32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx

XLSX spreadsheet 502 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This file is an Air Force Form 3065 Contract Progress Report template dated April 1, 1996, designed for tracking weekly contract progress across multiple reporting periods. The template includes 48 weeks of reporting with standardized sections for documenting work elements, percentage of total job completed, scheduled and actual progress percentages, and a progress or completion certification section. Each weekly report provides space for contractor and contracting officer details, project and contract numbers, reporting periods, and a breakdown of work element completion status.

The form is structured to facilitate detailed contract performance tracking, with fields for line item work elements, percentage of total job completed (both for the current period and cumulatively), and designated areas for remarks and official signatures. The template is intended to support progress payment calculations and provide a consistent method for contractors to report their contract advancement to the contracting officer, specifically for the Air Force Base Civil Engineer.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030016.pdf PDF
Solicitation Amendment FA486125R00030016 SF 30.pdf PDF
Solicitation Amendment FA486125R00030015 SF 30.pdf PDF
Solicitation Amendment FA486125R00030014 SF 30.pdf PDF
3 - Self Scoring Matrix 17 Feb 26.xlsx XLSX spreadsheet
Att 3 -Self Scoring Matrix 3_Feb_2026.xlsx XLSX spreadsheet
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_28January2026 (003).pdf PDF
Att 78 RFI Log Additional Responses General Solicitation 27 Jan 2026_.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030012 SF 30.pdf PDF
Solicitation Amendment FA486125R00030007 SF 30.pdf PDF
(Attachment 56) SABER Seed SOO Honor Guard Building 10250 Attachment 2- HAZMAT Results 10250 Restrooms part 2.pdf PDF
(Attachment 59) SABER Seed SOO Honor Guard Building 10250 Attachment 6 - Floorplan Conceptual.pdf PDF
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf PDF
(Attachment 62)SABER Seed SOO Honor Guard Building 10250Attachment 9 -Asbestos and Lead testing for installing air compressor.pdf PDF
(Attachment 64) SABER Seed SOO Honor Guard Building 10250 Attachment 11- Testing on exterior paint walls dated 6 November 2014.pdf PDF
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf PDF
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx XLSX spreadsheet
(Attachment 67) SABER Seed SOO Honor Guard Building 10250 Attachment 14 - B10250 refurbish space conceptual visuals.pdf PDF
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment FA486125R00030003 SF 30 .pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Attachment 53 Gordian SABER Technical Specifications.pdf PDF
Solicitation Amendment FA486125R00030002 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030001.pdf PDF
Atch 42 NV20250058 19Sep25 Hwy Clark.pdf PDF
Atch 50_RFI Log_General Solicitation.xlsx XLSX spreadsheet
Atch 51_RFI Log_ SABER Seed.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
34 - Schedule of Values Template.xlsx XLSX spreadsheet
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Info

1. CONTRACT NUMBER:
2. PROJECT NUMBER:
3. PROJECT TITLE:
4. STARTING DATE:
5. PROJECTED COMPLETION DATE:
6. PURCHASE REQUEST NO.
7. NTP DATE:
8. PERIOD OF PERFORMANCE:
9. CONTRACT COMPLETION DATE:
10. SUBMITTED BY:

Schedule1 # Work Elements 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99

0.00%

TOTALS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

123456789101112
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule2

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 10.00%
131415161718192021222324
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule3

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 20.00%
252627282930313233343536
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule4

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 30.00%
373839404142434445464748
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Week1

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
1FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

CONTRACTOR

BASE CIVIL ENGINEER

Week2

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
2FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week3

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
3FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week4

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
4FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week5

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
5FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week6

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
6FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week7

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
7FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week8

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
8FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week9

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
9FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week10

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
10FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week11

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
11FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week12

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
12FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week13

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
13FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week14

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
14FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week15

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
15FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week16

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
16FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week17

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
17FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week18

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
18FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week19

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
19FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week20

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
20FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .