3-SLCI26081 Attachment 2 Scope of Work.pdf

PDF 120 KB Posted

Attached to
Salt Lake City Request for Bid SLCI26081 Crushed Recycled Concrete
Solicitation number
SLCI26081
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a Scope of Work document for Salt Lake City Corporation's Request for Bid SLCI26081 concerning the procurement of crushed recycled concrete materials. The contractor is required to supply 1" minus screened or 1.5" crushed recycled concrete for use as sub-base material under sidewalks, curbs, gutters, and roads for the City's Streets Division on an as-needed basis. The City will arrange pickup of materials from the contractor's designated location during normal business hours, Monday through Friday between 8:00 a.m. and 4:30 p.m. Upon arrival, contractor personnel must direct City personnel to the appropriate loading location. The contractor must maintain a dedicated pickup site and provide material samples for City approval upon request.

The contractor warrants that all products furnished conform to specified requirements and are of good merchantable quality suitable for the intended purpose. The City reserves the right to audit invoices for all purchases made under the agreement. Additionally, the City may drop off used materials at the contractor's site for processing into 1" minus screened material. The Scope of Work does not specify contract term, pricing structure, renewal options, or funding sources within the provided document excerpt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

CRUSHED RECYCLED CONCRETE

The responsibilities of Contractor include, but shall not be limited to, the following.

A. Contractor shall provide crushed recycled concrete for City’s Streets Division on an “as needed” basis.

1. Contractor shall supply City with 1” minus screened or 1.5” crushed recycled concrete to be used for sub-base under sidewalks, curbs, gutters, and roads.

2. City shall pick-up materials from Contractors site. Upon arrival at

Contractors location Contractors personnel shall clearly direct City personnel to the appropriate place for loading of material.

3. Contractors shall have a pick-up location at <to be completed upon award of contract>

4. Pick-up of materials shall be made during Contractors normal business hours of, at minimum, Monday – Friday between 8:00 am and 4:30 pm.

B. Contractor warrants that products furnished conform to the requirements specified and are of good merchantable quality and suitable for the purpose intended.

C. City may, at any time, audit invoices for purchases made by City from Contractor under this Agreement.

D. City may drop off amounts of used materials to site for 1” minus screened

Contractor.

E. SAMPLES

Upon request by the designated representative of City, Contractor shall provide samples of all materials intended for use for prior approval.

File details come from the government source that posted it. Updated .