27-Attachment A - Construction Sign 2025 6x4.pdf

PDF 133 KB Posted

Attached to
Intersection Improvements for East County Line Road at Grand Hampton Drive
Solicitation number
IFB-26-00398
Issued by
Hillsborough County, Florida

About this file

This file contains a construction sign document from Hillsborough County Engineering and Operations Department in Florida for a road resurfacing project on 24th Street between E. College Avenue. The three-mile project is part of the Roadway Pavement Preservation Program and includes condition inspection, routine repairs, preventative maintenance treatments, and road repaving. The project completion date is mid-2026. The related state and local contract opportunity is for Intersection Improvements at East County Line Road at Grand Hampton Drive, located in Section 2 Township 27S, Range 19E in Tampa within Hillsborough County.

The road resurfacing project is estimated at $3,565,776 and is funded by HCFL.gov with approval from the Board of County Commissioners. The intersection improvements project is estimated at $1,239,930.07 and includes a Small Business Enterprise (SBE) goal of 5% participation as subcontractors. For information regarding the projects, interested parties may contact (813) 635-5400, with relay services available for hearing or voice impaired individuals by calling 711.

View the file

Other files

File Type Posted
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
31-Performance Bond.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
32-Payment Bond.pdf PDF
4-Application for Payment.pdf.pdf PDF
16-Subcontractor Letter of Intent .pdf PDF
25-Bid Bond.doc.doc DOC document
8-Consent of Surety to Final Payment.pdf.pdf PDF
26-Attachment F - Supplemental Specifications.pdf PDF
11-Substitute W9 Form.pdf.pdf PDF
28-Attachment A - Construction Sign 2025 4x6.pdf PDF
6-Payment Assistance (SBE Set-Aside).pdf.pdf PDF
9-Change Order Form.pdf.pdf PDF
30-1.Terms Conditions.pdf PDF
20-Attachment D - Project Map.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
19-Attachment C - COT Water UWS WUR-26-0036.pdf PDF
21-Attachment E - TrafficControlOfficer 6.10.docx DOCX document
18-Attachment B - Geotech report.pdf PDF
24-Agreement - Construction - Stand Alone-IFB-26-00398.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
14-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
22-Attachment G - Insurance Requirements.pdf PDF
17-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
10-Insurance Certificate.doc.doc DOC document
15-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
23-Attachment H - Plans 20260424 SS.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
2-Vendor Eligibility Check Prior to Contract Award.pdf.pdf PDF
29-Attachment A - Construction Sign 2025 8x4.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road Resurfacing: 24th St. - E.

College Ave. Optional second line This three mile project is part of the Roadway Pavement Preservation Program, which includes condition inspection, routine repairs, preventative maintenance treatments and road repaving.

Cost: $3,565,776 Completion Date: Mid 2026

Funded by:

HCFL.gov

Approved by the Board of County Commissioners

For information call (813) 635-5400 Hearing /Voice Impaired Call: 711

File details come from the government source that posted it. Updated .