26231 Ottawa Building - SIGMA Move to First Floor - Specifications.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ 171 260000000470 2
- Issued by
- Grand Traverse County, Lansing City, Michigan
About this file
This is a MICHSPEC Division 0 specification document issued by the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration for construction work at the Ottawa Building in Lansing, Michigan. The project, titled "Ottawa Building – SIGMA Move to First Floor – Specifications" (File No. 171/26231.ABG), involves renovations to the first floor west suite of the Ottawa Building located at 611 W Ottawa Street, Lansing, Michigan 48933. The scope of work includes construction of private office spaces, refurbishment of an existing kitchenette space, reconfiguration of workspaces and storage areas, installation of new carpet and wall paint, replacement of ceiling tiles and light fixtures, demolition of existing spaces to accommodate new conference rooms and flexible workspaces, and alterations to electrical and HVAC systems. The total first floor area is 28,146 square feet, with 14,787 square feet designated for renovation under this contract. A mandatory pre-bid conference is scheduled for October 7, 2026, at 1:00 PM ET at the project site, with an optional site tour beginning at 1:30 PM ET. Electronic bids must be submitted through the SIGMA VSS website by 2:00 PM ET on October 21, 2026. The Contract Times are specified in Section 00500 Agreement, with liquidated damages also detailed in that section. Bids must remain open for acceptance by the Owner for no less than the specified bid hold period of 60 calendar days after bid opening.
Bidders must submit bid security in the amount of five percent of the Base Bid, payable to the State of Michigan, in the form of a certified or cashier's check, money order, or duly executed Bid Bond. Apparent low bidders must submit qualification submittals including a pre-award schedule (CPM Schedule or Bar Chart Schedule) within five calendar days of the Professional's request, along with a list of subcontractors within two business days. All bids must include sales and use taxes, tariffs, and the cost of all permits, approvals, licenses, and fees necessary for the project. The contract documents incorporate prevailing wage requirements as specified in Appendix III and require compliance with Michigan's Soil Erosion and Sedimentation Control regulations (1994 PA 451, Part 91). The State reserves the right to cancel the invitation to bid, reject any or all bids, waive irregularities, issue post-bid addenda and rebid without re-advertising, or withhold award for any reason. Prospective bidders must obtain a SIGMA Vendor Number prior to submission and should review the "SOM VSS User Guide for New Vendors" for registration instructions. Questions regarding bidding should be directed to David Moss at Colliers Engineering and Design (David.moss@collierseng.com).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHSPECTM DTMB
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from
Contract Forms and Conditions of the Contract FORMSPEC Michigan Model and suggested for use with Bidding Requirements
File No. 171/26231.ABG Department of Technology, Management and
Budget Ottawa Building – SIGMA Move to First Floor
Lansing, Michigan
September 18, 2026
1997 Edition/R 4/26v3
MICHSPECTM DTMB
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 1
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1
SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1
SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 2 ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 2 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 4 ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 4 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 5 ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 5 ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 6 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 7 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 7 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 8 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 9 ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 9 ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 9 ARTICLE 15 EXECUTION OF THE AGREEMENT .............................................................................................................. 00100 - 12 ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -12 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -13 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1
SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1
SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1
SECTION 00300 BID SUMMARY ....................................................................................................................................... 00300 - 1
SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 2 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 2 ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 2 ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 3 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 3 ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 3 ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 4 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 6 ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 7
SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1
SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................... 00320 – 1
SECTION 00330 ASBESTOS ABATEMENT ATTESTATION........................................................................................... 00330 – 1
SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1
SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1 ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1 ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2 ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3
SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1
SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN SPECIFICATIONS .................................................................... 00440 - 2
SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1 ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2
MICHSPEC DTMB 00010 2
ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3 ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 4 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 4 ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 4 ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 5
SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1
SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1
SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1
SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1 ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1
1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1
1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1
1.3 Priority of the Contract Documents: ....... 00700 - 2
1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 3
1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 3
1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3
1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 4
ARTICLE 2 THE OWNERGENERAL PROVISIONS .......................................................................................................... 00700 - 4
2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 4
2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 4
2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 4
2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4
2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 5
2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 5
ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS .......................................................................................... 00700 - 5
3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 5
3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 5
3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 6
3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 6
3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 6
ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS ........................................................................................... 00700 - 6
4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 6
4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 6
4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 7
4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 7
4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 8
4.6 Use of Premises: .......................................................................................................................................................... 00700 - 8
4.7 Record Documents: ...................................................................................................................................................... 00700 - 9
4.8 Emergencies: ................................................................................................................................................................ 00700 - 9
4.9 Indemnification: ............................................................................................................................................................ 00700 - 9
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS ........................................................................................................ 00700 - 10
5.1 Employment of Subcontractors: .................................................................................................................................. 00700 - 10
5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................. 00700 - 10
5.3 The Contractor’s Continuing Responsibilities: .......................................................................................................... 00700 - 11
ARTICLE 6 SUBMITTALS .................................................................................................................................................. 00700 - 11
6.1 Shop Drawing, Sample and Other Technical Submittals: ........................................................................................... 00700 - 11
6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 12
6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 12
6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 13
6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 13
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 13
7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 13
7.2 Sales and Use Tax and Other Similar Taxes, including Tariffs: .................................................................................. 00700 - 14
7.3 Safety and Protection: ................................................................................................................................................ 00700 - 14
7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 15
7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 15
7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 16
7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 16
MICHSPEC DTMB 00010 3
7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 16
7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 16
7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 17
7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 17
7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 17
7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 18
7.14 Prevailing Wages: ....................................................................................................................................................... 00700 - 18
7.15 Asbestos Abatement:.................................................................................................................................................. 00700 - 19
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 20
8.1 Starting the Work: ....................................................................................................................................................... 00700 - 20
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 20
8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 20
8.4 Substantial Completion: .............................................................................................................................................. 00700 - 20
8.5 Partial Use: ................................................................................................................................................................. 00700 - 21
8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 21
8.7 Suspension of Work: .................................................................................................................................................. 00700 - 21
8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 22
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 22
9.1 Warranty: ................................................................................................................................................................... 00700 - 22
9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 22
9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 23
9.4 Correction of Work: .................................................................................................................................................... 00700 - 23
9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 24
9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 24
ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 24
10.1 Changes in the Work: ................................................................................................................................................ 00700 - 24
10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 25
10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 26
10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 26
10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 26
10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 27
10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 27
10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 27
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME ......................................................................................................................................... 00700 - 28
11.1 General Provisions: ................................................................................................................................................... 00700 - 28
11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 28
11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 29
11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 29
11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 30
11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 30
11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 30
11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 30
11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 31
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 31
11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 32
11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 32
11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 33
11.14 Access to Records: ..................................................................................................................................................... 00700 - 33
11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 33
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 34
12.1. Schedule of Values: ................................................................................................................................................... 00700 - 34
12.2 Requests for Payment: .............................................................................................................................................. 00700 - 34
12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 35
12.4 Refusal to Make or to Recommend Payment: ........................................................................................................... 00700 - 35
12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 35
12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 36
12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 36
12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 36
ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 36
MICHSPEC DTMB 00010 4
13.1 Related Work at Site: ................................................................................................................................................. 00700 - 36
13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 37
13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 37
ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 38
14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 38
14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 38
14.3 Surety Default: ........................................................................................................................................................... 00700 - 39
14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 39
14.5 The Contractor May Suspend Work: ........................................................................................................................ 00700 - 40
ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 40
15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 40
15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 41
15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 41
15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 41
15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 42
15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 42
15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 42
SECTION 00800 SUPPLEMENTARY CONDITIONS ......................................................................................................... 00800 - 1
SECTION 01310 PROGRESS SCHEDULE ....................................................................................................................... 01310 – 1
SECTION 024119 SELECTIVE DEMOLITION ............................................................................................................................. 1 - 6
SECTION 061053 MISCELLANEOUS ROUGH CARPENTRY ................................................................................................... 1 – 5
SECTION 079200 SF JOINT SEALANTS ................................................................................................................................. 1 – 10
SECTION 081113 HOLLOW METAL DOORS AND FRAMES ..................................................................................................... 1 - 8
SECTION 081416 FLUSH WOOD DOORS .................................................................................................................................. 1 - 7
SECTION 087100 DOOR HARDWARE ...................................................................................................................................... 1 - 13
SECTION 088000 GLAZING......................................................................................................................................................... 1 - 9
SECTION 092216 NON-STRUCTURAL METAL FRAMING ........................................................................................................ 1 - 7
SECTION 092900 GYPSUM BOARD ........................................................................................................................................... 1 - 8
SECTION 095113 ACOUSTICAL PANEL CEILINGS .................................................................................................................. 1 - 7
SECTION 099123 INTERIOR PAINTING ..................................................................................................................................... 1 - 8
SECTION 230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC ............................................................................... 1 - 9
SECTION 230713 DUCT INSULATION ....................................................................................................................................... 1 – 9
SECTION 230923.27 TEMPERATURE INSTRUMENTS .............................................................................................................. 1 – 9
SECTION 233113 METAL DUCTS ............................................................................................................................................ 1 – 13
SECTION 23300 AIR DUCT ACCESSORIES............................................................................................................................... 1 – 5
SECTION 233600L AIR TERMINAL UNITS ................................................................................................................................. 1 – 6
SECTION 233713.13 AIR DIFFUSERS ........................................................................................................................................ 1 – 3
SECTION 233713.23 FL REGISTERS AND GRILLES ................................................................................................................ 1 – 3
SECTION 260010 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL............................................................................ 1 - 35
SECTION 260011 FACILITY PERFORMANCE REQUIREMENTS FOR ELECTRICAL .............................................................. 1 - 9
SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES ..................................................... 1 - 8
SECTION 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS ...................................................................... 1 - 5
SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS ....................................................................... 1 - 4
SECTION 260533.13 CONDUITS FOR ELECTRICAL SYSTEMS ............................................................................................... 1 - 4
SECTION 260533.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS ............................................................................ 1 - 5
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS ........................................................................................ 1 - 10
SECTION 260923 LIGHTING CONTROL DEVICES .................................................................................................................... 1 - 5
SECTION 262726 WIRING DEVICES ........................................................................................................................................... 1 - 8
SECTION 262726.33 GENERAL-GRADE DUPLEX STRAIGHT-BLADE RECEPTACLES ........................................................ 1 - 4
SECTION 262726.37 RECEPTACLES WITH ARC-FAULT AND GROUND-FAULT PROTECTIVE DEVICES .......................... 1 - 4
SECTION 262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS .................................................................................. 1 - 10
MICHSPEC DTMB 00010 5
SECTION 265119 LED INTERIOR LIGHTING ............................................................................................................................. 1 - 7
SECTION 265213 EMERGENCY AND EXIT LIGHTING .............................................................................................................. 1 - 9
APPENDIX I – GLOSSARY
APPENDIX II – SPECIAL WORKING CONDITIONS
APPENDIX III – PREVAILING WAGE RATE SCHEDULES AND FEDERAL PROVISIONS ADDENDUM
Prevailing Wage Rates for State Funded Projects
APPENDIX IV – RESERVED
DRAWINGS - BOUND SEPARATELY
TITLE SHEETS THRU
GENERAL G000, G001
ARCHITECTURAL A001, A002, AD101, AD121, A101, A121, A141, A161, A421, A602
HEATING, VENTILATING AND AIR CONDITIONING M000, MD101, M101, M401, M600
FIRE PROTECTION F000, F101
ELECTRICAL E001, ED101, E101, E201, E801
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in Division 0 of the Specifications have these intent and meanings:
Activity An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph
3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.
The term Bid includes a Rebid.
Bidder The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
MICHSPEC DTMB 00020 - 2
Bidding Requirements The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board The Administrative Board of the State of Michigan.
Bonds Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents.
Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Construction MechanicA skilled or unskilled mechanic, laborer, worker, helper, assistant, or apprentice working on a state project but shall not include executive, administrative, professional, office, or custodial employees
Contact Person Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Contract Award The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.
Contract Documents Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.
Contract Float Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.
Contract Price The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).
Contract Times The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.
Contractor Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.
Correction Period The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.
MICHSPEC DTMB 00020 - 3
Cost of the Work Involved The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.
CPM Schedule Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
Critical Path Method (CPM) The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.
Date of Commencement of the Contract Time The date when the Contract Time starts to run.
Defective An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.
Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.
Delay Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.
Tariffs, trade restrictions, or governmental pricing measures do not constitute a Delay and shall not excuse performance or entitle the Contractor to additional compensation or time.
*Department (DTMB) Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.
Director-SFA- The Director of DTMB State Facilities Administration.
Director-DCD- The Director of DTMB State Facilities Administration, Design and Construction Division
Division Each of…
This is the start of the file's text. The full file is on GovTribe.