The SABER Design Intent Drawing Set is a comprehensive document outlining design requirements for a construction project at Nellis Air Force Base, specifically for constructing a Visitor Control Center (Building B697). The document provides detailed guidance for two levels of design submittals (Level 1 and Level 2), covering multiple engineering disciplines including civil, architectural, structural, mechanical, electrical, plumbing, fire protection, and telecommunications.

The design intent drawings specify precise requirements for each discipline, including general notes, symbol lists, floor plans, equipment schedules, system layouts, utility connections, grounding plans, and detailed technical specifications. Each discipline's drawings progressively increase in complexity from Level 1 (basic conceptual design) to Level 2 (more detailed and technically specific design), providing contractors with comprehensive guidance for design development. The document includes example drawings demonstrating the expected level of detail and information for each design discipline, ensuring consistent and thorough design documentation for the construction project at Nellis Air Force Base.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Design Intent Drawing Set

SABER DESIGN INTENT DRAWING SET – LEVEL 1

The following serves as a supplement to the Statement of Work (SOW) to outline the Nellis AFB requirements for design drawings required under the SABER Contract. An acceptable level 1 design submission shall reflect the final basic plan with sufficient detail to illustrate (as applicable) the structural, architectural, mechanical, electrical, fire and communications systems as well as the paving/grading/drainage plan, haul route and proposed storage site, designed to level 1 definition. Drawings shall include detailed schedules and legends appropriate to describe the design, as well as be of sufficient detail to fully communicate the design concept. Drawings for level 1 shall include all applicable drawings from the following list and any additional required to fully illustrate the work.

Cover Sheet and Drawing Index

• Project number and full project name

• Contract and task order number

• Date drawings were issued

• Name of the Contractor, DOR, and other agencies involved

• Drawing index outlining all sheets in the drawing set

Level 1 Cover Sheet Example

Haul Route and Contractor’s Storage Site

• Haul route from entrance onto base to location of project

• Project site location with laydown yard for equipment storage

Level 1 Haul Route Example

Civil Drawings

• General notes

• Existing conditions, elements, and areas to be demolished; all applicable exterior and interior features

• New construction and exterior work

• Building location and orientation

• Airfield runways, taxiways, ramps, streets, roads, walks, and parking

• Exterior utilities beyond five feet (5’) building line

• Landscape plan and plant schedule

Level 1 General Civil Notes Example

Level 1 Demolition Plan Example

Level 1 Civil Plan Example

Level 1 Utility Plan Example

Architectural Drawings

• General notes, symbol list, and abbreviations

• Overall key floor plan with room legend

• Interior finish schedules

• Architectural features

Level 1 Architectural Symbols, Abbreviations, and Notes Example

Level 1 Floor Plan Example

Level 1 Interior Finish Schedules Example

Plumbing Drawings

• Symbol list and abbreviations

• Floor plan – system layout, tie-in to supporting utilities

Level 1 Plumbing Symbol List and Abbreviations Example

Level 1 Plumbing Floor Plan Example

Mechanical (Heating, Ventilation, Air Conditioning, Refrigeration) Drawings

• General notes and symbol list

• Floor plan – system layout, tie-in to supporting utilities

Level 1 Mechanical Legend and Abbreviations Example

Level 1 Mechanical Notes Example

Level 1 Mechanical Floor Plan Example

Electrical Drawings

• General notes and symbols

• Floor plan with fixture location, circuiting, switching, convenience outlets-electrical service to equipment, and existing power panels

Level 1 Electrical Notes and Symbols Example

Level 1 Electrical (Lighting) Floor Plan Example

Level 1 Electrical (Power) Floor Plan Example

Telecommunication Drawings

• Symbol list and abbreviations

• Overall floor plan

• Details of OSP routes

• Location of all cable terminations

• Notes shall include all equipment being provided by the Contractor

Level 1 Telecommunication Symbols and Abbreviations Example

Level 1 Telecommunication Floor Plan Example

Level 1 OSP Route/Riser Diagram Example

SABER DESIGN INTENT DRAWING SET – LEVEL 2

The following serves as a supplement to the Statement of Work (SOW) to outline the Nellis AFB requirements for design drawings required under the SABER Contract. An acceptable level 2 design submission shall automatically incorporate all requirements/levels/aspects of the level 1 design requirements and reflect the final basic plan with sufficient detail to illustrate (as applicable) the structural, architectural, mechanical, electrical, fire and communications systems as well as the paving/grading/drainage plan, haul route and proposed storage site, designed to a level 2 definition. Major mechanical and electrical equipment items shall be shown on the drawings with single line diagrams, and all utilities and structures shall be shown.

Drawings shall include detailed schedules and legends appropriate to describe the design, as well as be of sufficient detail to fully communicate the design concept. Drawings for a level 2

Design shall include all applicable drawings from the following list and any additional required to fully illustrate the work.

Cover Sheet and Drawing Index

• Project number and full project name

• Contract and task order number

• Date drawings were issued

• Name of the Contractor, DOR, and other agencies involved

• Drawing index outlining all sheets in the drawing set

Level 2 Cover Sheet Example

Haul Route and Contractor’s Storage Site

• Haul route from entrance onto base to location of project

• Project site location with laydown yard for equipment storage

Level 2 Haul Route Example

Civil Drawings

• General notes

• Existing conditions, elements, and areas to be demolished; all applicable exterior and interior features

• New construction and exterior work

• Building location and orientation

• Airfield runways, taxiways, ramps, streets, roads, walks, and parking, including subsurface

• Exterior utilities beyond five feet (5’) building line. Details of connection into existing utilities

• Landscape plan and plant schedule

Level 2 General Civil Notes Example

Level 2 Demolition Plan Example

Level 2 Civil Plan Example

Level 2 Utility Plan Example

Structural Drawings

• General notes, symbols, and abbreviations

• Foundation plan with column locations

Level 2 Structural Abbreviations Example

Level 2 Structural Notes Example

Level 2 Foundation Plan Example

Architectural Drawings

• General notes, symbol list, and abbreviations

• Overall key floor plan with room legend

• Roof plan with slopes

• Reflected ceiling plan

• Interior and exterior elevations

• Interior finish schedules

• Door and window schedules

• Hardware schedule

• Exterior building elevations

• Architectural features

Level 2 Architectural Notes, Symbol List, Abbreviations Example

Level 2 Floor Plan Example

Level 2 Roof Plan Example

Level 2 Reflected Ceiling Plan

Level 2 Exterior Elevations Example

Level 2 Exterior Elevations Example

Level 2 Interior Elevations Example

Level 2 Door, Window, and Hardware Schedules Example

Level 2 Interior Finish Schedules Example

Fire Protection Drawings

• Fire Alarm/Mass Notification System notes, symbol list, and abbreviations

• Floor plan and riser diagram indicating arrangement of automatic sprinkler system, smoke and/or heat detectors, and alarm systems provided by the Contractor in areas applicable to the task order

• Typical device details

• Schedule of fire resistance ratings for fire walls, interior partitions, and fire doors

Level 2 Fire Alarm and Mass Notification System Notes and Symbols Example

Level 2 FA/MNS Floor Plan Example

Level 2 FA/MNS Device Details Example

Level 2 FA/MNS Riser Diagram Example

Level 2 Fire Sprinkler System Layout Example

Plumbing Drawings

• Symbol list and abbreviations

• Floor plan – system layout, tie-in to supporting utilities

• Key details

• Fixture and equipment schedules

Level 2 Plumbing Symbol List and Abbreviations Example

Level 2 Plumbing Floor Plan Example

Level 2 Plumbing Fixtures and Equipment Schedules and Details Example

Mechanical (Heating, Ventilation, Air Conditioning, Refrigeration) Drawings

• General notes and symbol list

• Floor plan – system layout, tie-in to supporting utilities

• Equipment details

• Fixture and equipment schedule

• System controls and utility metering

Level 2 Mechanical Legend and Abbreviations Example

Level 2 Mechanical Notes Example

Level 2 Mechanical Floor Plan Example

Level 2 Mechanical Equipment Details Example

Level 2 Mechanical Fixture and Equipment Schedule Example

Level 2 System Controls and Utility Metering Example

Electrical Drawings

• General notes and symbol list

• Floor plan with fixture location, circuiting, switching, convenience outlets-electrical service to equipment, and existing power panels

• Grounding and lightning protection plan

• Electrical details, mountings, tie-in to existing, and supporting utilities

• Panel board schedules for items being provided by the Contractor

• Single line and electrical riser diagram for areas applicable to the task order

• Fixture and equipment schedules for items being provided by the Contractor

Level 2 Electrical Notes and Symbol List Example

Level 2 Grounding Plan Example

Level 2 Electrical (Lighting) Floor Plan Example

Level 2 Fixture and Equipment (Lighting) Schedule Example

Level 2 Electrical (Power) Floor Plan Example

Level 2 Electrical Riser Diagram and Panel Schedule Example

Level 2 Fixture and Equipment (Feeder) Schedule Example

Level 2 Single Line Diagram Example

Telecommunication Drawings

• Symbol list and abbreviations

• Overall floor plan

• Details of OSP routes. Specify exact route of underground cable

• Location of all cable terminations

• Telecommunications OSP and riser diagrams

• Notes shall include all equipment being provided by the Contractor

• Details of all wire ways and cable tray(s)/support locations

• Details of all grounding systems, points, and connections IAW codes/standards

• Electrical, structural, architectural, mechanical, fire protection, and other systems required to support communications infrastructure, IAW codes shall be included in those respective design sheets

• Identified labels for each termination and cable

• Details of wiring and components showing compliance with TIA/EIA-568 o Equipment support frame o Connector blocks, cable guides, and patch panels o Optical fiber distribution panels o Telecommunications outlet/connector assemblies o Alarm circuits, access controls, & IDS o Critical communication facilities and nodes o Location of equipment cabinets/racks

Level 2 Telecommunication Symbol List and Abbreviations Example

Level 2 Telecommunication Floor Plan and Notes Example

Level 2 OSP Route/Riser Diagram Example

Level 2 OSP Route Underground Cable Example

Level 2 OSP Route Underground Cable Example Continued

Level 2 Telecommunications Riser Diagram Example