This is a Schedule of Items for the Thomas Fire Disaster Road Repairs 2025 project at Los Padres National Forest in Santa Barbara/Ojai Ranger District. The solicitation (127EAW26Q0005) is issued as a Request for Quotation (RFQ) and is a Total Small Business Set-Aside with a size standard of $45 million, classified under NAICS code 237310 for Highway, Street, and Bridge Construction.
The base scope of work includes road repairs across approximately 32.22 miles, with line items for mobilization (2 units), road blading using graders (30 miles) and bulldozers (2.2 miles), drainage restoration (32.22 miles), installation of corrugated metal spillways and flumes in both 18-inch (94 units) and 24-inch (3 units) sizes, drainage structure maintenance (4 units), removal and end hauling of damaged structures (1 lump sum item), and maintenance of unpaved shoulders with rip rap armor (1 lump sum item). An optional item includes roadside vegetation cutting along 10 feet on both sides of the road for 20.47 miles (1 unit). Contractors must submit pricing for all items, with payment based on actual work performed. Quantities are estimated and contractors are required to field verify requirements against maps, the Statement of Work, and specifications. An organized site visit is scheduled for February 19, 2026. All contract pricing must include performance and payment bond premiums within the quoted price rather than as additional costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment A00003 - 127EAW26Q0005 - Thomas Fire Disaster Road Repairs 2025..pdf | ||
| Amendment A00002 - 127EAW26Q0005 - Thomas Fire Disaster Road Repairs 2025.pdf | ||
| Amendment A00001 - 127EAW26Q0005 - Thomas Fire Disaster Road Repairs 2025.pdf | ||
| 4. Vicinity Map.pdf | ||
| 6. Contract Points Description.pdf | ||
| 10. Contract Administration Data.pdf | ||
| 5. Fire Plan.pdf | ||
| 8. NRR & CP Full Plan.pdf | ||
| 9. ECR Full Plan - Map.pdf | ||
| 11. Service Contract Act WD - 2015-5647 - Santa Barbara.pdf | ||
| 1. Solicitation Terms and Conditions - Thomas Fire Disaster Road Repairs 2025.pdf | ||
| 2. Statement of Work.pdf | ||
| 7. Specifications.pdf | ||
| 12. Service Contract Act WD - 2015-5625 - Ventura.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Thomas Fire Disaster Road Repairs 2025
| ITEM |
| DESCRIPTION |
| ENGLISH |
| ENGLISH |
| UNIT |
| TOTAL |
NO.
| UNIT |
| QTY |
| PRICE |
SANTA BARBARA/OJAI RANGER DISTRICT
| 805 |
| MOBILIZATON |
| Each |
| 2.00 |
| 811 |
| ROAD BLADING (Grader) |
| Miles |
| 30.00 |
| 811 |
| ROAD BLADING (Bulldozer needed at rocky areas and drainage crossings) |
| Miles |
| 2.20 |
| 839 |
| RESTORE DRAINAGE FUNCTION |
| Miles |
| 32.22 |
| 840 |
| 18" CORRUGATED METAL SPILLWAY AND 10' FLUME (NO RIP RAP) |
| Each |
| 94 |
| 840 |
| 24" CORRUGATED METAL SPILLWAY AND 10' FLUME (NO RIP RAP) |
| Each |
| 3 |
| 834 |
| DRAINAGE STRUCTURE MAINTENANCE (CMP/Basin Cleaning) |
| Each |
| 4 |
| 832 |
| REMOVE AND END HAUL (remove damaged OSD's) |
| Lump |
| 1 |
| 816 |
| MAINTENANCE OF UNPAVED SHOULDERS (50LF + Armor with 6" rip rap) |
| Lump |
| 1 |
| BID SUBTOTAL |
| $ |
OPTION #1
| 805 |
| MOBILIZATON |
| Each |
| 1.00 |
| 842 |
| CUTTING ROADSIDE VEGITATION (10' both sides of road) |
| Miles |
| 20.47 |
| BID SUBTOTAL |
| $ |
BID TOTAL
(Base and Option)
SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE MAPS, STATEMENT OF WORK, AND SPECIFICATIONS. Payment will be made on actual work performed.
* One award will be made from this solicitation. Contractors are required to submit pricing for all items.
NOTE: In accordance with FAR Clause 52.228-16, Performance and Payment Bonds - Other than Construction (NOV 2006), payment for bond premiums shall be included within the contract price and shall not be considered an additional cost.
The contractor shall complete the table below and include the information with their proposal.
Company Name:
Company Address:
UEI Number:
POC Name and Title:
Phone Number:
Email:
Tax ID:
127EAW26Q0005 - Thomas Fire Disaster Road Repairs 2025 Los Padres National Forest
File details come from the government source that posted it. Updated .