This is Amendment A00003 to Solicitation 127EAW26Q0005 for the Thomas Fire Disaster Road Repairs 2025 project at Los Padres National Forest, issued by the USDA Forest Service Field Procurement Operations on March 3, 2026. The amendment is effective immediately and incorporates Request For Information (RFI) responses into the solicitation requirements. All offerors must acknowledge receipt of this amendment prior to the bid opening date specified in the original solicitation or as amended. Failure to acknowledge receipt at the designated place prior to the specified hour and date may result in rejection of the offer. Contractors are not required to sign and return copies of this document to the issuing office.
The amendment addresses two primary technical clarifications regarding project scope. First, regarding culvert removal specifications, the response clarifies that one 20-foot section of 24-inch culvert and one 20-foot section of 48-inch culvert need to be removed and hauled off site. Second, concerning overside drain (OSD) fabrication details, the contracting officer references attached drawings on pages 3, 4, and 5 from Amendment A00002 for the 18-inch OSD headwall and flume specifications required for the 94 quantity 18-inch overside drains, confirming that no additional drawings beyond those referenced are available. The amendment explicitly states that failure to use the revised documents and requirements will result in a non-responsive proposal.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED 16C. DATE SIGNED
PAGE OF PAGES
CODE
(X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A00003
6. ISSUED BY
USDA FOREST SERVICE
FIELD PROCUREMENT OPERATIONS (FPO)
PROCUREMENT & PROPERTY SERVICES (PPS)
CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
ALL OFFERORS
9A. AMENDMENT OF SOLICITATION NUMBER
127EAW26Q0005
11 2
03/03/2026
9B. DATED (SEE ITEM 11)
02/05/2026
1155756
7EAW
X 1
X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation: 127EAW26Q0005 Project Name: Thomas Fire Disaster Road Repairs 2025 Los Padres National Forest
Amendment A00003
The purpose of this solicitation Amendment is to provide Request For Information (RFI) Responses. See page 2 for additional information.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TANYA I. TORRES
AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2 OF 2
CONTINUATION PAGE
CONTRACT NO:
127EAW26Q0005
ORDER NO: MODIFICATION NO:
A00003
14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)
A. Below are the Request For Information (RFI) responses which are hereby incorporated into any subsequent contract award.
Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
I. How many feet of 24-inch and 48-inch culvert need to be removed and hauled off site?
Response: 20 foot sections.
Follow-up RFI: Can you please indicate how many 20’ sections will need to be removed so that we have a better indication of calculating the costs involved to properly complete that task?
Response: One 20ft section of 24” and one 20ft section of 48”
II. Regarding the alternate overside drain fabrication detail, there is only a 24” OSD detail provided. Can you please provide the 18” OSD data.
Response: See attached drawings on page 3,4, and 5 from Amendment A00002.
Follow-up RFI: We need detail for an 18-inch OSD headwall and flume. The fabrication shop we are getting quotes from cannot accurately quote the 94 qty- 18" overside drains without a detailed drawing.
Response: Please refer to the attached drawings on pages 3, 4, and 5 included in Amendment A00002. These drawings represent the design requirements for the project. No additional drawings are available.
B. All other terms and conditions remain unchanged.
///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////
| A00001 - 127EAW24R0017 - Crestline Group CG Renovation |
| Amendment - A00001 - 127EAW23R0011 - Sky Ranch Road |
| SF 30 Continuation Page |
| 840-2a 18 Inch Detail.pdf |
| Sheets and Views |
| 840-2a-Layout1 |
| 840-2a Flume.pdf |
| Sheets and Views |
| 840-2a Flume-Layout1 |
| 840-2a Starter.pdf |
| Sheets and Views |
| 840-2a Starter-Layout1 |
File details come from the government source that posted it. Updated .