26078-Tuluksak BFU Drawings.pdf.pdf
PDF 19 MB Posted
- Attached to
- Tuluksak Bulk Fuel Upgrades Project
- Solicitation number
- 26078
- Issued by
- Dillingham Census Area, Alaska
About this file
Tuluksak Bulk Fuel Upgrades Project - Construction Drawing Specifications
This is a comprehensive set of construction drawings and specifications issued by the State of Alaska, through the Alaska Energy Authority, for the Tuluksak Bulk Fuel Upgrades Project (Project No. 26078). The project encompasses the design and installation of bulk fuel storage and handling infrastructure including gravel pads, eleven aboveground fuel storage tanks with capacities ranging from 500 to 30,000 gallons, steel containment dikes, dual-product retail fuel dispensers, fleet fueling hose reel systems, interconnected fuel piping systems, and complete electrical infrastructure. The drawings specify two primary tank farm locations: a co-located tank farm with nine 30,000-gallon tanks, one 5,000-gallon dual-product tank, and associated dispensing equipment, and a school tank farm with three 30,000-gallon tanks and one 500-gallon day tank. The project also includes decommissioning and salvage of existing outdated fuel storage tanks across four separate tank farms. The non-mandatory pre-bid meeting is scheduled for May 1, 2026, at 10:00 AM AKST via teleconference, with bids due on May 12, 2026, at 2:00 PM AKST and public bid opening on May 21, 2026, at 2:00 PM AKST. No mandatory site visit is required prior to bid opening.
The engineer's estimate for the project ranges between $7,000,000 and $8,000,000, with a required bid guarantee of 5 percent of the amount bid. The apparent low bidder must provide Performance and Payment Bonds each at 100 percent of the contract amount and submit a subcontractor list within five working days of notification. Contract award will be made within 40 calendar days following proposal opening to the lowest responsible and responsive bidder. The project is subject to the Build America Buy America (BABA) Act due to Federal funding provided by the Environmental Protection Agency (EPA), requiring that all materials meet domestic sourcing requirements unless documented under approved waivers, including EPA's multi-agency Tribal Public Interest, De Minimis, or Minor Components Waivers. Required qualifications include a valid Alaska Business License and Alaska Contractor's Certificate of Registration prior to award. No specific set-asides for disadvantaged enterprises, women-owned businesses, or minority-owned businesses are identified in the solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TULUKSAK RIVER
RUSSIA
ANCHORAGE
NOME
KOTZEBUE
BARROW
JUNEAU
FAIRBANKS
CANADA
KODIAK
BETHEL
UNALASKA
Su si tn a
Koyukuk Yukon
Yu ko n
Ku sk ok wi m
River
River Rive r
River
Tanana
River
River
Kobuk
Colville Rive r
C op pe r
Rive r
River
ISSUED FOR CONSTRUCTION
APRIL 2026
OETATS
49 TH
A
AKSALF
REGI STERED PROFESS I ONAL ENGI N
EE
RNicholas C. Phelps
CE-123218
TULUKSAK TULUKSAK, ALASKA
BULK FUEL UPGRADE
G1.0
O
ETATS
TH
A
AKSAL
F
REGI ST ERED
P
RO
FE
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
PROJECT SCOPE
GENERAL NOTES
CIVIL LEGEND (GENERAL)
UTILITY LINE/PIPELINE DESIGNATIONS
DETAIL/SECTION REFERENCES
ABBREVIATIONS
TESTING, STARTUP AND COMMISSIONING PROCEDURES
G1.1
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
G1.2
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
G1.3
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
G1.4
TANK FARM 1 DECOMMISSIONING/SALVAGE SCHEDULE
TANK I.D.
DIAMETER
(FT-INCHES) LENGTH (FT) TANK ORIENTATION TANK TYPE PRODUCT
CAPACITY
(GALLONS) COMMENTS
TD1 11'-0" 42'-8" HORIZONTAL STEEL DIKED DIESEL 8,823 DECOMMISSION
TD2 11'-0" 42'-8" HORIZONTAL STEEL DIKED GASOLINE 8,779 DECOMMISSION
T10A/B 8’-6.5” 14’-8” HORIZONTAL PROTECTED DIESEL/GASOLINE 5,000 SALVAGE/REUSE
W
W W
W W
W W
W W
W W
W W
W
WW
W W
W W
W
W W
W
W
W W W W W W W
W W W
W W
W W
W
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/TOE/TOE/TOE/TOE/TOE/T
OE/TOE/T
SS
W W
W W
W W
W
W
W
W
W
W
W W
W W
W W
W W
W
S
W
W
W
W
S
S S
S S
SSS
OE/T OE/T OE/T OE/T OE/T OE/T OE/T OE/T OE/T
O E/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
S S
S S
S S
S S
S S
S S
S S
S S
W
W W
W W
W W
W W
W W
W W
S S S S S
S S
S S
S S
S S
S S
S S
W W
W W
W W
W W
W W
W W W W W
W W
W W
WWWWWWWW
SS
SS SS SS
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
G1.5
TANK I.D.
DIAMETER
(FT-INCHES) LENGTH (FT) TANK ORIENTATION TANK TYPE PRODUCT
CAPACITY
(GALLONS) COMMENTS
TD3 9'-8.4" 42'-8" VERTICAL SINGLE WALL DIESEL 6,500 DECOMMISSION
TD4 9'-3.6" 42'-8" VERTICAL SINGLE WALL DIESEL 6,500 DECOMMISSION
TD5 - - HORIZONTAL SINGLE WALL DIESEL 500 DECOMMISSION
G1.6
TANK FARM 3 DECOMMISSIONING/SALVAGE SCHEDULE
TANK I.D.
DIAMETER
(FT-INCHES) LENGTH (FT) TANK ORIENTATION TANK TYPE PRODUCT
CAPACITY
(GALLONS) COMMENTS
TD6 11'-0" 42'-8" VERTICAL SINGLE WALL DIESEL 25,000 DECOMMISSION
TD7 11'-0" 42'-8" VERTICAL SINGLE WALL DIESEL 25,000 DECOMMISSION
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
F F
F F
F F F
F
OE/T OE/T OE/T OE/T OE/T OE/T OE/T OE/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
OE/T
OE/T
OE/T
OE/T
O E
/T O
E /T
O E
/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
G1.7
TANK FARM 4 DECOMMISSIONING/SALVAGE SCHEDULE
TANK I.D.
DIAMETER
(FT-INCHES) LENGTH (FT) TANK ORIENTATION TANK TYPE PRODUCT
CAPACITY
(GALLONS) COMMENTS
TD1 10'-2" 13'-7" VERTICAL STEEL DIKED DIESEL 7,750 DECOMMISSION
TD2 9'-5" 13'-7" VERTICAL STEEL DIKED DIESEL 7,000 DECOMMISSION
TD3 9'-10" 13’-8” VERTICAL STEEL DIKED DIESEL 7,750 DECOMMISSION
TD4 9'-5" 13'-8" VERTICAL STEEL DIKED DIESEL 8,500 DECOMMISSION
TD5 7'-4" 13'-2" VERTICAL STEEL DIKED DIESEL 4,250 DECOMMISSION
TD6 8'-0" 13’-2” VERTICAL STEEL DIKED DIESEL 5,000 DECOMMISSION
TD7 6'-4" 13’-2” VERTICAL STEEL DIKED GASOLINE 3,000 DECOMMISSION
TD8 9'-4" 13’-7” VERTICAL STEEL DIKED DIESEL 7,000 DECOMMISSION
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
WS
SP
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
S
S S
S S
S
FM
FM
FM
FM
FM
S S
S
S
S
S
S
S
S
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O
E/T OE/T OE/T OE/T OE/T OE/T OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
OE/T
O E
/T O
E /T
O E
/T O
E /T
O E/
T O
E/ T
O E/
T
O E/
T O
E/ T
O E/
T O
E/ T
W
W
W
W
W
W
W
W
W
W
G1.8
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
USS 3797
LOT 1
USS 4435
LOT 2
TULUKSAK AIRPORT
TRACT 2
MORAVIAN
MISSION
RESERVE
TRACT A
UTILITY CORE
SITE LEASE
DOC. 2005-000252-00
SECTIO
N 27
REMAIN
DER O
F
GOV'T LO
T 16
LANDFILL AND SEWAGE
LAGOON SITE
DOC. 2003-001054-00
SECTION 27
GOV'T LOT 21
SECTION 27
REMAINDER OF
GOV'T LOT 16
MORAVIAN
MISSION
RESERVE
TRACT B
TULUKSAK HEIGHTS
SUBDIVISION
L8 L9
L10 L11
L12 L13
TULUKSAK SCHOOL
SUBDIVISION
TULU
KSAK R
IV
ER
PARCEL 4
PARCEL 2
STATUTORY QUITCLAIM DEED
WASTEWATER LAGOON SITE
DOC. 2014-001099-0
Sec. 34
SECTION 27
REMAINDER OF
GOV'T LOT 16
ROW LEASE AGREEMENT
HORIZONTAL CONTROL
POINT #
NORTHING
49,081.663
49,937.530
48,814.554
49,269.956
49,422.439
49,448.178
49,198.960
49,662.733
49,709.430
49,933.090
49,980.080
EASTING
28,756.992
30,000.232
31,176.871
31,183.469
29,064.783
28,982.521
29,819.821
29,300.910
29,159.306
29,390.834
29,248.339
LATITUDE
N61° 05' 47.9563"
N61° 05' 56.3848"
N61° 05' 45.3261"
N61° 05' 49.8105"
N61° 05' 51.3123"
N61° 05' 51.5657"
N61° 05' 49.1120"
N61° 05' 53.6787"
N61° 05' 54.1384"
N61° 05' 56.3410"
N61° 05' 56.8036"
LONGITUDE
W160° 57' 46.2846"
W160° 57' 20.9953"
W160° 56' 57.0613"
W160° 56' 56.9261"
W160° 57' 40.0242"
W160° 57' 41.6977"
W160° 57' 24.6651"
W160° 57' 35.2212"
W160° 57' 38.1018"
W160° 57' 33.3922"
W160° 57' 36.2910"
DESCRIPTION
SET 2" ALCAP CRW CNTL
SET 12" SPIKE - DISTROYED
3 1/4" BRASS CAP
1 1/2" PLASTIC CAP
3 1/4" BRASS CAP
3 1/4" BRASS CAP
2 1/2" IRON POST
2" ALCAP
2" ALCAP
2" ALCAP
2" ALCAP
HORIZONTAL CONTROL
POINT #
NORTHING
49,899.437
48,572.648
48,586.410
48,286.212
48,387.171
47,803.130
47,722.666
46,098.580
48,306.390
48,563.158
48,587.921
EASTING
29,679.455
29,009.793
29,368.429
29,396.118
29,470.226
30,431.659
30,371.736
36,073.106
29,411.084
28,536.477
28,476.342
LATITUDE
N61° 05' 56.0097"
N61° 05' 42.9442"
N61° 05' 43.0800"
N61° 05' 40.1239"
N61° 05' 41.1181"
N61° 05' 35.3669"
N61° 05' 34.5746"
N61° 05' 18.5663"
N61° 05' 40.3226"
N61° 05' 42.8503"
N61° 05' 43.0940"
LONGITUDE
W160° 57' 27.5208"
W160° 57' 41.1414"
W160° 57' 33.8465"
W160° 57' 33.2830"
W160° 57' 31.7757"
W160° 57' 12.2204"
W160° 57' 13.4392"
W160° 55' 17.4961"
W160° 57' 32.9786"
W160° 57' 50.7688"
W160° 57' 51.9921"
DESCRIPTION
3 1/4" BRASS CAP
3 1/4" ALCAP
3 1/4" BRASS CAP
3 1/4" ALCAP
3 1/4" ALCAP
3 1/4" BRASS CAP
3 1/4" ALCAP
3 1/4" BRASS CAP - PACS TAT A
2 1/2" BRASS CAP
5/8" REBAR
2" ALCAP
* DENOTES NOT SHOWN WITHIN VIEW PORT.
VERTICAL CONTROL
POINT #
NORTHING
49,051.12
48,706.92
49,422.44
49,899.44
46,098.58
EASTING
28,757.86
28,732.77
29,064.78
29,679.46
36,073.11
ELEVATION
31.69
31.84
30.77
34.28
30.31
DESCRIPTION
FOUND TBM SPIKE IN POWER POLE
FOUND TBM SPIKE IN POWER POLE
3 1/4" BRASS CAP
3 1/4" BRASS CAP
3 1/4" BRASS CAP - PACS TAT A*
O
ETATS
F
REGISTERED
PR
OF
ES
SI
ON
AL
LA
ND
SU
RVEYOR
Br ad fo rd
W . W at ts
LS
-1
HORIZONTAL CONTROL STATEMENT
FOR THIS PROJECT CRW CREATED A CUSTOM LOCAL LOW DISTORTION PROJECTION (LDP) SURFACE GRID COORDINATE SYSTEM. THIS LDP WAS USED FOR THE TULUKSAK WATER TREATMENT PLANT & WASHETERIA PROJECT.
CRW ESTABLISHED THE BASIS OF COORDINATES BY A MULTIPLE DAY STATIC GPS OPUS SOLUTION ON CRW #101, A 12" NAIL SET AT GROUND SURFACE. ALL OTHER CONTROL POINTS WERE MEASURED BY RAPID STATIC OR REDUNDANT RTK
MEASUREMENTS AND POST PROCESSED WITH LEICA INFINITY SOFTWARE, VERSION 3.2.
** POINT 101 HAS BEEN DESTROYED AND IS ONLY BEING SHOWN FOR REFERENCE.**
OPUS SOLUTION VALUES OF #101 ARE:
NAD 83 (2011) STATE PLANE ZONE 7 GRID COORDINATES
LATITUDE: 61° 05' 56.38484" N NORTHING: 2,595,069.617'
LONGITUDE: 160° 57' 20.99527" W EASTING:1,825,173.820'
NGS BASE STATIONS USED FOR GPS POST PROCESSING
PID DESIGNATION LATITUDE LONGITUDE
DK4091 BET1 BETHEL WAAS CORS ARP 60° 47' 16.508" N 161° 50' 30.124" W
DL6432 AB25 TATALINA AK2008 CORS ARP 62° 55' 45.524" N 156° 01' 24.113" W
DL6426 AB14 DILLINGHAMAK2007 CORS ARP 59° 06' 29.405" N 159° 05' 29.431" W
CRW LOCAL COORDINATE SYSTEM INFORMATION AND LDP PARAMETERS:
NAME: AK83 TULUKSAK GRS80
LINEAR UNIT: US SURVEY FEET
GEODETIC DATUM: NAD83(2011)
ELLIPSOID: GRS80
PROJECTION: TRANSVERSE MERCATOR
LATITUDE OF ORIGIN: 61° 05' 57.00" N
CENTRAL MERIDIAN: 160° 57' 21.00" W
FALSE NORTHING: 50,000.00
FALSE EASTING: 30,000.00
SCALE FACTOR : 1.0000034
ALL DISTANCES AND BEARINGS SHOWN HEREON ARE PROJECTED (GRID) VALUES BASED ON THE PRECEDING PROJECTION DEFINITION. THE PROJECTION WAS DEFINED TO MINIMIZE THE DIFFERENCE BETWEEN PROJECTED (GRID) DISTANCES AND HORIZONTAL ("GROUND") DISTANCES AT THE TOPOGRAPHIC SURFACE WITHIN THE DESIGN AREA OF
THIS COORDINATE SYSTEM.
THE BASIS OF BEARINGS IS GEODETIC NORTH. (NOTE: THE GRID BEARINGS SHOWN HEREON (OR IMPLIED BY GRID
COORDINATES) DO NOT EQUAL GEODETIC BEARINGS DUE TO MERIDIAN CONVERGENCE.
VERTICAL CONTROL STATEMENT
THE BASIS OF THE VERTICAL DATUM USED FOR THIS PROJECT IS NAVD88 AS COMPUTED BY GEOID06.
THIS DATUM WAS BASED ON CRW PT #603 THAT WAS PREVIOUSLY DETERMINED TO HAVE AN ELEVATION OF 30.77' NAVD88 (GEOID06) AS SHOWN ON THE TULUKSAK AIRPORT RELOCATION PROJECT, RECORD OF SURVEY(ROS), PLAT 2007-1, BRD. PER PLAT 2007-1, VERTICAL DATUM IS BASED ON STATIC GPS WITH TWO AVERAGED OPUS SOLUTIONS ON ROS PT #551, PACS "TLT A" (CRW PT.#619). THE ELEVATION WAS TRANSFERRED TO ROS PT #704 (CRW PT #603) BY
CLOSED DIFFERENTIAL LEVELS FROM "TLT A".
**AT THE TIME OF CRW FIELD SURVEY, PT #619 "TLT A" WAS FOUND 0.7' ABOVE GRADE AND BE OUT OF VERTICAL POSITION FROM THE VALUE SHOWN ON THE ROS. THE ELEVATION ON PT# 619 REFLECTS THE CRW MEASURED VALUE.**
DATUM NOTE: TO CONVERT FROM GEOID06 TO GEOID12B DATUMS, ADD 1.30' TO ELEVATIONS SHOWN.
FLOOD NOTE: CORRELATION BETWEEN GEOID06 ELEVATIONS TO U.S. ARMY CORP. OF ENGINEERS (USACE) FLOOD DATA.
BASED ON R&M'S PLAT 2007-1, TWO OF USACE TULUKSAK FLOOD ELEVATIONS (HIGH WATER MARKS) WERE FIELD
VERIFIED TO COMPUTE THE FOLLOWING CORRELATIONS.
1) GEOID 06 ELEVATION 37.8' = 3.9' RECORD FLOOD ELEVATION
2) GEOID 06 ELEVATION 39.8' = 5.9' RECOMMENDED BUILDING ELEVATION
3) GEOID 06 ELEVATION 33.9' = 0.0 BASE ELEVATION
LEGEND
FOUND ALUMINUM CAP
FOUND BRASS CAP
FOUND REBAR OR IRON POST
TEMPORARY BENCH MARK
CONTROL SET BY CRW
CONTROL POINT NUMBER
G1.9
GENERAL NOTES
1. ALL COORDINATES AND DIMENSIONS SHOWN ARE IN U.S.
SURVEY FEET.
2. A FIELD SURVEY FOR BULK FUEL UPGRADE PROJECT WAS
CONDUCTED IN JUNE 24-25, 2025 BY CRW ENGINEERING
GROUP, INC.
C1.1
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C1.2
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C3.1
C3.1
CO-LOCATED TANK FARM TANK SCHEDULE
TANK I.D. CAPACITY
GAL TYPE PRODUCT OWNER
T1 30,000 HORIZONTAL SINGLE WALL DIESEL TNC
T2 30,000 HORIZONTAL SINGLE WALL DIESEL TNC
T3 30,000 HORIZONTAL SINGLE WALL DIESEL TNC
T4 30,000 HORIZONTAL SINGLE WALL DIESEL TNC
T5 30,000 HORIZONTAL SINGLE WALL DIESEL TNC
T6 30,000 HORIZONTAL SINGLE WALL DIESEL CORP.
T7 30,000 HORIZONTAL SINGLE WALL DIESEL CORP.
T8 30,000 HORIZONTAL SINGLE WALL GASOLINE CORP.
T9 30,000 HORIZONTAL SINGLE WALL GASOLINE CORP.
T10A 2,500 HORIZONTAL PROTECTED GASOLINE CORP.
T10B 2,500 HORIZONTAL PROTECTED DIESEL CORP.
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
C1.3
C3.2
C3.2
SCHOOL TANK FARM TANK SCHEDULE
TANK I.D. CAPACITY
GAL TYPE PRODUCT OWNER
T1S 30,000 HORIZONTAL SINGLE WALL DIESEL TNS
T2S 30,000 HORIZONTAL SINGLE WALL DIESEL TNS
T3S 30,000 HORIZONTAL SINGLE WALL DIESEL TNS
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C1.4
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
CO-LOCATED TANK FARM TANK GRADING POINTS
NUMBER ELEVATION NORTHING EASTING DESCRIPTION
101 40.000' 49411.0565' 27803.5204' DIKE WALL CORNER
102 40.000' 49559.9224' 27948.8297' DIKE WALL CORNER
103 40.000' 49521.2766' 27988.4223' DIKE WALL CORNER
104 40.000' 49372.4094' 27843.1143' DIKE WALL CORNER
105 40.000' 49410.9553' 27806.9141' COLOCATED PAD CORNER R=10.0'
106 40.000' 49556.5104' 27949.0470' COLOCATED PAD CORNER R=10.0'
107 40.000' 49520.8803' 27984.8913' COLOCATED PAD CORNER R=10.0'
108 40.000' 49375.9447' 27843.0715' COLOCATED PAD CORNER R=10.0'
109 36.400' 49608.2284' 28020.5546' COLOCATED DISPENSER CORNER
110 36.400' 49594.1574' 28034.7676' COLOCATED DISPENSER CORNER
111 33.995' 49522.5795' 28024.5930' FENCE CORNER
112 33.281' 49598.2094' 27947.1104' FENCE CORNER
113 32.544' 49412.2058' 27765.5508' FENCE CORNER
114 33.186' 49508.3914' 27859.4383' SWING GATE, CENTER OF
115 32.178' 49336.5742' 27843.0348' FENCE CORNER
116 40.000' 49492.2349' 27876.0408' ACCESS STAIR, TOP
117 33.335' 49503.9005' 27864.0789' ACCESS STAIR, BOTTOM
118 36.670' 49577.8280' 27999.3503' CONNEX CORNER
119 36.670' 49569.1040' 27979.6553' CONNEX CORNER
C1.5
SCHOOL TANK FARM TANK GRADING POINTS
NUMBER ELEVATION NORTHING EASTING DESCRIPTION
201 40.000' 50103.1869' 30054.8877' DIKE WALL CORNER
202 40.000' 50081.3632' 30009.9008' DIKE WALL CORNER
203 40.000' 50021.7878' 30038.8020' DIKE WALL CORNER
204 40.000' 50043.6108' 30083.7872' DIKE WALL CORNER
205 40.000' 50098.5094' 30053.2646' PAD CORNER R=10.0'
206 40.000' 50079.7418' 30014.5775' PAD CORNER R=10.0'
207 40.000' 50026.4645' 30040.4235' PAD CORNER R=10.0'
208 40.000' 50045.2322' 30079.1106' PAD CORNER R=10.0'
209 40.000' 50032.0610' 30021.0366' PAD CORNER, R= 5'
210 40.000' 50053.6543' 30010.5612' PAD CORNER, R= 5'
211 38.900' 50032.5714' 30006.0509' PAD CORNER, R= 2'
212 38.900' 50041.5685' 30001.6861' PAD CORNER, R= 2'
213 38.900' 50041.8230' 30009.0840' HOSE REEL ENCLOSURE
214 38.900' 50038.9944' 30003.2461' ACCESS STAIR, TOP
215 34.382' 50033.7478' 29992.5781' ACCESS STAIR, BOTTOM
216 34.901' 50115.9990' 30040.3695' ACCESS STAIR, BOTTOM
217 34.901' 50101.5661' 30047.3719' ACCESS STAIR, TOP
218 34.606' 50045.6953' 29983.1699' FENCE CORNER
219 33.787' 50016.1396' 29997.5080' FENCE CORNER
220 34.855' 50025.4060' 30016.6093' FENCE CORNER
221 34.992' 49997.2182' 30030.2838' FENCE CORNER
222 34.752' 50035.0687' 30108.3676' FENCE CORNER
223 35.151' 50128.4867' 30063.0523' FENCE CORNER
224 35.965' 50090.6113' 29984.9769' FENCE CORNER
225 34.832' 50054.9617' 30002.2713' FENCE CORNER
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
BM
BM
MWW
BM
X
OE/T
OE/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
O E/T
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
RWRW
S
O H
/E
O H
/E
W
F
F F
F
F
F
F
F
F
F F
F F
F F
F F
O H
/E
O H
/E
C1.6
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
M3.1
FUEL PIPELINE POINTS
NUMBER NORTHING EASTING DESCRIPTION NOTES
1 49392.3338' 27964.4180' ANGLE POINT
2 49044.4968' 28506.1562' ANGLE POINT
3 48980.8899' 28674.5932' ANGLE POINT
4 48971.6960' 28697.7413' TIE-IN POINT
BM
O E/T
O E
/T O
E/T O
E /T
O E/T
O E/T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T O
E /T
O E
/T
O E/T
O E/T
O E/T
O E/T
OE/T
OE/T
OE/T
F F F F F
F F
F F
F F
F F
F F
F F
F F
F F
F
C1.7
FUEL PIPELINE POINTS
NUMBER NORTHING EASTING DESCRIPTION NOTES
1 49392.3338' 27964.4180' ANGLE POINT
2 49044.4968' 28506.1562' ANGLE POINT
3 48980.8899' 28674.5932' ANGLE POINT
4 48971.6960' 28697.7413' TIE-IN POINT
M3.1
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C3.1
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C3.2
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.1
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.2
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.3
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.4
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.5
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.6
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.7
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.8
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
O
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
C4.9
ETATS
F
REGI STERED
P
RO
F E
SS
IO
NA
L EN
GINEER
Ni ch ola s C
. P he lps
CE
-1
GENERAL NOTES:
1. INFORMATION SHOWN ON THE DRAWINGS IS TAKEN FROM A NON-DESTRUCTIVE WALK
THROUGH OF THE FACILITY AND AS-BUILT DRAWINGS. THERE IS NO GUARANTEE TO THE
ACCURACY OF THE INFORMATION SHOWN. CONTRACTOR SHALL FIELD VERIFY ALL ITEMS
SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
2. MECHANICAL DRAWINGS ARE GENERALLY DIAGRAMMATIC, CONTRACTOR TO FIELD
LOCATE ALL PIPES, DUCTS, MECHANICAL EQUIPMENT AND ASSOCIATED APPURTENANCES
TO AVOID CONFLICTS WITH OTHER EQUIPMENT, PIPING, LIGHTING, AND ELECTRICAL
CLEARANCES.
VENT (V)
WASTE (W)
COLD WATER (CW)
HOT WATER (HW)
HEATING GLYCOL RETURN (HGR)
HEATING GLYCOL SUPPLY (HGS)
HEATING WATER RETURN (HWR)
HEATING WATER SUPPLY (HWS)
RECOVERED HEAT RETURN (WHGR)
RECOVERED HEAT SUPPLY (WHGS)
W
HGR
HGS
HWR
HWS
WHGR
WHGS
DETAIL NUMBER
SHEET LOCATED ON
XX
XXX
XX
XXX
XX
XXX
HOT WATER RECIRCULATION (HWC)
REFRIGERANT SUCTION (S)
REFRIGERANT LIQUID (L)
RS
RL
OVERFLOW RAIN LEADER (OL)OSD
TRAP PRIMER (TP)TP
TEMPERED WATER (TW)TW
DEMOLISHED
SNOWMELT GLYCOL RETURN (SGR)
SNOWMELT GLYCOL SUPPLY (SGS)
SGR
SGS
FIRE SPRINKLER (FS)FS
COMPRESSED AIR (AIR)AIR
DIESEL (D)D
GASOLINE (G)G
EXISTING (E)
NEW
PIPING LEGEND
OILY WASTE (OW)OW
PUMPED WASTE (PW)PW
STORM DRAIN (SD)SD
H
S
T
GLOBE VALVE
CHECK VALVE
THREE-WAY CONTROL VALVE
THREE-WAY VALVE
FLOW INDICATOR
STRAINER
STRAINER WITH BLOWDOWN
FUEL OIL METER
FLOW METER
FLOW SWITCH
SOLENOID VALVE
FLOW DIRECTION
UNION
BALANCE VALVE
TWO-WAY CONTROL VALVE
THERMOSTATIC MIXING VALVE
FUEL OIL FILTER
BALL / ISOLATION VALVE
PRESSURE SWITCH
FLEXIBLE CONNECTOR
REDUCER
GATE VALVE
BUTTERFLY VALVE
PIPING SYMBOL LEGEND
FILL VALVE
PRESSURE REDUCING VALVE
SHEAR VALVE
M
M
T
S
M
M
FS
PS
THERMOWELL
INSTRUMENT TAG WITH THERMOWELL
SENSOR
THERMOSTAT
HUMIDISTAT
INSTRUMENT TAG
INSTRUMENTATION LEGEND
CONTROLLER TAG
NOTE:
NOT ALL SYMBOLS AND ABBREVIATIONS ARE USED ON THIS
PROJECT.
GENERAL LEGEND
SHEET NOTE
POINT OF CONNECTION TO EXISTING
PRV
TYPICAL: PRV-314 - INSTRUMENT INDENTIFICATION
OR TAG NUMBER
FORMAT PRV - FUNCTIONAL IDENTIFICATION
P - FIRST LETTER
RV - SUCCEEDING LETTER(S)
SUCCEEDING LETTERS
(INSTRUMENT SYMBOLS)
FIRST LETTER
INSTRUMENT
LOOP NUMBER
TAG NUMBERS
EXPANDED: PRV-314 - TAG NUMBER
FORMAT A - OPTIONAL SUFFIX
X
XXX
TEE UP
TEE DOWN
ISOLATION FLANGE
CAP
PIPE CONTINUATION
PIPE DOWN
PIPE UP
CLEANOUT
PIPE CONTINUATION
PRESSURE INDICATOR
WATER HAMMER ARRESTOR
PRESSURE RELIEF VALVE (PRV)
PRESSURE TEST PORT
TEMPERATURE INDICATOR
PRESSURE INDICATOR
W/ ISOLATION VALVE
HIGH POINT AIR VENT
W/ ISOLATION VALVE
SPRINKLER HEAD
DOWNSPOUT WALL NOZZLE
FLOOR CLEANOUT (FCO)
FLOOR DRAIN (FD-X)
HOSE BIBB (HB-X)
PUMP
M GAS METER
BOILER EMERGENCY SHUTDOWN
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
M E
C H
A N
IC
A
L L
E G
E N
D A
N D
A B
B R
E V
IA
T
IO
N
S
T U
L U
K S
A K
A
L A
S K
A
M1.1
/1
/2
B C
A
B R
P --
WHA WATER HAMMER ARRESTOR
WC WATER COLUMN
WB WET BULB
W/O WITHOUT
W/ WITH
VTR VENT THROUGH ROOF
VFD VARIABLE FREQUENCY DRIVE
VAV VARIABLE AIR VOLUME
UPC UNIFORM PLUMBING CODE
UL UNDERWRITERS LABORATORIES
(TYP) TYPICAL
SQ FT SQUARE FEET
RPM REVOLUTIONS PER MINUTE
PSI POUNDS PER SQUARE INCH
PH PHASE
PG PROPYLENE GLYCOL
PD PRESSURE DROP
OC ON CENTER
NTS NOT TO SCALE
NPT NATIONAL PIPE THREAD
N.O. NORMALLY OPEN
NIC NOT IN CONTRACT
N.C. NORMALLY CLOSED
MIN MINIMUM
MFGR MANUFACTURER
MBH THOUSAND BTUH
MAX MAXIMUM
LWT LEAVING WATER TEMPERATURE
LGT LEAVING GLYCOL TEMPERATURE
LF LINEAL FEET
LB POUNDS
LAT LEAVING AIR TEMPERATURE
IN INCH
HR HOUR
HP HORSEPOWER
HOA HAND-OFF-AUTO
HD HEAD
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR
GAL GALLONS
GA GAUGE
FT FEET
FPM FEET PER MINUTE
FPF FINS PER FOOT
FLA FULL LOAD AMPERES
FDC FIRE DEPARTMENT CONNECTION
F FAHRENHEIT
EWT ENTERING WATER TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
EGT ENTERING GLYCOL TEMPERATURE
EAT ENTERING AIR TEMPERATURE
(E) EXISTING
DWG DRAWING
DN DOWN
DIA/ø DIAMETER
DEG DEGREES
dB DECIBELS
DB DRY BULB
CO/C.O. CLEANOUT
CMU CONCRETE MASONRY UNIT
CFM CUBIC FEET PER MINUTE
CFH CUBIC FEET PER HOUR
BTUH BRITISH THERMAL UNIT PER HOUR
BLDG BUILDING
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ARCH ARCHITECTURAL
AFG ABOVE FINISHED GRADE
AFF ABOVE FINISHED FLOOR
ADA AMERICANS WITH DISABILITIES ACT
AAV AUTOMATIC AIR VENT
ABBREVIATIONS
N O
R
E V
IS
IO
N B
Y D
A T
E
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
C O
M P
O N
E N
T S
C H
E D
U L
E S
I
T U
L U
K S
A K
A
L A
S K
A
M1.2
/1
/2
B C
A
B R
P --
COLOCATED TANK FARM FUEL TANK SCHEDULE
SYMBOL OWNER TYPE MEDIUM MATERIAL
TANK CAPACITY
(GAL)
LISTING REMARKS
T-1 TNC HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-2 TNC HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-3 TNC HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-4 TNC HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-5 TNC HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-6 TULKISARMUTE HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-7 TULKISARMUTE HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-8 TULKISARMUTE HORIZONTAL SINGLE WALL GASOLINE STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-9 TULKISARMUTE HORIZONTAL SINGLE WALL GASOLINE STEEL 30,000 UL 142 TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE PROVIDED NEW BY CONTRACTOR. SEE DETAILS FOR APPURTENANCES AND LAYOUT.
T-10A/B TULKISARMUTE HORIZONTAL PROTECTED GASOLINE/DIESEL STEEL 2,500/2,500 UL 2085 EXISTING 5,000GAL DUAL PRODUCT DISPENSING TANK FURNISHED BY OWNER, CONTRACTOR INSTALLED. APPURTENANCES TO BE A COMBINATION OF SALVAGED AND PROVIDED NEW BY CONTRACTOR AS REQUIRED, SEE TANK DETAILS.
COLOCATED TANK FARM PUMP SCHEDULE
SYMBOL MANUFACTURER MODEL FUNCTION/SERVICE MEDIUM GPM
HEAD
(FT)
RPM HP
ELECTRICAL
(VOLTS/PH)
REMARKS
P-1 GORMAN-RUPP 02K3-X2 1P BULK TRANSFER DIESEL 68 75 3450 2 230/1 EXPLOSION PROOF SELF PRIMING CENTRIFUGAL PUMP.
P-2 GORMAN-RUPP 81 1/2D3-X1 1P INTERMEDIATE TRANSFER DIESEL 40 40 3450 1 230/1 EXPLOSION PROOF SELF PRIMING CENTRIFUGAL PUMP.
P-3 GORMAN-RUPP 81 1/2D3-X1 1P INTERMEDIATE TRANSFER GASOLINE 40 40 3450 1 230/1 EXPLOSION PROOF SELF PRIMING CENTRIFUGAL PUMP.
P-10A RED JACKET P75U1 DISPENSING GASOLINE 10 87 3450 3/4 208/1 EXPLOSION PROOF SUBMERSIBLE PUMP.
P-10B RED JACKET P75U1 DISPENSING DIESEL 25 79 3450 3/4 208/1 EXPLOSION PROOF SUBMERSIBLE PUMP.
GV-1 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FLG REMOVE HANDLE AFTER SETTING FLOW TO 25 GPM N
GLOBE VALVES (GV-X)
SV-3 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FNPT -- N
SV-2 1-1/2 RETAIL DISPENSER ENCLOSURE FNPT -- N
SV-1 1-1/2 RETAIL DISPENSER ENCLOSURE FNPT -- N
SHEAR VALVES (SV-X)
ASV-10B 2 TANK T10A/B FNPT -- N
ASV-10A 2 TANK T10A/B FNPT -- N
ANTI SIPHON VALVES (AV-X)
FLV-10B 2 TANK T10A/B FNPT -- Y
FLV-10A 2 TANK T10A/B FNPT -- Y
FILL LIMITING VALVES (FLV-X)
PRV-11 1 RETAIL DISPENSER ENCLOSURE FLG PRESSURE SET AT 25 PSI Y
PRV-10 1 RETAIL DISPENSER ENCLOSURE FLG PRESSURE SET AT 25 PSI Y
PRV-9 1 BULK TRANSFER HOSE REEL ENCLOSURE FLG PRESSURE SET AT 25 PSI Y
PRV-8 1 TANK T10A/B FLG PRESSURE SET AT 25 PSI Y
PRV-7 1 TANK T10A/B FLG PRESSURE SET AT 25 PSI Y
PRV-6 1 TULKISARMUTE PUMP CABINET FLG PRESSURE SET AT 25 PSI Y
PRV-5 1 TULKISARMUTE PUMP CABINET FLG PRESSURE SET AT 25 PSI Y
PRV-4 1 TANK T8 FLG PRESSURE SET AT 25 PSI Y
PRV-3 1 TANK T6 FLG PRESSURE SET AT 25 PSI Y
PRV-2 1 TNC PUMP CABINET FLG PRESSURE SET AT 25 PSI Y
PRV-1 1 TANK T5 FLG PRESSURE SET AT 25 PSI Y
PRESSURE RELIEF VALVES (PRV-X)
CV-10B 2 TANK T10A/B FLG -- Y
CV-10A 2 TANK T10A/B FLG -- Y
CV-3 4 BARGE HEADER FLG -- Y
CV-2 4 BARGE HEADER FLG -- Y
CV-1 4 BARGE HEADER FLG -- Y
CHECK VALVES (CV-X)
MV-3 2 TULKISARMUTE PUMP CABINET FLG -- Y
MV-2 2 TULKISARMUTE PUMP CABINET FLG -- Y
MV-1 3 TNC PUMP CABINET FLG -- Y
MOTORIZED VALVES (MV-X)
BV-20 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FLG -- Y
BV-19 2 TANK T10A/B FLG -- Y
BV-18 1-1/2 RETAIL DISPENSER ENCLOSURE FLG -- Y
BV-17 1-1/2 RETAIL DISPENSER ENCLOSURE FLG -- Y
BV-16 2 TANK T10A/B FLG -- Y
BV-15 2 TULKISARMUTE PUMP CABINET FLG -- Y
BV-14 2 TULKISARMUTE PUMP CABINET FLG -- Y
BV-13 3 TNC PUMP CABINET FLG -- Y
BV-12 4 BARGE HEADER FLG -- Y
BV-11 4 BARGE HEADER FLG -- Y
BV-10 4 BARGE HEADER FLG -- Y
BV-9 3 TANK T9 FLG -- Y
BV-8 3 TANK T8 FLG -- Y
BV-7 3 TANK T7 FLG -- Y
BV-6 3 TANK T6 FLG -- Y
BV-5 3 TANK T5 FLG -- Y
BV-4 3 TANK T4 FLG -- Y
BV-3 3 TANK T3 FLG -- Y
BV-2 3 TANK T2 FLG -- Y
BV-1 3 TANK T1 FLG -- Y
BALL VALVES (BV-X)
VALVE ID SIZE LOCATION END CONNECTION COMMENT ID TAG REQ'D
COLOCATED TANK FARM VALVE SCHEDULE
HR-1 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE MNPT -- N
HOSE REEL (HR-X)
M-1 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FNPT -- N
FUEL METER (M-X)
F-4 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FNPT CIM TEK CENTURION DOUBLE N
F-3 1-1/2 TULKISARMUTE PUMP CABINET FNPT CIM TEK CENTURION DOUBLE N
F-2 1-1/2 TULKISARMUTE PUMP CABINET FNPT CIM TEK CENTURION DOUBLE N
F-1 2 TNC PUMP CABINET FNPT CIM TEK CENTURION TRIPLE N
FUEL FILTERS (F-X)
PT-6 3/4 BULK TRANSFER HOSE REEL ENCLOSURE -- -- N
PT-5 3/4 TANK T10A/B -- -- N
PT-4 3/4 TANK T10A/B -- -- N
PT-3 3/4 TULKISARMUTE PUMP CABINET -- -- N
PT-2 3/4 TULKISARMUTE PUMP CABINET -- -- N
PT-1 3/4 TNC PUMP CABINET -- -- N
PRESSURE TEST POINTS (PT-X)
QC-3 4 BARGE HEADER FNPT -- N
QC-2 4 BARGE HEADER FNPT -- N
QC-1 4 BARGE HEADER FNPT -- N
QUICK COUPLERS (QC-X)
S-3 4 BARGE HEADER FLG -- N
S-2 4 BARGE HEADER FLG -- N
S-1 4 BARGE HEADER FLG -- N
STRAINERS (S-X)
FC-24 3 (E) POWER PLANT TANK FLG -- N
FC-23 3 TNC PUMP CABINET MNPT X FLG -- N
FC-22 3 TNC PUMP CABINET MNPT X FLG -- N
FC-21 1-1/2 BULK TRANSFER HOSE REEL ENCLOSURE FLG -- N
FC-20 2 TANK T10A/B (FILL GRADE TRANSITION) FLG -- N
FC-19 2 TANK T10A/B (FILL GRADE TRANSITION) FLG -- N
FC-18 1-1/2 TULKISARMUTE PUMP CABINET MNPT X FLG -- N
FC-17 1-1/2 TULKISARMUTE PUMP CABINET MNPT X FLG -- N
FC-16 1-1/2 TULKISARMUTE PUMP CABINET MNPT X FLG -- N
FC-15 1-1/2 TULKISARMUTE PUMP CABINET MNPT X FLG -- N
FC-14 1-1/2 RETAIL DISPENSER ENCLOSURE MNPT X FLG -- N
FC-13 1-1/2 RETAIL DISPENSER ENCLOSURE MNPT X FLG -- N
FC-12 2 TANK T10A/B (DISCHARGE GRADE TRANSITION) FLG -- N
FC-11 2 TANK T10A/B (DISCHARGE GRADE TRANSITION) FLG -- N
FC-10B 2 TANK T10A/B (PUMP DISCHARGE) FLG -- N
FC-10A 2 TANK T10A/B (PUMP DISCHARGE) FLG -- N
FC-9 3 TANK T9 FLG -- N
FC-8 3 TANK T8 FLG -- N
FC-7 3 TANK T7 FLG -- N
FC-6 3 TANK T6 FLG -- N
FC-5 3 TANK T5 FLG -- N
FC-4 3 TANK T4 FLG -- N
FC-3 3 TANK T3 FLG -- N
FC-2 3 TANK T2 FLG -- N
FC-1 3 TANK T1 FLG -- N
FLEXIBLE CONNECTORS (FC-X)
VALVE ID SIZE LOCATION END CONNECTION COMMENT ID TAG REQ'D
COLOCATED TANK FARM MISCELLANEOUS COMPONENT SCHEDULE
N O
R
E V
IS
IO
N B
Y D
A
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
C O
M P
O N
E N
T S
C H
E D
U L
E S
I I
T U
L U
K S
A K
A
L A
S K
A
M1.3
/1
/2
B C
A
B C
A --
GV-1S 1-1/2 SCHOOL HOSE REEL ENCLOSURE FLG REMOVE HANDLE AFTER SETTING FLOW TO 25 GPM N
GLOBE VALVE (GV-XS)
SV-1S 1-1/2 SCHOOL HOSE REEL ENCLOSURE FNPT -- N
SHEAR VALVE (SV-XS)
FLV-1S 2 (E) SCHOOL TANK FNPT -- Y
FILL LIMITING VALVES (FLV-XS)
PRV-4S 1 SCHOOL HOSE REEL ENCLOSURE FLG PRESSURE SET AT 25 PSI Y
PRV-3S 1 SCHOOL PUMP CABINET FLG PRESSURE SET AT 25 PSI Y
PRV-2S 1 SCHOOL PUMP CABINET FLG PRESSURE SET AT 25 PSI Y
PRV-1S 1 TANK T11 FLG PRESSURE SET AT 25 PSI Y
PRESSURE RELIEF VALVES (PRV-XS)
CV-1S 3 SCHOOL BARGE HEADER FLG -- Y
CHECK VALVES (CV-XS)
MV-2S 2 SCHOOL PUMP CABINET FLG -- Y
MV-1S 2 SCHOOL PUMP CABINET FLG -- Y
MOTORIZED VALVES (MV-XS)
BV-6S 1-1/2 SCHOOL HOSE REEL ENCLOSURE FLG -- Y
BV-5S 2 SCHOOL PUMP CABINET FLG -- Y
BV-4S 3 TANK T3S FLG -- Y
BV-3S 3 TANK T2S FLG -- Y
BV-2S 3 TANK T1S FLG -- Y
BV-1S 3 SCHOOL BARGE HEADER FLG -- Y
BALL VALVES (BV-XS)
VALVE ID SIZE LOCATION END CONNECTION COMMENT ID TAG REQ'D
SCHOOL TANK FARM VALVE SCHEDULE
HR-1S 1-1/2 SCHOOL HOSE REEL ENCLOSURE MNPT -- N
HOSE REEL (HR-XS)
M-1S 1-1/2 SCHOOL HOSE REEL ENCLOSURE FNPT -- N
FUEL METER (M-XS)
F-1S 1-1/2 SCHOOL PUMP CABINET FNPT CIM TEK CENTURION DOUBLE N
FUEL FILTERS (F-XS)
PT-2S 3/4 SCHOOL HOSE REEL ENCLOSURE -- -- N
PT-1S 3/4 SCHOOL PUMP CABINET -- -- N
PRESSURE TEST POINTS (PT-X)
QC-1S 3 SCHOOL BARGE HEADER FNPT -- N
QUICK COUPLERS (QC-XS)
S-1S 3 SCHOOL BARGE HEADER FLG -- N
STRAINERS (S-XS)
FC-7S 1-1/2 SCHOOL HOSE REEL ENCLOSURE FLG -- N
FC-6S 2 (E) SCHOOL TANK FLG -- N
FC-5S 1-1/2 SCHOOL PUMP CABINET FLG -- N
FC-4S 1-1/2 SCHOOL PUMP CABINET FLG -- N
FC-3S 3 TANK T3S FLG -- N
FC-2S 3 TANK T2S FLG -- N
FC-1S 3 TANK T1S FLG -- N
FLEXIBLE CONNECTORS (FC-XS)
VALVE ID SIZE LOCATION END CONNECTION COMMENT ID TAG REQ'D
SCHOOL TANK FARM MISCELLANEOUS COMPONENT SCHEDULE
SCHOOL TANK FARM FUEL TANK SCHEDULE
SYMBOL OWNER TYPE MEDIUM MATERIAL
TANK CAPACITY
(GAL)
LISTING REMARKS
T-1S TNS HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 SEE TANK DETAILS FOR APPURTENANCES AND LAYOUT.
T-2S TNS HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 SEE TANK DETAILS FOR APPURTENANCES AND LAYOUT.
T-3S TNS HORIZONTAL SINGLE WALL DIESEL STEEL 30,000 UL 142 SEE TANK DETAILS FOR APPURTENANCES AND LAYOUT.
T-4S TNS HORIZONTAL SINGLE WALL DIESEL STEEL 500 UL 142 DAY TANK FOR TECHER HOUSING, SEE TANK DETAILS FOR APPURTENANCES AND LAYOUT. SEE CIVIL FOR TANK INSTALLATION AND LOCATION.
SCHOOL TANK FARM PUMP SCHEDULE
SYMBOL MANUFACTURER MODEL FUNCTION/SERVICE MEDIUM GPM
HEAD
(FT)
RPM HP
ELECTRICAL
(VOLTS/PH)
REMARKS
P-1S GORMAN-RUPP 81 1/2D3-X1 1P SCHOOL TRANSFER DIESEL 34 43 3450 1 230/1 EXPLOSION PROOF SELF PRIMING CENTRIFUGAL PUMP.
N O
R
E V
IS
IO
N B
Y D
A
FM
GASOLINE DIESEL
SV-2SV-1
FC-14FC-13
PRV-10
BV-17 BV-18
DIESEL HR-1
M-1 F-4
SV-3FC-21 PT-6 BV-20
PRV-9
PRV-11
LSHA-10B
LSH-10B
LSL-10B
LSLL-10B
LSHA-10A
LSLL-10A
LSL-10A
LSH-10A
P-10AP-10B
ASV-10AASV-10B
FLV-10B FLV-10A
FC-10B FC-10ABV-19
PRV-8
BV-16
PRV-7
CV-10B CV-10A
PT-4 PT-5
PUMP CABINET
PT-3
MV-2
PT-2
F-3
FC-18
P-3
FC-17
PRV-6
BV-15
F-2
FC-16
P-2
FC-15
BV-14
PRV-5
PUMP CABINET
BV-13
PRV-2
FC-22
P-1
FC-23
F-1
PT-1
TANK T5
30,000 - GAL
DIESEL
TANK T4
30,000 - GAL
DIESEL
TANK T3
30,000 - GAL
DIESEL
TANK T2
30,000 - GAL
DIESEL
TANK T1
30,000 - GAL
DIESEL
TANK T6
30,000 - GAL
DIESEL
TANK T7
30,000 - GAL
DIESEL
TANK T8
30,000 - GAL
GASOLINE
TANK T9
30,000 - GAL
GASOLINE
LS
H
A -5
LS
H
-5
LS
L-
LS
H
A -4
LS
H
-4
LS
L-
LS
H
A -3
LS
H
-3
LS
L-
LS
H
A -2
LS
H
-2
LS
L-
LS
H
A -1
LS
H
-1
LS
L-
LS
H
A -6
LS
H
-6
LS
L-
LS
H
A -7
LS
H
-7
LS
L-
LS
H
A -8
LS
H
-8
LS
L-
LS
H
A -9
LS
H
-9
LS
L-
QC-3QC-2QC-1
BV-10 BV-11 BV-12
S-1 S-2 S-3
CV-1 CV-2 CV-3
TANK (E)
12,000 - GAL
DIESEL
TULKISARMUTE CONTAINMENT DIKE
TANK (E)
12,000 - GAL
DIESEL
MM
F
FF
TANK
T10A/B
MV-3
PRV-1 PRV-3
TNC CONTAINMENT DIKE
FC-12 FC-11
FC-20FC-19
BV-9BV-8BV-7BV-6BV-5BV-4BV-3BV-2BV-1
PRV-4
FC-1 FC-2 FC-3 FC-4 FC-5 FC-6 FC-7 FC-8 FC-9
RETAIL DISPENSER ENCLOSURE
BULK TRANSFER HOSE REEL ENCLOSURE
EXISTING WTP TANK
EXISTING POWER
PLANT TANK
DDD
D D
GGG
DDD
GD
D G
GD
D
D
G
D
G
D
G G
GV-1
M
FC-24
MV-1
M
D
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
C O
L O
C A
T E
D T
A N
K F
A R
M S
C H
E M
A T
IC
T U
L U
K S
A K
A
L A
S K
A
M1.4
/1
/2
B C
A
B R
P --
SCALE: NTS
COLOCATED TANK FARM SCHEMATIC
CO-LOCATED TANK FARM OPERATIONAL NARRATIVE:
FILLING TNC TANK FARM FROM BARGE HEADER:
THE TANK FARM WILL BE FILLED VIA A BARGE HEADER WITH 4-INCH FILL PIPELINE. FLOAT
SWITCHES MONITOR THE LEVEL OF FUEL IN THE BULK TANKS. WHEN FUEL LEVEL(S) FALL
BELOW THE 2%-FULL POINT, LOW LEVEL LIGHTS WILL ILLUMINATE ON CONTROL PANEL
CP-2. BEFORE BEGINNING THE FILL PROCESS THE OPERATOR SHALL CONFIRM THAT THE
POWER PLANT AND WTP TANKS ARE ISOLATED AND THAT ALL TNC TANK ISOLATION
VALVES ARE CLOSED. BULK TANKS SHOULD BE FILLED ONE AT A TIME BY SEQUENTIALLY
OPENING AND CLOSING INDIVIDUAL TANK ISOLATION BALL VALVES. LINE PRESSURE WILL
BE SUPPLIED BY THE BARGE PUMPING SYSTEM. THE TANK FARM OPERATOR WILL
MONITOR THE FILLING PROCESS VIA CLOCK GAUGES AND/OR GAUGING ROD AT EACH
TANK. WHEN THE TANK LEVEL REACHES 90%, A LIGHT ON THE CONTROL PANEL WILL
INDICATE THAT THE TANK IS FULL. IF FILLING CONTINUES TO THE 95% LEVEL, A FLOAT
WILL ACTIVATE AN ALARM AND THE "TANK OVERFULL" LIGHT WILL ILLUMINATE. AT THE
CONCLUSION OF FILLING, CLOSE BARGE HEADER & TANK ISOLATION VALVES AND
DISCONNECT FILL HOSE.
FILLING TULKISARMUTE TANK FARM FROM BARGE HEADER:
THE TANK FARM WILL BE FILLED VIA A TWO PRODUCT BARGE HEADER WITH TWO 4-INCH
FILL PIPELINES. FLOAT SWITCHES MONITOR THE LEVEL OF FUEL IN THE BULK TANKS.
WHEN FUEL LEVEL(S) FALL BELOW THE 2%-FULL POINT, LOW LEVEL LIGHTS WILL
ILLUMINATE ON CONTROL PANEL CP-1. BEFORE BEGINNING THE FILL PROCESS THE
OPERATOR SHALL CONFIRM THAT THE DISPENSING TANKS ARE ISOLATED AND THAT ALL
TULKISARMUTE TANK ISOLATION VALVES ARE CLOSED. BULK TANKS SHOULD BE FILLED
ONE AT A TIME BY SEQUENTIALLY OPENING AND CLOSING INDIVIDUAL TANK ISOLATION
BALL VALVES. LINE PRESSURE WILL BE SUPPLIED BY THE BARGE PUMPING SYSTEM. THE
TANK FARM OPERATOR WILL MONITOR THE FILLING PROCESS VIA CLOCK GAUGES
AND/OR GAUGING ROD AT EACH TANK. WHEN THE TANK LEVEL REACHES 90%, A LIGHT
ON THE CONTROL PANEL WILL INDICATE THAT THE TANK IS FULL. IF FILLING CONTINUES
TO THE 95% LEVEL, A FLOAT WILL ACTIVATE AN ALARM AND THE "TANK OVERFULL" LIGHT
WILL ILLUMINATE. AT THE CONCLUSION OF FILLING, CLOSE BARGE HEADER & TANK
ISOLATION VALVES AND DISCONNECT FILL HOSE.
FILLING TULKISARMUTE DISPENSING TANKS FROM TULKISARMUTE TANK FARM:
THE DUAL PRODUCT DISPENSING TANK CONTAINS TWO COMPARTMENTS, ONE FOR
GASOLINE AND ONE FOR DIESEL. THE COMPARTMENTS ARE FILLED FROM
CORRESPONDING BULK TANKS. THE DISPENSING TANK FILL OPERATION IS CONTROLLED
MANUALLY FROM CONTROL PANEL CP-1 LOCATED WITHIN THE SALES KIOSK. FLOAT
SWITCHES MONITOR THE LEVEL OF FUEL IN THE DISPENSING TANKS. WHEN FUEL
LEVEL(S) FALL BELOW THE 50%-FULL POINT, LOW LEVEL LIGHTS WILL ILLUMINATE ON
CONTROL PANEL CP-1. ENSURE THAT THE BULK TANKS HAVE SUFFICIENT FUEL FOR THE
TRANSFER. PRESS THE PUMP START BUTTON ON CONTROL PANEL CP-1. THE PUMP WILL
RUN FOR UP TO 15 MINUTES BEFORE NEEDING TO BE STARTED AGAIN. HIGH LEVEL
FLOAT SWITCHES WITHIN THE DISPENSING TANK AUTOMATICALLY DE-ENERGIZE THE
TRANSFER PUMP AND CLOSE THE MOTORIZED BALL VALVE WHEN THE FUEL LEVEL
REACHES 90% FULL. IF THE MOTORIZED VALVE & PUMP FAIL TO SHUTOFF, A MECHANICAL
FILL LIMITER WILL STOP FUEL FLOW AT 95% AND AN ALARM WILL SOUND. DO NOT LEAVE
THE FACILITY WHEN TRANSFERS ARE UNDERWAY!
RETAIL DISPENSER OPERATION:
RETAIL FUEL SALES WILL BE CONDUCTED VIA AN ELECTRONIC POINT OF SALE SYSTEM
LOCATED WITHIN THE CORPORATION FUEL SALES CONNEX. CUSTOMERS WILL ENTER
THE CONNEX AND PREPAY FOR FUEL, AT WHICH TIME THE FUEL ATTENDANT WILL
ENERGIZE THE DISPENSER. THE FUEL CONTROL SYSTEM WILL LIMIT THE DISPENSED
QUANTITY TO THE PREPAID AMOUNT, AFTER WHICH THE CUSTOMER WILL RETURN TO
THE FUEL SALES CONNEX TO RECEIVE A RECEIPT FOR THE TRANSACTION.
BULK TRANSFER HOSE REEL DISPENSER OPERATION:
PRIOR TO FILLING, TURN OFF ENGINE, CHOCK WHEELS AND CONNECT STATIC
GROUNDING CABLE. OPEN ISOLATION VALVE, INPUT DESIRED FUEL VOLUME INTO PRE-
SET METER, AND SET SPRING LOADED MECHANICAL VALVE. UNWIND HOSE, PLACE
NOZZLE IN APPROVED FUEL CONTAINER, DEPRESS PUMP START BUTTON ON
CONTROLLER CP-2 TO PRESSURIZE HOSE, AND DEPRESS TRIGGER TO INITIATE FLOW.
THE PUMP WILL RUN FOR UP TO 15 MINUTES BEFORE NEEDING TO BE STARTED AGAIN.
PROVIDE CONTINUOUS MONITORING DURING FUELING PROCESS. FLOW WILL
AUTOMATICALLY STOP AT PRE-SET VOLUME, BUT PUMP WILL CONTINUE TO RUN. WHEN
FUELING IS COMPLETE, DEPRESS PUMP STOP BUTTON, WIND HOSE ONTO REEL, HANG
UP NOZZLE, AND NOTE VOLUME OF FUEL DISPENSED.
FILLING POWER PLANT/WTP TANKS FROM TNC TANK FARM:
THE TWO SEPARATE TANKS ARE FILLED FROM CORRESPONDING BULK TANKS VIA AN
ABOVE GRADE 3-INCH FILL PIPELINE. THE TANK FILL OPERATION IS CONTROLLED
MANUALLY BY A COMBINATION OF THE EXISTING CONTROLS, CONTROL PANEL CP-3
LOCATED AT THE TNC TANK FARM, AND CONTROLLER CP-4 ADJACENT TO THE POWER
PLANT TANK. BEFORE STARTING FUEL TRANSFER, ENSURE THAT THE BULK TANKS HAVE
SUFFICIENT FUEL FOR THE TRANSFER AND THE FUEL TRANSFER ISOLATION VALVES FOR
THE POWER PLANT/WTP TANKS ARE CLOSED. PRESS THE PUMP START BUTTON ON
CONTROLLER CP-4 TO START THE TRANSFER PUMP AND OPEN MV-1. OPEN THE DESIRED
FUEL TRANSFER CONTROL VALVE WITH THE EXISTING CONTROLS TO START THE FUEL
TRANSFER. THE PUMP WILL RUN FOR UP TO 15 MINUTES BEFORE NEEDING TO BE
STARTED AGAIN. WHEN THE EXISTING LEVEL MONITORING SYSTEMS INDICATE THE TANK
IS FULL, PRESS THE PUMP STOP BUTTON ON CONTROLLER CP-4 TO STOP THE TRANSFER
PUMP AND CLOSE MV-1. THEN ALSO CLOSE THE CONTROL VALVE THAT WAS BEING USED
FOR FUEL TRANSFER WITH THE EXISTING CONTROLS. IF FILLING CONTINUES, THE
EXISTING MECHANICAL FILL LIMITER WILL POSITIVELY SHUT OFF FUEL FLOW TO THE
TANK. DO NOT LEAVE THE FACILITY WHEN TRANSFERS ARE UNDERWAY!
GENERAL NOTES:
1. SYSTEM REPRESENTATIONS ON THIS SHEET ARE SCHEMATIC, NOT ALL PIPE FITTINGS
(BENDS, REDUCERS, BUSHINGS, ETC.) ARE SHOWN. CONTRACTOR SHALL PROVIDE ALL
NECESSARY FITTINGS FOR PROPER COMPONENT FIT-UP.
2. NOT ALL TANK APPURTENANCES (VENTS, ETC.) ARE SHOWN ON THIS SHEET. SEE TANK
SHEETS FOR COMPONENT CALLOUTS AND INSTALLATION DETAILS.
N O
R
E V
IS
IO
N B
Y D
A T
E
CP-3
HA-LSL HA--10A
4" G
3" D TO POWER PLANT/WTP TANKS,
FOR CONTINUATION SEE CIVIL
4" G4" G4" G4" G
4" G
4" D 4" D 4" D 4" G 4" G
2" D 2" G
T-9T-8T-7T-6
T-5T-4T-3T-2T-1
T-10A/B
P-10B
P-10A
4" G
M1.7
3" D
M3.1
TIMBER PIPE SUPPORTS (TYP),
FOR DETAIL SEE 5
M3.1 2" D 4" G
2" G
2" D
M1.7
3" D
4" D
2" D 2" G
2" D 2" G
5 5 5 5 5 5 5 5 5
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
C O
L O
C A
T E
D T
A N
K F
A R
M P
IP
IN
G P
L A
N
T U
L U
K S
A K
A
L A
S K
A
M1.5
/1
/2
B C
A
B R
P --
SHEET NOTES:
1. 2" G TO RETAIL DISPENSER, FOR CONTINUATION SEE CIVIL
2. 2" D TO RETAIL DISPENSER AND HOSE REEL, FOR CONTINUATION SEE CIVIL
3. BARGE HEADER, FOR DETAIL SEE
4. PUMP CABINET, FOR DETAIL SEE
5. REDUCE PIPING TO 3" BEFORE TANK FLEXIBLE CONNECTOR.
0 16'8'4'
SCALE: 1/8" = 1'-0"
COLOCATED TANK FARM PIPING PLAN
GENERAL NOTES:
1. NOT ALL APPURTENANCES (VENTS, ETC.) ARE SHOWN ON THIS SHEET. SEE TANK
DETAILS AND FUEL PIPING SCHEMATIC.
N O
R
E V
IS
IO
N B
Y D
A
M3.1
M1.7
T-2S
T-1S
3" D
3" D
2" D
2" D TO SCHOOL TANK, FOR
CONTINUATION SEE CIVIL
3" D
3" D
T-3S
3" D
M3.2
2" D
3" D
PUMP CABINET
BV-5S
PRV-2S
FC-4SP-1SFC-5S
F-1SPT-1S
TANK T2S
30,000 - GAL
DIESEL
TANK T1S
30,000 - GAL
DIESEL
LSHA-2S
LSH-2S
LSL-2S
LSHA-1S
LSH-1S
LSL-1S
TANK (E)
DIESEL
F
PRV-1S
CONTAINMENT DIKE
BV-3S
BV-2S FC-1S
FC-2S
EXISTING SCHOOL TANK
D D
D M
FC-6S
MV-1S
D
QC-1S
BV-1S
S-1S
CV-1S
M
DIESEL HR-1S
M-1S
SV-1SFC-7S PT-2S BV-6S
PRV-4S
SCHOOL HOSE REEL ENCLOSURE
GV-1S
TANK T3S
30,000 - GAL
DIESEL
LSHA-3S
LSH-3S
LSL-3S
BV-4S FC-3S
D
M MV-2S
PRV-3S
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
S C
H O
O L T
A N
K F
A R
M P
IP
IN
G P
L A
N A
N D
S C
H E
M A
T
IC
T U
L U
K S
A K
A
L A
S K
A
M1.6
/1
/2
B C
A
B C
A --
SHEET NOTES:
1. BARGE HEADER, FOR DETAIL SEE
2. PUMP CABINET, FOR DETAIL SEE
3. HOSE REEL DISPENSER, FOR DETAIL SEE
0 16'8'4'
GENERAL NOTES:
1. NOT ALL APPURTENANCES (VENTS, ETC.) ARE SHOWN ON THIS SHEET. SEE TANK
DETAILS.
SCALE: 1/8" = 1'-0"
SCHOOL TANK FARM PIPING PLAN
SCHOOL TANK FARM OPERATIONAL NARRATIVE:
FILLING SCHOOL TANK FARM FROM BARGE HEADER:
THE TANK FARM WILL BE FILLED VIA A BARGE HEADER WITH 3-INCH FILL PIPELINE. FLOAT
SWITCHES MONITOR THE LEVEL OF FUEL IN THE BULK TANKS. WHEN FUEL LEVEL(S) FALL
BELOW THE 2%-FULL POINT, LOW LEVEL LIGHTS WILL ILLUMINATE ON CONTROL PANEL
CP-5. BEFORE BEGINNING THE FILL PROCESS THE OPERATOR SHALL CONFIRM THAT THE
SCHOOL INTERMEDIATE TANK IS ISOLATED AND THAT ALL TANK ISOLATION VALVES ARE
CLOSED. BULK TANKS SHOULD BE FILLED ONE AT A TIME BY SEQUENTIALLY OPENING
AND CLOSING INDIVIDUAL TANK ISOLATION BALL VALVES. LINE PRESSURE WILL BE
SUPPLIED BY THE BARGE PUMPING SYSTEM. THE TANK FARM OPERATOR WILL MONITOR
THE FILLING PROCESS VIA CLOCK GAUGES AND/OR GAUGING ROD AT EACH TANK. WHEN
THE TANK LEVEL REACHES 90%, A LIGHT ON THE CONTROL PANEL WILL INDICATE THAT
THE TANK IS FULL. IF FILLING CONTINUES TO THE 95% LEVEL, A FLOAT WILL ACTIVATE AN
ALARM AND THE "TANK OVERFULL" LIGHT WILL ILLUMINATE. AT THE CONCLUSION OF
FILLING, CLOSE BARGE HEADER & TANK ISOLATION VALVES AND DISCONNECT FILL HOSE.
FILLING INTERMEDIATE SCHOOL TANK FROM SCHOOL TANK FARM:
THE INTERMEDIATE SCHOOL TANK IS FILLED FROM CORRESPONDING BULK TANKS VIA A
BURIED 2-INCH FILL PIPELINE. THE TANK FILL OPERATION IS CONTROLLED BY CONTROL
PANEL CP-5 LOCATED AT THE SCHOOL TANK FARM AND CONTROLLER CP-6 LOCATED
ADJACENT TO THE INTERMEDIATE SCHOOL TANK. WHEN FUEL LEVEL FALLS BELOW 50%
FULL, AS MEASURED BY THE LOW LEVEL SWITCH OF THE CLOCK GAUGE, A LOW LEVEL
LIGHT WILL ILLUMINATE ON CP-5. BEFORE STARTING FUEL TRANSFER, ENSURE THAT THE
BULK TANKS HAVE SUFFICIENT FUEL FOR THE TRANSFER AND THE FUEL TRANSFER
ISOLATION VALVES FOR THE TANKS ARE OPEN. PRESS THE PUMP START BUTTON ON
CONTROLLER CP-6 TO START THE TRANSFER PUMP AND OPEN MV-1S TO START THE
FUEL TRANSFER. THE PUMP WILL RUN FOR UP TO 15 MINUTES BEFORE NEEDING TO BE
STARTED AGAIN. AT 90% FULL AS MEASURED BY THE HIGH LEVEL SWITCH OF THE CLOCK
GAUGE, CP-5 TO STOP THE TRANSFER PUMP, CLOSE MV-1S, AND ILLUMINATE A HIGH
LEVEL LIGHT ON CP-5. IF FILLING CONTINUES, A MECHANICAL FILL LIMITER WILL
POSITIVELY SHUT OFF FUEL FLOW TO THE TANK AT 95% FULL. DO NOT LEAVE THE
FACILITY WHEN TRANSFERS ARE UNDERWAY!
SCHOOL HOSE REEL DISPENSER OPERATION:
PRIOR TO FILLING, TURN OFF ENGINE, CHOCK WHEELS AND CONNECT STATIC
GROUNDING CABLE. OPEN ISOLATION VALVE, INPUT DESIRED FUEL VOLUME INTO PRE-
SET METER, AND SET SPRING LOADED MECHANICAL VALVE. UNWIND HOSE, PLACE
NOZZLE IN APPROVED FUEL CONTAINER, DEPRESS PUMP START BUTTON ON
CONTROLLER CP-7 TO START THE PUMP AND OPEN MV-2S, THEN DEPRESS TRIGGER TO
INITIATE FLOW. PROVIDE CONTINUOUS MONITORING DURING FUELING PROCESS. FLOW
WILL AUTOMATICALLY STOP AT PRE-SET VOLUME, BUT PUMP WILL CONTINUE TO RUN.
THE PUMP WILL RUN FOR UP TO 15 MINUTES BEFORE NEEDING TO BE STARTED AGAIN.
WHEN FUELING IS COMPLETE, DEPRESS PUMP STOP BUTTON ON CONTROLLER CP-7 TO
STOP PUMP AND CLOSE MV-2S, WIND HOSE ONTO REEL, HANG UP NOZZLE, AND NOTE
VOLUME OF FUEL DISPENSED.
SCALE: NTS
SCHOOL TANK FARM SCHEMATIC
N O
R
E V
IS
IO
N B
Y D
A
M1.7
PUMP CABINET ENCLOSURE, FOR DETAIL SEE CIVIL
3 3
7 7
3 3
7 7
M3.1
2" G 1 1/2" G2" G1" G
2" D 1 1/2" D2" D1" D
CONTINUATIONS TO DISPENSING TANK
CONTINUATION TO
BULK TANKS
CONTINUATION TO
BULK TANKS
2" D
2" G
1 1/2" D
2" D
2" D
1" D
2" D
2' -6
CONTINUATIONS TO DISPENSING TANKCONTINUATION TO
BULK TANKS
FINISHED GRADE
FOR PRV CONNECTION
DETAIL, SEE 4
M3.1
2" D
PUMP CABINET ENCLOSURE, FOR DETAIL SEE CIVIL
PIPE SUPPORTS
AS REQUIRED
2" G
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
P U
M P
C A
B
IN
E T
P
IP
IN
G
T U
L U
K S
A K
A
L A
S K
A
M1.7
/1
/2
B C
A
B R
P --
SCALE: 1" = 1'-0"
PUMP CABINET ENLARGED PLAN
SCALE: 1" = 1'-0"
PUMP CABINET VIEW
SHEET NOTES:
1. BALL VALVE
2. FUEL FILTER
3. FLEXIBLE CONNECTOR
4. TRANSFER PUMP
5. MOTORIZED BALL VALVE
6. PRESSURE RELIEF VALVE
7. ENVIROFLEX PENETRATION BOOT
8. PRESSURE TEST CONNECTION, FOR DETAIL SEE
9. BOTTOM OF PUMP CABINET MUST BE HIGHER THAN TOP OF DIKE
GENERAL NOTES:
1. TULKISARMUTE PUMP CABINET SHOWN, OTHER PUMP CABINETS TO BE SIMILAR.
N O
R
E V
IS
IO
N B
Y D
A
M2.1
345 63
M2.4
M2.4
7 8
8"
LSL
90% LSH
95% LSHA
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
,0
G A
L L
O N
T A
N K
D E
T A
IL
S
T U
L U
K S
A K
A
L A
S K
A
M2.1
/1
/2
B C
A
B R
P --
SCALE: NTS
30,000 GALLON SINGLE WALL TANK PLAN
SCALE: NTS
30,000 GALLON SINGLE WALL TANK ELEVATION
SHEET NOTES:
1. SHOP FABRICATED BOLT ON ACCESS LADDER AND PLATFORM.
2. 2" NPT THREADED TANK OPENING - GAUGE HATCH
3. 2" NPT THREADED TANK OPENING - PRV OR SPARE WITH PLUG AS APPROPRIATE
4. 2" NPT THREADED TANK OPENING - CLOCK GAUGE ON 2" Ø X 18" LONG NIPPLE, SET GREEN
ARROW AT 50% LEVEL AND RED ARROW AT 90%, FOR DETAIL SEE
5. 3" NPT THREADED TANK OPENING - PRESSURE/VACUUM VENT WITH WHISTLE ALARM
6. 3" NPT THREADED TANK OPENING - 3-POSITION LEVEL SWITCH, SENSOR POSITIONS
FACTORY SET AS SHOWN.
7. 4" NPT THREADED TANK OPENING - SPARE WITH PLUG
8. 10" FLANGED PENETRATION - EMERGENCY VENT
9. 24" FLANGED ACCESS HATCH WITH COVER
10. 1" ANSI#300 R.F. FLANGED TANK NOZZLE - WATER DRAW
11. 3" FLANGED NOZZLE - FILL/DRAW, FOR DETAIL SEE
GENERAL NOTES:
1. 30,000 GALLON TANKS SHALL BE OWNER FURNISHED AND CONTRACTOR INSTALLED.
2. SEE CIVIL FOR TANK FABRICATION AND FOUNDATION DETAILS.
3. CONTRACTOR SHALL PROVIDE ALL VALVES, NORMAL VENTS, EMERGENCY VENTS, LEVEL
GAUGES, SAMPLE HATCHES, FLOATS, PLUGS, AND OTHER APPURTENANCES. SEE
SPECIFICATIONS FOR DETAILED COMPONENT SPECIFICATIONS.
4. PROVIDE UL APPROVED GROUNDING LUG ON TANK SKIDS (TYP 2, ON OPPOSITE CORNERS)
5. INSTALL PRESSURE RELIEF VALVE (PRV) ASSEMBLIES IN LOCATIONS INDICATED ON PIPING
PLAN AND SCHEMATIC.
6. ALL REQUIRED PENETRATIONS, STANDOFFS, PIPE SUPPORTS, ETC. SHALL BE BOLT ON OR
FACTORY INSTALLED. FIELD WELDING ON TANKS IS PROHIBITED.
N O
R
E V
IS
IO
N B
Y D
A
M2.2
M2.2
68 7
7 8
11 11
9 6
5 5
M2.4
M2.4
M2.4
14 14
13 13
1"1"
12 12
LSLA
90% LSH
95% LSHA
8"8"
50% LSL
LSLA
90% LSH
95% LSHA
50% LSL
COMBUSTIBLE
2,500 GALLON
DIESEL
FLAMMABLE
2,500 GALLON
GASOLINE
(OPPOSITE SIDE)
10 13
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :2
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
,0
G
A L L
O N
T A
N K
R E
F U
R B
IS
H
M E
N T
D E
T A
IL
S
T U
L U
K S
A K
A
L A
S K
A
M2.2
/1
/2
B C
A
B R
P --
SCALE: NTS
EXISTING 5,000 GALLON DUAL PRODUCT DISPENSING TANK PLAN
SCALE: NTS
EXISTING 5,000 GALLON DUAL PRODUCT DISPENSING TANK ELEVATION
SCALE: NTS
EXISTING 5,000 GALLON DUAL PRODUCT DISPENSING TANK END VIEW
GENERAL NOTES:
1. EXISTING 5,000 GALLON DUAL PRODUCT PROTECTED TANK SHALL BE FURNISHED BY THE
CORPORATION AND TRIBE, AND INSTALLED BY THE CONTRACTOR. THE TANK IS EXISTING,
UNUSED, AND APPROXIMATELY 8'-6.5" OUTER DIAMETER BY 14'-6.625" LONG.
2. CONTRACTOR SHALL TRANSFER ANY LIQUIDS IN THE TANK, CLEAN, FIELD PREP AND TOUCH
UP THE TANK EXTERIOR COATING IN ACCORDANCE WITH THE SPECIFICATIONS AND AS
DIRECTED BY THE ENGINEER.
3. CONTRACTOR SHALL CONFIRM SALVAGEABLE APPURTENANCES AVAILABLE ONSITE IN THE
AEA CONNEX AND PROVIDE NEW COMPONENTS AS REQUIRED; INCLUDING VALVES,
NORMAL VENTS, EMERGENCY VENTS, LEVEL GAUGES, SAMPLE HATCHES, PLUGS, AND
OTHER APPURTENANCES.
4. CONTRACTOR SHALL FIELD VERIFY TANK PENETRATIONS PRIOR TO ORDERING
COMPONENTS.
5. INSTALL PRESSURE RELIEF VALVE (PRV) ASSEMBLIES IN LOCATIONS INDICATED ON PIPING
PLAN AND SCHEMATIC.
SHEET NOTES:
1. EXISTING BOLT ON ACCESS LADDER AND PLATFORM FURNISHED BY OWNER, CONTRACTOR
FIELD INSTALLED.
2. 2" NPT THREADED TANK OPENING - WATER DRAW, FOR DETAIL SEE
3. 2" NPT THREADED TANK OPENING - SECONDARY TANK MONITORING BUNG WITH PLUG.
4. 2" NPT THREADED TANK OPENING - CLOCK GAUGE ON 2" Ø X 18" LONG NIPPLE, SET GREEN
ARROW AT 50% LEVEL AND RED ARROW AT 90%, FOR DETAIL SEE
5. 2" NPT THREADED TANK OPENING - 2" NPT GAUGE HATCH INSTALLED ON 2" Ø X 4" LONG
NIPPLE.
6. 4" NPT THREADED TANK OPENING - FILL WITH DROP TUBE, CONNECT PIPING WITH 4" X 2"
REDUCING BUSHING.
7. 3" NPT THREADED TANK OPENING - 2" PRESSURE VACUUM VENT WITH WHISTLE ALARM.
INSTALL WITH 3" X 2" REDUCING BUSHING, NIPPLE LENGTH WILL VARY WITH TANK
DIAMETER. VENT MUST BE 12' ABOVE FINISHED GRADE. FEED CABLE THROUGH PIPE PRIOR
TO CONNECTING TO TANK. SET WHISTLE TO ALARM AT 90% FULL.
8. 3" FLANGED PENETRATION - 4-POSITION LEVEL SWITCH, SENSOR POSITIONS FACTORY SET
AS SHOWN.
9. 8" FLANGED PENETRATION - SECONDARY EMERGENCY VENT.
10. 24" FLANGED PENETRATION - MANHOLE.
11. 6" FLANGED PRIMARY EMERGENCY VENT.
12. SUBMERSIBLE PUMP, FOR DETAIL SEE
13. BOLT ON PIPE SUPPORT.
14. WELDED ON STRUT SUPPORT.
N O
R
E V
IS
IO
N B
Y D
A
1"
6"
5'-2"
3'-4"
ELEVATED STAND NOT SHOWN
1" FLANGED BALL VALVE
1" SCH 80 FUEL LINE
GRAVITY TO INTERIOR OIL
BURNING APPLIANCES
1" DROP TUBE2" DROP TUBE
LIFTING LUG (TYP)
2" DIA TANK FPT (WATER DRAW)
4" DIA SPARE (TYP)
4" DIA TANK FPT (EMERGENCY VENT)
2" DIA TANK FPT (CLOCK GAUGE)
4" DIA BUNG (TANK FILL W/ OVERFILL PREVENTION VALVE)
2" DIA TANK FPT (NORMAL VENT, 12" MIN AFG)58" (M
AX)
9" 16"
66"
91"
8"
25"
ELEVATED TANK
HOLD DOWN ASSEMBLY
1/4" A36 STEEL BOTTOM
PLATE ENSURE LIQUID-TIGHT
CONNECTION TO SIDE WALLS
1/8" A36 STEEL PLATES SEAL WELD
ENTIRE PERIMETER AS NEEDED FOR
LIQUID-TIGHT CONSTRUCTION
8X12 TREATED TIMBER (TYP)
L2"X2"X3/8"
EARTH ANCHOR WITH 4' MIN
EMBEDMENT (DB-88 TYP 4)
3/4" PLUG WITH CHAIN
WELDED TO BODY
DEMOLISH EXISTING TANK AND STAND
ABANDON DIESEL SUPPLY LINE PER
CIVIL DECOMMISSIONING PLAN, SEE
CIVIL FOR CONTINUATION DEMOLISH EXISTING TANK AND STAND
EXISTING FUEL OIL SUPPLY PIPING TO
REMAIN, CONNECT TO NEW TANK
O
ETATS
T H
A
AKSAL
F
R E G I S T
E R E D
P R O F E S S I O N A L
E N
G
IN
EE
R
B ra n d o n
C A d k in s
M E
-1
Sheet No.
P lo t
D a te
D e s ig n e d
D ra w n
A p p ro v e d
P lo t D a te
A L
A S
K A
E N
E R
G Y
A U
T H
O R
IT
Y
/1 /2
/1
/2
:2 :3
P
M
T U
L U
K S
A K
B U
L K
F U
E L
U P
G R
A D
E S
G A
L L
O N
T A
N K
D E
T A
IL
S
T U
L U
K S
A K
A
L A
S K
A
M2.3
/1
/2
N C
P
B C
A --
GENERAL NOTES:
1. FOR TANK INSTALLATION AND LOCATION SEE CIVIL.
TANK STAND NOTES:
1. SUPPORT MEMBERS SHALL BE 2-INCH X 2-INCH X 3/8-INCH ANGLE MINIMUM, OR AS
REQUIRED TO MEET UL-142.
2. LADDERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH OSHA REQUIREMENTS.
3. 1/8-INCH ASTM A36 STEEL SIDE PLATES SHALL BE BENT OR SEAL WELDED TO PROVIDE A
LIQUID TIGHT PERIMETER FOR THE OVERSPILL PAN. INSTALL A 3/4-INCH PLUG WITH CHAIN
WELDED TO PAN BODY WALL AS INDICATED ON DRAWING. PLUG REMOVAL SHALL NOT
REQUIRE DISCONNECTING CHAIN.
4. BOTTOM PLATE SHALL BE CONSTRUCTED USING 1/4-INCH ASTM A36 STEEL PLATE AND SEAL
WELDED TO THE SIDE PLATES TO CREATE A LIQUID TIGHT OVERSPILL PAN. ADHERE
CLOSELY TO THE INDICATED DIMENSIONS FOR THE OVERSPILL PAN.
5. PROVIDE HOLD DOWN ASSEMBLIES TO ATTACH TO TANK STAND. CUSTOMIZED LENGTH ACE
TANK ACHDAOXXE WITH ISOLATION STRIP ACHDA-RS AND TURNBUCKLE ACHDA-TB OR
APPROVED EQUAL.
6. PROVIDE 3-INCH X 3-INCH X 3/8-INCH ASTM A36 ANGLE CLIPS WELDED TO THE OUTSIDE
EDGE OF THE DRIP PAN AS INDICATED ON THE DRAWING.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .