29 - Nuclear Gauge Form 2.docx

DOCX document 26 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a Request for Authorization to Bring Radioactive Materials (RAM) onto Nellis AFB, Creech AFB, or the Nevada Test and Training Range (NTTR). The form requires detailed information from a licensee seeking to conduct activities involving radioactive materials, including well logging, portable gauges, radiography, or other specified work. Key submission requirements include providing a copy of the USAF contract, current NRC or Agreement State license, authorization for periodic safety assessments, training certificates for authorized users, and a current leak test certificate. The request must be submitted at least 30 calendar days before bringing RAM onto the installation, with strict warnings about false statements potentially resulting in denial, rescission of authorization, and potential civil or criminal penalties.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
(Attachment 56) SABER Seed SOO Honor Guard Building 10250 Attachment 2- HAZMAT Results 10250 Restrooms part 2.pdf PDF
(Attachment 59) SABER Seed SOO Honor Guard Building 10250 Attachment 6 - Floorplan Conceptual.pdf PDF
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf PDF
(Attachment 62)SABER Seed SOO Honor Guard Building 10250Attachment 9 -Asbestos and Lead testing for installing air compressor.pdf PDF
(Attachment 64) SABER Seed SOO Honor Guard Building 10250 Attachment 11- Testing on exterior paint walls dated 6 November 2014.pdf PDF
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf PDF
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030003 SF 30 .pdf PDF
Attachment 53 Gordian SABER Technical Specifications.pdf PDF
Solicitation Amendment FA486125R00030002 SF 30.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Solicitation Amendment - FA486125R00030001.pdf PDF
Atch 42 NV20250058 19Sep25 Hwy Clark.pdf PDF
Atch 50_RFI Log_General Solicitation.xlsx XLSX spreadsheet
Atch 51_RFI Log_ SABER Seed.xlsx XLSX spreadsheet
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
34 - Schedule of Values Template.xlsx XLSX spreadsheet
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR AUTHORIZATION TO BRING RADIOACTIVE MATERIALS (RAM) ONTO NELLIS AFB, CREECH AFB, OR THE NEVADA TEST AND TRAINING RANGE (NTTR)

1. NAME OF LICENSEE (person or firm proposing to conduct the activities described below)

2. TYPE OF REQUEST

|_| INITIAL |_| UPDATE

3. ADDRESS OF LICENSEE (mailing address or other location where licensee may be located)

4. LICENSEE CONTACT AND TITLE

5.
6. PHONE NUMBER

7. WORK CELL NUMBER

8. FAX NUMBER

9. LICENSEE RADIATION SAFETY OFFICER NAME

10. RSO PHONE NUMBER

11. LICENSEE EMAIL ADDRESS

12. ACTIVITES TO BE CONDUCTED ON THE INSTALLATION

|_| Well Logging |_| Leak Testing and/or Calibrations |_| Portable Gauges |_| Other (specify):

|_| Radiography

13. INSTALLATION WHERE ACTIVITIES WILL BE CONDUCTED

|_| Nellis AFB |_| Creech AFB

|_| NTTR

14. PRIMARY CONTRACTOR INFORMATION (Name, Address, City, State, Zip Code)

15. ACTUAL PHYSICAL ADDRESS OF WORK LOCATION (Provide GPS coordinates if known)

16. PRIMARY CONTRACTOR PHONE NUMBER
17. WORK LOCATION PHONE NUMBER

Office

Work Cell Office Work Cell

18. DATES FOR REQUEST AUTHORIZATION
19. NUMBER OF DAYS

20. ADD

21. DELETE

22. CONTRACT PROJECT NUMBER

FROM:

TO:

WEEKENDS

|_| YES |_| NO

LIST ADDITIONAL WORK SITES ON A SEPARATE SHEET(S) TO INCLUDE ALL INFORMATION CONTAINED IN ITEMS 12-21 ABOVE

23. PROVIDE A DESCRIPTION OF THE TYPE AND SCOPE OF THE ACTIVITIES TO BE PERFORMED

24. MANUFACTURER:

25. MODEL NO:

26. SERIAL NO:

27. RAM License Number:

28. STATE:
29. EXPIRATION DATE:

30. AUTHORIZED USERS: (Last Name, First Name) This request for authorization must be submitted to the Installation RSO at least 30 calendar days before bringing RAM onto the installation IAW AFI 40-201. Submission of this request for authorization with less than 30 days notice requires a signed letter by the requesting military organization addressing why the requirements of AFI 40-201 could not be met. The letter must also contain a signed acknowledgement from the requesting organization’s group commander.

In addition to this document the following information must be submitted as a part of the request for authorization:

· A copy of the USAF contract clause describing work to be performed at the installation and the inclusive dates of the work.

· A copy of a current NRC or Agreement State license

· Written authorization for the Installation RSO to conduct periodic assessments to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.

· Applicants holding a RAM license not issued by an Agreement State must also submit an approved NRC Form 241.

· Applicants applying to bring RAM onto NTTR must also submit an approved NRC Form 241.

· A copy of training certificates for all authorized users listed on this document. Training should be commensurate with the hazard/material being used.

· A copy of a current leak test certificate which meets the requirements of the RAM license.

Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.

NOTE: If locations, dates, and times cannot be provided as a result of them being undetermined, written or email notification will be provided to the Installation RSO not later than 24 hours prior to bringing RAM onto the installation. The notification must contain the location, date, and time window of the activity is to be performed. Failure to comply with this requirement may result in rescinding of the authorization and notification to the NRC and/or State.

WARNING: False statements on this request for authorization to bring radioactive material onto Nellis AFB, Creech AFB, or the NTTR will result in immediate denial of this application or rescinding of your authorization if already issued. Additionally, notification will be made immediately to the Nuclear Regulatory Commission and/or the Agreement State jurisdictionally responsible for your license. Notification to the NRC or State may result in civil and/or criminal penalties.

File details come from the government source that posted it. Updated .