2 - Price Schedule 23 September 25.pdf

PDF 407 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a Pricing Schedule for the Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract covering five ordering periods. The contract covers construction and engineering services for areas within and around Nellis Air Force Base, Creech Air Force Base, and the Nellis Test and Training Range, with pricing structured across multiple project magnitudes ranging from $15,000 to $4,500,000.

The pricing schedule includes detailed line items for various work categories such as standard and non-standard working hours in unrestricted, controlled, and restricted areas, contractor-provided escorts, and multiple levels of project cost proposals. These include Level 0 and Level 1 initial and revised cost proposals, as well as design and survey components. Each project magnitude has specific pricing for different scopes of work, with contractors required to prepare detailed cost proposals, attend site visits and meetings, negotiate project terms, and potentially conduct lead-based paint and asbestos surveys. The contract allows for flexible task order issuance by the Contracting Officer under specified terms and conditions.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER IDIQ

PRICING SCHEDULE – ORDERING PERIOD 01

0001: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER):

shall furnish all plant labor, equipment, materials, transportation, supervision, administration, and all else necessary to perform all work ordered under this Indefinite-Delivery, Indefinite-Quantity

(IDIQ) type contract. Individual task orders for construction projects issued by the Contracting

Officer under the contract may be issued and all work shall be accomplished, under the terms and conditions specified, attached, or referenced herein.

ITEM # DESCRIPTION Estimated

Annual

Amount

Estimated

Coefficient

Total

Nellis AFB to include work within 10 miles of

Nellis AFB

0001AA Unrestricted Area Standard Working

Hours (as defined in "Definitions" of specifications)

0001AB Unrestricted Area Non-Standard Working

0001AC Controlled Area Standard Working Hours

(as defined in "Definitions" of

0001AD Restricted Area Standard Working Hours

Creech AFB to include work within 20 miles of Creech AFB

0001AE Unrestricted Area Standard Working

0001AF Unrestricted Area Non-Standard Working

0001AG Controlled Area Standard Working Hours

0001AH Restricted Area Standard Working Hours

Nellis Test and Training Range

0001AI Unrestricted Area Standard Working

0001AJ Unrestricted Area Non-Standard Working

0001AK Controlled Area Standard Working Hours

0001AL Restricted Area Standard Working Hours

ITEM # DESCRIPTION Estimated Days Price Per Day

Per Escort

Escorts

0001AM Contractor Provided Escort (In accordance with Attachment 01, paragraph 1.30.4)

ITEM # DESCRIPTION Estimated Quantity Unit Price Total

SABER Project – Level 0 Cost proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost proposal (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a

Statement of Work (SOW) and drawings, where applicable.

0001AN MAGNITUDE 1 value projects

($15,000 to $500,000)

0001AO MAGNITUDE 2 value projects

($500,001 to $1,500,000)

0001AP MAGNITUDE 3 value projects

($1,500,001 to $3,000,000)

0001AQ MAGNITUDE 4 value projects

($3,000,001 to $4,000,000)

SABER Project – Level 0 Revised

Cost Proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost proposal (to include prepriced and non-prepriced items) and a period of performance due to a change in scope.

Government will provide a Statement of Work (SOW) and drawings, where applicable.

0001AR MAGNITUDE 1 value projects

0001AS MAGNITUDE 2 value projects

0001AT MAGNITUDE 3 value projects

0001AU MAGNITUDE 4 value projects

SABER Project – Level 1 Design & provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.

0001AV MAGNITUDE 1 value projects

0001AW MAGNITUDE 2 value projects

0001AX MAGNITUDE 3 value projects

0001AY MAGNITUDE 4 value projects

SABER Project – Level 1 Revised

Design & Cost Proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.

0001AZ MAGNITUDE 1 value projects

0001BA MAGNITUDE 2 value projects

0001BB MAGNITUDE 3 value projects

0001BC MAGNITUDE 4 value projects

SABER Project – Level 1 Design, Cost Proposal & Survey:

Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint

(LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work

(SOW), and a period of performance for ordered projects.

0001BD MAGNITUDE 1 value projects

0001BE MAGNITUDE 2 value projects

0001BF MAGNITUDE 3 value projects

0001BG MAGNITUDE 4 value projects

Design, Cost Proposal & Survey:

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0001BH MAGNITUDE 1 value projects

0001BI MAGNITUDE 2 value projects

0001BJ MAGNITUDE 3 value projects

0001BK MAGNITUDE 4 value projects

SABER Project – Level 2 Design & provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0001BL MAGNITUDE 1 value projects

0001BM MAGNITUDE 2 value projects

0001BN MAGNITUDE 3 value projects

0001BO MAGNITUDE 4 value projects

SABER Project – Level 2 Revised

Design & Cost Proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0001BP MAGNITUDE 1 value projects

0001BQ MAGNITUDE 2 value projects

0001BR MAGNITUDE 3 value projects

0001BS MAGNITUDE 4 value projects

SABER Project – Level 2 Design, Cost Proposal & Survey:

Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint

(LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work

(SOW), and a period of performance for ordered projects.

0001BT MAGNITUDE 1 value projects

0001BU MAGNITUDE 2 value projects

0001BV MAGNITUDE 3 value projects

0001BW MAGNITUDE 4 value projects

Design, Cost Proposal & Survey:

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0001BV MAGNITUDE 1 value projects

0001BX MAGNITUDE 2 value projects

0001BY MAGNITUDE 3 value projects

0001BZ MAGNITUDE 4 value projects

Grand Total: Add all totals for first year contract prices to arrive at grand total for first year ordering period.

PRICING SCHEDULE – ORDERING PERIOD 02

0002: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER):

shall furnish all plant labor, equipment, materials, transportation, supervision, administration, and all else necessary to perform all work ordered under this Indefinite-Delivery, Indefinite-Quantity

(IDIQ) type contract. Individual task orders for construction projects issued by the Contracting

Officer under the contract may be issued and all work shall be accomplished, under the terms and conditions specified, attached, or referenced herein.

ITEM # DESCRIPTION Estimated

Annual

Amount

Estimated

0002AA Unrestricted Area Standard Working

0002AB Unrestricted Area Non-Standard Working

0002AC Controlled Area Standard Working Hours

0002AD Restricted Area Standard Working Hours

0002AE Unrestricted Area Standard Working

0002AF Unrestricted Area Non-Standard Working

0002AG Controlled Area Standard Working Hours

0002AH Restricted Area Standard Working Hours

0002AI Unrestricted Area Standard Working

0002AJ Unrestricted Area Non-Standard Working

0002AK Controlled Area Standard Working Hours

0002AL Restricted Area Standard Working Hours

0002AM Contractor Provided Escort (In all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items) and a period of performance for ordered projects. Government will provide a

0002AN MAGNITUDE 1 value projects

0002AO MAGNITUDE 2 value projects

0002AP MAGNITUDE 3 value projects

0002AQ MAGNITUDE 4 value projects

($3,000,001 to $4,500,000)

Cost proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items) and a period of scope. Government will provide a

0002AR MAGNITUDE 1 value projects

0002AS MAGNITUDE 2 value projects

0002AT MAGNITUDE 3 value projects

0002AU MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include prepriced and non-prepriced items), drawings, a Statement of

Work (SOW), and a period of

0002AV MAGNITUDE 1 value projects

0002AW MAGNITUDE 2 value projects

0002AX MAGNITUDE 3 value projects

0002AY MAGNITUDE 4 value projects

Design & Cost proposal: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0002AZ MAGNITUDE 1 value projects

0002BA MAGNITUDE 2 value projects

0002BB MAGNITUDE 3 value projects

0002BC MAGNITUDE 4 value projects

Cost proposal & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.

0002BD MAGNITUDE 1 value projects

0002BE MAGNITUDE 2 value projects

0002BF MAGNITUDE 3 value projects

0002BG MAGNITUDE 4 value projects

Design, Cost proposal & Survey:

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0002BH MAGNITUDE 1 value projects

0002BI MAGNITUDE 2 value projects

0002BJ MAGNITUDE 3 value projects

0002BK MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0002BL MAGNITUDE 1 value projects

0002BM MAGNITUDE 2 value projects

0002BN MAGNITUDE 3 value projects

0002BO MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0002BP MAGNITUDE 1 value projects

0002BQ MAGNITUDE 2 value projects

0002BR MAGNITUDE 3 value projects

0002BS MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0002BT MAGNITUDE 1 value projects

0002BU MAGNITUDE 2 value projects

0002BV MAGNITUDE 3 value projects

0002BW MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0002BV MAGNITUDE 1 value projects

0002BX MAGNITUDE 2 value projects

0002BY MAGNITUDE 3 value projects

0002BZ MAGNITUDE 4 value projects

Grand Total: Add all totals for second year contract prices to arrive at grand total for second year ordering period.

PRICING SCHEDULE – ORDERING PERIOD 03

0003: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER):

shall furnish all plant labor, equipment, materials, transportation, supervision, administration, and all else necessary to perform all work ordered under this Indefinite-Delivery, Indefinite-Quantity

(IDIQ) type contract. Individual task orders for construction projects issued by the Contracting

Officer under the contract may be issued and all work shall be accomplished, under the terms and conditions specified, attached, or referenced herein.

ITEM # DESCRIPTION Estimated

Annual

Amount

Estimated

0003AA Unrestricted Area Standard Working

0003AB Unrestricted Area Non-Standard Working

0003AC Controlled Area Standard Working Hours

0003AD Restricted Area Standard Working Hours

0003AE Unrestricted Area Standard Working

0003AF Unrestricted Area Non-Standard Working

0003AG Controlled Area Standard Working Hours

0003AH Restricted Area Standard Working Hours

0003AI Unrestricted Area Standard Working

0003AJ Unrestricted Area Non-Standard Working

0003AK Controlled Area Standard Working Hours

0003AL Restricted Area Standard Working Hours

0003AM Contractor Provided Escort (In all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items) and a period of performance for ordered projects. Government will provide a

0003AN MAGNITUDE 1 value projects

0003AO MAGNITUDE 2 value projects

0003AP MAGNITUDE 3 value projects

0003AQ MAGNITUDE 4 value projects provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items) and a period of performance due to a change in scope. Government will provide a

0003AR MAGNITUDE 1 value projects

0003AS MAGNITUDE 2 value projects

0003AT MAGNITUDE 3 value projects

0003AU MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0003AV MAGNITUDE 1 value projects

0003AW MAGNITUDE 2 value projects

0003AX MAGNITUDE 3 value projects

0003AY MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0003AZ MAGNITUDE 1 value projects

0003BA MAGNITUDE 2 value projects

0003BB MAGNITUDE 3 value projects

0003BC MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0003BD MAGNITUDE 1 value projects

0003BE MAGNITUDE 2 value projects

0003BF MAGNITUDE 3 value projects

0003BG MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0003BH MAGNITUDE 1 value projects

0003BI MAGNITUDE 2 value projects

0003BJ MAGNITUDE 3 value projects

0003BK MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0003BL MAGNITUDE 1 value projects

0003BM MAGNITUDE 2 value projects

0003BN MAGNITUDE 3 value projects

0003BO MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0003BP MAGNITUDE 1 value projects

0003BQ MAGNITUDE 2 value projects

0003BR MAGNITUDE 3 value projects

0003BS MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0003BT MAGNITUDE 1 value projects

0003BU MAGNITUDE 2 value projects

0003BV MAGNITUDE 3 value projects

0003BW MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0003BV MAGNITUDE 1 value projects

0003BX MAGNITUDE 2 value projects

0003BY MAGNITUDE 3 value projects

0003BZ MAGNITUDE 4 value projects

Grand Total: Add all totals for third year third year ordering period.

PRICING SCHEDULE – ORDERING PERIOD 04

0004: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER):

shall furnish all plant labor, equipment, materials, transportation, supervision, administration, and all else necessary to perform all work ordered under this Indefinite-Delivery, Indefinite-Quantity

(IDIQ) type contract. Individual task orders for construction projects issued by the Contracting

Amount

Estimated

0004AA Unrestricted Area Standard Working

0004AB Unrestricted Area Non-Standard Working

0004AC Controlled Area Standard Working Hours

0004AD Restricted Area Standard Working Hours

0004AE Unrestricted Area Standard Working

0004AF Unrestricted Area Non-Standard Working

0004AG Controlled Area Standard Working Hours

0004AH Restricted Area Standard Working Hours

0004AI Unrestricted Area Standard Working

0004AJ Unrestricted Area Non-Standard Working

0004AK Controlled Area Standard Working Hours

0004AL Restricted Area Standard Working Hours

0004AM Contractor Provided Escort (In all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items) and a period of performance for ordered projects. Government will provide a

0004AN MAGNITUDE 1 value projects

0004AO MAGNITUDE 2 value projects

0004AP MAGNITUDE 3 value projects

0004AQ MAGNITUDE 4 value projects provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items) and a period of performance due to a change in scope. Government will provide a

0004AR MAGNITUDE 1 value projects

0004AS MAGNITUDE 2 value projects

0004AT MAGNITUDE 3 value projects

0004AU MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0004AV MAGNITUDE 1 value projects

0004AW MAGNITUDE 2 value projects

0004AX MAGNITUDE 3 value projects

0004AY MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0004AZ MAGNITUDE 1 value projects

0004BA MAGNITUDE 2 value projects

0004BB MAGNITUDE 3 value projects

0004BC MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0004BD MAGNITUDE 1 value projects

0004BE MAGNITUDE 2 value projects

0004BF MAGNITUDE 3 value projects

0004BG MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0004BH MAGNITUDE 1 value projects

0004BI MAGNITUDE 2 value projects

0004BJ MAGNITUDE 3 value projects

0004BK MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0004BL MAGNITUDE 1 value projects

0004BM MAGNITUDE 2 value projects

0004BN MAGNITUDE 3 value projects

0004BO MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0004BP MAGNITUDE 1 value projects

0004BQ MAGNITUDE 2 value projects

0004BR MAGNITUDE 3 value projects

0004BS MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0004BT MAGNITUDE 1 value projects

0004BU MAGNITUDE 2 value projects

0004BV MAGNITUDE 3 value projects

0004BW MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0004BV MAGNITUDE 1 value projects

0004BX MAGNITUDE 2 value projects

0004BY MAGNITUDE 3 value projects

0004BZ MAGNITUDE 4 value projects

Grand Total: Add all totals for fourth year fourth year ordering period.

PRICING SCHEDULE – ORDERING PERIOD 05

0005: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER):

shall furnish all plant labor, equipment, materials, transportation, supervision, administration, and all else necessary to perform all work ordered under this Indefinite-Delivery, Indefinite-Quantity

(IDIQ) type contract. Individual task orders for construction projects issued by the Contracting

Amount

Estimated

0005AA Unrestricted Area Standard Working

0005AB Unrestricted Area Non-Standard Working

0005AC Controlled Area Standard Working Hours

0005AD Restricted Area Standard Working Hours

0005AE Unrestricted Area Standard Working

0005AF Unrestricted Area Non-Standard Working

0005AG Controlled Area Standard Working Hours

0005AH Restricted Area Standard Working Hours

0005AI Unrestricted Area Standard Working

0005AJ Unrestricted Area Non-Standard Working

0005AK Controlled Area Standard Working Hours

0005AL Restricted Area Standard Working Hours

0005AM Contractor Provided Escort (In all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items) and a period of performance for ordered projects. Government will provide a

0005AN MAGNITUDE 1 value projects

0005AO MAGNITUDE 2 value projects

0005AP MAGNITUDE 3 value projects

0005AQ MAGNITUDE 4 value projects provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items) and a period of performance due to a change in scope. Government will provide a

0005AR MAGNITUDE 1 value projects

0005AS MAGNITUDE 2 value projects

0005AT MAGNITUDE 3 value projects

0005AU MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0005AV MAGNITUDE 1 value projects

0005AW MAGNITUDE 2 value projects

0005AX MAGNITUDE 3 value projects

0005AY MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0005AZ MAGNITUDE 1 value projects

0005BA MAGNITUDE 2 value projects

0005BB MAGNITUDE 3 value projects

0005BC MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0005BD MAGNITUDE 1 value projects

0005BE MAGNITUDE 2 value projects

0005BF MAGNITUDE 3 value projects

0005BG MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0005BH MAGNITUDE 1 value projects

0005BI MAGNITUDE 2 value projects

0005BJ MAGNITUDE 3 value projects

0005BK MAGNITUDE 4 value projects provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement

0005BL MAGNITUDE 1 value projects

0005BM MAGNITUDE 2 value projects

0005BN MAGNITUDE 3 value projects

0005BO MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0005BP MAGNITUDE 1 value projects

0005BQ MAGNITUDE 2 value projects

0005BR MAGNITUDE 3 value projects

0005BS MAGNITUDE 4 value projects shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a

0005BT MAGNITUDE 1 value projects

0005BU MAGNITUDE 2 value projects

0005BV MAGNITUDE 3 value projects

0005BW MAGNITUDE 4 value projects

Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost proposal (to include pre-priced and non-pre-priced items), drawings, a Statement of Work (SOW), and a period of

0005BV MAGNITUDE 1 value projects

0005BX MAGNITUDE 2 value projects

0005BY MAGNITUDE 3 value projects

0005BZ MAGNITUDE 4 value projects

Grand Total: Add all totals for fifth year fifth year ordering period.

File details come from the government source that posted it. Updated .