26B1516001 RENOVATE BUILDINGS 536Q+534Q CG SPECS PART 2.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ 171 260000000277 1
- Issued by
- Crawford County, Michigan
About this file
Summary
This is a comprehensive specification document for the renovation of Buildings 536Q and 534Q at Camp Grayling, a state facility operated by the Department of Military and Veterans Affairs (DMVA). The project involves extensive interior and exterior upgrades including structural repairs, mechanical and electrical systems, flooring, roofing, doors, windows, hardware, painting, and various finishes. The specifications detail technical requirements across multiple construction disciplines, including execution of demolition, concrete work, masonry, metal fabrications, carpentry, thermal insulation, roofing systems, and interior finishes. The document establishes standards for submittals, quality assurance, field conditions, delivery and storage of materials, installation procedures, adjusting and cleaning protocols, and protection of work throughout the construction period.
The specifications emphasize compliance with relevant industry standards including ASTM, ANSI, ADA accessibility guidelines, NFPA fire codes, and various manufacturer requirements. Key materials and systems are identified with basis-of-design products from manufacturers such as Sherwin-Williams for paints, CertainTeed for roofing, Merillat for cabinetry, and various hardware suppliers. The project requires detailed submittals including product data, shop drawings, samples, test reports, and warranties. Warranty periods vary by system, ranging from two to ten years from substantial completion. The specifications include comprehensive environmental limitations, surface preparation requirements, and quality control procedures, with multiple references to manufacturer's written instructions and industry standards to ensure proper installation and performance of all building systems and finishes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXECUTION 017300 - 1
SECTION 017300 – EXECUTION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general administrative and procedural requirements governing execution of the
Work including, but not limited to, the following:
1. Installation of the Work.
2. Cutting and patching.
3. Progress cleaning.
4. Protection of installed construction.
1.2 DEFINITIONS
A. Cutting: Removal of in-place construction necessary to permit installation or performance of other work.
B. Patching: Fitting and repair work required to restore construction to original conditions after installation of other work.
1.3 SUBMITTALS
A. Dust Control Plan – Plan shall show how dust will be contained and removed during drilling, coring and cutting operations.
1. Plan contents.
a. Coordination drawing and narrative that indicates the dust- and HVAC-control measures proposed for use, proposed locations, and proposed time frame for their operation. Identify further options if proposed measures are later determined to be inadequate.
2. Do not start work without approved dust control plan. If work is done under this contract begins prior to approved plan contractor shall take full responsibility for cleaning or replacing any and all computer and communications equipment that is contaminated with dust.
1.4 QUALITY ASSURANCE
A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.
1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from Architect before proceeding.
Shore, brace, and support structural element during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection
2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 2
decreased operational life or safety. Other construction elements include but are not limited to the following:
4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections.
1. For projects requiring compliance with sustainable design and construction practices and procedures, use products for patching that comply with sustainable design requirements.
B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to Architect for the visual and functional performance of in-place materials.
C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.
1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; underground electrical services, and other utilities.
2. Before digging Call the MISS DIG system. 811 or 800-482-7171, and Camp Grayling
DPW Mike Halcomb at 989-344-6184.
B. Examination and Acceptance of Conditions: Before proceeding with each component of the
Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
1. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.
2. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 3
3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
4. If any conditions are found to be detrimental to the performance of the Work as required provide a written statement to the Design Professional with the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates.
c. List of unacceptable installation tolerances.
d. Recommended corrections
C. Written Report: Where a written report listing conditions detrimental to performance of the
Work is required by other Sections, include the following:
1. Description of the Work, including Specification Section number and paragraph, and
Drawing sheet number and detail, where applicable.
2. List of detrimental conditions, including substrates.
3. List of unacceptable installation tolerances.
4. Recommended corrections.
D. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the
Work.
B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.
C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Architect according to requirements in
Section 00700 "GENERAL CONDITIONS."
D. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work
3.3 DUST CONTROL
A. Contractor shall provide dust control in accordance with approved dust control plan. All concrete dust shall be contained and disposed of during drilling, coring and cutting operations.
Room has sensitive equipment that must be protected from dust.
1. Do not start work without approved dust control plan. If work is done under this contract begins prior to approved plan contractor shall take full responsibility for cleaning or replacing any and all computer and communications equipment that is contaminated with dust.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 4
B. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas.
1. Prior to commencing work, isolate the HVAC system in area where work is to be performed according to coordination drawings.
2. Disconnect supply and return ductwork in work area from HVAC systems servicing occupied areas.
3. Maintain negative air pressure within work area using HEPA-equipped air-filtration units, starting with commencement of temporary partition construction, and continuing until removal of temporary partitions is complete.
4. Maintain dust partitions during the Work. Use vacuum collection attachments on dust-producing equipment. Isolate limited work within occupied areas using portable dust-containment devices.
5. Perform daily construction cleanup and final cleanup using approved, HEPA-filter-equipped vacuum equipment. Insert special requirements for laying out the Work to suit
Project.
3.4 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure the best possible results.
Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations.
F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
G. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 5
integral anchors, that are to be embedded in concrete or masonry. Deliver such items to
Project site in time for installation.
H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.5 CUTTING AND PATCHING
A. Also see Section 01040 COORDINATION for additional Cutting and Patching Requirements.
B. Cutting and Patching, General: Employ skilled workers to perform cutting and patching.
Proceed with cutting and patching at the earliest feasible time, and complete without delay.
1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.
C. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.
D. Temporary Support: Provide temporary support of work to be cut.
E. Protection: Protect in-place construction during cutting and patching to prevent damage.
Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
F. Adjacent Occupied Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.
4. Pavement: Cut using a cutting machine, such as an abrasive saw to provide smooth straight cut for clean butt joint with new work.
5. Excavating and Backfilling: Comply with requirements in applicable Sections where required by cutting and patching operations.
6. Proceed with patching after construction operations requiring cutting are complete.
H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 6
practicable. Provide materials and comply with installation requirements specified in other
Sections, where applicable.
1. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing.
2. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
3. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance.
4. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition and ensures thermal and moisture integrity of building enclosure.
I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.
3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold waste materials for more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F.
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 7
H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
3.7 STARTING AND ADJUSTING
A. Coordinate startup and adjusting of equipment and operating components with requirements in other specification sections including but not limited to 230593 Testing Balancing and
Adjusting for HVAC.
B. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.
C. Adjust equipment for proper operation. Adjust operating components for proper operation without binding.
D. Test each piece of equipment to verify proper operation. Special cleaning provisions are often required on projects that include alterations to existing buildings. See Evaluations.
3.8 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
B. Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the
Work.
C. Comply with manufacturer's written instructions for temperature and relative humidity.
3.9 CORRECTION OF THE WORK
A. Repair or remove and replace damaged, defective, or nonconforming Work. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Repair Work previously completed and subsequently damaged during construction period.
Repair to like-new condition.
C. Restore permanent facilities used during construction.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
EXECUTION 017300 - 8
D. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
E. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
F. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
END OF SECTION 017300
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 1
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Salvaging nonhazardous demolition and construction waste.
2. Recycling nonhazardous demolition and construction waste.
3. Disposing of nonhazardous demolition and construction waste.
B. Related Requirements:
1. Section 024119 "Selective Demolition" for disposition of waste resulting from partial demolition of buildings, structures, and site improvements, and for disposition of hazardous waste.
2. Section 311000 "Site Clearing" for disposition of waste resulting from site clearing and removal of above- and below-grade improvements.
1.2 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
1.3 PERFORMANCE REQUIREMENTS
A. General: Achieve end-of-Project rates for salvage/recycling of 60 percent by weight of total non-hazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials.
1.4 SUBMITTALS
A. Waste Management Plan: Submit plan within 30 days of date established for the Notice to
Proceed.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 2
B. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit report. Use Form CWM-7 for construction waste and Form CWM-8 for demolition waste.
Include the following information:
1. Material category.
2. Generation point of waste.
3. Total quantity of waste in tons.
4. Quantity of waste salvaged, both estimated and actual in tons.
5. Quantity of waste recycled, both estimated and actual in tons.
6. Total quantity of waste recovered (salvaged plus recycled) in tons.
7. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.
C. Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.
D. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.
E. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.
F. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
G. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.
1.6 WASTE MANAGEMENT PLAN
A. General: Develop a waste management plan according to ASTM E 1609 and requirements in this Section. Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.
B. Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing, and construction waste generated by the Work. Use Form CWM-1 for construction waste and
Form CWM-2 for demolition waste. Include estimated quantities and assumptions for estimates.
C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Use Form CWM-3 for construction waste and
Form CWM-4 for demolition waste. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 3
1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this
Project, describe methods for preparing salvaged materials before incorporation into the
Work.
2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location where materials separation will be performed.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan.
C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.
1. Distribute waste management plan to everyone concerned within three days of submittal return.
2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.
3. Store items in a secure area until installation.
4. Protect items from damage during transport and storage.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 4
5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.
B. Salvaged Items for Sale and Donation: Not permitted on Project site.
C. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL
A. General: Recycle paper and beverage containers used by on-site workers.
B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Contractor.
C. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.
D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.
1. Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.
a. Inspect containers and bins for contamination and remove contaminated materials if found.
2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
3. Stockpile materials away from construction area. Do not store within drip line of remaining trees.
4. Store components off the ground and protect from the weather.
5. Remove recyclable waste from Owner's property and transport to recycling receiver or processor.
3.4 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 5
B. Burning: Do not burn waste materials.
C. Disposal: Remove waste materials from Owner's property and legally dispose of them.
3.5 ATTACHMENTS
A. Form CWM-1 for construction waste identification.
B. Form CWM-2 for demolition waste identification.
C. Form CWM-3 for construction waste reduction work plan.
D. Form CWM-4 for demolition waste reduction work plan.
E. Form CWM-5 cost/revenue analysis of construction waste reduction work plan.
F. Form CWM-6 cost/revenue analysis of demolition waste reduction work plan.
G. Form CWM-7 for construction waste
H. Form CWM-8 for demolition waste.
END OF SECTION 017419
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
DM
VA CFM
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G
536Q /534Q
LO
CATIO
N
CAM
P G
RAYLIN
G
FILE N
U M
BER
511/26126.AG
Y
Packaging: C ardboard
Packaging: B oxes
Packaging: Plastic Sheet or Film Packaging: Polystyrene Packaging: Pallets or Skids Packaging: C rates Packaging: Paint C ans Packaging: Plastic Pails Site-C learing W aste
M asonry or C
M U
Lum ber: C ut-O ffs
Lum ber: W arped Pieces Plyw ood or O
SB
(scraps) W ood Form s
W ood W aste C hutes
W ood Trim
(cut-offs) M etals Insulation R oofing Joint Sealant Tubes G ypsum B oard (scraps) C arpet and Pad (scraps) Piping Electrical C onduit O ther:
*Insert units of m easure.
FO
R
M C
W M
-1: C O
N
STR
U C
TIO
N
W
ASTE ID
EN
TIFIC
ATIO
N
M
ATER
IAL C
ATEG
O R
Y
TO
TAL EST.
Q U
AN
TITY O
F W
ASTE*
(C
= A x B
R
EM
AR
K
S AN
D
ASSU
M
PTIO
N
S G
EN
ER
ATIO
N
PO
IN
T
EST.
Q
U
AN
TITY O
F
M
ATER
IALS
R
EC
EIVED
(A)
EST. W
ASTE -
(B
EST. VO
LU
M E C
Y (C
M
EST. W
EIG
H
T TO
N S
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
DMVA CFMO
PROJECT NAME RENOVATE BUILDING 536Q/534Q
LOCATION CAMP GRAYLING
FILE NUMBER 511/26126.AGY
Asphaltic Concrete Paving Concrete Brick
CMU
Lumber Plywood and OSB Wood Paneling Wood Trim
Miscellaneous Metals
Structural Steel Rough Hardware Insulation Roofing Doors and Frames Door Hardware Windows Glazing Acoustical Tile Carpet Carpet Pad Demountable Partitions Equipment Cabinets Plumbing Fixtures Piping Piping Supports and Hangers Valves Sprinklers Mechanical Equipment Electrical Conduit Copper Wiring Light Fixtures Lamps Lighting Ballasts Electrical Devices Switchgear and Panelboards Transformers Other:
FORM CWM-2: DEMOLITION WASTE IDENTIFICATION
MATERIAL
DESCRIPTION
EST.
QUANTITY REMARKS AND ASSUMPTIONSEST.
VOLUME CY
EST. WEIGHT
TONS
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
D M
VA CFM
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G 536Q
/534Q
LO
CATIO
N
CAM
P G
RAYLIN
G
FILE N
U
M
BER
511/26126.AG
Y
Packaging: C ardboard
Packaging: B oxes
Packaging: Plastic Sheet or Film Packaging: Polystyrene Packaging: Pallets or Skids Packaging: C rates Packaging: Paint C ans Packaging: Plastic Pails Site-C learing W aste
M asonry or C
M U
Lum ber: C ut-O ffs
Lum ber: W arped Pieces Plyw ood or O
SB
(scraps) W ood Form s
W ood W aste C hutes
W ood Trim
(cut-offs) M etals Insulation R oofing Joint Sealant Tubes G ypsum B oard (scraps) C arpet and Pad (scraps) Piping Electrical C onduit O ther:
G
EN
ER
ATIO
N
PO
IN
T
TO
TAL EST. Q
U
AN
TITY O
F
W
ASTE TO
N S
D
ISPO
SAL M
ETH
O D
AN
D
Q U
AN
TITY
H
AN
D
LIN
G
AN
TR
SPO
R
TIO
PR
O C
ED
U
R
ES
FO
R
M C
W M
-3: C O
N
STR
U C
TIO
N
W
ASTE R
ED
U
C
TIO
N W
O R
K
PLAN
M
ATER
IAL C
ATEG
O R
Y
EST. AM
O U
N
T SALVAG
ED
TO
S
EST. AM
O U
N T R
EC
YC
LED
S
EST. AM
O U
N T D
ISPO
SED
LAN
FILL TO
N
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G
536Q /534Q
LO
CATIO
N
CAM
P G
RAYLIN
G
FILE N
U M
BER
511/26126.AG
Y
Transform ers
Sw itchgear and Panelboards
O ther:
Lighting B allasts
Lam ps
Electrical D evices
C opper W iring
Electrical C onduit
Light Fixtures
Sprinklers Valves
M echanical Equipm ent
Supports and H angers
Piping
Plum bing Fixtures
C abinets
Equipm ent
D em ountable Partitions
C arpet Pad
C arpet
Acoustical Tile G lazing W indow s
D oor H ardw are
D oors and Fram es
R oofing
Insulation R ough H ardw are Structural Steel
M iscellaneous M etals
W ood Trim
W ood Paneling
Plyw ood and O
SB
Lum ber
C M
U B rick
FO
R
M C
W M
-4: D
EM
O
LITIO
N W
ASTE R
ED
U C
TIO
N
W O
R K
PLAN
M
ATER
IAL C
ATEG
O R
Y
D
ISPO
SAL M
ETH
O D
AN
D
Q U
AN
TITY
H
AN
D
LIN
G
AN
D
TR
AN
SPO
R
TIO
PR
C
ED
U R
ES
C oncrete
Asphaltic C oncrete Paving
G
EN
ER
T
TO
TAL EST. Q
U
AN
TITY O
F W
ASTE
TO
N
S
EST. AM
O U
N
T SALVAG
S
EST. AM
O U
N T R
EC
YC
LED
S
EST. AM
O U
N T D
ISPO
SED
LAN
D
FILL TO
N
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G
536Q /534Q
LO
CATIO
N
CAM
P G
RAYLIN
G
FILE N
U M
BER
511/26126.AG
Y
TO
TAL Q
U
AN
TITY
O
F M
ATER
IALS
(VO
L. O R
W
EIG
H T)
(A)
EST. C
O
ST O
F
D
ISPO
SAL
(B
TO
TAL EST. C
O
ST O
F D
ISPO
SAL
(C = A X B
R
EVEN
U
E FR
R
EC
YC
LED
M
ATER
IALS
(E)
R
EVEN
U
E FR
SALVAG
M
ATER
IALS
(D
LAN
D
FILL
TIPPIN
G
FEES
AVO
ID
ED
(F)
H
AN
D
LIN
G
TR
SPO
R
TATIO
C
STS AVO
ID
(G
O ther:
Electrical C onduit
Piping
C arpet and Pad (scraps)
G ypsum
B oard (scraps)
Joint Sealant Tubes
R oofing
Insulation M etals
W ood Trim
(cut-offs)
W ood W aste C hutes
W ood Form s
Plyw ood or O
SB
(scraps)
Lum ber: W arped Pieces
Lum ber: C ut-O ffs
M asonry or C
M U
Site-C learing W aste
Packaging: Plastic Pails
Packaging: Paint C ans
Packaging: C rates
Packaging: Pallets or Skids
Packaging: Polystyrene
Packaging: Plastic Sheet or Film
FO
R
M C
W M
-5: C O
ST/R
EVEN
U
E AN
ALYSIS O
F C
O N
STR
U
C
TIO
N W
ASTE R
ED
U C
TIO
N
W O
R K
PLAN
M
ATER
IALS
Packaging: B oxes
Packaging: C ardboard
N
ET C
O
ST SAVIN
G S
O F W
O R
K
PLAN
(H
= D + E + F+ G
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
VA CFM
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G 536Q
/534Q
LO
CATIO
N
CAM
P G
RAYLIN
G
FILE N
U
M
BER
511/26126.AG
Y
Asphaltic Concrete Paving Concrete Brick
CM
U Lum ber Plyw ood and O
SB
W ood Paneling
W ood Trim
M iscellaneous M etals Structural Steel Rough Hardw are Insulation Roofing Doors and Fram es Door Hardw are W indow s
G lazing
Acoustical Tile Carpet Carpet Pad Dem ountable Partitions Equipm ent Cabinets Plum bing Fixtures Piping Supports and Hangers Valves Sprinklers M ech. Equipm ent
Electrical Conduit Copper W iring Light Fixtures Lam ps Lighting Ballasts Electrical Devices Sw itchgear and Panelboards Transform ers O ther:
TO
TAL Q
UANTITY O
F
M
ATERIALS (VO
L.
O
R W
EIG
HT)
(A)
FO
RM
CW
M
-6: CO
ST/REVENUE ANALYSIS O
F DEM
O
LITIO
N W
ASTE REDUCTIO
N W
O
RK PLAN
M
ATERIALS
NET CO
ST SAVING
S O
F W O
RK PLAN
(H = D + E + F + G
EST. CO
ST O
F
DISPO
SAL (B)
TO
TAL EST.
CO
ST O
F
DISPO
SAL
(C = A X B)
REVENUE FRO
SALVAG
M
ATERIALS
(D)
REVENUE FRO
RECYCLED
ATERIALS
(E)
LANDFILL
TIPPING
FEES
AVO
IDED
(F)
HANDLING
AND
TRANSPO
RTATIO
N
CO
STS A VO
IDED (G
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G 536Q
/534Q
LO
CATIO
N
CAM
P GRAYLIN
G
FILE N
U M
BER
511/26126.AGY
Electrical C onduit
Piping
G
EN
ER
T
TO
TAL Q
U
AN
TITY O
F
W
ASTE TO
N S
(A)
ESTIM
ATED
S
AC
TU
AL TO
N
S (B
S
O ther:
C arpet and Pad (scraps)
R oofing
W ood Trim
(cut-offs)
G ypsum
B oard (scraps)
Joint Sealant Tubes
Insulation M etals
W ood W aste C hutes
W ood Form s
Plyw ood or O
SB
(scraps)
Lum ber: W arped Pieces
Lum ber: C ut-O ffs
M asonry or C
M U
Site-C learing W aste
Packaging: Plastic Pails
Packaging: Paint C ans
Packaging: C rates
Packaging: Pallets or Skids
Packaging: Polystyrene
Packaging: Plastic Sheet or Film
AC
TU
AL TO
N
S (C
FO
R
M C
W M
-7: C O
N
STR
U C
TIO
N
W
ASTE R
ED
U
C
TIO
N
PR
O G
R
ESS R
EPO
R
T
M
ATER
IAL C
ATEG
O R
Y
Q U
AN
TITY O
F W
ASTE SALVAG
ED
Q
U
AN
TITY O
F W
ASTE R
EC
YC
LED
Packaging: B oxes
Packaging: C ardboard
TO
TAL
Q U
AN
TITY O
F W
ASTE
R
EC
O
VER
S
(D = B
+ C
TO
TAL
Q U
AN
TITY O
F W
ASTE
R
EC
O
(D
/ A X 100)
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
VA CFM
O
PRO
JECT N
AM
E
REN
O
VATE BU
ILDIN
G 536Q /534Q
LO
CATIO
N
CAM
P GRAYLIN
G
FILE N
U
M
BER
511/26126.AGY
Asphaltic C oncrete Paving
C oncrete
B rick
C M
U Lum ber Plyw ood and O
SB
W ood Paneling
W ood Trim
M iscellaneous M etals Structural Steel R ough H ardw are Insulation R oofing D oors and Fram es
D oor H ardw are
W indow s G lazing Acoustical Tile C arpet C arpet Pad D em ountable Partitions
Equipm ent
C abinets
Plum bing Fixtures
Piping Supports and H angers Valves Sprinklers M echanical Equipm ent
Electrical C onduit
C opper W iring Light Fixtures Lam ps Lighting B allasts Electrical D evices Sw itchgear and Panelboards Transform ers O ther:
TO
TAL
Q U
AN
TITY O
F W
ASTE
R
EC
O
S
(D = B
+ C
TO
TAL
Q U
AN
TITY O
F W
ASTE
R
EC
O
(D
/ A X 100)
FO
R
M C
W M
-8: D
EM
O
LITIO
N W
ASTE R
ED
U C
TIO
N
PR
O
G R
ESS R
EPO
R T
M
ATER
IAL C
ATEG
O R
Y
Q U
AN
TITY O
F W
ASTE
SALVAG
ED
Q U
AN
TITY O
F W
ASTE
R
EC
YC
LED
G
EN
ER
T
TO
TAL Q
U
AN
TITY
O
F W
ASTE TO
N S
(A)
S
AC
TU
AL
TO
N S
(B
S
AC
TU
AL
TO
N S
(C
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
PROJECT RECORD DOCUMENTS 017839 - 1
SECTION 017839 - PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for Project Record Documents, including the following:
1. Record Drawings.
2. Record Product Data.
B. Related Requirements:
1. Section 013300 “SUBMITTALS"
1.2 CLOSEOUT SUBMITTALS
A. Record Drawings: Comply with the following:
1. Number of Copies: Submit copies of Record Drawings as follows:
a. Initial Submittal:
1) Submit PDF electronic files of scanned record prints and one hard copy set of prints.
2) Architect/Engineer will indicate whether general scope of changes, additional information recorded, and quality of drafting are acceptable.
b. Final Submittal:
1) Submit PDF electronic files of scanned Record Prints and one set of hard copy prints.
2) Print each drawing, whether or not changes and additional information were recorded.
B. Record Product Data: Submit annotated PDF electronic files and directories and one set of paper copies of each submittal.
PART 2 - PRODUCTS
2.1 RECORD DRAWINGS
A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop
Drawings, incorporating new and revised Drawings as modifications are issued.
1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints.
a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.
b. Record data as soon as possible after obtaining it.
c. Record and check the markup before enclosing concealed installations.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
PROJECT RECORD DOCUMENTS 017839 - 2
2. Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up record prints.
3. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.
4. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.
5. Prior to submittal Contractors authorized Representative shall review and mark each record drawing sheet with red ink as follows:
a. Print or stamp "PROJECT RECORD DRAWING" in a prominent location.
b. Date of review.
c. Contractors Authorized Signature.
B. Format: Submit one bound paper set of record prints and one electronic copy.
2.2 RECORD PRODUCT DATA
A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.
3. Note related Change Orders, record Specifications, and record Drawings where applicable.
4. Prior to submittal Contractors authorized Representative shall review updated product data, then prepare a cover sheet with an index of updated product data and mark cover sheet with red ink as follows:
a. Print or stamp "PROJECT RECORD SPECIFICATION” in a prominent location.
b. Date of review.
c. Contractors Authorized Signature.
B. Format: Submit bound paper set of record Product Data with cover sheet and one electronic copy.
PART 3 - EXECUTION
3.1 RECORDING AND MAINTENANCE
A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project.
B. Maintenance of Record Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Design Professional’s and Construction Manager’s reference during normal working hours.
END OF SECTION 017839
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. APPENDIX III Special Project Procedures
a. Demolition and Remodeling Procedures.
b. Hazardous Material Project Procedures.
c. Asbestos Abatement Project Procedures.
2. Section 01010 Summary of Work.
3. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.4 SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
SELECTIVE DEMOLITION 024119 - 2
C. Qualification Statements: For refrigerant recovery technician.
D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed in accordance with EPA regulations. Include name and address of technician and date refrigerant was recovered.
E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.5 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is included in specifications for review and use.
Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.6 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
Bidding and Contract Document Project Name: Renovate Buildings 536Q/534Q File No. 511/26126
SELECTIVE DEMOLITION 024119 - 3
B. Review Project Record Documents of existing construction or other existing condition information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey of Existing Conditions: Record existing conditions by use of measured drawings.
3.2 UTILITY SERVICES AND BUILDING SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, electrical, and
HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide…