HMSG Gardens Bid Sheet J1 Revision 1.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 333302-23RF-0010010
- Issued by
-
Smithsonian Institution
About this file
This solicitation seeks offers for the revitalization of the Hirshhorn Museum and Sculpture Garden. Key details include: the Smithsonian Institution is seeking proposals through RFP 333302-23RF-0010010 to revitalize the Hirshhorn Museum and Sculpture Garden per construction drawings and specifications, with a project completion date of 927 calendar days from notice to proceed. Offerors shall provide fixed pricing for the base scope of revitalizing the museum plaza and garden per the original 1974 Bunshaft design, including repair of deteriorated concrete walls and replacement of the central reflecting pool, as well as three options adding landscaping of east and west aprons, repair of an east buttress, and application of a sealer to exposed surfaces. The bid due date is May 25, 2023 by 3pm, with funding spread over two fiscal years from 2023 through 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33330223RF0010010 Amendment 6.pdf | ||
| Addendum 2.docx | DOCX document | |
| Project Report Manual.docx | DOCX document | |
| 33330223RF0010010 Amendment 5.pdf | ||
| Revit HMSG RFI Questions and Responses 283-420.pdf | ||
| Revit HMSG RFI Questions Bundle 6_AE Responses 274-282.pdf | ||
| SF 1442 Pg 1 Rev 2.pdf | ||
| 33330223RF0010010 Amendment 4.pdf | ||
| 33330223RF0010010 Amendment 3.pdf | ||
| SF 1442 Pg 1 Rev 1.pdf | ||
| Company Experience Form.pdf | ||
| Addendum 1 download location.docx | DOCX document | |
| 33330223RF0010010 Amendment 2.pdf | ||
| 33330223RF0010010 Amendment 1.pdf | ||
| J2 Specifications and Drawings.docx | DOCX document | |
| J1 - Bid Sheet.xlsx | XLSX spreadsheet | |
| J3 Graphics.docx | DOCX document | |
| J4 - 333302 23RF 0010010 RFP.pdf | ||
| J1 - multi year funding.pdf | ||
| J5 - DC20220001 Heavy.txt | TXT text file | |
| J5 - DC20230002 Building.txt | TXT text file | |
| Health Screening Questions_Contractors.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank bid summary
| Title : | Revitalization of the Sculpture Garden | Prepared by : |
| Facility : | Hirshhorn Museum and Sculpture Garden | Date : |
| Project Number : | 1521108 | Company: |
| Base Bid | ||||
| BASE BID: All work associated withRevitalization of the Hirshhorn Museum and Sculpture Garden, as described herein and in the Graphics Package dated February 2, 2022, Construction Drawings and Specifications dated11/21/2022. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
| BASE BIDTotal | ||
| Title : | Revitalization of the Sculpture Garden | Prepared by : |
| Facility : | Hirshhorn Museum and Sculpture Garden | Date : |
| Project Number : | 1521108 | Company: |
| OPTION 1 | ||||
| OPTION 1: All work associated with East and West aprons Revitalization of the Hirshhorn Museum and Sculpture Garden, as described herein and in the Graphics Package dated February 2, 2022, Construction Drawings and Specifications dated 11/21/2022. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
| OPTION 1 | ||
| Title : | Revitalization of the Sculpture Garden | Prepared by : |
| Facility : | Hirshhorn Museum and Sculpture Garden | Date : |
| Project Number : | 1521108 | Company: |
| OPTION 2 | ||||
| OPTION 2: All work associated with East buttress below north sidewalk Revitalization of the Hirshhorn Museum and Sculpture Garden, as described herein and in the Graphics Package dated February 2, 2022, Construction Drawings and Specifications dated 11/21/2022. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
| OPTION 2 | ||
| Title : | Revitalization of the Sculpture Garden | Prepared by : |
| Facility : | Hirshhorn Museum and Sculpture Garden | Date : |
| Project Number : | 1521108 | Company: |
| OPTION 3 | ||||
| OPTION 3: All work associated with Sealer to exposed surfaces Revitalization of the Hirshhorn Museum and Sculpture Garden, as described herein and in the Graphics Package dated February 2, 2022, Construction Drawings and Specifications dated 11/21/2022. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
OPTION 3
B-&P
Sheet1
File details come from the government source that posted it. Updated .