About this file

This is a pre-proposal meeting presentation for two continuing services contracts issued by the Palm Beach County Water Utilities Department under the Consultants' Competitive Negotiation Act (CCNA). Project 26-017 seeks General Utility, Architectural and Value Engineering Continuing Services with up to two firms to be selected for a four-year term, while Project 26-019 seeks Utility Distribution & Collection System Continuing Engineering Services with up to five firms to be selected, also for a four-year term. Both contracts will provide planning, engineering, condition assessment, land surveying, geotechnical, and architectural services across the department's extensive infrastructure, including five wastewater treatment plants, five water treatment plants, reclaimed water facilities, and collection systems spanning 2,570 miles of water mains and 1,371 miles of gravity sewer. Representative projects include lift station upgrades, pipeline replacement and design, septic-to-sewer conversions, hydraulic modeling, and feasibility studies. The pre-proposal meeting occurred on June 8, 2026, with proposals due by 3:30 P.M. on July 8, 2026. Contract award is projected for December 2026.

Proposals must include a letter of interest, GSA Form SF 330, questionnaires, OSBD Schedules 1 and 2, certifications, and conflict of interest disclosures submitted in nine originals. For Project 26-017, proposers must be certified in multiple CCNA categories including topography, soils and foundation, architectural, mechanical engineering (wastewater treatment and collection, water supply treatment and distribution), electrical, structural, environmental, and subsurface utility engineering. For Project 26-019, certifications are required in land surveying, topography, soils and foundation, mechanical engineering (wastewater collection and water distribution), electrical, structural, environmental, and subsurface utility engineering. Both contracts have a mandatory minimum 20 percent Small Business Enterprise (SBE) participation goal, with up to 15 evaluation preference points awarded based on SBE dollar participation. Individual project construction costs are estimated not to exceed $7.75 million, with professional services fees capped at $500,000 per study.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Palm Beach County Water Utilities Department

General Utility, Architectural and Value Engineering

Continuing Services WUD Project No. 26-017

Utility Distribution & Collection System

Continuing Engineering Services

WUD Project No. 26-019

Pre-proposal Meeting June 8, 2026

Disclaimer

Any statements, drawings, graphical representations or technical references in this presentation are for information purposes only.

The originally issued solicitation and any subsequent addenda modifying the solicitation are the definitive documents for this Request for Proposal and shall control over any conflict with the provisions of this presentation.

PBC Water Utilities Department

• 3rd largest utility in Florida

• Serve over 600,000 residents

• Service area is 1,300 square miles

WASTEWATER TREATMENT & COLLECTION

Wastewater Treatment Plants

• SRWRF- 35 MGD

• CRRWF- 3 MGD

• ECRWRF- 24 MGD

• WRWWTP- 6.5 MGD

• WRNWWTP- 1.2 MGD

Water Treatment Plants Water Treatment Plants

• WTP 2- 16.4 MGD

• WTP 3- 30 MGD

• WTP 8- 30 MGD

• WTP 9- 26.88 MGD

• WTP 11- 10 MGD

RECLAIMED AND REUSE WATER SYSTEM

Water Reclamation Facilities

• SRWRF- 22 MGD

• CRRWF- 3 MGD

• ECRWRF- 27 MGD

Water Reuse Facility

• SRWRF- 2 MGD

Water Distribution System

Distribution System

• 2,570 mi. mains

• 20,978 fire hydrants

• 42,282 isolation valves

• 765 ARVs

Wastewater Collection System

Collection System

• 1,371 mi. gravity sewer

• 624 mi. force main

• 1,077 lift stations

• 35,069 Manholes

• 4,950 Valves

• 882 ARVs

Reclaimed Water System

Transmission System

• 76 mi. main

26-017 General Utility, Architectural and Value Engineering Continuing Services

• The term of the contract is four (4) years.

• Up to two (2) firms will be selected.

• Provide planning, architecture, engineering, land surveying, geotechnical, condition assessment, plan review and staff augmentation services at Palm Beach County Water Utilities Department Water Treatment Facilities, Production and Disposal wells, Wastewater Treatment Facilities, Reclaimed Water Treatment Facilities, Reuse Facility, storage, pumping, transmission and collection facilities and other County and non-County facilities.

PROJECT EXAMPLES – 26-017 General Utility, Architectural and Value Engineering Continuing Services

• Integrated Utility Master Plan

• Septic to Sewer Conversion

• Lift Station Upgrade and Rehabilitation

• Pipeline Upgrade and New

• Pipeline design for roadway projects

• Countywide Hydraulic Modeling

• Lead Services Line Inventory

• Condition Assessment and Leak Detection

• Engineer’s Bond and Insurance Reports

• Zoning assistance

26-019 Utility Distribution & Collection System Continuing Engineering Services

• The term of the contract is four (4) years.

• Up to five (5) firms will be selected.

• Provide planning, condition assessment, engineering, land surveying, and geotechnical services at Palm Beach County Water Utilities Department utility transmission, collection, lift station, and pump station facilities and other County and non-County facilities.

PROJECT EXAMPLES – 26-019 Utility Distribution & Collection System Continuing Engineering Services

• Lift Station Upgrade and Rehabilitation

• Pump Station Upgrade and Rehabilitation

• Septic to Sewer Conversion

• Pipeline design for roadway projects

• Water Main Replacement and New

• Force Main Replacement and New

• Pipelines and Lift Stations Feasibility Studies and

Evaluations

• Countywide Hydraulic Modeling

• Technical Assistance

Continuing Contract

• FS 287.055 Limitations per Authorization- Consultants’ Competitive Negotiation Act (CCNA)

• Estimated construction cost of each individual project under the contract does not exceed $7.75 million, as may be amended.

• Fee for professional services for each individual study under the contract does not exceed $500,000.

Proposal Requirements

• Proposal due no later than 3:30 P.M. on Wednesday, July 8, 2026

• Letter of Interest (10 pages maximum)

• GSA Form SF 330

• Prime Consultant Questionnaire

• Sub-consultant Letter of Intent to Perform and Questionnaire (for each sub-consultant)

• OSBD Schedules 1 and 2

• Commercial Non-Discrimination Certification

• Conflict of Interest Disclosure Form

• Nine (9) originals

• Eight (8) originals bound (combed/notebook format)

• 1 original unbound

• 1 CD/USB Flash Drive with PDF

Proposal Requirements: 26-017 General Utility, Architectural and Value Engineering Continuing Services

The Proposer or sub-consultants shall be certified in the following Palm Beach County CCNA categories:

5.02 Topography – Engineering Surveying

6.01 Soils and Foundation – Geological & Geophysical Studies

6.04 Soils and Foundation – Hydraulic & Hydrologic Studies

7.01- Architectural – Architect 7.05

8.01 Mechanical Engineering – Waste Water Treatment Systems

8.02 Mechanical Engineering – Waste Water Collection Systems

8.03 Mechanical Engineering – Water Supply Treatment Systems

8.04 Mechanical Engineering – Water Distribution Systems

9.03 Electrical Engineering –Industrial Facilities

10.03 Structural Engineering - Industrial

12.06 Environmental Engineering – Water Resource Evaluation and Development

- Subsurface Utility Engineering

Proposal Requirements: 26-019 Utility Distribution & Collection System Continuing Engineering Services

The Proposer or sub-consultants shall be certified in the following Palm Beach County CCNA categories:

5.01 Topography – Land Surveying

5.02 Topography – Engineering Surveying

6.01 Soils and Foundation - Geological and Geophysical Studies

6.06 Soils and Foundation - Materials Testing

8.02 Mechanical Engineering – Waste Water Collection Systems

8.04 Mechanical Engineering - Water Distribution Systems

9.03 Electrical Engineering – Industrial Facilities

10.03 Structural Engineering – Industrial

12.02 Environmental Engineering – Environmental Audit/Site Investigation

- Subsurface Utility Engineering

APIs are various program tools and solicitation incentives that are used to encourage greater prime and subcontract participation by SBEs, including, but not limited to, bonding assistance, evaluation preferences, and subcontracting goals.

Projects were presented to Goal Setting Committee and the following APIs were applied:

Affirmative Procurement Initiatives (APIs)

Affirmative Procurement Initiatives (API):

- General Utility, Architectural and Value Engineering Continuing Services

- Utility Distribution & Collection System Continuing Engineering Services

A minimum mandatory goal of 20% SBE participation is established for this contract. See SBD Ordinance Section 2-80.24(2)(d)

Up to 15 evaluation preference points shall be awarded based upon the relative level of dollar participation by certified SBE firms that have been committed to on the respondent’s team. See SBD Ordinance Section 2-80.24(2)(c)- Option 2

Projected Schedule

• Advertisement May 31, 2026

• Advertisement June 7, 2026

• Pre-proposal Meeting June 8, 2026

• Proposals Due July 8, 2026

Projected Dates

• Short List Meeting August 2026

• Selection Committee Meeting Aug/Sept 2026

• Contract Award December 2026

Advantage Website

• The Request for Proposal and additional information can be found at the Palm Beach County Vendor Self Service located at: https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService

• All solicitation documents and subsequent amendments are posted to VSS.

https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService

CCNA Process: Resources

• Selection Process defined by PPM CW-O-048 http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf

• Relevant Forms and Instructions for completing RFP submittals are found at:

http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway- Publications.aspx

• Palm Beach County Vendor Search (directory) https://www.pbcgov.org/pbcvendors http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf http://pbcgov.com/publicaffairs/ppm/pdf/cw-o-048.pdf http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx https://www.pbcgov.org/pbcvendors

CCNA Process:

Tips

• Prime & Subs must be registered as vendors in VSS

• Prime & Subs CCNA certified in the listed categories prior to proposal due date

• Prime and Sub-consultant(s) must verify “fees considered”

• Office of Small Business Development

• SBEs shall be certified prior to proposal due date

• Submit Schedule 1 and Schedule 2

• After the proposal due date

• Firms shall not add or delete team members

• No adjusting of team participation

CCNA Process: Tips

• Florida Department of State, Division of Corporations https://search.sunbiz.org/Inquiry/CorporationSearch/ByName

• Confirm correct name of each firm on team

• Confirm principals for each firm on team https://search.sunbiz.org/Inquiry/CorporationSearch/ByName

If already registered, Enter User ID and Password

To Access Palm Beach County Solicitations Select the following link: https://pbcvssp.pbc.gov/vssprd/Advantage4

1. Click “View Published Solicitations” located in the top right corner of the screen https://pbcvssp.pbc.gov/vssprd/Advantage4

2. Type project # “26-016” in search box

26-016

4. Click “Attachments” tab

3. Under the Solicitation Number column, select the RFP link

All documents will be posted to the

“Attachments” tab.

Questions

Palm Beach County �Water Utilities Department
Disclaimer
PBC Water Utilities Department
WASTEWATER TREATMENT & COLLECTION
Water Treatment Plants
RECLAIMED AND REUSE WATER SYSTEM
Water Distribution System
Wastewater Collection System
Reclaimed Water System
26-017 General Utility, Architectural and Value Engineering Continuing Services
PROJECT EXAMPLES – 26-017 General Utility, Architectural and Value Engineering Continuing Services
26-019 Utility Distribution & Collection System Continuing Engineering Services
PROJECT EXAMPLES – 26-019 Utility Distribution & Collection System Continuing Engineering Services
Continuing Contract
Proposal Requirements
Proposal Requirements: 26-017 General Utility, Architectural and Value Engineering Continuing Services
Proposal Requirements: 26-019 Utility Distribution & Collection System Continuing Engineering Services
Affirmative Procurement Initiatives�(APIs)
Affirmative Procurement Initiatives (API): - General Utility, Architectural and Value Engineering Continuing Services�- Utility Distribution & Collection System Continuing Engineering Services�
Projected Schedule
Advantage Website
CCNA Process: Resources
CCNA Process:�Tips
CCNA Process: Tips
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28
Questions

File details come from the government source that posted it. Updated .