SOV_Maintenance Shop at Gamboa - REV.xls
XLS spreadsheet 146 KB Posted
- Solicitation number
- 33330221RF0010028
- Issued by
-
Smithsonian Institution
About this file
This document contains a schedule of values and construction cost estimate worksheet for the refurbishment of a maintenance shop located at Gamboa, Panama.
The schedule of values lists line items for various construction tasks and materials required for the project, but does not include pricing. The cost estimate worksheet provides a format to estimate costs by dividing work into prime contractor and subcontractor responsibilities for different construction divisions. Neither document specifies the required products or services for the federal contract opportunity.
The related federal contract opportunity notice is for the potential remodeling of an existing building into marine and facilities maintenance shops in Gamboa, Panama. Interested offerors should monitor the website for release of a request for proposal around June 8, 2021. The solicitation number is 33330221RF0010028. The project value is estimated between $0.9-1.2 million with a 300-day performance period. Offerors must be licensed and bonded in Panama with English language capabilities. The selected contractor must register with SAM and DUNS. The Smithsonian Institution is the contracting agency.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| SMITHSONIAN INSTITUTION | |||
| SMITHSONIAN FACILITIES | |||
| STRI BRANCH | |||
| SCHEDULE OF VALUES | |||
| Project : | Maintenance Shop at Building 78 - Gamboa | Contractor: | |
| SF Project No.: | 1680001 | Date: | |
| BASE BID | $0.00 | ||
| OPTION No.1 - Demolition and reconstruction Concrete Floor from Axis 7 to 10 | $0.00 | ||
| TOTAL PROPOSAL WITH OPTIONS | $0.00 | ||
| DISCLAIMERS: | |||
| SI does not guarantee the integrity of files, formulas, or graphics. Spreadsheet user is responsible for the accuracy of all calculations. |
BASE BID
| SMITHSONIAN INSTITUTION | |||||||||
| SMITHSONIAN FACILITIES | |||||||||
| STRI BRANCH | |||||||||
| SCHEDULE OF VALUES | |||||||||
| Project : | Maintenance Shop at Building 78, Gamboa | Contractor: | |||||||
| SF Project No.: | 1680001 | Date: | |||||||
| Materials | Labor | Subcontracts | |||||||
| ITEM | Unit | Quantity | Unit Cost | SubTotal | Unit Cost | SubTotal | Unit Cost | SubTotal | TOTAL |
| BASE BID | TOTAL PRICE | $ - 0 | |||||||
| GENERAL REQUIREMENTS | TOTAL | $ - 0 | |||||||
| Mobilization (build temporary perimeter fence, temporary camp, equipment) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temperorary Office and Structures (field office and main office costs) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Field Office Staff | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temporary Potable Water and Electrical Installations | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Temporary Sanitary Instalations | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Bonds and Insurances | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Construction Permit | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Occupancy Permit | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Pandemic Mitigation Supplies | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Site Security | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Surveys | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Submittals | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| As-built drawings | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Demobilization | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EXISTING CONDITIONS | TOTAL | $ - 0 | |||||||
| Demolition of Concrete and Masonry elements | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dismantle mettallic and existing finishes elements | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| CONCRETE | TOTAL | $ - 0 | |||||||
| Columns Footings | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Seismic Beams | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Concrete Pedestals | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| New Concrete Floor, Axis 10 to 14 | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Access Roadyway | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| MASONRY | TOTAL | $ - 0 | |||||||
| 6" CMU - Interior Walls | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6" CMU - Exterior Walls | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Rebar for New CMU Walls | ton | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Bond Beams and Columns | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Cement Mortar Plaster | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| METALS | TOTAL | $ - 0 | |||||||
| Structural Steel | ton | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Galvanized Steel purlins | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Stiffners | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| THERMAL AND MOISTURE PROTECTION | TOTAL | $ - 0 | |||||||
| Replace existing insulation | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Standing Seam Roof, GIX White Color | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dow Thermax Insulation for Roof, White Finish 1" | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Standing Seam panel walls, GIX, White Color | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Dow Thermax Insulation for Walls, White Finish 1" | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Metal roof ridge | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sheet metal flashings | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Joint sealant | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Ridge Cap | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| OPENINGS | TOTAL | $ - 0 | |||||||
| Overhead coiling door, ST-R | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-C | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-F | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hollow metal doors, ST-B | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Alum. Frame windows - 1x3.76 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Alum. Frame windows - 1x1.60 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Door hardware | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Louvers | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FINISHES | TOTAL | $ - 0 | |||||||
| Suspended tile ceiling | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Ceramic wall tiling | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Floor tiles - shower area | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Concrete sealer - floor finish | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Metal Structure paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Interior paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exterior paint | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| SPECIALTIES | TOTAL | $ - 0 | |||||||
| Mirror | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Toilets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Lavatory | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Towel dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Tissue dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Soap dispenser | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Shower curtain | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Shower faucet | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Soap holder | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Towel hook | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EQUIPMENT | TOTAL | $ - 0 | |||||||
| Kitchen cabinets | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FURNISHINGS | TOTAL | $ - 0 | |||||||
| Concrete Sinks | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FIRE SUPPRESSION | TOTAL | $ - 0 | |||||||
| 6" pipe from existing connection to building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6x6x4 Tee* | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6" gate valve | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 6" plug* | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" pipe to building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" gate valve | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4" check valve | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4x4x4 Tee* | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Main Riser Assembly with supervised valves | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thrust blocks | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Above Ground fire suppresion system pipes | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Above Ground Pipe Accessories | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hangers | units | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Hanger Rods | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sesimic Bracing for above ground pipes | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sprinkler heads supply and installation | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Sprinkler system testing and acceptance | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| PLUMBING | TOTAL | $ - 0 | |||||||
| Site Potable Water | |||||||||
| Connection to existing potable water line | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 1-1/2"x1-1/2"x1-1/2" Tee | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 1-1/2" line | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Buildiing's Potable Water Rough In | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Site Sanitary | |||||||||
| 6" line | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Connection to manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Septic Tank | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Building's Sanitary System's Rough In | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Building | |||||||||
| Shop's Plumbing Fixtures | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Rain Water Installation | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Plumbing, A/C drain | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Oil/water separator | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Emergency Shower | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| HVAC | TOTAL | $ - 0 | |||||||
| 12000 btu A/C Units | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 24000 btu A/C Units | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| ELECTRICAL | TOTAL | $ - 0 | |||||||
| Main Breaker at Existing Laboratory Building | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Main Wiring up to Existing Laboratory Building | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Underground Electric Conduits up to existing Manhole | m | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Maint Shop Distribution Panel and Transformer | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Electrical wall outlets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Elec. wall outlets, gfci | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Elec. wall outlets, 208 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| A/C outlet | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Safety outlet | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Light switch, regular | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Light switch, 3w | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Room troffer, 2x2 | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Open space lamps | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Open space lamps w/ EM | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exterior wall pack | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Emergency lights | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Exit lights | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| COMMUNICATIONS | TOTAL | $ - 0 | |||||||
| Voice/Data provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| CPT box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Outlets | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| CCTV provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| CCTV box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thru boxes, tubing for camera | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Access control provisions | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| PAR box | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Thru boxes, tubing for camera | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| FIRE ALARM | TOTAL | $ - 0 | |||||||
| Fire alarm control panel (PACI) | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Monitor module (IAM) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Manual pull station (M) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Smoke detector (H) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Heat Detector (C ) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Strobe light w/ siren | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Strobe light | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| End line resistance (RFL) | Ea | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Programming | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Connection/Programming to Lab Bldg.PACI | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EARTHWORK | TOTAL | $ - 0 | |||||||
| Site clearing for exterior pavement | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Grading | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Base aggregate for exterior pavement | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Base aggregate for interior floor | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Foundations Excavation | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Foundations Backfill | m3 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| EXTERIOR IMPROVEMENTS | TOTAL | $ - 0 | |||||||
| Repair sidewalks/concrete surfaces | m2 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| UTILITIES | TOTAL | $ - 0 | |||||||
| Fire Alarm civil infrasctructure up to existing manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Communication civil infrastructure up to exist manhole | ls | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Notes: | |||||||||
| 1. Contractor to include all requirements of MINSA and MITRADEL with regards to the COVID Protection and Prevention | |||||||||
| 2. Contractor to Include SAFETY PLAN and Safety Officer. For projects over $1Million Dollars to $5 Million to include the corresponding payment of $10,000 | |||||||||
| payable to FONDO DE SEGURIDAD OCUPACIONAL DEL MITRADEL. | |||||||||
| 3. Contractor to include Temporary Office Shed for the Inspection Group. |
Division 5
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 8 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.5-Metals | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 11
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 14 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.11-Equipment | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 13
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 16 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.13-Special Construction | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 14
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 17 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.14-Conveying Systems | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Division 25
| CONSTRUCTION COST ESTIMATE WORKSHEET | ||||||||||||||||
| SMITHSONIAN INSTITUTION | ||||||||||||||||
| OFFICE OF ENGINEERING, DESIGN AND CONSTRUCTION | ||||||||||||||||
| Title : | 0 | Based on | ||||||||||||||
| Location: | 0 | Estimated By: | 0 | 0 | ||||||||||||
| Project #: | 0 | Date: | 31-Dec-99 | Sheet: 21 of 27 | ||||||||||||
| PRIME CONTRACTOR | SUBCONTRACTOR | |||||||||||||||
| ITEM | TOTAL | |||||||||||||||
| DESCRIPTION | QUANTITY | MATERIAL | LABOR | EQUIPT | MATERIAL | LABOR | EQUIPT | COST | ||||||||
| # | Unit | Unit | Total | Unit | MH | Total | Total | Unit | Total | Unit | MH | Total | Total | Unit | Total | |
| Div.25-Integrated Automation | ||||||||||||||||
| SUBTOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |