260338 Deficiency Log.pdf

PDF 55 KB Posted

Attached to
ITB 260338 Inspection, Testing, and Maintenance of Fire Suppression Sy
Solicitation number
BD-26-1069-MILDV-30000-129013
Issued by
Massachusetts

About this file

This is a deficiency log document for the Commonwealth of Massachusetts, prepared in connection with ITB 260338 for inspection, testing, and maintenance of fire suppression systems at Camp Edwards. The log identifies specific deficiencies across multiple kitchen facilities that require remediation as part of the contract scope. Building 3132 requires re-piping of a range with three 1F nozzles for proper coverage. Building 3139 has no reported deficiencies. Building 1200 requires installation of an additional PCL 300 Tank to address improper coverage on four oversized burners and ensure proper nozzle protection. Building 5220 has two areas of concern: the front section contains tanks and a cartridge that are overdue for hydrostatic testing and cartridge replacement, while the rear section requires both tanks and cartridge hydrostatic testing along with manifold reconstruction.

These deficiencies represent the known issues that the selected contractor must address within the first year of the three-year service contract, which includes two one-year renewal options. The repairs identified in this log are separate from the semi-annual inspection and maintenance services that will be performed on fire suppression systems across two dining facilities, two kitchens, and one HAZMAT storage facility throughout the contract term.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Camp Edwards Kitchen Hood Deficiency Log

Bldg. # Deficiencies

3132 Range needs re-pipe for proper coverage with (3) 1F nozzles

3139 N/A

1200 Improper coverage on oversized burners (4). Will need additional PCL 300 Tank installed to spilt coverage for proper nozzle protection.

5220 Front 1-4GM and 1-2.5G tank overdue for Hydro and Cartridge.

5220 Rear Both tanks and Cartridge overdue for Hydro. Manifold needs to be redone.

APPENDIX A

File details come from the government source that posted it. Updated .