25PW15 - Addendum 1.pdf
PDF 604 KB Posted
- Attached to
- 25PW15 - Parrott Creek Culvert Replacements
- Solicitation number
- S-KR1079-00015938
- Issued by
- Deschutes County, Oregon
About this file
This is Addendum No. 1 to the contract documents for the Parrott Creek Culvert Replacements project issued by the City of Roseburg Public Works Department on February 19, 2026. The addendum modifies the original bidding documents by adding the "Geotechnical Design Report Parrot Creek Culvert Replacements Roseburg Oregon," prepared by the Galli Group in 2025, to the contract documents. Bidders must acknowledge receipt of this addendum on their bid forms; failure to do so may result in disqualification. Sealed bids for the project are due by 2:00 p.m. on March 3, 2026, with project completion scheduled for November 1, 2026. The scope of work includes replacement of corroded metal pipe culverts with precast reinforced concrete three-sided structures across multiple locations in southeast Roseburg, encompassing 145 feet of culvert structures ranging from 14 to 6-7 feet tall, 500 feet of storm sewer pipe, 3,000 cubic yards of excavation, 2,250 square feet of MSE retaining walls, erosion control measures, and site restoration with native planting.
Bidders must be licensed with the Oregon Construction Contractors Board or State Landscape Contractors Board and must provide bid bonds, performance bonds, and payment bonds equal to ten percent of the bid amount. Contractors are required to comply with Oregon prevailing wage law and the federal Davis-Bacon Act, paying the higher of the two applicable wage rates. Environmental compliance is mandatory, including turbidity monitoring, fish salvage coordination, and adherence to NPDES 1200-CA permit conditions with in-water work restricted to June 1 through September 15. Contractors qualifying as disadvantaged, minority, women, disabled veteran, or emerging small businesses under ORS 200.055 are exempt from filing a $30,000 Public Works Bond; all other contractors must file this bond prior to work commencement. Asbestos-containing materials may be present in existing underground pipe systems and must be handled by DEQ-licensed contractors in accordance with Oregon Department of Environmental Quality regulations. The contract uses a unit-price bid structure with the base bid covering three culverts and an additive alternate for a fourth culvert, with final contract award value dependent on bidder pricing and quantities of work performed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 1
TO THE
CONTRACT DOCUMENTS FOR CONSTRUCTION OF
PARROTT CREEK CULVERT REPLACEMENT
PROJECT #25PW15
THIS ADDENDUM IS HEREBY MADE A PART OF THE CONTRACT DOCUMENTS DATED
FEBRUARY 19, 2026, TO THE SAME EXTENT AS THOUGH IT WERE ORIGINALLY
INCLUDED THEREIN.
ISSUED THIS 19th DAY OF FEBRUARY, 2026.
CITY OF ROSEBURG
PUBLIC WORKS DEPARTMENT
900 SE DOUGLAS AVENUE
ROSEBURG, OREGON 97470
(541) 492-6730
Project# 25PW15 Addendum No. 1
This addendum forms a part of the Contract Documents and modifies the original Bidding Documents as noted below. Acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
Appendix:
Add: “Geotechnical Design Report Parrot Creek Culvert Replacements Roseburg
Oregon”, by the Galli Group, 2025, to the Contract Documents.
END OF ADDENDUM NO. 1
Jesten Brenner, P.E.
City of Roseburg Public Works Department Issued February 19, 2026