This is a Fee Schedule Proposal specification document issued by Hudson Valley Community College (HVCC) in Troy, New York, soliciting commissioning services for the ATEC Building Project. The scope encompasses ongoing commissioning activities throughout the project duration, including observation and documentation of systems testing as outlined in commissioning specifications 01 91 13, 01 91 14, and 23 08 00, with the exclusion of building envelope commissioning which the general contractor will perform. Interested firms must submit complete proposals through the Bonfire Portal or via mail/hand delivery to the Director of Procurement by May 18th, 2026 at 2:00 PM. Construction documents and the milestone schedule are available through a provided DropBox link. The College anticipates issuing a Purchase Order by Wednesday, June 1st, 2026. Proposals will be reviewed privately by the Owner, Construction Manager, and Architect.
Proposals must include detailed daily rates for all staff positions covering regular hours, overtime, and shift differentials, as well as a total estimated cost for the project. Firms must submit supporting documentation including company history and ownership structure, firm capacity with the number and titles of professional staff, relevant project experience from the past five years with specific project details, proposed project team credentials, and a comprehensive insurance certificate. Insurance requirements are substantial and include Commercial General Liability ($1,000,000 each occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000), Umbrella Excess Liability ($5,000,000 with $10,000 retention), and statutory Worker's Compensation coverage. Hudson Valley Community College, Turner Construction Company, and JMZ Architects and Planners, P.C. must be named as additional insureds on applicable policies on a primary and non-contributory basis. Firms must also disclose any past claims, disputes, or arbitration proceedings from the preceding five years.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 1st, 2026
PROJECT COMMISSIONING SERVICES - FEE SCHEDULE PROPOSAL
Due Date: May 18th, 2026 @ 2:00PM
Return Proposals to: Responses should be submitted through the Bonfire Portal. Reponses may also be mailed or hand delivered to :
Tabitha D’Attilio
Director of Procurement Hudson Valley Community College Administration Building, Room 240
80 Vandenburgh Ave Troy, NY 12180
NOTICE TO BIDDERS:
You are invited to submit your Fee Schedule with Total estimated cost for the Project Commissioning Services for the ATEC Building Project at Hudson Valley Community College (HVCC). The commissioning activities will be ongoing and done over the course of the project. Please refer to the Commissioning specifications 01 91 13, 01 91 14 and 23 08 00 for a requirements and a list of systems to be included.
Building Envelope commissioning shall be EXCLUDED from this scope as it is being performed by the GC. Cx to observe and document the testing performed by the GC.
Construction Documents, including milestone schedule, are available via DropBox Link:
Proposals will be reviewed privately by the Owner, CM, and Architect.
The College intends to issue a Purchase Order by Wednesday June 1st, 2026.
The Owner reserves the right to reject any or all proposals for any reason.
Please submit a complete Fee Schedule that includes, but is not limited to;
I. Daily Rates –
• Staff positions (including overtime, 2nd shift, 3rd shift, weekend rates & travel)
• PM shall also be included for on-site meetings and variance amendment preparation.
• Reports / Final Closeout Report
II. Proposal -
• Total Estimated Cost
ADDITIONAL REQUIREMENTS:
Supporting Documents:
Firm history and ownership Firm capacity – number of professional staff members & titles
Firm Experience – similar projects completed in the last five years (project name, location, size, costs, duration and brief description of the work).
Project Team – project managers and key staff proposed for this project.
Insurance – firm’s insurance company and agent, insurance coverage including types and limits (see
Scope of Work for details).
Past claims and disputes – indicate any claims, disputes or arbitration proceedings that have occurred on any projects in the past 5 years.
Billing rates – List billing rates for personnel included in project team.
Insurance Requirements:
Provide a copy of insurance certificate to indicate the insurance limits for Workers Compensation, Employers Liability, Commercial General Liability, and Business Automobile Liability. See specifications for full requirements.
Commercial General Liability Insurance (including contractual liability coverage) – $1,000,000 each occurrence / $2,000,000 aggregate;
Automobile Liability Insurance – $1,000,000 – any vehicle or schedules, hired and non-owned;
Umbrella Excess Liability – $5,000,000 – over primary insurance, $10,000 retention for self-insured hazards;
Worker’s Compensation Insurance – statutory limits.
On the General Liability insurance, the Owner: Hudson Valley Community College (HVCC), Turner Construction Company and JMZ Architects and Planners, P.C. shall be named as additional insured, including products completed operations coverage on a primary and non-contributory basis. For all other coverage’s, except Workman’s Compensation, Hudson Valley Community College (HVCC), Turner Construction Company and JMZ Architects and Planners, P.C. should be named as an additional insured to all policy on a primary and non-contributory basis.
Should there be any questions, please do not hesitate to call.
Very truly yours, Hudson Valley Community College
Tabitha D’Attilio Director of Procurement
Steve Cowan Owner’s Representative