This is a bid schedule document for Collier County, Florida, for the CCSO Jail (J3) Roof Replacement and Louver Repair construction project under ITB No. 26-8693. The project involves four primary construction line items: roof and flashing replacement, louver replacement, metal framing/sheathing and wall panel system installation, and general conditions. Sealed bids are due electronically by 3:00 p.m. local time on October 12, 2026, through the County's online bidding system at https://procurement.opengov.com/portal/collier-county-fl, with public opening and reading of bids to follow. A non-mandatory pre-bid conference is scheduled for September 9, 2026, at 11:00 a.m. at the Procurement Services Division in Naples, Florida. A mandatory site visit is required as a condition of bid responsiveness, and prospective bidders must submit Form 13 - Mandatory Site Visit Attestation Form with their bids; failure to attend this site visit results in immediate disqualification.
The anticipated project budget is $3,000,000.00. The bid schedule provided shows all four line items with unit costs and total costs currently listed at zero dollars, indicating this is a template awaiting bidder pricing. The County has allocated an Owner's Allowance of $324,600.00 for unforeseen conditions and work directed by the Owner after award; this allowance is not guaranteed to be paid in full and any expenditures will be authorized through change orders with supporting documentation of time and materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Vendor Name: |
| CCSO Jail (J3) Roof Replacement and Louver Repair |
| CONSTRUCTION ITB NO. 26-8693 |
| BID SCHEDULE |
| ITEM NO. | DESCRIPTION | QTY | UNIT COST | TOTAL COST |
| 1 | ROOF AND FLASHING REPLACEMENT | 1 | $ - 0 | $ - 0 |
| 2 | LOUVER REPLACEMENT | 1 | $ - 0 | $ - 0 |
| 3 | METAL FRAMING, SHEATHING, AND WALL PANEL SYSTEM | 1 | $ - 0 | $ - 0 |
| 4 | GENERAL CONDITIONS | 1 | $ - 0 | $ - 0 |
| TOTAL BID COST: | $ - 0 |
Staff has allocated $324,600.00 in Owner's Allowance for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.