Reference to enclosed document K_REVISED bid form excel file.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Renew Cheetah Conservation Station – Africa Trail (CCS-AT) at the Smithsonian’s National Zoo and Conservation Biology Institute (NZCBI)
Solicitation number
33330224RF0010014
Issued by

About this file

This document is a bid form excel file for a federal contract opportunity titled "Renew Cheetah Conservation Station (CSS) - Africa Trail" at the Smithsonian Institution's National Zoo and Conservation Biology Institute in Washington, D.C.

The solicitation number is 33330224RF0010014, and the project number is 2033108. The scope of work includes mechanical, electrical, and plumbing (MEP) system upgrades, security and building infrastructure improvements, stormwater management, yard renovations, containment fencing, and pedestrian surface repairs. The work will restore operational functionality and support animal care needs. The project has a base bid and six additional bid alternates, including roof replacement, reinforced asphalt at the service yard, ceiling insulation, ceiling finishes, stall air filtration, and stainless steel animal doors. The total estimated project cost is over $10 million, with a period of performance of 730 calendar days. The proposal due date is Thursday, May 16, 2024, at 3:00 PM Eastern Standard Time. The subcontracting goals include 40% for small businesses, with specific set-asides for small disadvantaged, women-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
33330224RF0010014 Amendment 0011.pdf PDF
33330224RF0010014 Amendment 0010.pdf PDF
Reference to enclosed document Q REVISED2 bid form R2.xlsx XLSX spreadsheet
33330224RF0010014 Amendment 0009.pdf PDF
33330224RF0010014 Amendment 0008.pdf PDF
33330224RF0010014 Amendment 0007.pdf PDF
33330224RF0010014 Amendment 0006.pdf PDF
33330224RF0010014 Amendment 0005.pdf PDF
33330224RF0010014 Amendment 0004.pdf PDF
33330224RF0010014 Amendment 0003.pdf PDF
33330224RF0010014 Amendment 0002.pdf PDF
33330224RF0010014 Amendment 0001.pdf PDF
Payment Bonds.pdf PDF
2023-12-21 PN 2033108 Cheetah Conservation Station - Dwgs FINAL CD_Part1.pdf PDF
2023-12-21 PN 2033108 Cheetah Conservation Station - Dwgs FINAL CD_Part3.pdf PDF
2023-12-21 PN 2033108 Cheetah Conservation Center - Specs Volume 2.pdf PDF
Davis Bacon.pdf PDF
Final 33330224RF0010014 SOL NZP-DC Renew Cheetah Conservation Station.pdf PDF
2024-01-25 PN 2033108 Cheetah Conservation Station - Multi-Year Funding.docx DOCX document
Release of Claim Form.pdf PDF
Contractor_COVID-19_Safety Protocols_LOW_3.30.22-eg.pdf PDF
2024-01-25 PN 2033108 Cheetah Conservation Station - Bid Schedule.xlsx XLSX spreadsheet
2022-04-14 PN 2033108 Cheetah Conservation Station - LBP and ACM Survey Report.pdf PDF
2023-12-21 PN 2033108 Cheetah Conservation Station - Dwgs FINAL CD_Part2.pdf PDF
2023-12-21 PN 2033108 Cheetah Conservation Center - Specs Volume 1.pdf PDF
Performance bonds.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid

TitleRenew Cheetah Conservation Station (CSS) - Africa TrailPrepared by
FacilitySmithsonian NZP-DCDate
Project Number2033108
Base Bid
BASE BID: All work associated with Renewing Cheetah Conservation Station as described in the specifications and drawings dated November 3, 2023.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0$ - 0
HAZMAT$ - 0$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0$ - 0
Div. 11 Equipment$ - 0$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0$ - 0
Div. 23 HVAC$ - 0$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0$ - 0
Div. 31 Earthwork$ - 0$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0$ - 0

BASE BID SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

BASE BID Total $ - 0

Provide both Base bid and Alternate pricings listed on the following pages 2 thru 4.

ADD ALTERNATE 1
ADD ALTERNATE 1: All work associated with Roof Replacement as described in the specifications and drawings dated November 3, 2023.
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - Replace 10% of all existing roofs with R-4 roof type (structures A, C, D, G).$ - 0$ - 0$ - 0$ - 0

Add Alt 1 - Replace 100% of all existing roofs with R-4 roof type (structures A, C, D, G). $ - 0 $ - 0 $ - 0 $ - 0

SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

ADD ALTERNATE 2
ADD ALTERNATE 2: All work associated with Reinforced Asphalt at Service Yard as described in the specifications and drawings dated November 3, 2023.
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - New typical asphalt (3/C171 GI) at service yard area, as shown on C122 CS.$ - 0$ - 0$ - 0$ - 0
Subtract Base Bid - New reinforced concrete (4/S501 DT) at dumpster area only, as shown on C122 CS.$ - 0$ - 0$ - 0$ - 0

Add Alt 2 - New reinforced concrete at all areas of the service yard (4/C171 GI). $ - 0 $ - 0 $ - 0 $ - 0

SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

ADD ALTERNATE 3
ADD ALTERNATE 3: All work associated with Ceiling Mineral Wool Batt Insulation as described in the specifications and drawings dated November 3, 2023.
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - New ceiling type CLG-3 as shown on 9/A501 DT, at spaces in existing structures A, C, D, G as shown on A103 RCP.$ - 0$ - 0$ - 0$ - 0
Add Alt 3 - New ceiling type CLG-3 with R-30 mineral wool batt insulation, at existing structures A, C, D, G (BOD Comfortbatt® Thermal Batt Insulation 7.25").$ - 0$ - 0$ - 0$ - 0
SUBTOTAL$ - 0
Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

ADD ALTERNATE 4
ADD ALTERNATE 4: All work associated with Ceiling finish in E3, E4, and E5 as described in the specifications and drawings dated November 3, 2023
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - New GWB acoustic tile ceiling type CLG-6 for spaces E3, E4, and E5.$ - 0$ - 0$ - 0$ - 0

Add Alt 4 - New suspended acoustic tile ceiling BOD Armstrong 1903 Air Guard Humiguard for spaces E3, E4, and E5. $ - 0 $ - 0 $ - 0 $ - 0

SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

ADD ALTERNATE 5
ADD ALTERNATE 5: All work associated with Stall Air Filtration as described in the specifications and drawings dated November 3, 2023
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - All exhaust fans sized per fan schedule/M601, column “MFR’s NO. (TWIN CITY)”.$ - 0$ - 0$ - 0$ - 0
Subtract Base Bid - All intake louvers sized as indicated on M401 and M402.$ - 0$ - 0$ - 0$ - 0
Add Alt 5 - All exhaust fans increased by one model size.$ - 0$ - 0$ - 0$ - 0
Add Alt 5 - All intake louvers to be increased in size to 24” x 12”$ - 0$ - 0$ - 0$ - 0

SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

ADD ALTERNATE 6
ADD ALTERNATE 6: All work associated with Animal Doors as described in the specifications and drawings dated November 3, 2023
DescriptionMaterialLaborEquipmentTotal
Subtract Base Bid - All animal door to be (A, A3, B, B2, C, C1, D, I and J) galvanized & painted per schedules on A005 & A006. Includes frames, tracks and components.$ - 0$ - 0$ - 0$ - 0

Add Alt 6 - All animal doors types (A, A3, B, B2, C, C1, D, I and J) to be stainless steel in place of galvanized & painted. Includes frames, tracks and components. $ - 0 $ - 0 $ - 0 $ - 0

SUBTOTAL $ - 0

Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

TOTAL BASE BID WITH ALTERNATES $ - 0

B-&P

File details come from the government source that posted it. Updated .