2024-01-25 PN 2033108 Cheetah Conservation Station - Bid Schedule.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 33330224RF0010014
- Issued by
-
Smithsonian Institution
About this file
This document is a Bid Schedule for the "Renew Cheetah Conservation Station (CSS) - Africa Trail" project at the Smithsonian National Zoo and Conservation Biology Institute (NZCBI) in Washington, D.C.
The Bid Schedule outlines the base bid and six alternate bids for the project, which involves mechanical, electrical, and plumbing (MEP) system upgrades, security and building infrastructure improvements, stormwater management, and related site work. The base bid is estimated at over $10,000,000, with a 730-calendar day period of performance. The alternate bids cover items such as roof replacement, reinforced asphalt at the service yard, ceiling insulation, ceiling finishes, stall air filtration, and animal doors. Subcontracting goals include 40% small business participation, with specific targets for small disadvantaged businesses, women-owned small businesses, HUBZone small businesses, veteran-owned small businesses, and service-disabled veteran-owned small businesses. The proposal due date is Thursday, May 16, 2024, at 3:00 PM Eastern Standard Time.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid
| Title | Renew Cheetah Conservation Station (CSS) - Africa Trail | Prepared by |
| Facility | Smithsonian NZP-DC | Date |
| Project Number | 2033108 |
| Base Bid | ||||
| BASE BID: All work associated with Renewing Cheetah Conservation Station as described in the specifications and drawings dated November 3, 2023. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 7 Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 11 Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 31 Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
BASE BID Total $ - 0
Provide both Base bid and Alternate pricings listed on the following pages 2 thru 4.
| ADD ALTERNATE 1 | ||||
| ADD ALTERNATE 1: All work associated with Roof Replacement as described in the specifications and drawings dated November 3, 2023. | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - Replace 10% of all existing roofs with R-4 roof type (structures A, C, D, G). | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Add Alt 1 - Replace 100% of all existing roofs with R-4 roof type (structures A, C, D, G). $ - 0 $ - 0 $ - 0 $ - 0
SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
| ADD ALTERNATE 2 | ||||
| ADD ALTERNATE 2: All work associated with Reinforced Asphalt at Service Yard as described in the specifications and drawings dated November 3, 2023. | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - New typical asphalt (3/C171 GI) at service yard area, as shown on C122 CS. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Base Bid - New reinforced concrete (4/S501 DT) at dumpster area only, as shown on C122 CS. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Add Alt 2 - New reinforced concrete at all areas of the service yard (4/C171 GI). $ - 0 $ - 0 $ - 0 $ - 0
SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
| ADD ALTERNATE 3 | ||||
| ADD ALTERNATE 3: All work associated with Ceiling Mineral Wool Batt Insulation as described in the specifications and drawings dated November 3, 2023. | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - New ceiling type CLG-3 as shown on 9/A501 DT, at spaces in existing structures A, C, D, G as shown on A103 RCP. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Add Alt 3 - New ceiling type CLG-3 with R-30 mineral wool batt insulation, at existing structures A, C, D, G (BOD Comfortbatt® Thermal Batt Insulation 7.25"). | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 |
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
| ADD ALTERNATE 4 | ||||
| ADD ALTERNATE 4: All work associated with Ceiling finish in E3, E4, and E5 as described in the specifications and drawings dated November 3, 2023 | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - New GWB acoustic tile ceiling type CLG-6 for spaces E3, E4, and E5. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Add Alt 4 - New suspended acoustic tile ceiling BOD Armstrong 1903 Air Guard Humiguard for spaces E3, E4, and E5. $ - 0 $ - 0 $ - 0 $ - 0
SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
| ADD ALTERNATE 5 | ||||
| ADD ALTERNATE 5: All work associated with Stall Air Filtration as described in the specifications and drawings dated November 3, 2023 | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - All exhaust fans sized per fan schedule/M601, column “MFR’s NO. (TWIN CITY)”. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Base Bid - All intake louvers sized as indicated on M401 and M402. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Add Alt 5 - All exhaust fans increased by one model size. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Add Alt 5 - All intake louvers to be increased in size to 24” x 12” | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
| ADD ALTERNATE 6 | ||||
| ADD ALTERNATE 6: All work associated with Animal Doors as described in the specifications and drawings dated November 3, 2023 | ||||
| Description | Material | Labor | Equipment | Total |
| Base Bid - All animal door to be (A, A3, B, B2, C, C1, D, I and J) galvanized & painted per schedules on A005 & A006. Includes frames, tracks and components. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Add Alt 6 - All animal doors types (A, A3, B, B2, C, C1, D, I and J) to be stainless steel in place of galvanized & painted. Includes frames, tracks and components. $ - 0 $ - 0 $ - 0 $ - 0
SUBTOTAL $ - 0
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total $ - 0
TOTAL BASE BID WITH ALTERNATES $ - 0
B-&P