Company Experience Form.pdf
PDF 214 KB Posted
- Solicitation number
- 333302-23RF-0010010
- Issued by
-
Smithsonian Institution
About this file
This document includes a request for proposals for the revitalization of the Hirshhorn Museum Sculpture Garden. The Smithsonian Institution seeks offers to revitalize the sculpture garden located north of the Hirshhorn Museum across Jefferson Drive in Washington, D.C. The project includes improvements to address deterioration of the original concrete walls and reflecting pool, lack of stormwater management, and closure of the underground passage due to security and flooding concerns. Offerors must meet the requirements set forth in the construction drawings and specifications to revitalize the sculpture garden according to the design developed by architect Hiroshi Sugimoto. Technical and cost proposals are due by May 25, 2023, and the Smithsonian will execute a fixed-price construction contract with the successful offeror to complete the project over two fiscal years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33330223RF0010010 Amendment 6.pdf | ||
| Addendum 2.docx | DOCX document | |
| Project Report Manual.docx | DOCX document | |
| 33330223RF0010010 Amendment 5.pdf | ||
| Revit HMSG RFI Questions and Responses 283-420.pdf | ||
| Revit HMSG RFI Questions Bundle 6_AE Responses 274-282.pdf | ||
| HMSG Gardens Bid Sheet J1 Revision 1.xlsx | XLSX spreadsheet | |
| SF 1442 Pg 1 Rev 2.pdf | ||
| 33330223RF0010010 Amendment 4.pdf | ||
| 33330223RF0010010 Amendment 3.pdf | ||
| SF 1442 Pg 1 Rev 1.pdf | ||
| Addendum 1 download location.docx | DOCX document | |
| 33330223RF0010010 Amendment 2.pdf | ||
| 33330223RF0010010 Amendment 1.pdf | ||
| J2 Specifications and Drawings.docx | DOCX document | |
| J1 - Bid Sheet.xlsx | XLSX spreadsheet | |
| J3 Graphics.docx | DOCX document | |
| J4 - 333302 23RF 0010010 RFP.pdf | ||
| J1 - multi year funding.pdf | ||
| J5 - DC20220001 Heavy.txt | TXT text file | |
| J5 - DC20230002 Building.txt | TXT text file | |
| Health Screening Questions_Contractors.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revitalization of the Hirshhorn Museum Sculpture Garden 333302-23RF-0010010
COMPANY EXPERIENCE/PERFORMANCE
COMPARABLE EXPERIENCE - List a minimum of five (5) comparable projects of similar size and diversity where the Offeror was the prime contractor completed in the past five (5) years. Do not include more than five (5) projects. In assessing comparable experience as part of this RFQ, value will be placed on projects to the extent they meet the criteria set forth in the construction documents.
Firm’s office or branch that managed this project: _________________________________________
Project Name: ___________________________City ___________________ State _____ Zip ______
Project Size (SF): _______________ Contract Completion Date _______ Building Type: Museum ___, Library/Archive ___, Other Cultural ___, Government (y/n), if Other Describe _____________
Contract Type: GMP ___, D/B ___, Fixed Price ___, Other ___, If Other, Describe________________
Orig. Contract Amount: $______________ Final Contract Amount: $____________ % Change: ____*
Orig. Contract Duration ______________ Actual Contract Duration ___________ % Change: ____*
* If either Contract Completion time or Value increased by more than 5% attach an explanation.
Has this project received any awards (Construction, Quality, Safety or other): Yes ______ No ______
If yes, list: _____________________________________________________________________
Client Reference for Construction: (it is your responsibility to assure that the telephone number is correct. If your reference can not be contacted, this project may not count as a comparable.)
Owner’s Representative or Project Manager:
Telephone: ____________________________ Email Address: _____________________________
Project Description (Building): ________________________________________________________
File details come from the government source that posted it. Updated .