees and warranties specified in the Contract Documents, the Contractor shall correct it within five (5) working days, or such other period as mutually agreed, after receipt of a written notice from the COTR to do so.

(e) Any materials or other portions of the Work, installed, furnished or stored on site which are not of the character or quality required by the specifications, or are otherwise not acceptable to the COTR, shall be immediately removed and replaced by the Contractor to the satisfaction of the COTR, when notified to do so by the COTR.

(f) If the Contractor fails to correct defective or nonconforming Work as required by the Construction Contract Clause entitled "Correction of Work", or if the Contractor fails to remove defective or nonconforming Work from the site, as required by the Construction Contract Clause entitled "Uncovering of Work", the S.I. may elect to either correct such work in accordance with the Construction Contract Clause entitled "Smithsonian Institution's Right to Carry Out The Work", or remove and store materials and equipment at the expense of the Contractor.(g) The Contractor shall bear the cost of making good all work of the S.I., separate contractors or others, destroyed or damaged by such correction or removal required under this Construction Contract Clause or the Construction Contract Clauses entitled "Uncovering of Work" and "Correction of Work", or elsewhere in the Contract Documents.

SI-0080 Period of Performance-NTP The contract shall become effective upon execution of the contract and upon the Smithsonian Institution Contracting Officer's Notice to Proceed.

Section G - Contract Administration Data 52.202-S0003 Definitions (Apr 1988)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation or contract was issued, unless modified herein--

(a) "Head of the agency," means the Secretary of the Smithsonian Institution.

(b) "Contracting Officer" (C.O.) means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings and to settle all claims. (c) "Government" means the Smithsonian Institution (S.I.). The Contracting Officer (C.O.) shall be deemed to be the authorized representative of the S.I. The Smithsonian Institution shall hereinafter be referred to by its initials, "S.I.", or as "the Government".

(d) "Contractor" means the person or persons, firm or company whose proposal has been accepted by S.I. and includes the Contractor's personal representatives, successors and assigns permitted by S.I. (e) "Contracting Officer's Technical Representative" (COTR) means the Project Manager appointed by the Contracting Officer to act as COTR for the purpose of the Contract. Written notification of the appointment or recession of such appointment shall be promptly furnished to the Contractor.

52.202-S0012 Specialist (Jun 2000)

The term "Specialist" as used in the contract specification shall mean an individual or firm of established reputation (or, if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workmen skilled in either (as applicable) manufacturing or fabricating items required by the contract, installing items required by the Contract or otherwise performing work required by the Contract. Where the contract specification requires installation by a specialist, that term shall also be deemed to mean either the manufacturer of the item, an individual or firm licensed by the manufacturer, or an individual or firm who will perform the work under the manufacturer's direct supervision.

52.202-S0059 Contract Management

Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Smithsonian and the Contractor. The following individuals will be the Smithsonian points of contact during the performance of the contract.

52.202-S0060 Contracting Officer

All contract administration will be effected by the Contracting Officer. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .