33330224RF0010014 Amendment 0003.pdf
PDF 7 MB Posted
- Solicitation number
- 33330224RF0010014
- Issued by
-
Smithsonian Institution
About this file
This document is an amendment to a federal solicitation for the Renew Cheetah Conservation Station - Africa Trail (CCS-AT) project at the Smithsonian Institution's National Zoo and Conservation Biology Institute (NZCBI) in Washington, DC. The project involves mechanical, electrical, and plumbing (MEP) system upgrades, security and building infrastructure improvements, stormwater management and yard renovations, new containment fencing, and pedestrian surface repairs. Key details include a 730-calendar day period of performance, a $10+ million estimated fixed price, and subcontracting goals of 40% small business, 7% small disadvantaged business, 7% women-owned small business, 4% HUBZone small business, 4% veteran-owned small business, and 4% service-disabled veteran-owned small business. The amendment provides responses to 62 questions received as part of a request for information (RFI) process and extends the bid due date to May 16, 2024 at 3:00 PM EST.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330224RF0010014
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
OCON
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
SMITHSONIAN INSTITUTION
203310805/02/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/01/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
A.2. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The Solicitation Number cited above, to Renew Cheetah Conservation Station - Africa Trail (CCS-AT) at the Smithsonian's National Zoo and Conservation Biology Institute (NZCBI), located in Washington, DC, is hereby amended as follows:
A.1. Attached hereto and made part of this Amendment Three are SI Responses to RFI's for Questions Number 6 to 62. (additional RFI's will be posted soon)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 16
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
33330224RF0010014/0003
B. THE BID DUE DATE IS MAY 16, 2024, AT 3 PM EST.
Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.
END OF AMENDMENT THREE
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
DATE UPDATED: 05/02/2024
Renew Cheetah Conservation Station (CSS) - Africa Trail - Pre Bid RFI Tracker RFI # Company Name RFI RFI Answer 1 Grunley 1. Section L.3. Past Performance requires three projects of similar size and scope, and indicates that, “projects should demonstrate experience working in: an operating urban campus; constrained sites with limited laydown area, and; adjacency to public areas and animal habitats.” Please confirm that the three projects can be adjacent to public areas and/or animal habitats.
Three projects can be adjacent to public areas and/or animal habitats. Higher consideration will be given to projects adjacent to public areas and animal habitats.
2 Abacus Sports I just left you a message regarding the Cheetah project that is out to bid. Your specs and finish schedule call for our Padenpor DLX, but spec seems to be written around a Stonehard product with using Stonclad epoxies and mortars. It reads like the specification have been mixed together. Which product do you want for these floors ((FLR – 2). Assuming you do want our floor, what thickness do you want?
Please see attached our flooring spec. Padenpor is available in different thicknesses.
Please note the two specs and BOD for each:
1) RESINOUS FLOOR SYSTEM BASIS OF DESIGN STONEHARD STONE CLAD GR, Spec 09 6723
2) RESILIENT FLOORING BOD ABACUS PADENPOR DLX™ – 9/16" CUSHIONED ZOO FLOORING, Spec 09 See sheet A501DT for details
3 WM Schlosser 1.Spec Sec on 051200 Structural Steel Framing (part 1.06-D) calls for “A qualified steel fabricator that is accredited by the International Accreditation Service (IAS) Fabricator Inspection Program for Structural Steel”. Since most local fabricators do not have this IAS accreditation, can this requirement be waived? If not, can you add “or AISC Certified Fabricator Category BU” to this requirement?
IAS and AISC BU certified fabricators are acceptable
It is acceptable to lower the requirements to include AISC Certified Fabricator Category BU (Building Fabricator). - AE / McM
4 Whiting Turner Executive Order (EO) 14603 indicates that all federal projects valued at $35 million and above will require a project labor agreement (PLA) unless a federal contracting agency expressly grants an exception. As the expected project value is under this limit, please confirm if a project labor agreement will be required on this project.
Until further notice, PLA is not required
5 Whiting Turner Based on the technical nature and specialty aspects the project includes, is a bid extension anticipated?
At this time an extension is not being issued
6 Whiting Turner Please clarify if CAD files, or the project model can be shared for use in the RFP submission.
CAD files will be shared with the awarded GC. Please note that BIM was not a requirement for the AE to use during document production so the drawings were created using a multitude of software’s including Revit (BIM) and AutoCAD. All bidders should assume 2D CAD only.
7 Whiting Turner Referencing the solicitation, Section L, 52.244-S0013 Subcontractors, Item (b) (1) (Page 149 of 183) notes subcontractors must be named (10) days after subcontract execution. This seems to contradict Section L, 2. Key Personnel and Subcontractors (Page 177 of 183) where it notes the submission of major subcontractors to include organization plans, resumes, past projects ,etc. Please confirm if subcontractors may be named following success award and are not required to be named as part of the bid submission process.
Subcontractors are required to be named as part of the bid submission process.
8 Whiting Turner Referencing the solicitation, the FUNDING INCREMENT portion lists “Testing and Commissioning” as a cost line item (Page 14 of 183). Please define this line item as an independent commissioning consultant will be held by Smithsonian as outlined in specification section 01 9113, 1.1 A
Confirmed Smithsonian will provide an independent commissioning consultant, but the does not diminish the contractor's contract requirements for prefunctional testing and operational verifications.
9 Whiting Turner Referencing the solicitation, Section L, L.3. 52.216-1 Type of Contract notes a Firm Fixed Price contact will be utilized but does not clarify contact type. Can a sample contact be provided for review?
This is a Firm Fixed Price Contract. Reference Federal Acquisition Regulations (FAR) Part 16 Types of Contracts, specifically FAR 16.202. A sample will not be provided.
10 Whiting Turner Referencing the solicitation, Section C (Page 15 of 183) notes schedule duration of 730 calendar days from Notice to Proceed (NTP) and reference target schedule dates.
Schedule requirements per Specification Section 010000 is reference under L.29.1.A of the solicitation (page 175/183) but does not provide any information on schedule milestones.
a.Please verify the an cipated No ce to Proceed for the project.
b.Please provide a schedule outline including a NTP, phases of work, target dates/milestones and required substantial completion and required completion dates.
c.Please clarify any work constraints through the years of the project.
In response to several questions:
SI Milestones - After the contract is awarded SI will work with the contractor identifying tasks to be tracked to measure progress. This project is not phased with a NTP date, contract duration, completion date with multi year funding.
a) October 2024
b) This is a contractor requirement that incorporates means and methods.
c) Multi-Year Funding
11 Whiting Turner Please confirm a cost loaded schedule is required per 1.3.B of specification section 013200.
Confirmed
12 Whiting Turner In Specification Section 01 1000 1.6.B work hours are listed as 6:00 AM – 6:00 PM. In Specification Section 01 1000 1.7 C, normal work hours are referenced at 6:00 AM- 2:30 PM. Please clarify.
As project requirements change work hours can be adjusted with coordination with the COTR. For this project noise concerns with our adjoining residents has often limited the work hours.
13 Whiting Turner Referencing the solicitation, Section L.31. 52.219-S0097 outlines the Small Business Subcontracting Plan (page 179/183). Please clarify if the Small Business and Small Disadvantaged Business Subcontracting Plan shall be submitted as part of the overall proposal, or submitted by the successful bidder following subcontractor naming (see question #5).
Small Business Subcontracting Plan will be submitted by the successful bidder. See contract clause 52.219-S0097(b) on p. 179.
14 Whiting Turner Referencing the Solicitation, Section F, 52.211-S0025 , (c ), (4), (iii) (Page 21 of 183) references defined allowances for normal inclement weather. Please define the weather allowance to be carried in the contract schedule.
If there are abnormal inclement weather, such as rain, snow or extreme temperature, a time extension may be provided.
15 Whiting Turner Referencing the solicitation, Section H, 52.236-S0030 Availability and Use of Utility Services (Page 28 of 183) and Section H, 52.236-14 (page 116 of 183) please confirm utility consumption on the project will be by The Government.
Confirmed, contingent on the contractor implementing basic energy conservation measures.
16 Whiting Turner Referencing the solicitation, Section L 31. 52.219-S0097 outlines goals of 40% SBE of which includes 7% SDB, 7% WOSB, 4% HubSB, 4% VOSB, and 4 % SDV (page 179 of 183). Section L.4. 52.222-23 notes 28% minority participate and 6.9% female participation (Page 168 of 183). Please clarify if both requirements are correct, and if participation can count for multiple requirements.
Both requirements apply. Participation can count for multiple requirements.
17 Whiting Turner Please clarify if the intent is for field offices to be place w/in the site/Limits of Disturbance, or if an area would be provided outside the LOD. In addition, please clarify if space will be provided outside the LOD for staging and storage of materials.
All field offices and project's operational requirements are required to be place within the site's Limits of Disturbance.
No additional space will be provided outside the LOD for staging and storage of materials.
18 Whiting Turner Specification section 01 1000, 1.6.F outlines traffic control requirements. These requirements include providing one traffic control professional at “each unlocked project vehicle/staff entrance during construction operating hours. It is assumed the “Gate Entrance” outlined on C140 is the sole entry point to the project. Please clarify if additional entry points are required which would require controlled supervision.
All Contractor's project entry pointes will be proposed by the contractor on the Site Utilization Plan submission and approved by COTR.
The Smithsonian is not requiring any project entry points..
19 Whiting Turner Specification section 01 1000 1.7.A.3 notes onsite contractor parking may be arranged in off-season operations. Can timing and costs of this option be shared for bid purposes?
CONTRACTOR PARKING
1. SI will provide one (1) hang tag permit for one (1) parking space for one (1) registered company vehicle to be parked in Lot C at no cost to the contractor. This vehicle must be clearly marked with a company name and/or logo. The hang tag must be hung from the vehicle’s rear-view mirror in clear view. Employee should use a SI issued Contractor’s Badge for daily lot access.
2. With 48 hours prior notice, the Contractor may request for one (1) vehicle, registered to the company, with identifiable signage to park in the gravel parking lot which is adjacent to Lot C at no cost.
3 Upon request SI will provide up to 15 hang tags on a monthly basis for parking spaces for the contractor’s personal vehicles. To obtain the hang tags the contractor must pay in advance with one company check, at rate of $15 per working day. Issued hang tags must be hung from the vehicle’s rear-view mirror in clear view. The exact location of the on-campus parking will be determined NZCBI Park Management on a monthly basis.
4 General Parking is available at $30 per day. For arrivals prior to 8:00 AM a parking pass must be purchased online a minimum of one day in advance. After 8:00 AM payments are to me made to parking attendants in the vehicle check-in lot bus lot. Early arrival parking vouchers must be to be printed and displayed in the windshield for identification.
5 All Vehicles not in compliance with NZCBI Parking Requirements are subject to ticketing and towing by the Smithsonian Police. All costs associated with parking violations shall be the sole responsibility of the Contractor’s personnel.
20 Whiting Turner Please verify not Federal, State or Local Taxes are to be included in the bid amount per Section I, “52.229-3 Federal, State, and Local Taxes” (page 104 of 183) of the bid solicitation.
Total contract price, including applicable taxes, are to be included in the bid amount.
21 Whiting Turner Please verify the “Data Capture (Laser Scan) requirement per specification section 013233.1.3.D is applicable to this project and costs should be carried for the services.
Confirmed, Data Capture (Laser Scan) is required for this project. Scans are required during rough-in, prior to close-in, and at project completion.
22 Whiting Turner Building on temporary utilities noted in Specification Section 01 5000, please verify usage fees of temporary utilizes including gas, water, electricity, discharge are NOT to be included in the bid, and are by Smithsonian.
Confirmed there are no temporary utility usage fees , contingent on the contractor implementing basic energy conservation measures.
23 Whiting Turner Specification Section 015639 1.03.C notes an arborist may be carried by the contractor or COTR at the COTR’s discretion. Please confirm an arborist shall not be carried by the general contractor or provide an outline of timing and services for the bid.
Yes providing a project certified arborist is to be provided by the contractor as required.
24 WM Schlosser Is a bid bond required to be submitted with the bid? Bid bond is not required with the bid. Reference contract clause 52.228-S0014R.
25 WM Schlosser What are the liquidated damages? Liquidated damages does not apply
26 Consigli Is this a Taxable project or Permanent Materials are exempt from sales tax?
Drawing / spec reference: RFP
Taxable Project
27 Consigli Please provide a geotechnical report for this project if available.
Drawing / spec reference: Spec. 01 1000-3 (2.3 bullet item 4).
Geo tech report is not available at this time as it is a work in progress. It will be share with the awarded general contractor
28 Consigli Please provide as-built documentation of existing structures and infrastructures.
Drawing / spec reference: Spec. 01 1000-3 (2.3 bullet item 4).
Refer to demo drawing for most accurate information on existing conditions
29 Consigli Please clarify that the control and management of access gate entrance off North Road will be the responsibility of the General Contractor throughout the construction period. SI will have no use for the gate during the 730 calendar days."
Drawing / spec reference: General / RFP/C140
Control and management of access gate entrance off the North Road will be the sole responsibility of the General Contractor throughout the construction period.
SI personnel will not require any daily operational site access to or thru the job site. SI reserves the right to access the job site at any time.
30 Consigli Please provide the 3D model of the design if available.
Drawing / spec reference: General
Refer to answer #6 above
31 Consigli Due to the technical complexity and specialized nature of certain aspects of the project, Also in few cases a limited number of suppliers/installers, including some niche scope items, Bidders must submit substitute qualifiers at least 14 days before the bid opening. Could SI consider revising the timeline for substitute qualifier submissions to occur after the NTP? Alternatively, should we anticipate a bid extension?
Drawing / spec reference: General / Spec. 03 21 00 (1.5.G)/05 59 64 (1.3.A)
Confirmed bidders must submit substitute qualifiers at least 14 days before the bid opening.
In the event of a bid time extension the contractor's will be notified
32 Consigli The specifications have provided a list of prequalified fabricators and installers for the caging scope components. It's noted that if contractors are not listed, they must have a minimum of ten (10) years' experience in metalwork of this type, along with at least three (3) similar projects involving animal containment. Companies seeking consideration should submit written and photographic evidence of previously completed projects.
Given the interest from other local subcontractors in this scope, could you please provide guidance and clarification on the timeline for requesting consideration.
Drawing / spec reference: General /05 59 64 (1.3.A and 2.2A)
Three workdays for SI's review from the time of the submission to confirm acceptable proposed candidates.
33 Consigli Plan sheet AD101, KeyNote #0204, specifies the removal, storage, and reinstallation of sheds according to CORT directions. Please provide the storage/salvage location for the sheds, as well as some datasheets/as-built documents for the existing sheds.
Drawing / spec reference: AD101
Sheds will be moved from the site by SI prior to the start of construction. Moving these sheds is not in contract of the awarded General Contractor
34 Consigli Upon receipt of the notice of award, are there any deliverables or requirements that would be owed prior to receiving the notice to proceed?
Drawing / spec reference: RFP
100% payment and performance bonds and certificate of insurance are required prior to the issuance of the Notice to Proceed.
35 Consigli Which areas will the existing boulders be reset, and where will they be stored until required installation?
Drawing / spec reference:
MMM- If the contractor can not store them within the Job Site NZP will provide a temporary site with the NZP Campus Grounds.
36 Consigli Regarding existing 10' WRF and sliding gate - are they intended to remain in place during construction?
Drawing / spec reference: C-110CD, C-111CD, Yes
37 Consigli Regarding the existing sliding gate: Will the 10-foot tall sliding gate remains open during construction, while the construction entrance gate is managed by the General Contractor for the work?
Drawing / spec reference: C-110CD, C-111CD, Correct - SI is willing to discuss other operational procedures for the existing gate's operation and fulling securing to work site on and off hours. For Example Gate placed in a Manual Mode or having the Contractor's Posted Guard with a gate operation Badge
38 Consigli The pedestrian egress outside the LOD in conjunction with the Construction Gate and the 10-foot Sliding Gate is undefined and unclear. How is SI planning to facilitate public access from Parking Lot A to the asphalt walks outside of the LOD leading to the SI Zoo?
Drawing / spec reference: C-110CD, C-111CD, C-140CSC, C-141CSC
Please review the enclosed site utilization plan.
Public will not be able to enter the limits of construction's exclusion barriers.
39 Consigli On sheet C-141CSC, the design of the 6' chain-link fence aims to restrict public access to the northwest and west sides of the CCS site (specifically S8, S1, and part of S2 yards). Can the SI make a modification to the layout of the 6' chain-link fence to completely block off the entire asphalt walk for enhanced public safety and to optimize construction and public flow around the site? This could, possibly, involve relocating the 6' CLF to the outer edge of the asphalt walk in the NW and west directions.
Drawing / spec reference: C-110CD, C-111CD, C-140CSC, C-141CSC
Reference to enclosed document "A"
40 Grunley Section 011000 requires both a Traffic Safety Officer and Flaggers. Can the Traffic Safety Officer also be a Flagger or does this need to be a separate full time person?
If the individual meets the requirements and work load of both positions, yes this can be the same person.
41 Grunley Please clarify how many full time flaggers are required? Minimum of one per open access point at all times. Contractor shall determine staffing levels based upon work flow and safe operations for this difficult project access point.
42 Grunley The Safety Manager is listed as a key personnel. Does this person need to be on site full time?
No, but a minimum of weekly documented visits.
43 Grunley Please consider a week extension to the RFI submission deadline. Contractor will be officially notified in the event of a time extension.
44 Grunley The Factor 2 - Key Personnel and Subcontractors requirements identifies Commissioning as one of the elements of work to name a subcontractor for. The commissioning section states that Smithsonian will be hiring the Commissioning Agent. Please confirm that the commissioning element of work may be deleted.
Refer to answer #8 above
45 Grunley The Factor 2 - Key Personnel and Subcontractors requirements identifies Structures as one of the elements of work to name a subcontractor for. Structures is inclusive of several subcontractors. Please identify which trades you expect to see named subcontractors for under the Structures heading.
Above ground building structures
46 Grunley Sheet S001FP (VI) and Section 014000 paragraph 1.2.B calls for contractor to be responsible for all tests and inspections, even ones explicitly assigned to the Owner.
Please confirm testing and inspections called out in sections 032100, 055965, 321316 as owner engaged, are to be by contractor.
Confirmed the contractor shall provide all of the project's testing and verification services required within the contract's documents. This statement overrides all other references for "Owner to Provide".
47 Grunley C-150CU shows an electrical ductbank crossing Olmsted Walk which will require trenching. Are there any specific phasing or work hour restrictions when performing this work?
Contractor is required to maintain a 8' wide ADA compliant access walkway to pass thru the work area during the Zoo's open times. Contractor my schedule off hours work as required to complete this task safely.
48 HSU Development Reference: Resinous Flooring Question: Per Specification Section 096723 the approved manufacturers are Stonhard and Abacus Animal Flooring. Will the Smithsonian accept other manufacturers that meet the performance requirements for the Resinous Floors?
Substitutions request must meet the performance requirements of the specs / basis of design product and will be for review and consideration
49 HSU Development Reference: Permits Question: Per Specification Section 013100 – Paragraph 1.3.G.a DC Storm Water Management and Sediment Control Permits will be required. Have these permits been applied for by the Civil Engineer on the Design Team?
Drawings have been submitted for permitting plan review to DOEE for Storm Water Management and Sediment Control permits. This is still processing and will more than likely take a few month before permits are granted. Our goal is to have the permits ready when the awarded GC is selected, but this is unpredictable as we cannot control DOEE processing times
50 HSU Development Reference: Record Drawings Question: Per Specification Section 017839 the awarded GC is to provide electronic files of the Record Drawings. Will the awarded GC be provided with the electronic files of the Design Drawings for preparation of the Record Drawings?
Yes
51 HSU Development Reference: Site Usage Question: Will all the animals be removed from the project site prior to the start of this project?
Yes
52 HSU Development Reference: RFP, Page 177, Section L.29, 2.B – Resumes, “Key personnel include Sr.
Project Manager, Superintendent, CQC Representative, Safety Manager…” Question: Will offerors be permitted to dual-hat key personnel roles?
Yes, but work loads and skill levels are a factor.
53 HSU Development Reference: RFP, Page 178, Section L.29, 3.A – Past Performance, “If possible, identify past projects in the Past Performance Information Retrieval System (PPIRS) by Project Title, Agency Client Name, and PPIRS Contract Number.”
Question: Please confirm that the evaluation team will be using CPARS instead of PPIRS. PPIRS retired on January 15, 2019, and was merged into CPARS.gov.
Correct
54 HSU Development 12.Reference: RFP Page 178, Sec on L.29, 3.A Past Performance, “Provide three projects of similar size and complexity where the Offeror was the Prime Contractor.
Question: Please clarify whether three projects is the maximum number of projects offerors can submit, or if offerors can submit more than three projects.
Contractor is limited three best example project's
55 HSU Development Reference: RFP Page, Section L.29, 3.B, Past Performance, Technical, “Provide a completed Contractor’s Qualifications Statement (AIA Document A-305)”.
Question: Please confirm whether offerors are required to submit Exhibits A – E as part of the AIA 305 form.
Bidders are to submit Exhibits A-E of the AIA 305 Form
56 HSU Development Reference: Parking Question: Please advise if a parking space will be designated for the project superintendent.
Refer to answer #19 above
57 HSU Development Reference: Outer Walkway Closed Question: At the site-walk it was mentioned that a section of the outer visitor walkway will be closed off by SI for the duration of the project. Please confirm/ indicate the limits that will be closed to the public.
Refer to answer #39 above
58 HSU Development Reference: Laydown Question: Is there a designated laydown area for this project?
Not outside of the limits of construction
59 HSU Development Reference: AD-101-FP Note 0204 Question: At the site-walk it was mentioned that these sheds could be stored onsite.
Please confirm.
Refer to answer #33 above
60 Whiting Turner Question: Please clarify if another site visit may be set up for any subcontractors and vendors who were not able to attend.
No, just public areas during the Zoo's Hours
61 Whiting Turner Referencing the solicitation, Section C (Page 15 of 183) notes schedule duration of 730 calendar days from Notice to Proceed (NTP). Please clarify if this duration is for construction or include owner FFE, move-in, etc. leading to opening. If the latter, please provide a layout/timeframe for activities following construction.
All owner's activities will be held off until after the contractor's substantial completion date.
62 Whiting Turner The Davis Bacon wadge rates provided as part of the solicitation do not include power equipment operators (excavator, bulldozer, skid steer, loader, roller, paver, backhoe, sweeper, etc.) or truck drivers (off road truck, on road truck, water truck, tri-axel truck, low boy, etc.). Please provide operator rates for use on the proposal.
Both Davis Bacon Wage Determination DC20240002 (Building) and DC20240001 (Heavy) shall apply.
Prior to Award, the most current version shall apply.
CONC. SIDEWALK
ASPHALT
CONC. V DITCH
CONC. SIDEW
ALK
FD
FD
SIT
AT
UNGA
YARD 2
SIT
AT
UNGA
ST
AL
L 2
A-1
BO
ILE
R / U
TIL
ITY
A-1
KEEPER
A-1
AD
DAX
ST
AL
L 2 A-1
AN
IMAL
LO
ADING
HOG STALL1G-101
CHEETAH / MATERNITY
ISOLATION DEN
G-105
HOG STALL2G-102
HOG STALL3G-103
HOG STALL4G-104
KEEPER
SPACEG-106
CHEETAH DEN
1F-101
CHEETAH DEN
2F-102
CHEETAH DEN
3F-103
CHEETAH DEN
4F-104
ZE
BR
A S
TA
LL
D-10
ZE
BR
A S
TA
LL
D-10
ANIMAL
KIT
CHEN
D-10
SIT
AT
UNGA
ST
AL
L 1
A-10
HOG YARD1
HOG YARD2
HOG YARD3
CHEETAH /MATERNITY YARD
ADDAX
ST
AL
L 1
A-10
AD
DAX
ST
AL
L 3 A-1
SIT
AT
UNGA
YA
RD 1
IT
ROOM
INDUST
RIAL
SINK
FR
EE
ZE
R
UNDER
COUNTE
R
REF
ADDAX VULTURE
HABITAT
ZEBRA / OSTRICH /
HABITAT
TO HABITAT
TO HABITAT
ZE
BR
A S
TA
LL
D-10
VULTURE YARD
VULTURE STALL
1B-100-A
VULTURE STALL
2B-100-B
ADDAX/ ZEBRA
STALL1C-101
ADDAX/ ZEBRA
STALL2C-102
ADDAX/ ZEBRA
YARD1
ADDAX/ ZEBRA
YARD2
ADDAX/ ZEBRA
STALL3C-103
ADDAX/ ZEBRA
STALL4C-104
ZEBRA/ OSTRICH
YARD3
ZEBRA/ OSTRICH
STALL5C-106
ZEBRA/ OSTRICH
YARD4
ZEBRA/ OSTRICH
STALL6C-107
ZEBRA/ OSTRICH
STALL7C-108
REF
REF
INDUSTRIAL
GRADE WASHER
BY ZOO
TO
HAB
ITA
T
TO
HAB
ITA
T
TOHABITAT
VULTURE APRON
8"x 8"
DARTIN
G PORT
ACCESS DOOR, TY
P
KUDU
STALL1K-101
KUDU
STALL2K-102
KUDU
STALL3K-103
KUDU
STALL4K-104
CHEETAH YARDE-104
OFF
ICE
E-5
OPE
N
OFF
ICE
E-4
RES
TR
OOM
E-2
E-3
LO
CKE
R
LA
UNDRY / U
TIL
ITY
E-1
FD
FD
SIT
AT
UNGA
YARD 2
SIT
AT
UNGA
ST
AL
L 2
A-1
BO
ILE
R / U
TIL
ITY
A-1
KEEPER
A-1
AD
DAX
ST
AL
L 2 A-1
AN
IMAL
LO
ADING
HOG STALL1G-101
CHEETAH / MATERNITY
ISOLATION DEN
G-105
HOG STALL2G-102
HOG STALL3G-103
HOG STALL4G-104
KEEPER
SPACEG-106
CHEETAH DEN
1F-101
CHEETAH DEN
2F-102
CHEETAH DEN
3F-103
CHEETAH DEN
4F-104
ZE
BR
A S
TA
LL
D-10
ZE
BR
A S
TA
LL
D-10
ANIMAL
KIT
CHEN
D-10
SIT
AT
UNGA
ST
AL
L 1
A-10
HOG YARD1
HOG YARD2
HOG YARD3
CHEETAH /MATERNITY YARD
ADDAX
ST
AL
L 1
A-10
AD
DAX
ST
AL
L 3 A-1
SIT
AT
UNGA
YA
RD 1
IT
ROOM
INDUST
RIAL
SINK
FR
EE
ZE
R
UNDER
COUNTE
R
REF
ADDAX VULTURE
HABITAT
ZEBRA / OSTRICH /
HABITAT
TO HABITAT
TO HABITAT
ZE
BR
A S
TA
LL
D-10
VULTURE YARD
VULTURE STALL
1B-100-A
VULTURE STALL
2B-100-B
ADDAX/ ZEBRA
STALL1C-101
ADDAX/ ZEBRA
STALL2C-102
ADDAX/ ZEBRA
YARD1
ADDAX/ ZEBRA
YARD2
ADDAX/ ZEBRA
STALL3C-103
ADDAX/ ZEBRA
STALL4C-104
ZEBRA/ OSTRICH
YARD3
ZEBRA/ OSTRICH
STALL5C-106
ZEBRA/ OSTRICH
YARD4
ZEBRA/ OSTRICH
STALL6C-107
ZEBRA/ OSTRICH
STALL7C-108
REF
REF
INDUSTRIAL
GRADE WASHER
BY ZOO
TO
HAB
ITA
T
TO
HAB
ITA
T
TOHABITAT
VULTURE APRON
8"x 8"
DARTIN
G PORT
ACCESS DOOR, TY
P
KUDU
STALL1K-101
KUDU
STALL2K-102
KUDU
STALL3K-103
KUDU
STALL4K-104
CHEETAH YARDE-104
OFF
ICE
E-5
OPE
N
OFF
ICE
E-4
RES
TR
OOM
E-2
E-3
LO
CKE
R
LA
UNDRY / U
TIL
ITY
E-1
#8
"EDUCATION &
ADMINISTRATION
BUILDING"
#126
"PANDA RESTROOM"
204205
198199
215216
211212
205206207208209210
210211
1"=1"
1" 2"
1/8"=1'-0"
4' 8' 16'
1"=100'-0"
100' 200'
1/16"=1'-0"
8' 16' 32'
1"=50'-0"
50' 100'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
REVISION # DATE REVISION DESCRIPTION
NOT FOR
CONSTRUCTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
DRAWING TYPE
architrave p.c.
:4 :3
P M
RENEW CHEETAH
CONSERVATION
STATION (CCS)
1401.39
RENEW CHEETAH CONSERVATION
STATION (CCS)
2/7/23 100% - CDS
A
B Y
A p p ro ve r E n te r Is su e
D a te
C D S
NZP CHEETAH CONSERVATION
STATION
3001 CONNECTICUT AVENUE,
WASHINGTON DC
NZP CHEETAH
CONSERVATION
STATION
2033108 architrave p.c.
420 10th Str. SE, Washington DC 20003
202.544.1640 architravep.com
Author CheckerDesigner
L-104
MES
ANIMAL BARRIER AND FENCING
LAYOUT
1 04L- LS
ANIMAL BARRIER & FENCING LAYOUT
SCALE = 1/16" = 1'-0"
MCC
SuperakJA Snapshot
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text x
AutoCAD SHX Text
FF=223.3
AutoCAD SHX Text T3154
AutoCAD SHX Text 10"
AutoCAD SHX Text 17"
AutoCAD SHX Text T3149
AutoCAD SHX Text T3153
AutoCAD SHX Text 35"
AutoCAD SHX Text T3137
AutoCAD SHX Text 52"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 8"
AutoCAD SHX Text 13"
AutoCAD SHX Text 9"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 13"
AutoCAD SHX Text 10"
AutoCAD SHX Text 9"
AutoCAD SHX Text 4"
AutoCAD SHX Text 12"
AutoCAD SHX Text 15"
AutoCAD SHX Text 30"
AutoCAD SHX Text 20"
AutoCAD SHX Text 14"
AutoCAD SHX Text 24"
AutoCAD SHX Text 12"
AutoCAD SHX Text 18"
AutoCAD SHX Text 30"
AutoCAD SHX Text T3292
AutoCAD SHX Text T3293
AutoCAD SHX Text T3181
AutoCAD SHX Text T3180
AutoCAD SHX Text T3179
AutoCAD SHX Text T3178
AutoCAD SHX Text T3177
AutoCAD SHX Text T3176
AutoCAD SHX Text T3175
AutoCAD SHX Text T3169
AutoCAD SHX Text T3167
AutoCAD SHX Text T3166
AutoCAD SHX Text T3165
AutoCAD SHX Text T3164
AutoCAD SHX Text T3163
AutoCAD SHX Text T3161
AutoCAD SHX Text T3160
AutoCAD SHX Text T3162
AutoCAD SHX Text 40"
AutoCAD SHX Text 33"
AutoCAD SHX Text 20"
AutoCAD SHX Text 13"
AutoCAD SHX Text 40"
AutoCAD SHX Text
AutoCAD SHX Text 36"
AutoCAD SHX Text 40"
AutoCAD SHX Text 38"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 38"
AutoCAD SHX Text 20"
AutoCAD SHX Text 17"
AutoCAD SHX Text 18"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 13"
AutoCAD SHX Text 10"
AutoCAD SHX Text 27"
AutoCAD SHX Text 24"
AutoCAD SHX Text 14"
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 14"
AutoCAD SHX Text 16"
AutoCAD SHX Text 12"
AutoCAD SHX Text 19"
AutoCAD SHX Text 20"
AutoCAD SHX Text 9"
AutoCAD SHX Text 15"
AutoCAD SHX Text 42"
AutoCAD SHX Text 22"
AutoCAD SHX Text 36"
AutoCAD SHX Text 25"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 19"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 23"
AutoCAD SHX Text 20"
AutoCAD SHX Text 18"
AutoCAD SHX Text 10"
AutoCAD SHX Text 35"
AutoCAD SHX Text 28"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 22"
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 22"
AutoCAD SHX Text 26"
AutoCAD SHX Text 21"
AutoCAD SHX Text 20"
AutoCAD SHX Text 22"
AutoCAD SHX Text 25"
AutoCAD SHX Text 16"
AutoCAD SHX Text T248
AutoCAD SHX Text T247
AutoCAD SHX Text T239
AutoCAD SHX Text T118
AutoCAD SHX Text T238
AutoCAD SHX Text T150
AutoCAD SHX Text T151
AutoCAD SHX Text T152
AutoCAD SHX Text T153
AutoCAD SHX Text T256
AutoCAD SHX Text T257
AutoCAD SHX Text T255
AutoCAD SHX Text T258
AutoCAD SHX Text T158
AutoCAD SHX Text T159
AutoCAD SHX Text T171
AutoCAD SHX Text T165
AutoCAD SHX Text T166
AutoCAD SHX Text T168
AutoCAD SHX Text T206
AutoCAD SHX Text T216
AutoCAD SHX Text T117
AutoCAD SHX Text T108
AutoCAD SHX Text T109
AutoCAD SHX Text T110
AutoCAD SHX Text T111
AutoCAD SHX Text T113
AutoCAD SHX Text T114
AutoCAD SHX Text T115
AutoCAD SHX Text T116
AutoCAD SHX Text T229
AutoCAD SHX Text T198
AutoCAD SHX Text T197
AutoCAD SHX Text T196
AutoCAD SHX Text T195
AutoCAD SHX Text T194
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text T125
AutoCAD SHX Text T124
AutoCAD SHX Text T123
AutoCAD SHX Text T122
AutoCAD SHX Text T121
AutoCAD SHX Text T126
AutoCAD SHX Text T127
AutoCAD SHX Text T128
AutoCAD SHX Text T129
AutoCAD SHX Text T130
AutoCAD SHX Text T131
AutoCAD SHX Text T132
AutoCAD SHX Text T133
AutoCAD SHX Text T134
AutoCAD SHX Text T135
AutoCAD SHX Text T136
AutoCAD SHX Text T137
AutoCAD SHX Text T138
AutoCAD SHX Text T139
AutoCAD SHX Text T140
AutoCAD SHX Text T141
AutoCAD SHX Text T142
AutoCAD SHX Text T143
AutoCAD SHX Text T144
AutoCAD SHX Text T145
AutoCAD SHX Text T146
AutoCAD SHX Text T147
AutoCAD SHX Text T148
AutoCAD SHX Text T149
AutoCAD SHX Text T199
AutoCAD SHX Text T178
AutoCAD SHX Text T112
AutoCAD SHX Text T101
AutoCAD SHX Text T106
AutoCAD SHX Text T107
AutoCAD SHX Text T104
AutoCAD SHX Text T105
AutoCAD SHX Text T179
AutoCAD SHX Text T180
AutoCAD SHX Text T181
AutoCAD SHX Text T182
AutoCAD SHX Text T183
AutoCAD SHX Text T184
AutoCAD SHX Text T185
AutoCAD SHX Text T186
AutoCAD SHX Text T187
AutoCAD SHX Text T188
AutoCAD SHX Text T189
AutoCAD SHX Text T190
AutoCAD SHX Text T191
AutoCAD SHX Text T192
AutoCAD SHX Text T193
AutoCAD SHX Text T218
AutoCAD SHX Text T219
AutoCAD SHX Text T220
AutoCAD SHX Text T221
AutoCAD SHX Text T222
AutoCAD SHX Text T223
AutoCAD SHX Text T259
AutoCAD SHX Text T260
AutoCAD SHX Text T261
AutoCAD SHX Text T262
AutoCAD SHX Text T263
AutoCAD SHX Text T264
AutoCAD SHX Text T265
AutoCAD SHX Text T266
AutoCAD SHX Text T267
AutoCAD SHX Text T268
AutoCAD SHX Text T269
AutoCAD SHX Text T270
AutoCAD SHX Text T271
AutoCAD SHX Text T249
AutoCAD SHX Text T251
AutoCAD SHX Text T252
AutoCAD SHX Text T253
AutoCAD SHX Text T250
AutoCAD SHX Text T272
AutoCAD SHX Text T273
AutoCAD SHX Text T274
AutoCAD SHX Text T275
AutoCAD SHX Text T276
AutoCAD SHX Text T277
AutoCAD SHX Text T278
AutoCAD SHX Text T279
AutoCAD SHX Text T200
AutoCAD SHX Text T201
AutoCAD SHX Text T202
AutoCAD SHX Text T203
AutoCAD SHX Text T204
AutoCAD SHX Text T205
AutoCAD SHX Text T207
AutoCAD SHX Text T208
AutoCAD SHX Text T209
AutoCAD SHX Text T210
AutoCAD SHX Text T211
AutoCAD SHX Text T212
AutoCAD SHX Text T213
AutoCAD SHX Text T214
AutoCAD SHX Text T216
AutoCAD SHX Text T215
AutoCAD SHX Text T237
AutoCAD SHX Text T163
AutoCAD SHX Text T154
AutoCAD SHX Text T155
AutoCAD SHX Text T156
AutoCAD SHX Text T157
AutoCAD SHX Text T158
AutoCAD SHX Text T159
AutoCAD SHX Text T160
AutoCAD SHX Text T161
AutoCAD SHX Text T162
AutoCAD SHX Text T164
AutoCAD SHX Text T167
AutoCAD SHX Text T169
AutoCAD SHX Text T165
AutoCAD SHX Text T172
AutoCAD SHX Text T173
AutoCAD SHX Text T174
AutoCAD SHX Text T175
AutoCAD SHX Text T176
AutoCAD SHX Text T102
AutoCAD SHX Text T103
AutoCAD SHX Text T119
AutoCAD SHX Text T120
AutoCAD SHX Text T240
AutoCAD SHX Text T142
AutoCAD SHX Text T243
AutoCAD SHX Text T244
AutoCAD SHX Text T245
AutoCAD SHX Text T246
AutoCAD SHX Text T242
AutoCAD SHX Text T238
AutoCAD SHX Text T239
AutoCAD SHX Text T247
AutoCAD SHX Text T248
AutoCAD SHX Text T168
AutoCAD SHX Text T171
AutoCAD SHX Text T108
AutoCAD SHX Text T109
AutoCAD SHX Text T110
AutoCAD SHX Text T111
AutoCAD SHX Text T113
AutoCAD SHX Text T114
AutoCAD SHX Text T115
AutoCAD SHX Text T116
AutoCAD SHX Text T117
AutoCAD SHX Text T118
AutoCAD SHX Text T206
AutoCAD SHX Text T152
AutoCAD SHX Text T151
AutoCAD SHX Text T150
AutoCAD SHX Text T153
AutoCAD SHX Text
AutoCAD SHX Text T194
AutoCAD SHX Text T195
AutoCAD SHX Text T196
AutoCAD SHX Text T197
AutoCAD SHX Text T198
AutoCAD SHX Text T224
AutoCAD SHX Text T225
AutoCAD SHX Text T226
AutoCAD SHX Text T227
AutoCAD SHX Text T228
AutoCAD SHX Text T256
AutoCAD SHX Text T255
AutoCAD SHX Text T257
AutoCAD SHX Text T258
AutoCAD SHX Text T170
AutoCAD SHX Text T166
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EM
AutoCAD SHX Text
MH
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EO
AutoCAD SHX Text
EO
AutoCAD SHX Text
EO
AutoCAD SHX Text E
AutoCAD SHX Text x
AutoCAD SHX Text
FF=223.3
AutoCAD SHX Text C
AutoCAD SHX Text
EO
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
SHED
AutoCAD SHX Text
SHED
AutoCAD SHX Text 44.4
AutoCAD SHX Text 100.9
AutoCAD SHX Text 44.7
AutoCAD SHX Text 11.3
AutoCAD SHX Text 22.3
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text 44.6
AutoCAD SHX Text 12.7
AutoCAD SHX Text 12.7
AutoCAD SHX Text 44.6
AutoCAD SHX Text 49.5
AutoCAD SHX Text 49.5
AutoCAD SHX Text 14.0
AutoCAD SHX Text 14.0
AutoCAD SHX Text 100.9
AutoCAD SHX Text 44.0
AutoCAD SHX Text 44.1
AutoCAD SHX Text 12.7
AutoCAD SHX Text 12.8
AutoCAD SHX Text 12.1
AutoCAD SHX Text 12.1
AutoCAD SHX Text 12.8
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text 42.3
AutoCAD SHX Text 42.3
AutoCAD SHX Text 15.3
AutoCAD SHX Text 15.3
AutoCAD SHX Text
FENCING H2
AutoCAD SHX Text
FENCING H1
AutoCAD SHX Text
FENCING H3
AutoCAD SHX Text
FENCING H4
AutoCAD SHX Text
FENCING M1
AutoCAD SHX Text
FENCING M2
AutoCAD SHX Text
FENCING M3
AutoCAD SHX Text
FENCING M4
batulabbas 44.6 batulabbas E batulabbas E batulabbas
SHED
batulabbas 44.4 batulabbas 100.9 batulabbas 44.7 batulabbas 11.3 batulabbas 22.3 batulabbas E batulabbas E batulabbas 44.6 batulabbas 12.7 batulabbas 12.7 batulabbas 49.5 batulabbas 49.5 batulabbas 14.0 batulabbas 14.0 batulabbas 100.9 batulabbas 44.0 batulabbas 44.1 batulabbas 12.7 batulabbas 12.8 batulabbas 12.1 batulabbas 12.1 batulabbas 12.8 batulabbas V batulabbas V batulabbas E batulabbas
EO
batulabbas
SHED
batulabbas
FF=223.3
batulabbas C batulabbas E batulabbas E batulabbas E batulabbas
EM
batulabbas
MH
batulabbas
SYL
batulabbas C batulabbas C batulabbas E batulabbas E batulabbas E batulabbas E batulabbas
EO
batulabbas x batulabbas
EO
batulabbas
EO
batulabbas E batulabbas
FENCING M1
batulabbas
FENCING M2
batulabbas
FENCING M3
batulabbas
FENCING M4
batulabbas
FENCING H4
batulabbas
FENCING H3
batulabbas
FENCING H1
batulabbas 15.3 batulabbas 15.3 batulabbas 42.3 batulabbas 42.3 batulabbas V batulabbas V batulabbas Snapshot batulabbas
FENCING H2
SuperakJA Line
SuperakJA Text Box Closed cross walk / demoed
SuperakJA PolyLine
SuperakJA PolyLine
SuperakJA Line
SuperakJA PolyLine
SuperakJA Line
SuperakJA Text Box green = existing fencing
SuperakJA Text Box Contractors Entry Point
SuperakJA Line
SuperakJA Line
SuperakJA Line
SuperakJA Snapshot
SuperakJA Line
SuperakJA Text Box Decorative fence, 6' chain link with cladding and a conservation message applied to it
SuperakJA Text Box Trailer and material lay down to be internal to CCS footprint
SuperakJA Text Box maintain emergency access along Olmstead
SuperakJA Text Box Flag personnel to be used to truck in/out
SuperakJA Line
SuperakJA Single Door
SuperakJA Single Door
SuperakJA Single Door
SuperakJA Snapshot
SuperakJA Text Box Public circulation when CCS and bus lot bollards is under construction
Assume bus lot bollards project will start second week of January 2025, will reopen to public March 15, 2025
SuperakJA PolyLine
SuperakJA PolyLine
SuperakJA Line
SuperakJA Text Box purple line = fencing by GC when both CCS and bus lot bollards is under construction at the same time
SuperakJA Text Box Extents of bus lot bollards project
SuperakJA Text Box pink line = fencing by GC, braced for wind loads
ChanVC Typewriter Document A
CONC. SIDEWALK
ASPHALT
CONC. V DITCH
CONC. SIDEW
ALK
FD
FD
SIT
AT
UNGA
YARD 2
SIT
AT
UNGA
ST
AL
L 2
A-1
BO
ILE
R / U
TIL
ITY
A-1
KEEPER
A-1
AD
DAX
ST
AL
L 2 A-1
AN
IMAL
LO
ADING
HOG STALL1G-101
CHEETAH / MATERNITY
ISOLATION DEN
G-105
HOG STALL2G-102
HOG STALL3G-103
HOG STALL4G-104
KEEPER
SPACEG-106
CHEETAH DEN
1F-101
CHEETAH DEN
2F-102
CHEETAH DEN
3F-103
CHEETAH DEN
4F-104
ZE
BR
A S
TA
LL
D-10
ZE
BR
A S
TA
LL
D-10
ANIMAL
KIT
CHEN
D-10
SIT
AT
UNGA
ST
AL
L 1
A-10
HOG YARD1
HOG YARD2
HOG YARD3
CHEETAH /MATERNITY YARD
ADDAX
ST
AL
L 1
A-10
AD
DAX
ST
AL
L 3 A-1
SIT
AT
UNGA
YA
RD 1
IT
ROOM
INDUST
RIAL
SINK
FR
EE
ZE
R
UNDER
COUNTE
R
REF
ADDAX VULTURE
HABITAT
ZEBRA / OSTRICH /
HABITAT
TO HABITAT
TO HABITAT
ZE
BR
A S
TA
LL
D-10
VULTURE YARD
VULTURE STALL
1B-100-A
VULTURE STALL
2B-100-B
ADDAX/ ZEBRA
STALL1C-101
ADDAX/ ZEBRA
STALL2C-102
ADDAX/ ZEBRA
YARD1
ADDAX/ ZEBRA
YARD2
ADDAX/ ZEBRA
STALL3C-103
ADDAX/ ZEBRA
STALL4C-104
ZEBRA/ OSTRICH
YARD3
ZEBRA/ OSTRICH
STALL5C-106
ZEBRA/ OSTRICH
YARD4
ZEBRA/ OSTRICH
STALL6C-107
ZEBRA/ OSTRICH
STALL7C-108
REF
REF
INDUSTRIAL
GRADE WASHER
BY ZOO
TO
HAB
ITA
T
TO
HAB
ITA
T
TOHABITAT
VULTURE APRON
8"x 8"
DARTIN
G PORT
ACCESS DOOR, TY
P
KUDU
STALL1K-101
KUDU
STALL2K-102
KUDU
STALL3K-103
KUDU
STALL4K-104
CHEETAH YARDE-104
OFF
ICE
E-5
OPE
N
OFF
ICE
E-4
RES
TR
OOM
E-2
E-3
LO
CKE
R
LA
UNDRY / U
TIL
ITY
E-1
FD
FD
SIT
AT
UNGA
YARD 2
SIT
AT
UNGA
ST
AL
L 2
A-1
BO
ILE
R / U
TIL
ITY
A-1
KEEPER
A-1
AD
DAX
ST
AL
L 2 A-1
AN
IMAL
LO
ADING
HOG STALL1G-101
CHEETAH / MATERNITY
ISOLATION DEN
G-105
HOG STALL2G-102
HOG STALL3G-103
HOG STALL4G-104
KEEPER
SPACEG-106
CHEETAH DEN
1F-101
CHEETAH DEN
2F-102
CHEETAH DEN
3F-103
CHEETAH DEN
4F-104
ZE
BR
A S
TA
LL
D-10
ZE
BR
A S
TA
LL
D-10
ANIMAL
KIT
CHEN
D-10
SIT
AT
UNGA
ST
AL
L 1
A-10
HOG YARD1
HOG YARD2
HOG YARD3
CHEETAH /MATERNITY YARD
ADDAX
ST
AL
L 1
A-10
AD
DAX
ST
AL
L 3 A-1
SIT
AT
UNGA
YA
RD 1
IT
ROOM
INDUST
RIAL
SINK
FR
EE
ZE
R
UNDER
COUNTE
R
REF
ADDAX VULTURE
HABITAT
ZEBRA / OSTRICH /
HABITAT
TO HABITAT
TO HABITAT
ZE
BR
A S
TA
LL
D-10
VULTURE YARD
VULTURE STALL
1B-100-A
VULTURE STALL
2B-100-B
ADDAX/ ZEBRA
STALL1C-101
ADDAX/ ZEBRA
STALL2C-102
ADDAX/ ZEBRA
YARD1
ADDAX/ ZEBRA
YARD2
ADDAX/ ZEBRA
STALL3C-103
ADDAX/ ZEBRA
STALL4C-104
ZEBRA/ OSTRICH
YARD3
ZEBRA/ OSTRICH
STALL5C-106
ZEBRA/ OSTRICH
YARD4
ZEBRA/ OSTRICH
STALL6C-107
ZEBRA/ OSTRICH
STALL7C-108
REF
REF
INDUSTRIAL
GRADE WASHER
BY ZOO
TO
HAB
ITA
T
TO
HAB
ITA
T
TOHABITAT
VULTURE APRON
8"x 8"
DARTIN
G PORT
ACCESS DOOR, TY
P
KUDU
STALL1K-101
KUDU
STALL2K-102
KUDU
STALL3K-103
KUDU
STALL4K-104
CHEETAH YARDE-104
OFF
ICE
E-5
OPE
N
OFF
ICE
E-4
RES
TR
OOM
E-2
E-3
LO
CKE
R
LA
UNDRY / U
TIL
ITY
E-1
#8
"EDUCATION &
ADMINISTRATION
BUILDING"
#126
"PANDA RESTROOM"
204205
198199
215216
211212
205206207208209210
210211
1"=1"
1" 2"
1/8"=1'-0"
4' 8' 16'
1"=100'-0"
100' 200'
1/16"=1'-0"
8' 16' 32'
1"=50'-0"
50' 100'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
REVISION # DATE REVISION DESCRIPTION
NOT FOR
CONSTRUCTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
DRAWING TYPE
architrave p.c.
:4 :3
P M
RENEW CHEETAH
CONSERVATION
STATION (CCS)
1401.39
RENEW CHEETAH CONSERVATION
STATION (CCS)
2/7/23 100% - CDS
A
B Y
A p p ro ve r E n te r Is su e
D a te
C D S
NZP CHEETAH CONSERVATION
STATION
3001 CONNECTICUT AVENUE,
WASHINGTON DC
NZP CHEETAH
CONSERVATION
STATION
2033108 architrave p.c.
420 10th Str. SE, Washington DC 20003
202.544.1640 architravep.com
Author CheckerDesigner
L-104
MES
ANIMAL BARRIER AND FENCING
LAYOUT
1 04L- LS
ANIMAL BARRIER & FENCING LAYOUT
SCALE = 1/16" = 1'-0"
MCC
SuperakJA Snapshot
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text x
AutoCAD SHX Text
FF=223.3
AutoCAD SHX Text T3154
AutoCAD SHX Text 10"
AutoCAD SHX Text 17"
AutoCAD SHX Text T3149
AutoCAD SHX Text T3153
AutoCAD SHX Text 35"
AutoCAD SHX Text T3137
AutoCAD SHX Text 52"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 8"
AutoCAD SHX Text 13"
AutoCAD SHX Text 9"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 13"
AutoCAD SHX Text 10"
AutoCAD SHX Text 9"
AutoCAD SHX Text 4"
AutoCAD SHX Text 12"
AutoCAD SHX Text 15"
AutoCAD SHX Text 30"
AutoCAD SHX Text 20"
AutoCAD SHX Text 14"
AutoCAD SHX Text 24"
AutoCAD SHX Text 12"
AutoCAD SHX Text 18"
AutoCAD SHX Text 30"
AutoCAD SHX Text T3292
AutoCAD SHX Text T3293
AutoCAD SHX Text T3181
AutoCAD SHX Text T3180
AutoCAD SHX Text T3179
AutoCAD SHX Text T3178
AutoCAD SHX Text T3177
AutoCAD SHX Text T3176
AutoCAD SHX Text T3175
AutoCAD SHX Text T3169
AutoCAD SHX Text T3167
AutoCAD SHX Text T3166
AutoCAD SHX Text T3165
AutoCAD SHX Text T3164
AutoCAD SHX Text T3163
AutoCAD SHX Text T3161
AutoCAD SHX Text T3160
AutoCAD SHX Text T3162
AutoCAD SHX Text 40"
AutoCAD SHX Text 33"
AutoCAD SHX Text 20"
AutoCAD SHX Text 13"
AutoCAD SHX Text 40"
AutoCAD SHX Text
AutoCAD SHX Text 36"
AutoCAD SHX Text 40"
AutoCAD SHX Text 38"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 38"
AutoCAD SHX Text 20"
AutoCAD SHX Text 17"
AutoCAD SHX Text 18"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 13"
AutoCAD SHX Text 10"
AutoCAD SHX Text 27"
AutoCAD SHX Text 24"
AutoCAD SHX Text 14"
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 14"
AutoCAD SHX Text 16"
AutoCAD SHX Text 12"
AutoCAD SHX Text 19"
AutoCAD SHX Text 20"
AutoCAD SHX Text 9"
AutoCAD SHX Text 15"
AutoCAD SHX Text 42"
AutoCAD SHX Text 22"
AutoCAD SHX Text 36"
AutoCAD SHX Text 25"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 19"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 23"
AutoCAD SHX Text 20"
AutoCAD SHX Text 18"
AutoCAD SHX Text 10"
AutoCAD SHX Text 35"
AutoCAD SHX Text 28"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 22"
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 22"
AutoCAD SHX Text 26"
AutoCAD SHX Text 21"
AutoCAD SHX Text 20"
AutoCAD SHX Text 22"
AutoCAD SHX Text 25"
AutoCAD SHX Text 16"
AutoCAD SHX Text T248
AutoCAD SHX Text T247
AutoCAD SHX Text T239
AutoCAD SHX Text T118
AutoCAD SHX Text T238
AutoCAD SHX Text T150
AutoCAD SHX Text T151
AutoCAD SHX Text T152
AutoCAD SHX Text T153
AutoCAD SHX Text T256
AutoCAD SHX Text T257
AutoCAD SHX Text T255
AutoCAD SHX Text T258
AutoCAD SHX Text T158
AutoCAD SHX Text T159
AutoCAD SHX Text T171
AutoCAD SHX Text T165
AutoCAD SHX Text T166
AutoCAD SHX Text T168
AutoCAD SHX Text T206
AutoCAD SHX Text T216
AutoCAD SHX Text T117
AutoCAD SHX Text T108
AutoCAD SHX Text T109
AutoCAD SHX Text T110
AutoCAD SHX Text T111
AutoCAD SHX Text T113
AutoCAD SHX Text T114
AutoCAD SHX Text T115
AutoCAD SHX Text T116
AutoCAD SHX Text T229
AutoCAD SHX Text T198
AutoCAD SHX Text T197
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .