This document includes an amendment to a solicitation and responses to requests for information related to a federal contract opportunity for the revitalization of the Hirshhorn Museum Sculpture Garden. Key details include:
-
The solicitation is being amended to include a pre-bid site visit sign-in sheet from April 11, 2023 and responses to seven contractor questions clarifying aspects of the project scope, schedule, and specifications. Proposals are still due on May 25, 2023 by 3:00PM.
-
The project involves renovating the Sculpture Garden surrounding the Hirshhorn Museum of Modern Art to address deterioration, improve accessibility and visitor experience, and restore the original design intent. The work will be designed by Hiroshi Sugimoto and Quinn Evans Architects based on an earlier concept design.
-
Questions addressed aspects of asbestos and lead testing, traffic control plans, required underpinning details, allowable work hours including weekends/holidays, tower crane installation and removal, and applicability of small business price evaluation preferences. Clarifications were provided on each item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33330223RF0010010 Amendment 6.pdf | ||
| Addendum 2.docx | DOCX document | |
| Project Report Manual.docx | DOCX document | |
| 33330223RF0010010 Amendment 5.pdf | ||
| Revit HMSG RFI Questions and Responses 283-420.pdf | ||
| Revit HMSG RFI Questions Bundle 6_AE Responses 274-282.pdf | ||
| HMSG Gardens Bid Sheet J1 Revision 1.xlsx | XLSX spreadsheet | |
| SF 1442 Pg 1 Rev 2.pdf | ||
| 33330223RF0010010 Amendment 4.pdf | ||
| 33330223RF0010010 Amendment 3.pdf | ||
| SF 1442 Pg 1 Rev 1.pdf | ||
| Company Experience Form.pdf | ||
| Addendum 1 download location.docx | DOCX document | |
| 33330223RF0010010 Amendment 2.pdf | ||
| J2 Specifications and Drawings.docx | DOCX document | |
| J1 - Bid Sheet.xlsx | XLSX spreadsheet | |
| J3 Graphics.docx | DOCX document | |
| J4 - 333302 23RF 0010010 RFP.pdf | ||
| J1 - multi year funding.pdf | ||
| J5 - DC20220001 Heavy.txt | TXT text file | |
| J5 - DC20230002 Building.txt | TXT text file | |
| Health Screening Questions_Contractors.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330223RF0010010
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
152110803/03/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/03/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is Amendment Number One to Solicitation 333302-23RF-0010010 for the Revitalization of the Hirshhorn Museum Sculpture Garden.
1. Sign in sheet for the Pre-Bid site visit on April 11, 2023 (attached)
2. Response to RFI's 1-7 ( attached)
QUESTIONS/CLARIFICATIONS
It is desired that all questions/clarifications be sent in word format, sequentially
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Grant
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
33330223RF0010010/0001
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu. It is requested that all questions be sent in by Tuesday April 18, 2023, no later than 3PM EST.
Proposals are to be submitted to DropBox.com by Thursday, May 25, 2023 by 3:00PM using the link:
https://www.dropbox.com/request/edueuyXMP53ZTyKqmf
KM and express mailed on or before the due date on separate flash drives labeled Technical and Cost.
RFI # Drawing/Spec Reference Category Question Response by Response
1 section 028200 Asbestos Abatement
Asbestos Abatement has been provided within Volume 1 of the Specifications. A Survey of Hazardous Materials has not been provided. Please advise if asbestos containing material is anticipated to be disturbed by the work in this project.
SI Refer to Specification 010000, 50.9 for scope of PACM testing.
2 section 028300 lead containing material
Work Activities Impacting Lead-containing Materials has been provided within Volume 1 of the Specifications. A Survey of Hazardous Materials has not been provided. Please advise if lead containing material is anticipated to be disturbed by the work in this project.
SI No known lead containing material is anticipated to be disturbed. Refer to Specification 010000, 50.9.
3 drawing G1/S-432 traffic on Jefferson Drive
Per the RFP, through traffic on Jefferson Drive must be maintained. Per note 3 on drawing G1/S-432, Jefferson Drive is to be closed to traffic during underpinning of the existing tunnel. Please advise timeframes where closure of Jefferson Drive will be permitted in order to comply with the Structural note.
A/E
SI: Full closure of Jefferson Drive not permitted
A/E: Phased closure of Jefferson drive to be coordinated by contractor per civil drawings (C801 and C802) and keynote 9 on S101. Note 3 on G1/S-432 to be clarified as “ALL TUNNEL SLAB AND JOISTS TO BE SHORED DURING UNDERPINNING AND JEFFERSON DRIVE SHALL BE PARTIALLY
CLOSED TO TRAFFIC DURING UNDERPINNING. REFERENCE KEYNOTE 9 ON S101.”
4 underpinning specification
An underpinning specification was not included in the project manual. The underpinning shown in the Structural drawings is also serving as the foundation for the new concrete walls outboard of the existing tunnel. Please advise the Structural Engineer’s intended sequence of underpinning/ foundation construction, including: maximum width of underpinning, minimum width of new footing construction, reinforcing splice requirements between underpinning sequences, minimum proximity between underpinning sequences, minimum compressive strength of required prior to excavating for adjacent underpinning sequence.
A/E
A/E: We agree that more information is required to indicate the contractor's work on underpinning, but do not believe a unique underpinning specification is needed. The concrete mix for the underpinning is included in Specification Section 033000 Article 2.7a. Additional underpinning notes will be added to the Structural Design Notes on S001 or S002. The essence of these notes are that, similar to shoring and bracing, because there are numerous means and methods for design and installation, the Underpinning design and procedures are the sole responsibility of the Contractor. See below for language to be incorporated:
A. UNDERPINNING, UNDERPINNING DESIGN, AND PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
B. PREPARE AND SUBMIT FOR REVIEW UNDERPINNING DRAWINGS STAMPED, SEALED AND PREPARED BY A PROFESSIONAL STRUCTURAL ENGINEER REGISTERED IN PROJECT JURISDICTION SHOWING PLAN'S, DETAILS OF THE UNDERPINNING SCHEME, WORK
PROCEDURE AND PROPOSED TIME SCHEDULE FOR REVIEW.
C. BOTTOM OF EXISTING FOOTING ELEVATIONS SHOWN ARE PROVIDED FROM AVAILABLE INFORMATION AND MUST BE VERIFIED.
D. EXTEND UNDERPINNING TO ELEVATIONS SHOWN.
E. MINIMUM UNDERPINNING CONCRETE STRENGTH, PER STANDARD FOOTING MIX IN THE SPECIFICATIONS OR GREATER AS
DETERMINED BY CONTRACTOR’S ENGINEER.
F. MINIMUM NON-SHRINK GROUT STENGTH, F'C = 5,000 PS OR GREATER AS DETERMINED BY CONTRACTOR’S ENGINEER.
G. DRY PACK BETWEEN UNDERPINNING AND BOTTOM OF EXISTING FOOTING WITH NON-SHRINK GROUT AFTER UNDERPINNING
CONCRETE IS IN PLACE AT LEAST 24 HOURS.
H. SEQUENCE UNDERPINNING TO PROVIDE A MINIMUM 72 HOURS CONCRETE CURE AND 24 HOURS GROUT CURE PRIOR TO
ADJACENT NEW EXCAVATION OR LONGER AS DETERMINED BY CONTRACTOR’S ENGINEER.
I. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF INSTALLING UNDERPINNING AND MUST ADEQUATELY
SUPPORT EXISTING STRUCTURES AS IS NECESSARY TO MAINTAIN STABILITY.
J. LOCATE ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITY SERVICES AND STRUCTURES AND PROTECT
AT ALL TIMES.
5 specification section 0100000 section 14 work hours
1. Per specification section 0100000, section 14, work hours for the project are Monday-Friday, 6:00 am until 3:00
pm. Per the same section work is not permitted on holidays as listed in section 14.3. Per the RFP, Section F-Deliveries or Performance, “The Contractor…shall work such hours, including night shifts, overtime operations and Sundays and holidays, as may be necessary to insure the progress and completion of the Work in accordance with the approved and currently updated Progress Schedule.” Please clarify the allowable work hours for the project. Specifically, as it relates to make-up for lost days due to weather during the normal work week and early start/ late finish during concrete operations in order to maintain quality and consistency of the work. It is assumed that after hours work permits as required by the District of Columbia and/or any other AHJ would be a requirement and may or may/not be the same as any restrictions imposed by the Smithsonian Institution.
SI All work hours necessary to keep the project on schedule will be permissible.
6 tower crane
Are there any restrictions on the use of a tower crane to complete the work? If a tower crane is used, would Smithsonian Institution require the foundation be removed at the end of use?
SI There are no restrictions within the Smithsonian property footprint. Requirements for removal of the tower crane base will be contingent on how the foundation is placed within the aesthetics of the final landscape.
7 RFP SDB's Does 19.1307 Price evaluation preference for HUBZone small business concerns apply to this opportunity? SI No, this project is not in a HubZone Area. All contractors are deemed equal on this project. All SDBs have opportunity within our participation goals.
333302-23RF-0010010 Revitalization of the Hirshhorn Museum Sculpture Garden
REQUEST FOR INFORMATION