2PL102-E Plumbing.pdf
PDF 625 KB Posted
- Solicitation number
- 629-22-135
About this file
This document contains a second floor plumbing plan for a medical facility renovation project and the related federal contract opportunity solicitation. The plumbing plan details the layout and specifications of domestic water, sanitary, storm, and medical gas piping for an area of approximately 14,100 square feet. Piping includes sizes from 1/2 inch to 12 inches in diameter with associated valves, manifolds, and fixtures. The federal contract opportunity is a request for proposal to provide site preparation work for installation of a new dual energy CT scanner, with responses due by June 15, 2022. The awarded firm will be responsible for demolition, excavation, and installation of underground utilities to support the new medical imaging equipment.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
P-414 P-414
P-414
P-104A
P-414
P-414
P-528
P-414
P-414
P-414
P-414
P-414
P-414
P-414P-414
P-504
P-414 P-104A
P-701
P-414
P-104A
P-414
P-414
P-414
2P102-D
2P102-E
2P102-E
2P102-F
P-104
P-414
INTERVIEW
2F101
CORR
2E-C12
CORR
2E-C02
CORR
2E-C05
CORR
2E-C09
CORR
2E-C10
CORR
2E-C11
CORR
2E-C06
CORR
2E-C01
ACUTE-2
2E146
REF:2E157
DECONTAM
2E178
WORK
2E152B
ACUTE-1
2E147
REF:2E157
T/D
2E125
RADIOLOGY
2E132
RADIOLOGY
2E130
T/D
2E126
CT
SCAN
2E129
CONTROL
2E128
REF:2E107
SCR
2E109
CONTROL
2E107
HK
2E170
REF:1D217
T
2E167A
ALCOVE
2E160
ACUTE-11
2E166
REF:2E157
ACUTE-3
2E145
REF:2E157
ACUTE-4
2E144
REF:2E157
ACUTE-5
2E140
REF:2E157
ACUTE-6
2E155
ACUTE-7
2E156
REF:2E157
ACUTE-8
2E157
MEDS
2E154
WORK
2E152C
BLOOD
GAS
2E164
CONSULT
2E180
PACS
2E152E
MULTI-PURPOSE
2E175
CLEAN
2E149
TRIAGE
2E150
SCR
2E137
REF:2E109
HC
PATIENT
T/S
2E169
NURSE
STATION
2E152A
ISO
ACUTE-12
2E167
T
2E148
HK
2E138
REF:1D217 SIM
RAD
EQUIP
2E106
MH T
2E168
RAD
STRETCHER/WC
2E134
W C
/S T
R E
T C
H
S T
O R
E
STAFF
WORK
2E136
DRESS
2E115
REF:2E117
CC
2E139
RAD
ELEC
RM
2E105
EC
2E174
ALCOVE
2E151
NURSE
STATION
2E152D
COPY/WORK
2E153
REF:3G179
DRESS
2E116
REF:2E117
HK
2E104
REF:1D217
ACUTE-9
2E158
REF:2E157
ISO/GYN
ACUTE-10
2E159
T
2E159A
ENTRANCE
VESTIBULE
2E176
EQUIP
2E135
EQUIPMENT
2E133
CT
SCAN
2E108
CT
SCAN
2E110
CONTROL
2E111
REF:2E107
CT
PREP/WORK
2E114
CT
PREP
2E127
DRESS
2E118
REF:2E117
DRESS
2E119
REF:2E117
T/D
2E124
T/D
2E120
TELECOM
2E227A
NORM
ELEC
2E227C
EMER
ELEC
2E227D
SCRUB
VENDING
2E101C
SECURITY
2E227B
CLEAN
2E102
REF:2D161
ST
2E101A
LOCKER
ROOM
2E101
ST
2E101B
INTERVIEW
2E103A
INTERVIEW
2E103B
COMPLEX
TREATMENT
2E165
NURSE
MANAGER
2E181
COPY/WORK
2E182
MH-2
2E187
MH-RESTRAINT
2E189
RES
CONF/WORK
2E193
FAST
TRACK-8
2E195
CORR
2E-C07
CORR
2E-C08
DRESS
2E117
SHAFT
SHE06
SHAFT
SHE07
6"SS UP & DN
4"VS UP & DN
4"DCWL UP & 3"DN
2 1/2"DHWL UP & 1 1/2"DN
1 1/4"DHWLR UP & 3/4"DN
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
4"S UP
4"S UP
2"W UP 2"W UP
4"S UP
10"RL UP (14,100 SQ.FT.)
& 12"DN (22,870 SQ.FT.)
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
P-414
P-414 P-414
P-414
P-414
P-414
P-414
P-414
P-504
P-414
P-414
P-504 P-414
P-414
P-104A
P-414
P-104A
P-414
P-104A
P-414
P-104A
P-414
P-414
1 1/4" DHWL1 1/4" DHWL
1/2" DCWL
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
4"S DN & 2" V RISE
2"DCWL DROP
1/2"DHWL DROP
2"W & V RISE
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2" DCWL
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2" DCWL
2" D
C W
L
2" DCWL
2" D
C W
L
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
4"S DN & 2" V RISE
2"DCWL DROP
2"W & V RISE
1/2"DHWL DROP
1/ 2"
D H
W L
1/2" DCWL
3/ 4"
D C
W L
3/ 4"
D C
W L
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/ 2"
D H
W L
1/
4" D
C W
L
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2" D
C W
L 3/
4" D
C W
L
1/ 2"
D H
W L
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2"V DN & RISE
3"W DN
3/4"DCWL DROP
3/4"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
3/4" DCWL
3/ 4"
D H
W L
1 1/4" DHWL
2"W UP
2"W UP
1/
2" D
C W
L
4"VS UP & DN
4"SS UP & DN
3"V DN & RISE
2"W UP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2"W UP
2"W UP
2"W UP
TMV
2"W & V RISE
1/2"DHWL DROP
2"DCWL DROP
4"S DN & 2" V RISE
4"S UP
3/4"DCWL DROP
2"V DN & RISE
3"W DN
3/4"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1 1/2"DCWL DROP
4"S DN & 2" V RISE
4"SS UP&DN
4"VS UP&DN
4"SS UP&DN
4"VS UP&DN
4"S DN & 2" V RISE
2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2"W UP
1/2"DHWL DROP
2"V DN & RISE
2"W DN
1/2"DCWL DROP
4"S DN & 2" V RISE
2"DCWL DROP
2"W & V RISE
1/2"DHWL DROP
2" DHWL
1 1/4" DCWL
1 1/4" DHWL
1" DHWL
1" DHWL
1" D
H W
L
1" DHWL
1 1/4" DHWL
3/ 4"
D C
W L
3" DCWL
1 1/4" DHWL
3/ 4"
D C
W L
2" D
C W
L
3/ 4"
D C
W L
1" DHWL 1" DHWL
3/ 4"
D C
W L
2" D
C W
L
1 1/4" DHWL
1 1/2" DCWL
1 1/4" DHWL
P-104A
P-519A
3" DCWL
2" V
2" V
2" V
2" V
2" V
2" V
4"FD-B
4"FD-B
(2)4"V DN&RISE
4"W&T UP
4"V UP
4"V UP
4"W&T UP
(2)1/2"TP UP
TO MANIFOLD
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
1 1/4"DCWL DROP
2"W DN & V RISE
TMV
1 1/2"TW RISE
1-1/4"DHWL DROP
1/2" TP
1/2" TP
4" SAN (M.C.)
2" SAN (M.C.)
3" SAN (M.C.) 3" SAN (M.C.)
2" S
A N
(M .C
3/ 4"
D C
W L
P-804
AHU BY HVAC
AHU BY HVAC
3/4"DCWL DROP
4"S DN & 2" V RISE
2"DCWL DROP
1/2"DHWL DROP
2"W & V RISE
1/2"DHWL DROP
2"W & V RISE
2"DCWL DROP
4"S DN & 2"V RISE
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
3" V
2" V
1/ 2"
D C
W L
8"RL UP
(8,770 S.F.)
1/ 2"
D H
W L
1/
2" D
C W
L
1 1/2" DCWL
1/
4" D
H W
L
2" DHWL 2" DHWL 2" DHWL
2" DHWL
2" D
C W
L
1 1/4"DCWL DROP
1 1/4"TW RISE
1 1/4"DHWL DROP
2" DHWL
2" D
H W
L
1/2" DCWL
2" V
3" DCWL 3" DCWL
2"DCWL DN
1 1/2"DHWL DN
2"DCWL DN
1 1/2"DHWL DN
P-801
P-801
2" S
A N
(M .C
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG OP508
DSP-1
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG 0P508
DSP-1
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG OP508
DSP-1
2" S
A N
(M .C
8" R
L
8" RL
2" V
2" V
1 1/2" DHWL
NC BYPASS VALVE
NC BYPASS VALVE
3/4" DCWL
3/4"DCWL DROP
3/4" DCWL
3/ 4"
D C
W L
4" FD-B
1/2" DCWL
4”FD-B
1"DCWL DROP
1"RPBP
2"V DN & RISE
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN TO FD'S
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN TO FD'S
2"V DN & RISE
1"DCWL DROP
1"RPBP
1/2" DCWL
1/2" DCWL
2"DCWL DROP
4"W DN & 2"V RISE
2"DCWL DROP
4"W DN & 2"V RISE
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
3" V
3" SAN (M.C.)
4" S
A N
(M .C
2" V
4" SAN (M.C.)
3" SAN (M.C.)
3" V
2" V
2" V
3" V
2" V
4" SAN (M.C.)
4" S
A N
(M .C
2" S
A N
(M .C
2"V UP
3"W&T UP
4"S UP
2"V UP
2" SAN (M.C.)
4" S
A N
(M .C
4"SS UP&DN
4"VS UP&DN
2" SAN (M.C.)
4"SS UP&DN
4"VS UP&DN
P-104A
P-414
P-414
P-104A
P-528
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
2"DCWL DROP
4"W DN&2"V RISE
6" R
L 6"
R L
4" R
L
6" R
L
2"W UP
2" V 2" V
P-712
1/
4" D
H W
L
1/
2" D
C W
L
PROVIDE EXPANSION JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS) IN ALL PIPING
SYSTEMS
PROVIDE EXPANSION JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS) IN ALL PIPING
SYSTEMS
2" D
H W
L
2" DCWL
1 1/2" DHWL
1/2" DCWL
3" D
C W
L
2" SAN (M.C.)
3" SAN (M.C.)
3" S
A N
(M .C
3"FD-C
2"V DN&RISE
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN
TO FD'S
02 E G
02 D C
02 B
02 7
8.3
F.9
A.5
AA
5.3
AA.2
7.6
8.1
6.1
EJ 2
A
02 F
02 8
EJ
2.9
C.5
2" DCWL
1 1/2" DHWL
1/ 2"
D C
W L
1/
2" D
H W
L
3/4" DHWL
2" DCWL
SL
1B
3" V
3" V3" V3" V
2" V
2" V
2" V
2" V
3" V
2" V
3" V
2" V
3" V2" V
2" V
2" V
3" V
2" SAN (M.C.)
2" S
A N
(M .C
3" V
2" V
SS
2A
VS
2A
SS
2B
VS
2B
SS
2C
VS
2C
SS
2D
VS
2D
SS
2F
VS
2F
SS
2E
VS
2E
2"FD-C
4"W & T UP
2"V UP
4" SAN (M.C.)
(2)4"W& T UP
(2)2"V UP
9.6
XA
9.2
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
2PL102-E
BLDG 2 SECOND FLOOR PLUMBING PLAN - AREA E
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
NEW ORLEANS, LOUISIANA
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1. ALL HORIZONTAL PIPING SHALL BE INSTALLED IN THE INTERSTITIAL
SPACE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OWN ALL
REQUIRED CORING, SLEEVING, FIRESTOPPING, ETC. REFER TO
ARCHITECTURAL PLANS FOR INTERSITIAL SLAB CONSTRUCTION.
2. ALL DOMESTIC (POTABLE)AND NON DOMESTIC (NONPOTABLE) HOT,
COLD, AND HOT WATER CIRCULATION PIPING SHALL BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR IN ORDER TO MAINTAIN HOT WATER
TEMPERATURE TO ALL FIXTURES. IF PIPING CAN'T BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR, PIPING SHALL BE INSTALLED
BETWEEN THE INTERSTITIAL SPACE FLOOR AND THE CEILING AND THE
PIPING SHALL BE LOOPED TO ALLOW CONTINUOS HOT WATER
CIRCULATION.
3. ALL STACKS AND RISERS SHALL BE SUPPORTED AT THE INTERSTITIAL
SPACE FLOOR OR JUST ABOVE THE CEILING WHERE THE INTERSTIAL
SPACE DOES NOT EXIST. SEE DETAILS ON DWG 0P506.
4. PROVIDE A BALL VALVE IN THE OPEN POSITION WITH A LOCK AND CHAIN
AT ALL EMERGENCY SHOWERS
5. DRAIN VALVES SHALL BE PROVIDED AT THE BASE OF ALL PLUMBING
RISERS
6. ALL ISOLATION VALVES AT RISERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION, NO MORE THAN 12" ABOVE FINISHED CEILING
7. ALL MIXING VALVE AT SHOWERS SHALL HAVE THE TEMPATURE LIMIT
STOP ADJUSTED TO THE REQUIRED VA STANDARDS
GENERAL NOTES
1 Addendum 01 5/23/12
30 BULLETIN 029C-IMAGING 7/23/14
32 BULLETIN 029D-IMAGING 10/16/14
REFER TO SKETCH:
SK-8-1-NJ-2-PL-102-E-1
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
RFI 01757: MOVE
WALL NORTH 2"
RFI 01707: FUR OUT
PARTITION BEHIND
FIXTURE AND
CASEWORK 5'-2" IN
LENGTH
RFI 01707: FUR
WALL FOR FIXTURE
RFI 01707: FUR
OUT WALL
BEHIND FIXTURE
5'-2" IN LENGTH
RFI 01707: FUR WALL
BEHIND FIXTURE
INTO 2E133
RFI 01707: CREATE
BUMP OUT BY
FURRING OUT
WALL BEHIND LAV
TO WALL IN 2E114
RFI 01809.1: DELETE (1) 4" FD-B, (1) P-804,
(1) P-712 ((1) 4" FD-B to remain for humidifier and (1) 4" OED to be added)
THIS DRAWING HAS BEEN AFFECTED BY THE BIM
COORDINATION PROCESS. PLEASE REFER TO THE
BIM COORDINATED SHOP DRAWINGS FOR DETAILS.
GRAVITY PLUMBING PRESSURE PLUMBING
RFI:01904.1 -
Relocate Drops to 6" Partition on West side of Triage 2E150
RFI 07322: Add floor drain and associated drainage piping
RFI 07968Relocate Floor Drain