3-Attachment E- RFP Score Sheet.xls
XLS spreadsheet 90 KB Posted
- Attached to
- RM26-8 Sandbags
- Solicitation number
- RM26-8
- Issued by
- Utah
About this file
This is an RFP evaluation scoresheet template developed by the State of Utah Division of Purchasing for Solicitation RM26-8, a competitive procurement for sandbags used for flood control to serve all eligible users within the State of Utah. The RFP may result in multiple awards based on vendors meeting specified technical score thresholds and total score thresholds. The contract term is five (5) years, with vendors required to guarantee pricing for one year and maintain any discount percentages for the life of the contract. The scoresheet is designed as an interactive tool for evaluation committees to organize minimum mandatory requirements and scoreable technical criteria that will be used to evaluate vendor proposals.
The evaluation process requires vendors to pass all listed minimum mandatory requirements and achieve a minimum of 60 percent of available technical points to advance to cost evaluation. The scoresheet identifies two scoreable technical criteria, each weighted equally at 50 percent: (1) a detailed description of company qualifications to provide sandbags to Utah public entities, including the ability to respond to emergencies within 48 hours of purchase order receipt; and (2) a detailed description of how the vendor will meet the needs of Utah public entities, including how salespeople will identify Utah-contracted prices and reference the unique Utah-issued contract number on quotes and invoices. Cost represents 20 percent of the total evaluation score, with cost points calculated based on the lowest proposed price receiving 100 percent of available cost points and other proposals receiving proportional points using the formula: Cost Points × (Lowest Proposed Price/Proposed Price). The total possible evaluation score is 1,000 points, with 800 points available for technical evaluation and 200 points for cost evaluation. No administrative fee is applicable to this cooperative contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7-Attachment B-Scope of Work.docx | DOCX document | |
| 2-Vendor Prerequisites - Statewide RFP.pdf | ||
| 5-Attachment A- Terms and Conditions.docx | DOCX document | |
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 6-Attachment D- Technical Criteria.docx | DOCX document | |
| 4-Attachment C- Cost Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Interactive Scoresheet |
| Description: The interactive scoresheet is designed as a tool to help the evaluation committee organize the minimum mandatory requirements and the scoreable technical criteria that will be used in the RFP. The scoresheet will be filled out in phases and upon completion will become the scoresheet that is published with the RFP and eventually used to score the offers. Data should be entered in shaded cells only. This scoresheet may need to be modified, such as adding more rows and adjusting formulas accordingly, to meet the needs of your RFP. |
| Identify Important Criteria |
| 1. Begin by making a list of all criteria that is important to the eventual solution. The list can be done on the Interactive Scoresheet or any other program you are comfortable with, pen and paper included. The initial list should be a brainstorm. Consider items that would be important later in the life of the solution. For example, compatibility with existing technology, maintenance, service, scaleability, enterprise solutions, emerging technologies, etc. |
| Prioritize Important Criteria |
| 2. When you feel the list is fairly comprehensive, begin to organize the list. You may choose to organize similar items into subcategories, but most importantly, prioritize the criteria by what is most important. |
| Identify "Pass - Fail" Criteria |
| 3. Once you have identified all the criteria and their relative importance, consider which items are mandatory and can be scored with either a "Pass", meaning it meets the criteria, or "Fail", meaning it does not meet the criteria. These criteria can be used for Minimum Mandatory Requirements and an initial evaluation. |
| Insert Minimum Mandatory Requirements |
| 4. Taking the list of criteria, put the Minimum Mandatory requirements in the section labeled "Minimum Mandatory Requirements". You can add lines by clicking on row 20 to highlight the row, right-clicking, and selecting Insert Row. Follow this procedure for any additional lines needed. You will have to fix row numbering and formatting if you insert additional rows. |
| Insert Technical Criteria |
| 5. Copy Scoreable Technical Criteria items into the apprpriate section. You can add lines by clicking on row 46 to highlight the row, Right-clicking, and selecting Insert Row. Follow this procedure for any additional lines needed. You will have to fix row numbering and formatting if you insert additional rows. |
| Develop the RFP Scope of Work |
| 6. It is now time to begin writing the "Detailed Scope of Work" and "Proposal Requirements and Company Qualifications" sections of the RFP. The "Detailed Scope of Work" section is designed to describe each task as carefully and with as much detail as possible. If appropriately done, it will produce responsive Proposals and ease the task of managing the project/contract. |
| Ensure All Scorable Criteria is Included in RFP |
| 7. The "Proposal Requirements and Company Qualifications" section should spell out all of the items on the "Score Sheet". Begin with the "Minimum Mandatory" items and how the offeror will respond and meet the minimums. For example, if the scoresheet says, "Meets minimum wireless technology", this section will state what the minimum wireless technology is, and if necessary, how the offeror will demonstrate compliance. This could be done by stating in the response that the Offeror complies or providing some kind of documentation to establish compliance. |
| Identify RFP Page Numbers or Section Numbers for all Scoreable Criteria |
| 8. As you address each one of the "Minimum Mandatory" and "Scoreable Technical Criteria", put the section and page number of the criteria explanation on the "Score Sheet" in the cells provided. |
| Identify Weights for All Scorable Criteria |
| 9. Enter a weight for each "Scoreable Technical Criteria" in column J. The weight is used to identify the importance of the criteria to the project/contract. The weighting should clearly identify the priority of the "Scoreable Technical Criteria". For example, if you have the criteria "The solution should be blue to match our new furniture" and "The solution will sync with our legacy software", and one is more important than the other, you would identify that by the numbers assigned in the "Criteria Weight" column. For example, you could give weight assignments like the following: 1 and 2, 2 and 3, 1 and 4, or 1 and 6. Don't worry about assigning points. Just worry about the relative importance of each of the criteria against each other. This is important because if you weight one criteria of lesser importance the same as the most important criteria, then you could get a substandard solution. |
| Identify Required Minimum Technical Percentage |
| 10. Enter the technical score minimum threshhold that has to be met to be considered for award. |
| Identify Cost Percentage |
| 11. The last thing to consider before posting the Score Sheet is the percentage amount that will be used in scoring of the cost portion of the response. Cost has to equal a minimum of 30%. Please fill in the cell labeled "Percent of Total" at this time. |
| Filling out the RFP Score Sheet |
| 12. When it is time to score the evaluations, first make a copy of the "Score Sheet" tab by right-clicking on the tab and selecting Move or Copy. There is a check box for Make a Copy and you can select where in the workbook you would like the page to be located. Make a sheet for every offer you will be evaluating. |
| Evaluate Proposals |
| 13. Now is the time to evaluate the offers. First evaluate whether the offer meets each of the Minimum Mandatory Requirements. Use the drop down menu that appears in the cell for "Evaluation" when you click in the cell. If any of the Minimum Mandatory Requirements are not met, you do not need to continue your evaluation. |
| Proposals Passing Minimum Mandatory Requirements |
| 14. For all offers that pass the Minimum Mandatory Requirements, proceed to the Scoreable Technical Criteria. Using the requirements written in the RFP and identified on the Score Sheet, evaluate each criteria on a scale of 1 - 5. The scale is included on the Score Sheet for your reference. When it is time to make an award recommendation, you will need to put together a Justification Statement. You will have the information you need if you fill these sections out while performing the evaluation. |
| Scoresheet Summary |
| 15. The "Scoresheet Summary" tab may be used to make the evaluation score sheet that will be used at the Award Determination meeting. All committee members will have an opportunity to review scores before finalizing the technical scores. Some formulas can be used to facilitate this process, but those can only be written after it has been determined how many offers will be evaluated. For help on this please contact your Purchasing Agent. |
| Bonfire Posting |
| 16. The "U3P Posting" tab illustrates the format to use for the scoresheet summary posted in U3P when the award is made. The Purchasing Agent will complete this information from the Scoresheet Summary grand totals. Firms that have been disqualified will not be included in the U3P Posting document. |
Score Sheet
| SANDBAGS |
| SOLICITATION # RM26-8 |
| RFP EVALUATION SCORESHEET |
| Evaluation Process: |
1. Vendors must pass all listed minimum mandatory requirements to be considered.
2. Vendors must receive the minimum amount of technical points as stated in Attachment D - Technical Criteria, in order to advance to the cost evaluation stage.
3. Cost points are awarded and combined with the Vendor's technical score. The Cost evaluation is described in detail in Attachment C - Cost Sheet.
4. Vendors who meet the minimum total RFP score as described in the RFP information will be awarded a State of Utah Cooperative Contract.
| Score will be assigned as follows: | ||||||||||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information | ||||||||||
| Firm Name: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | |||||||||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | ||||||||||
| Evaluator: | 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | |||||||||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | ||||||||||
| Date: | 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | |||||||||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | ||||||||
| 1 | Vendor must upload their Attachment C: Cost Sheet to the Requested Information Section of the RFP. | MMR | ||||||||
| 2 | Vendor must upload their response to Attachment D: Technical Criteria to the Requested Information Section of the RFP. | MMR | ||||||||
| 0 | ||||||||||
| Scoreable Technical Criteria | RFP Section | Evaluator Score (0-5) | Criteria Weight | % of Tech Criteria | Points Possible | Points | ||||
| Earned | Minimum Required | |||||||||
| 1 | Provide a Detailed Description to WHY your company is qualified to provide the requested goods to Utah public entities. Include a statement addressing the offeror's ability to respond to Utah emergencies providing bags within 48 hours of purchase order receipt. | Attachment D Section 1 | 80 | 50.0% | 400.00 | 0.00 | ||||
| 2 | Provide a Detailed Description of HOW you will meet the needs of Utah public entities. Include a statement addressing the offeror's salespeople's ability to identify Utah-contracted prices and to reference a unique Utah-issued-contract number on all quotes and invoices | Attachment D Section 2 | 80 | 50.0% | 400.00 | 0.00 | ||||
| 13 | 0.0% | 0.00 | 0.00 | |||||||
| 14 | 0.0% | 0.00 | 0.00 | |||||||
| 15 | 0.0% | 0.00 | 0.00 | |||||||
| 16 | 0.0% | 0.00 | 0.00 | |||||||
| 17 | 0.0% | 0.00 | 0.00 | |||||||
| 18 | 0.0% | 0.00 | 0.00 | |||||||
| 19 | 0.0% | 0.00 | 0.00 | |||||||
| 20 | 0.0% | 0.00 | 0.00 | |||||||
| 21 | 0.0% | 0.00 | 0.00 | |||||||
| 22 | 0.0% | 0.00 | 0.00 | |||||||
| 23 | 0.0% | 0.00 | 0.00 | |||||||
| 100.0% | 800.00 | 0.00 | 0.00 | |||||||
| Required Technical Point Threshold | Min Percent | Min Points Required | Points Earned | Percent Earned | Evaluation | |||||
| 60% | 480.0 | 0.0 | 0.0% | 0 | ||||||
| Cost | Low Cost Option | Offered Cost | Percent of Total | Points Possible | Points Earned | |||||
| 20% | 200.0 | 0.0 | ||||||||
| * Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price). | ||||||||||
| Total Evaluation Points | Percent of Total | Points Possible | Points Earned | |||||||
| Total Technical Evaluation Points | 80% | 800.0 | 0.0 | |||||||
| Total Cost Evaluation Points | 20% | 200.0 | 0.0 | |||||||
| Total Evaluation Points | 100% | 1,000.0 | 0.0 |
Scoresheet Summary
| XX##### Solicitation Name Scoresheet Summary | |||||||||||||||||||||
| Instructions: | |||||||||||||||||||||
| Enter the solicitation number and name. | |||||||||||||||||||||
| Enter each Offeror name. | |||||||||||||||||||||
| Enter the Criteria name for each category. | |||||||||||||||||||||
| Enter the Weight in column B that corresponds to the Criteria Weight on the Score Sheet tab column J for each criterion. | |||||||||||||||||||||
| Enter the Total Possible Points for each Criterion, Cost Points, and Score Summary section. | |||||||||||||||||||||
| Mandatory Minimum Requirements: Evaluate each offer and enter pass or fail | |||||||||||||||||||||
| Ensure that the number of evaluator lines matches the number of evaluators. | |||||||||||||||||||||
| Offers not meeting the Minimum Mandatory Requirements will not be evaluated further. | |||||||||||||||||||||
| Ensure that the Total Average Score formula includes all of the evaluator line items. | |||||||||||||||||||||
| Technical Scores: Enter each evaluator score for each offer. | |||||||||||||||||||||
| Signatures: | Date: | ||||||||||||||||||||
| Evaluator 1 | __________________ | ||||||||||||||||||||
| Evaluator 2 | __________________ | ||||||||||||||||||||
| Evaluator 3 | __________________ | ||||||||||||||||||||
| Evaluator 4 | __________________ | ||||||||||||||||||||
| Evaluator 5 | __________________ | ||||||||||||||||||||
| Minimum Mandatory Requirements | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| 1 | |||||||||||||||||||||
| 2 | |||||||||||||||||||||
| 3 | |||||||||||||||||||||
| Weight | Technical Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Criteria #1 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #1 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #2 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #2 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #3 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #3 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #4 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #4 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #5 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #5 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #6 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #6 - Total Points (Total Possible XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #7 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Criteria #7 - Total Points (Total Possible Points = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Technical Points (Total Possible Points = XX) Minimum Threshold = XX | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points | Cost Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Cost | |||||||||||||||||||||
| 300.0 | Cost Points | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Score Summary | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| Total Technical Points (Total Possible = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points (Total Possible = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Grand Total Points (Total Possible = XX) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
File details come from the government source that posted it. Updated .