This document includes a schedule of values and construction cost estimate worksheets for the refurbishment of a maintenance shop located at Building 78 in Gamboa, Panama. The Smithsonian Institution is soliciting proposals to remodel an existing building into marine and facilities maintenance shops, with an estimated value between $900,000 to $1.2 million. The project must be completed within 300 calendar days of the notice to proceed and will require expertise in structural concrete, masonry, metal roofs, electrical, plumbing, HVAC, security, communications, and fire protection systems. Proposers must be legally registered construction companies located in Panama with the capacity to accomplish the work within the required timeframe. The selected contractor will be required to provide performance and payment bonds totaling 50% and 25% of the construction cost respectively, as well as CAR and civil liability insurance policies. The request for proposal will be published on June 8, 2021 on the Federal Business Opportunities website.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| SMITHSONIAN INSTITUTION | |||
| SMITHSONIAN FACILITIES | |||
| STRI BRANCH | |||
| SCHEDULE OF VALUES | |||
| Project : | Maintenance Shop at Building 78 - Gamboa | Contractor: | |
| SF Project No.: | 1680001 | Date: | |
| BASE BID | $0.00 | ||
| OPTION No.1 - Demolition and reconstruction Concrete Floor from Axis 7 to 10 | $0.00 | ||
| TOTAL PROPOSAL WITH OPTIONS | $0.00 | ||
| DISCLAIMERS: | |||
| SI does not guarantee the integrity of files, formulas, or graphics. Spreadsheet user is responsible for the accuracy of all calculations. |
BASE BID
| SMITHSONIAN INSTITUTION | |||||||||
| SMITHSONIAN FACILITIES | |||||||||
| STRI BRANCH | |||||||||
| SCHEDULE OF VALUES | |||||||||
| Project : | Maintenance Shop at Building 78, Gamboa | Contractor: | |||||||
| SF Project No.: | 1680001 | Date: | |||||||
| Materials | Labor | Subcontracts | |||||||
| ITEM | Unit | Quantity | Unit Cost | SubTotal | Unit Cost | SubTotal | Unit Cost | SubTotal | TOTAL |
| BASE BID | TOTAL PRICE | $ - 0 | |||||||
| GENERAL REQUIREMENTS | TOTAL | $ - 0 | |||||||
| Mobilization (build temporary perimeter fence, temporary camp, equipment) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temperorary Office and Structures (field office and main office costs) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Field Office Staff | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temporary Potable Water and Electrical Installations | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temporary Sanitary Instalations | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Bonds and Insurances | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Construction Permit | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Occupancy Permit | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Pandemic Mitigation Supplies | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Site Security | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Surveys | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Submittals | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| As-built drawings | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Demobilization | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EXISTING CONDITIONS | TOTAL | $ - 0 | |||||||
| Demolition of Concrete and Masonry elements | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dismantle mettallic and existing finishes elements | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| CONCRETE | TOTAL | $ - 0 | |||||||
| Columns Footings | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Seismic Beams | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Concrete Pedestals | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| New Concrete Floor, Axis 10 to 14 | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Access Roadyway | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| MASONRY | TOTAL | $ - 0 | |||||||
| 6" CMU - Interior Walls | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6" CMU - Exterior Walls | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Rebar for New CMU Walls | ton | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Bond Beams and Columns | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Cement Mortar Plaster | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| METALS | TOTAL | $ - 0 | |||||||
| Structural Steel | ton | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Galvanized Steel purlins | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Stiffners | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| THERMAL AND MOISTURE PROTECTION | TOTAL | $ - 0 | |||||||
| Replace existing insulation | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Standing Seam Roof, GIX White Color | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dow Thermax Insulation for Roof, White Finish 1" | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Standing Seam panel walls, GIX, White Color | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dow Thermax Insulation for Walls, White Finish 1" | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Metal roof ridge | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sheet metal flashings | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Joint sealant | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Ridge Cap | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| OPENINGS | TOTAL | $ - 0 | |||||||
| Overhead coiling door, ST-R | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-C/B | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-C/C | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-C/E | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-F/B | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-F/C | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-B | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Alum. Frame windows - 1x3.76 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Alum. Frame windows - 1x1.60 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Door hardware | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Louvers | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Entrance cyclone mesh | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FINISHES | TOTAL | $ - 0 | |||||||
| Suspended tile ceiling (escayola) | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Plycem roof (structure and plycem) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Ceramic wall tiling | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Floor tiles - shower area | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Concrete sealer - floor finish | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Metal Structure paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Interior paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exterior paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| SPECIALTIES | TOTAL | $ - 0 | |||||||
| Mirror | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Toilets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Lavatory | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Towel dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Tissue dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Soap dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Shower curtain | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Shower faucet | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Soap holder | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Towel hook | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EQUIPMENT | TOTAL | $ - 0 | |||||||
| Kitchen cabinets | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FURNISHINGS | TOTAL | $ - 0 | |||||||
| Concrete Sinks | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FIRE SUPPRESSION | TOTAL | $ - 0 | |||||||
| 6" pipe from existing connection to building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6" gate valve | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" plug* | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" pipe to building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" gate valve | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4x4x4 Tee* | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Main Riser Assembly with supervised valves | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thrust blocks | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Above Ground fire suppresion system pipes | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Above Ground Pipe Accessories | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hangers | units | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hanger Rods | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sesimic Bracing for above ground pipes | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sprinkler heads supply and installation | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sprinkler system testing and acceptance | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| PLUMBING | TOTAL | $ - 0 | |||||||
| Site Potable Water | |||||||||
| Connection to existing potable water line | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 1-1/2"x1-1/2"x1-1/2" Tee | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 1-1/2" line | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Buildiing's Potable Water Rough In | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Site Sanitary | |||||||||
| 6" line | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Connection to manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Septic Tank | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Building's Sanitary System's Rough In | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Building | |||||||||
| Shop's Plumbing Fixtures | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Rain Water Installation | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Plumbing, A/C drain | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Oil/water separator | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Emergency Shower | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| HVAC | TOTAL | $ - 0 | |||||||
| 12000 btu A/C Units | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 24000 btu A/C Units | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Extactors 70 pcm | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Extactors 115 pcm | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Extactors 2000 pcm | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| ELECTRICAL | TOTAL | $ - 0 | |||||||
| Main Breaker at Existing Laboratory Building | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Main Wiring up to Existing Laboratory Building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Underground Electric Conduits up to existing Manhole | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Maint Shop Distribution Panel and Transformer | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Electrical wall outlets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Elec. wall outlets, gfci | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Elec. wall outlets, 208 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Safety Switches | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| A/C outlet | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Light switch, regular | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Light switch, 3w | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Room troffer, 2x2 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Room troffer, 2x4 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Open space lamps | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Open space lamps w/ EM | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exterior wall pack | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Emergency lights | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exit lights | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| COMMUNICATIONS | TOTAL | $ - 0 | |||||||
| Voice/Data provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| CPT box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Outlets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| CCTV provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| CCTV box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thru boxes, tubing for camera | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Access control provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| PAR box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thru boxes, tubing for camera | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FIRE ALARM | TOTAL | $ - 0 | |||||||
| Fire alarm control panel (PACI) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Monitor module (IAM) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Manual pull station (M) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Smoke detector (H) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Heat Detector (C ) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Strobe light w/ siren | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Strobe light | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| End line resistance (RFL) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Programming | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Connection/Programming to Lab Bldg.PACI | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EARTHWORK | TOTAL | $ - 0 | |||||||
| Site clearing for exterior pavement | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Grading | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Base aggregate for exterior pavement | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Base aggregate for interior floor | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Foundations Excavation | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Foundations Backfill | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EXTERIOR IMPROVEMENTS | TOTAL | $ - 0 | |||||||
| Repair sidewalks/concrete surfaces | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| UTILITIES | TOTAL | $ - 0 | |||||||
| Fire Alarm civil infrasctructure up to existing manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Communication civil infrastructure up to exist manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Notes: | |||||||||
| 1. Contractor to include all requirements of MINSA and MITRADEL with regards to the COVID Protection and Prevention | |||||||||
| 2. Contractor to Include SAFETY PLAN and Safety Officer. For projects over $1Million Dollars to $5 Million to include the corresponding payment of $10,000 | |||||||||
| payable to FONDO DE SEGURIDAD OCUPACIONAL DEL MITRADEL. | |||||||||
| 3. Contractor to include Temporary Office Shed for the Inspection Group. |
Division 5
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 8 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.5-Metals | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 11
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 14 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.11-Equipment | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 13
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 16 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.13-Special Construction | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 14
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 17 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.14-Conveying Systems | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 25
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 21 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.25-Integrated Automation | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |