25106 - Portage Geo and Solar - PLMB Bid Set 25-08-29.pdf
PDF 435 KB Posted
- Attached to
- Town of Portage Town hall renovation
- Solicitation number
- 2130423
- Issued by
- Montgomery County, New York
About this file
This is a plumbing bid set document for the Town of Portage Town Hall Renovation project in Hunt, New York, prepared by Turner Engineering, PC. The project, identified as 25106, involves a comprehensive interior renovation and construction incorporating all new utilities within a net zero energy building design. The plumbing scope encompasses demolition of existing systems, installation of new domestic water and sanitary piping, hot water recirculation systems, and plumbing fixtures including water closets, lavatories, sinks, and floor drains distributed throughout multiple rooms including offices, bathrooms, kitchen, and mechanical spaces. The bid documents include detailed drawings (sheets P-001 through P-201), general notes, legends, specifications, design criteria, floor plans, demolition plans, foundation plans, and plumbing details. The project incorporates a 10-gallon electric water heater (AO Smith EJC-10) with master mixing valve to deliver 110°F domestic hot water, a hot water recirculation pump controlled by aquastat and programmable time clock, and expansion tank. All piping materials are specified, including Schedule 40 PVC for above-grade sanitary and waste piping and copper Type L for domestic water piping, with comprehensive requirements for excavation, bedding, backfill, support systems, fire-stopping, and flashing.
The bid documents establish strict specifications requiring all materials to meet federal, state, and local codes with current licensing and certification from contractors prior to work commencement. All work, materials, and labor are required to be included in the plumbing bid, encompassing excavation, equipment transportation, permits, inspections, taxes, temporary protection, scaffolding, and system operation instruction to owner personnel. Materials must be new, UL-listed or agency-approved, and meet AWWA standards for potable water systems and AGA regulations for gas-fired equipment. The contractor assumes full responsibility for construction safety, site cleanliness, equipment protection during construction, and winterization procedures. Lead-free materials compliant with NSF 61 are mandated for all domestic water system components. Specific valve requirements, insulation specifications (4 lb. density fiberglass), piping support and hanger requirements per 2020 New York Plumbing Code, and comprehensive testing and inspection protocols prior to concealment are detailed. No incumbent contractor information is provided, and no specific pricing terms, set-asides, funding sources, or contract award dates are included in the bid documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL DESCRIPTION
ABBREVIATIONS AND TAGSLINETYPE LEGEND
SYMBOL DESCRIPTION
MV MIXING VALVE
PD PUMP DISCHARGE
ESS EMERGENCY SAFETY SHOWER
BACKFLOW PREVENTERBFP
RPZ REDUCED PRESSURE ZONE
FDC FIRE DEPARTMENT CONNECTION
FIRE PROTECTION CONTRACTORFPC
VTR VENT THROUGH ROOF
AFF ABOVE FINISHED FLOOR
FS FLOOR SINK
WPCO WALL PLATE CLEANOUT
WMF WASHING MACHINE FITTING
TF TRUCK FILL
HR HOSE REEL
ERL EXISTING TO RELOCATE
EXISTING TO REMAINETR
PLUMBING CONTRACTORPC
(E) EXISTING
EC ELECTRICAL CONTRACTOR
GC GENERAL CONTRACTOR
NC NORMALLY CLOSED
NO NORMALLY OPEN
MC MECHANICAL CONTRACTOR
NTS NOT TO SCALE
POINT OF CONNECTION
POINT OF DISCONNECTION
REMOVAL KEYNOTE
INSTALLATION KEYNOTE
EEW EMERGENCY EYEWASH STATION
WH WALL HYDRANT
HB HOSE BIBB
BT BATHTUB
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
DCDA DOUBLE CHECK DETECTOR ASB
LAV LAVATORY
MSS MOP SERVICE SINK
PUMPP
SHR SHOWER
SK SINK
UR URINAL
WC WATER CLOSET
COLD WATER PIPING (C)
PIPING SYMBOLS
SYMBOL DESCRIPTION
* NOTE : THIS IS A STANDARD SYMBOLS LIST AND ALL ITEMS SHOWN MAY NOT BE USED.
RPDA REDUCED PRESSURE DETECTOR ASB
DCVA DOUBLE CHECK VALVE ASB
DPCO DECK PLATE CLEANOUT
CO CLEANOUT
DWH DOMESTIC WATER HEATER
COTG CLEANOUT TO GRADE
HOT WATER RECIRCULATION
PIPING - 140° (HWR 140)
HOT WATER PIPING - 140°
(HWS 140)
SANITARY OR WASTE PIPING
(SAN OR W)
HOT WATER PIPING (H)
HW RECIRCULATION PIPING
(HWR)
STORM PIPING (ST)
IW INDIRECT WASTE PIPING (IW)
DIRECTION OF FLOW
EXISTING PIPING
PIPING TO BE REMOVED
W WATER MAIN (EXTERIOR)
TW
TEMPERED WATER PIPING
(TW)
VENT PIPING (V)
DECK PLATE CLEANOUT (DPCO)
RUNNING TRAP
ROOF DRAIN (RD)
SHOWER HEAD
WH WALL HYDRANT
SA-_ SHOCK ABSORBER (SA)
ROLL DOWN
NEEDLE VALVE
BUTTERFLY VALVE
PLUG VALVE
RELIEF VALVE
REGULATOR
ANGLE VALVE
BALANCE VALVE
DROP CONNECTION
STRAINER
CLEANOUT (CO)
CAP OR PLUG
UNION
P-TRAP
THERMOMETER
PRESSURE GAGE
AQUASTAT
HB HOSE BIBB
FIRE HYDRANT
SHUT OFF VALVE
CHECK VALVE
PRESSURE REGULATING VALVE
TS VALVE WITH TAMPER SWITCH
FS FLOW SWITCH
ELBOW UP, ELBOW DOWN
FLOOR DRAIN (FD)
PUMP
MANUAL AIR VENT
TEE - BOTTOM CONNECTION
TEE - TOP CONNECTION
SPOOL PIECE
REDUCER
GATE VALVE
GLOBE VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
FLEXIBLE CONNECTION
MV
FC
TEMPERATURE SWITCHTS
PRESSURE SWITCHPS
AUTOMATIC AIR VENTAV
NO. PDI SYMBOL
SHOCK ABSORBER SCHEDULE
SIZE IN
INCHES
FIX. UNIT
RATING
F1"155-330SA-F
E1"114-154SA-E
D1"61-113SA-D
C1"33-60SA-C
B1"12-32SA-B
A1-11SA-A 3/4"
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
P-001
PLUMBING GENERAL
NOTES, LEGENDS,
SPECIFICATIONS AND
DESIGN CRITERIA Copy 1
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
PLUMBING GENERAL NOTES
A PLUMBING CONTRACTOR SHALL REQUEST A COMPLETE SET OF BID
DOCUMENTS (DRAWINGS AND SPECIFICATIONS) INCLUDING BUT NOT
LIMITED TO, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL,
CIVIL, FIRE PROTECTION, ETC. FOR BIDDING AND COORDINATION
PURPOSES.
B INCLUDE IN PLUMBING BID ALL LABOR, MATERIALS, TOOLS, PLANT,
TRANSPORTATION, EXCAVATION, EQUIPMENT, INSURANCE, TEMPORARY
PROTECTION, PERMITS, INSPECTIONS, TAXES AND ALL NECESSARY AND
RELATED ITEMS REQUIRED TO PROVIDE COMPLETE AND OPERATIONAL
PLUMBING SYSTEMS SHOWN AND DESCRIBED. PROVIDE ALL
SCAFFOLDING, RIGGING, HOISTING AND SERVICES NECESSARY FOR
ERECTION AND DELIVERY OF EQUIPMENT AND APPARATUS FURNISHED
INTO THE PREMISES. THESE ITEMS SHALL BE REMOVED FROM PREMISES
WHEN NO LONGER REQUIRED.
C REFERENCES TO CODES AND STANDARDS CALLED FOR IN THE
CONTRACT DOCUMENTS MEAN THE LATEST EDITION, AMENDMENT AND
REVISIONS TO THE CODES AND STANDARDS IN EFFECT ON THE DATE OF
THESE CONTRACT DOCUMENTS, UNLESS OTHERWISE NOTED.
D THE DRAWINGS ARE DIAGRAMMATIC. DRAWINGS SHOW APPROXIMATE
LOCATIONS OF EQUIPMENT, AND FIXTURES. COORDINATE ALL PLUMBING
AND SYSTEMS, EQUIPMENT, AND MATERIALS INSTALLATION WITH ALL
OTHER BUILDING COMPONENTS. PLUMBING CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY CHANGES IN OPENINGS AND LOCATIONS
NECESSITATED BY THE EQUIPMENT INSTALLED. THE ARCHITECTURAL
DRAWINGS SHALL INDICATE THE PLACEMENT OF ALL WALL AND CEILING
MOUNTED PLUMBING EQUIPMENT AND DEVICES IN ALL ROOMS WITH THE
EXCEPTION OF MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS. EXACT
LOCATIONS ARE SUBJECT TO THE APPROVAL OF THE ENGINEER AND
OWNER'S REPRESENTATIVE.
E DUE TO SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO
INDICATE ALL OFFSETS, FITTINGS, CHANGES IN ELEVATION, ETC. VERIFY
FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH
THE EQUIPMENT BEING CONNECTED. VERIFY EXACT LOCATION AND
ELEVATIONS AT WORK SITE PRIOR TO ANY ROUGH IN WORK. DO NOT
SCALE PLANS. IF FIELD CONDITIONS, DETAILS, CHANGES IN EQUIPMENT OR
SUBMITTAL INFORMATION REQUIRE A SIGNIFICANT CHANGE TO THE
ORIGINAL DOCUMENTS, CONTACT THE ENGINEER AND OWNER'S
REPRESENTATIVE FOR APPROVAL BEFORE PROCEEDING. COORDINATE
WORK WITH OTHER TRADES AND DETERMINE EXACT ROUTING OF ALL
DUCT, PIPE, CONDUIT, ETC., BEFORE FABRICATION AND INSTALLATION.
ARRANGE FOR ALL CHASES, SLOTS AND OPENINGS IN OTHER BUILDING
COMPONENTS THAT ARE NOT INDICATED ON DRAWINGS, TO ALLOW FOR
PLUMBING INSTALLATIONS. COORDINATE WITH ARCHITECTURAL DRAWINGS.
VERIFY WITH ENGINEER AND OWNER'S REPRESENTATIVE EXACT LOCATION
OF ALL EQUIPMENT IN FINISHED AREAS, SUCH AS THERMOSTATS, FIXTURE
AND SWITCH MOUNTING HEIGHTS, AND EQUIPMENT MOUNTING HEIGHTS.
F PROVIDE ALL NECESSARY PIPING, CONNECTIONS, ACCESSORIES,
SUPPORTS, HANGERS, ANCHORS, WIRING AND CONTROLS FOR COMPLETE
AND FUNCTIONAL INSTALLATION OF ALL THE ITEMS PROVIDED UNDER THIS
CONTRACT.
G PROVIDE ALL REQUIRED EXCAVATION, BACKFILL AND COMPACTION FOR
UNDERGROUND AND UNDERSLAB WORK.
H SLEEVE ALL PENETRATIONS THROUGH OUTSIDE OR FOUNDATION WALLS
WATERTIGHT.
I UNLESS OTHERWISE NOTED, PITCH ALL SANITARY PIPING 2 1/2" AND
SMALLER AT 1/4” PER FOOT AND ALL SANITARY PIPING 3" AND LARGER
AT 1/8" PER FOOT.
J FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER
TO ARCHITECTRUAL DRAWINGS FOR LOCATIONS AND RATING OF ALL
FIRE RATED ASSEMBLIES.
K CEILING HEIGHTS WILL NOT BE ADJUSTED DUE TO LACK OF
COORDINATION BETWEEN TRADES PRIOR TO INSTALLATION.
L FIELD VERIFY EXACT LOCATION, COMPOSITION AND CONDITION OF ALL
SITE PIPING, VALVES AND SYSTEMS AS REQUIRED FOR WORK OF THE
CONTRACT.
M ALL WATER CLOSETS SUPPLY LINES TO BE ROUGHED AT 8" A.F.F. WHERE
6" FLOORING BASE IS USED. WATER CLOSET FLUSH LEVERS SHALL FACE
THE OPEN SIDE OF THE ROOM AT ALL LOCATIONS.
N PROVIDE SUBMITTALS FOR ALL ITEMS SPECIFIED ON THIS DRAWING.
PLUMBING SPECIFICATIONS
1 ALL WORK AND MATERIALS SHALL CONFORM TO AND BE INSTALLED, INSPECTED
AND TESTED IN ACCORDANCE WITH THE GOVERNING RULES AND ALL
REGULATIONS OF FEDERAL, STATE AND LOCAL GOVERNMENTAL AGENCIES.
2 EACH CONTRACTOR SHALL HOLD A LICENSE AND/OR CERTIFICATION TO
PERFORM THE WORK REQUIRED WITHIN THE CONTRACT DOCUMENTS. COPIES OF
CURRENT LICENSE AND/OR CERTIFICATION SHALL BE SUBMITTED TO ENGINEER
AND OWNER’S REPRESENTATIVE FOR APPROVAL PRIOR TO START OF WORK.
3 APPLY AND INSTALL MATERIALS, EQUIPMENT, AND SPECIALTIES IN ACCORDANCE
WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CONFLICTS BETWEEN THE
MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT DOCUMENTS SHALL BE
REFERRED TO THE ENGINEER AND OWNER'S REPRESENTATIVE FOR RESOLUTION.
4 ALL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER. ALL
METHODS OF CONSTRUCTION, DETAILS OF WORKMANSHIP, THAT ARE NOT
SPECIFICALLY DESCRIBED OR INDICATED IN THE CONTRACT DOCUMENTS, SHALL
BE SUBJECT TO THE CONTROL AND APPROVAL OF THE ENGINEER AND OWNER'S
REPRESENTATIVE. EQUIPMENT AND MATERIALS SHALL BE OF THE QUALITY AND
MANUFACTURE INDICATED. THE EQUIPMENT SPECIFIED IS BASED UPON THE
ACCEPTABLE MANUFACTURERS LISTED. WHERE "APPROVED EQUAL" IS STATED,
EQUIPMENT SHALL BE EQUIVALENT IN EVERY WAY TO THE EQUIPMENT SPECIFIED
AND WILL BE ALLOWED SUBJECT TO APPROVAL.
5 MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE
DEVELOPED RATING OF 50 OR LESS, IN ACCORDANCE WITH ASTM E84 AND UL
723. EQUIPMENT SHALL BEAR THE UNDERWRITER'S LABORATORIES (UL), OR OTHER
APPROVED AGENCY-LISTING/LABEL. THIS LISTING REQUIREMENT APPLIES TO THE
ENTIRE ASSEMBLY. ANY MODIFICATIONS TO EQUIPMENT TO SUIT THE INTENT OF THE
SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL
ELECTRIC CODE AND LISTED BY U.L. POTABLE WATER SYSTEMS AND EQUIPMENT
SHALL BE BUILT ACCORDING TO AWWA STANDARDS. GAS-FIRED EQUIPMENT AND
SYSTEM SHALL MEET AGA REGULATIONS AND SHALL HAVE AGA LABEL. ALL
MATERIALS, UNLESS OTHERWISE SPECIFIED, SHALL BE NEW AND BE THE
STANDARD PRODUCTS OF THE MANUFACTURER. USED EQUIPMENT OR DAMAGED
MATERIAL WILL BE REJECTED. CATALOG NUMBERS ARE SOMETIMES LISTED IN
THE SPECIFICATIONS TO AID SELECTION OF THE EQUIPMENT AND ARE FOR
REFERENCE ONLY. ALL EQUIPMENT MUST MEET THE WRITTEN DESCRIPTION OF THE
SPECIFICATION, INCLUDING ALL REQUIRED ACCESSORIES, POWER SUPPLIES,
HARDWARE, ETC., REGARDLESS OF THE LISTED CATALOG NUMBER. ERRORS IN
THE CATALOG NUMBER DO NOT ALLEVIATE THE RESPONSIBILITY OF PROVIDING
THE PROPER EQUIPMENT REQUIRED FOR THE INSTALLATION AND FIELD
CONDITIONS. THE MATERIALS, PRODUCTS AND EQUIPMENT DESCRIBED IN THE
CONTRACT DOCUMENTS ESTABLISH A STANDARD OF QUALITY, FUNCTION,
DIMENSIONS AND APPEARANCE THAT MUST BE MET BY ANY PROPOSED
SUBSTITUTION.
6 EACH CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CONSTRUCTION SAFETY
AT ALL TIMES AND PROVIDE, AS PART OF CONTRACT, ALL TRENCH OR BUILDING
SHORING, SCAFFOLDING, SHIELDING, DUST/FUME PROTECTION,
MECHANICAL/ELECTRICAL PROTECTION, SPECIAL GROUNDING, SAFETY RAILINGS,
BARRIERS, AND OTHER SAFETY FEATURE REQUIRED TO PROVIDE SAFE
CONDITIONS FOR ALL WORKMEN AND SITE VISITORS.
7 IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP CLEAN ALL EQUIPMENT AND
PLUMBING FIXTURES PROVIDED UNDER THIS CONTRACT FOR THE DURATION OF
THE PROJECT. EACH TRADE SHALL KEEP THE PREMISES FREE FROM AN
ACCUMULATION OF WASTE MATERIAL OR RUBBISH CAUSED BY THEIR OPERATIONS.
IN FACILITIES REQUIRING AN ENVIRONMENT OF EXTREME CLEANLINESS, AND IT IS
THE CONTRACTOR'S RESPONSIBILITY TO ADHERE TO THE STRICT REGULATIONS
REGARDING PROCEDURES ON THE EXISTING PREMISES. AFTER ALL TESTS ARE
MADE AND INSTALLATIONS COMPLETED SATISFACTORILY. THOROUGHLY CLEAN
ENTIRE INSTALLATION, BOTH EXPOSED SURFACES AND INTERIORS. REMOVE ALL
DEBRIS CAUSED BY WORK. REMOVE TOOLS, SURPLUS, MATERIALS, WHEN WORK
IS FINALLY ACCEPTED.
8 ALL FINISHED EQUIPMENT SURFACES DAMAGED DURING CONSTRUCTION SHALL BE
BROUGHT TO “AS NEW” CONDITION BY TOUCH UP OR REPAINTING. ANY RUST SHALL
BE REMOVED AND PRIMED PRIOR TO REPAINTING. TAKE ALL NECESSARY
PRECAUTIONS WITH EQUIPMENT, SYSTEMS AND BUILDING TO PREVENT DAMAGE
DUE TO FREEZING AND/OR WATER DAMAGE. REPAIR OR REPLACE, AT NO CHANGE
IN CONTRACT, ANY SUCH DAMAGE TO EQUIPMENT, SYSTEMS AND BUILDING.
PERFORM FIRST SEASONS WINTERIZING IN PRESENCE OF OWNER'S OPERATING
STAFF.
9 ALL PIPING AND FITTINGS USED ON THIS PROJECT SHALL BE NEW AND MARKED
WITH MANUFACTURER'S NAME; AND SHALL COMPLY WITH ALL APPLICABLE ASTM
AND ANSI STANDARDS. ALL PIPING SHALL BE LABELED AND INSULATED AS
NOTED.
10 NO PLUMBING EQUIPMENT SHALL BE HIDDEN OR COVERED UP PRIOR TO
INSPECTION BY THE ENGINEER AND OWNER'S REPRESENTATIVE. ALL WORK THAT IS
DETERMINED TO BE UNSATISFACTORY SHALL BE CORRECTED IMMEDIATELY AT NO
ADDITIONAL COST. CONCEAL ALL CONTRACT WORK ABOVE CEILINGS AND IN
WALLS, BELOW SLABS, AND ELSEWHERE THROUGHOUT BUILDING. IF CONCEALMENT
IS IMPOSSIBLE OR IMPRACTICAL, NOTIFY ENGINEER AND OWNER'S
REPRESENTATIVE BEFORE STARTING THAT PART OF THE WORK AND INSTALL
ONLY AFTER THEIR APPROVAL. IN AREAS WITH NO CEILINGS, INSTALL ONLY
AFTER ENGINEER AND OWNER'S REPRESENTATIVE REVIEWS AND COMMENTS ON
ARRANGEMENT AND APPEARANCE.
11 BEFORE ACCEPTANCE OF THE WORK, FURNISH NECESSARY SKILLED LABOR TO
OPERATE ALL SYSTEMS BY SEASONS. INSTRUCT THE OWNER'S DESIGNATED
PERSONNEL ON THE PROPER OPERATION AND MAINTENANCE OF SYSTEMS AND
EQUIPMENT. OBTAIN WRITTEN ACKNOWLEDGMENT FROM PERSON INSTRUCTED
PRIOR TO ACCEPTANCE REPEAT THE INSTRUCTIONS IF ASKED TO DO SO.
CONTRACTOR IS FULLY RESPONSIBLE FOR SYSTEMS UNTIL ACCEPTANCE, EVEN
THOUGH OPERATED BY OWNER'S PERSONNEL, UNLESS OTHERWISE AGREED IN
WRITING. PROVIDE OPERATING, MAINTENANCE AND STARTING PRECAUTIONS AND
PROCEDURES TO BE FOLLOWED BY THE OWNER FOR OPERATING SYSTEMS AND
EQUIPMENT. MOUNT THE INSTRUCTION IN CLEAR PLASTIC HOLDER ON OR
ADJACENT TO THE EQUIPMENT.
PLUMBING SPECIFICATIONS
12 OPENINGS THROUGH ROOFS SHALL BE FLASHED IN A MANNER NOT TO AFFECT
ROOF GUARANTEE OR BOND. ENGAGE QUALIFIED ROOFING CONTRACTOR
LICENSED BY THE ROOFING MANUFACTURER, AS PART OF CONTRACT. PROVIDE
NON-FERROUS FLASHING PIECES, SKIRTS, HOODS AND COLLARS AS REQUIRED TO
MAKE DUCTS, PIPES, CONDUITS, AND OTHER PENETRATIONS WATERTIGHT. WHERE
CURBS ARE CALLED FOR WITH RESPECT TO RECTANGULAR OPENINGS IN NEW
ROOFS, FLASHING WILL BE DONE BY OTHERS UNLESS SPECIFICALLY INDICATED
OTHERWISE. CAULK AND WATERPROOF WITH ADDITIONAL MATERIAL SO AS TO
SEAL AIRTIGHT AND WATERTIGHT.
13 FIRE-STOPPING FOR OPENINGS THROUGH FIRE AND SMOKE RATED WALL AND
FLOOR ASSEMBLIES: PROVIDE MATERIALS AND PRODUCTS LISTED OR
CLASSIFIED BY AN APPROVED INDEPENDENT TESTING LABORATORY FOR
"THROUGH-PENETRATION FIRE-STOP SYSTEMS." THE SYSTEM SHALL MEET THE
REQUIREMENTS OF "FIRE TESTS OF "THROUGH-PENETRATION FIRE-STOPS"
DESIGNATED ASTM E814. PROVIDE FIRE-STOP SYSTEM SEALS AT ALL LOCATIONS
WHERE PIPING, TUBING, CONDUIT, ELECTRICAL BUSWAYS/CABLES/WIRES,
DUCTWORK AND SIMILAR UTILITIES PASS THROUGH OR PENETRATE FIRE RATED
WALL OR FLOOR ASSEMBLY. PROVIDE FIRE-STOP SEAL BETWEEN SLEEVE AND
WALL FOR DRYWALL CONSTRUCTION. THE MINIMUM REQUIRED FIRE RESISTANCE
RATINGS OF THE WALL OR FLOOR ASSEMBLY SHALL BE MAINTAINED BY THE
FIRE-STOP SYSTEM. THE INSTALLATION SHALL PROVIDE AN AIR AND WATERTIGHT
SEAL. THE METHODS USED SHALL INCORPORATE QUALITIES, WHICH PERMIT THE
EASY REMOVAL OR ADDITION OF ELECTRICAL CONDUITS OR CABLES WITHOUT
DRILLING OR USE OF SPECIAL TOOLS. THE PRODUCT SHALL ADHERE TO ITSELF
TO ALLOW REPAIRS TO BE MADE WITH THE SAME MATERIAL AND PERMIT THE
VIBRATION, EXPANSION AND/OR CONTRACTION OF ANY ITEMS PASSING THROUGH
THE PENETRATION WITHOUT CRACKING, CRUMBLING AND RESULTING REDUCTION IN
FIRE RATING.
14 PROVIDE ALL REQUIRED SUPPORTS, BEAMS, ANGLES, HANGERS, RODS, BASES,
BRACES, AND OTHER ITEMS TO PROPERLY SUPPORT CONTRACT WORK.
SUPPORTS SHALL MEET THE APPROVAL OF THE ENGINEER AND OWNER'S
REPRESENTATIVE. MODIFY STUDS, ADD STUDS, ADD FRAMING, OR OTHERWISE
REINFORCE STUDS IN METAL STUD WALLS AND PARTITIONS AS REQUIRED TO SUIT
CONTRACT WORK. IF NECESSARY, IN STUD WALLS, PROVIDE SPECIAL SUPPORTS
FROM FLOOR TO STRUCTURE ABOVE. FOR PRECAST PANELS/PLANKS AND
METAL DECKS, SUPPORT MECHANICAL/ELECTRICAL WORK AS DETERMINED BY
MANUFACTURER, ENGINEER, AND OWNER'S REPRESENTATIVE. PROVIDE HEAVY
GAUGE STEEL MOUNTING PLATES FOR MOUNTING CONTRACT WORK. MOUNTING
PLATES SHALL SPAN TWO OR MORE STUDS. SIZE, GAUGE, AND STRENGTH OF
MOUNTING PLATES SHALL BE SUFFICIENT FOR EQUIPMENT SIZE, WEIGHT, AND
DESIRED RIGIDITY.
15 PIPING SHALL NOT BE SUPPORTED BY WIRES, BAND IRON, CHAINS, OR FROM
OTHER PIPING OR DUCT WORK, NOR BY VERTICAL EXPANSION BOLTS. SUPPORT
PIPING WITH INDIVIDUAL HANGERS FROM CONCRETE INSERTS, WELDED SUPPORTS,
OR BEAM CLAMPS OF PROPER CONFIGURATION AND LOADING DESIGN
REQUIREMENTS FOR EACH LOCATION; REPLACE IF NOT SUITABLE. FOLLOW
MANUFACTURER'S SAFE LOADING RECOMMENDATIONS. SUSPEND WITH RODS OF
SUFFICIENT LENGTH FOR SWING, USING PROPER DIAMETER ROD FOR PIPE SIZE.
PROVIDE ADDITIONAL STRUCTURAL STEEL MEMBERS, HAVING ONE COAT
RUSTPROOF PAINT, WHERE REQUIRED FOR PROPER SUPPORT. PROVIDE
OVERSIZED HANGERS WHERE INSULATION/SUPPORTS MUST PASS BETWEEN PIPE
AND HANGER. PROVIDE CONTINUOUS SUPPORT OR EXTRA SUPPORTS FOR
PLASTIC PIPE PER MANUFACTURER'S REQUIREMENTS. HANGERS, WHEN ATTACHED
TO JOISTS, SHALL ONLY BE PLACED AT THE TOP OR BOTTOM CHORD PANEL
POINT. ONLY CONCENTRIC TYPE HANGERS ARE PERMISSIBLE; "C" TYPE NOT
PERMITTED ON JOISTS. PROVIDE RISER CLAMPS FOR EACH RISER AT EACH
FLOOR. USE TRAPEZE HANGERS WHERE A GROUP OF PIPING CAN BE INSTALLED.
16 PROVIDE COMPLETE PLUMBING CONNECTIONS TO ALL PLUMBING FIXTURES AND
EQUIPMENT. PROVIDE CONTROL CONNECTIONS TO EQUIPMENT WHERE INDICATED
ON THE DRAWINGS. PROVIDE VALVES ON PIPING AHEAD OF EACH PIECE OF
EQUIPMENT. PROVIDE ALL PIPING, TRIM, ACCESSORIES AND CONNECTIONS AS
REQUIRED FOR PROPER EQUIPMENT OPERATION OF EQUIPMENT PROVIDED BY
THIS CONTRACT, OWNER-FURNISHED EQUIPMENT AND EQUIPMENT FURNISHED BY
OTHER CONTRACTS. REFER TO MANUFACTURER'S DRAWINGS/SPECIFICATIONS
FOR REQUIREMENTS OF SPECIAL EQUIPMENT. VERIFY CONNECTION REQUIREMENTS
BEFORE BIDDING AND CONFIRM PRIOR TO ROUGHING.
17 PROVIDE ALL EXCAVATION AND BACKFILL, ROCK AND DEBRIS REMOVAL AND
RELATED WORK REQUIRED FOR ALL PLUMBING WORK.
18 TRENCH EXCAVATION: BY OPEN CUT, TO PROPER DEPTH AND GRADE NO WIDER
THAN REQUIRED FOR PLACEMENT OF WORK AND NOT MORE THAN 50 FT. IN
ADVANCE OF UTILITY BEING INSTALLED. SHOULD TRENCH BOTTOM BE WET,
UNSTABLE, AND/OR OTHERWISE INCAPABLE OF SUPPORTING THE CONTRACT
WORK, IMMEDIATELY REPORT SAME TO OWNER'S REPRESENTATIVE. SHOULD IT BE
DEEMED UNSUITABLE, EXCAVATE TO DEPTH AS DIRECTED AND BACKFILL WITH
GRAVEL TO TRENCH DEPTH, OR PROVIDE CONCRETE CRADLING. IN ADDITION TO
GOVERNING CODES, PROTECT SIDES OF EXCAVATIONS WITH SHEETING AND
BRACING WHERE NECESSARY TO PREVENT SLIDING OR CAVING OF BANKS AND
TO PROTECT ADJACENT STRUCTURES. REMOVE AS BACKFILL IS PLACED.
PROVIDE AT LOCATIONS ADJACENT TO EXISTING MANHOLES, HYDRANTS, AND
SIMILAR ITEMS.
19 CUSHION AND BEDDING SAND: CLEAN, COARSE, FREE OF ORGANIC MATTER,
CONFORMING TO NEW YORK SATE DOT ITEM NO. 703-06. CRUSHED STONE:
CRUSHED STONE, GRADED, FREE OF ORGANIC MATERIALS, NO. 1 TO NO. 4 SIZE.
CONFORMING TO NEW YORK STATE DOT ITEM NO. 703-0201. GRAVEL FILL:
WELL-GRADED NATURAL INORGANIC SAND AND GRAVEL CONFORMING TO NEW
YORK STATE DOT ITEM NO. 703-0202.
20 BEDDING: PROVIDE AROUND ALL PIPING WITH COARSE SAND FROM 6 IN. BELOW
TO 8 IN. ABOVE. APPLY BY HAND AND COMPACT UNDER AND AT SIDES BY
MECHANICAL MEANS. PIPING, JACKETS AND SAND BED MUST BE INSPECTED AND
TESTED PRIOR TO BACKFILL OF ANY NATURE. PROVIDE NECESSARY ANCHORS,
THRUST BLOCKS, FOR TESTING. FILL REMAINDER OF TRENCH IN 12 IN. LAYERS,
USE ORDINARY FILL MATERIAL, EXCEPT AS OTHERWISE SPECIFIED. DO NOT USE
FROZEN MATERIAL. REMOVE BOULDERS, STONES, BROKEN ROCK, WOOD, BRICKS,
BLOCKS, AND DEBRIS FROM FILL MATERIAL BEFORE BACKFILL OPERATION.
PROVIDE FINAL COMPACTION FOR ALL TRENCHES BY MECHANICAL MEANS. USE
MECHANICAL TAMPING MACHINERY.
PLUMBING SPECIFICATIONS
21 ORDINARY FILL: WELL-GRADED, NATURAL SOIL, MEETING THE FOLLOWING
REQUIREMENTS. FREE OF ORGANIC AND OTHER COMPRESSIBLE MATERIALS,
DEBRIS AND FROZEN MATERIALS, AND OF STONES LARGER THAN 4 IN. MAXIMUM
DIMENSION. BE OF SUCH NATURE AND CHARACTER THAT IT CAN BE COMPACTED
TO THE SPECIFIED DENSITIES. FREE OF ANY CLAY, HIGHLY PLASTIC CLAYS, OF
MATERIALS SUBJECT TO DECAY, DECOMPOSITION, OR DISSOLUTION, AND OF
CINDERS, ASH AND OTHER CORROSIVE MATERIALS. FREE OF WOOD, STUMPS,
ROOTS, ETC. MAXIMUM DRY DENSITY OF NOT LESS THAN 115 LBS. PER CU. FT.
MATERIAL FROM EXCAVATION ON THE SITE MAY BE USED AS ORDINARY FILL IF IT
MEETS THE ABOVE REQUIREMENTS.
22 BUILD LINES TO GRADE AND ELEVATIONS SHOWN. PROVIDE STAKES, GRADE
BOARDS, CLEATS, NAILS, INSTRUMENTS. LOCATE AND STAKE EACH NEW RUN FOR
ITS ENTIRE LENGTH. VERIFY ELEVATIONS GIVEN. START EACH EXCAVATION AT
LOW POINT. NOTIFY ENGINEER OF ELEVATION DISCREPANCIES. PROTECT MARKS
AND STATIONS. BEFORE STARTING EXCAVATING WORK, COORDINATE WITH
OWNER'S SITE REPRESENTATIVE AND FURNISH SCHEDULE OF OPERATIONS TO
OWNER. REMOVE MATERIALS INCLUDING MASONRY WORK, RUBBLE, EARTH,
BRICKWORK, CONCRETE, SAND, DEBRIS, ABANDONED PIPE LINES, DRAINS AND
SEWERS, ROCKS, BOULDERS, AND CONCRETE, ALL OF WHICH IS CONSIDERED
"EARTH EXCAVATION." PROVIDE FOR LEGAL DISPOSITION OF EXCESS
EXCAVATED MATERIALS. MAKE ALLOWANCE FOR GRAVEL FILL, SAND BASES,
THRUST BLOCKS, SHEET PIPING, DRAINAGE PUMPS, AND WORK SPACE. START
EXCAVATION AT ROUGH GRADE AND PROVIDE FORM WORK AND SHEET PILING
WHERE REQUIRED.
23 UNDER SLABS: BACKFILL IN 6 INCH LAYERS WITH GRAVEL OR CRUSHED STONE,
FREE FROM ORGANIC OR OTHER UNSUITABLE MATERIAL, TO GRADE.
THOROUGHLY COMPACT EACH LAYER. PROVIDE FINAL COMPACTION FOR ALL
TRENCHES BY MECHANICAL MEANS. USE MECHANICAL TAMPING MACHINERY.
24 ABOVE GRADE SANITARY, WASTE AND VENT PIPING - SCHEDULE 40 PVC.
EXCEPTION: PVC NOT ALLOWED IN PLENUM RETURN SPACES ABOVE CEILINGS. USE
DWV COPPER OR NO HUB SERVICE WEIGHT CAST IRON IN THESE LOCATIONS.
BELOW GRADE SANITARY, WASTE, AND VENT PIPING – SCHEDULE 40 PVC OR
SERVICE WEIGHT, HUB, AND SPIGOT CAST IRON FOR SANITARY AND WASTE PIPING;
NO HUB SERVICE WEIGHT CAST IRON FOR VENT PIPING.
25 NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL, WELDED
CONNECTIONS AND FITTINGS FOR PIPE SIZES 2-1/2" AND LARGER, THREADED AND
SCREWED FITTINGS FOR PIPE SIZES 2'' AND SMALLER (USE TEFLON TAPE FOR ALL
THREADED CONNECTIONS). PROVIDE ALL NATURAL GAS SYSTEMS IN COMPLIANCE
WITH THE FUEL GAS CODE OF NEW YORK STATE AND NATIONAL FUEL
REQUIREMENTS.
26 ACCURATELY ESTABLISH GRADE AND ELEVATION OF PIPING BEFORE SETTING
SLEEVES. INSTALL PIPING WITHOUT SPRINGING OR FORCING (EXCEPT WHERE
SPECIFICALLY CALLED FOR), MAKING PROPER ALLOWANCE FOR EXPANSION AND
ANCHORING. ARRANGE PIPING AT EQUIPMENT WITH NECESSARY OFFSETS, UNIONS,
FLANGES, AND VALVES, TO ALLOW FOR EASY PART REMOVAL AND
MAINTENANCE. OFFSET PIPING AND CHANGE ELEVATION AS REQUIRED TO
COORDINATE WITH OTHER WORK. AVOID CONTACT WITH OTHER MECHANICAL OR
ELECTRICAL SYSTEMS. PROVIDE ADEQUATE MEANS OF DRAINING AND VENTING
UNITS, RISERS, CIRCUITS AND SYSTEMS. CONCEAL PIPING UNLESS OTHERWISE
CALLED FOR. REAM PIPES AFTER CUTTING AND CLEAN BEFORE INSTALLING. CAP
OR PLUG EQUIPMENT AND PIPE OPENINGS DURING CONSTRUCTION. INSTALL
PIPING PARALLEL WITH LINES OF BUILDING, PROPERLY SPACED TO PROVIDE
CLEARANCE FOR INSULATION. MAKE CHANGES IN DIRECTION AND BRANCH
CONNECTIONS WITH FITTINGS. DO NOT INSTALL VALVES, UNIONS AND FLANGES IN
INACCESSIBLE LOCATIONS. MATERIALS WITHIN A SYSTEM AND BETWEEN SYSTEMS
SHALL BE CONSISTENT. IF THIS IS NOT POSSIBLE, INSTALL DIELECTRIC FITTINGS.
27 PROVIDE ALL HANGERS AND SUPPORTS FOR PIPING IN ACCORDANCE WITH THE
2020 PLUMBING CODE OF NEW YORK STATE, UNLESS NOTED OTHERWISE.
28 PROVIDE PIPE SHIELDS ON ALL INSULATED PIPING BETWEEN INSULATION AND EACH
HANGER. MAKE: MICHIGAN, B-LINE OR APPROVED EQUAL.
29 PROVIDE POLISHED CHROME METAL ESCUTCHEON PLATES FOR ALL PIPING UNDER
EACH PLUMBING FIXTURE AT WALL, AND ALL EXPOSED PIPING PASSING THROUGH
FLOORS, WALLS OR CEILINGS, IN ALL ROOMS EXCEPT IN BOILER, FAN AND
MECHANICAL ROOMS.
30 VALVES SHALL HAVE FOLLOWING REQUIREMENTS: WORKING PRESSURE STAMPED
OR CAST ON BODIES PER MSS SP-25. STEM PACKING SERVICEABLE WITHOUT
REMOVING VALVE FROM LINE AND SHALL BE FREE OF ASBESTOS. CHECK
VALVES: HORIZONTAL TYPE, BRONZE, SWING CHECK, 125 PSI SWP, 200 PSI WOG.
SCREWED ENDS, WATTS CV. SOLDER ENDS, WATTS CVS. BACKWATER TYPE WHERE
CALLED FOR. BALL VALVES: BRASS BODY, TWO PIECE, 600 PSI (WOG) FULL
PORT, WATTS LFFBV, LFB6081G2 (SCREWED OR SOLDERED). NATURAL GAS
VALVES: BRONZE BODY, SCREWED ENDS, AGA APPROVED AND UL LISTED.
MILWAUKEE BB2-100. ALL VALVES LOCATED WITHIN THE DOMESTIC WATER
SYSTEM SHALL BE "LEAD FREE" IN COMPLIANCE WITH NSF 61.
31 PROVIDE 4 LB. DENSITY FIBERGLASS INSULATION WITH A CONDUCTIVITY NOT
EXCEEDING .27 BTU X IN / H X SQ FT X °F AND AN ALL SERVICE JACKET ON ALL
DOMESTIC WATER PIPING. PROVIDE VAPOR BARRIER ON ALL DOMESTIC COLD
WATER PIPING. DOMESTIC COLD PIPING LESS THAN 1-1/2” IN DIAMETER SHALL BE
PROVIDED WITH 1/2'' THICK INSULATION AND ALL OTHER DOMESTIC COLD PIPING
SHALL BE PROVIDED WITH 1” THICK INSULATION. ALL DOMESTIC HOT AND
RECIRCULATION WATER PIPING LESS THAN 1-1/2” IN DIAMETER SHALL BE
PROVIDED WITH 1'' THICK INSULATION AND ALL OTHER DOMESTIC HOT AND
RECIRCULATION PIPING SHALL BE PROVIDED WITH 1-1/2” THICK INSULATION.
PROVIDE SHIELDS AND HANGERS/SUPPORTS ON OUTSIDE OF ALL INSULATION.
32 LABEL ALL PLUMBING PIPING ON PROJECT WITH ACRYLIC WRAP-AROUND LABELS
WITH FLOW ARROWS. LABEL PIPING EVERY 20'-0'' O.C. AND ON BOTH SIDES OF
WALL AND FLOOR PENETRATIONS.
33 DOMESTIC WATER PIPING: PIPE - TYPE L COPPER. TEES, ELBOWS, REDUCERS:
CAST BRONZE ASTM B62, ANSI B16.22. UNIONS AND FLANGES: UNIONS FOR 2 IN.
AND SMALLER. BRAZED TYPE CAST BRONZE GROUND JOINT, 150 LB. SWP
FLANGE FOR 2-1/2 IN. AND LARGER, BRAZED TYPE, CAST BRONZE, COMPANION
TYPE, GASKETED AND BOLTED, ASME DRILLED 150 LB. SWP. SOLDER MATERIALS:
NO-LEAD SOLDER, USING ALLOYS MADE FROM TIN, COPPER, SILVER AND NICKEL.
MAKE: HARRIS "STAY-SAFE 50" AND "BRIGHT", ENGLEHART "SILVERBRIGHT 100",
WILLARD INDUSTRIES "SOLDER SAFE (SILVER BEARING), CANFIELD "WATERSAFE".
ALL FITTINGS LOCATED WITHIN THE DOMESTIC WATER SYSTEM SHALL BE "LEAD
FREE" IN COMPLIANCE WITH NSF 61.
PLUMBING FIXTURE SCHEDULE
TAG ITEM WASTE VENT CW HW FITTINGS/ACCESSORIES ITEM DESCRIPTION DESIGN EQUIPMENT
WC-A WATER CLOSET - FLOOR MOUNT 3" 2" 1" NA -- FLOOR MOUNT TANK TOILET FIXTURE, VITREOUS CHINA, ADA COMPLIANT, 1.28 GPF AMERICAN STANDARD CADET 215AA.104
LAV-A LAV - WALL HUNG 1 1/2" 1 1/2" 1/2" 1/2" CHICAGO MODEL 895-317FCABCP WALL HUNG; VITREOUS CHINA; ADA COMPLIANT; 0.5 GPM SLOAN SS-3003 SERIES 4" CENTERSET
SK-A SINK - BREAK ROOM 1 1/2" 1 1/2" 1/2" 1/2" CHICAGO MODEL 895-317FCABCP 18 GA, 304 SS, DROP-IN; ADA COMPLIANT; 4" CENTERS; 1.5 GPM ELKAY MODEL LRADQ222255
FD-A FLOOR DRAIN 3" SEE
PLANS
NA NA JAY R SMITH 2692 TRAP GUARD JAY R SMITH 2005YA
DCPO DECK PLATE CLEANOUT SEE
PLANS
NA NA NA -- JAY R SMITH 4023
WPCO WALL PLATE CLEANOUT SEE
PLANS
NA NA NA -- JAY R SMITH 4422C-U-PC
PLUMBING ELECTRIC WATER HEATER SCHEDULE
TAG LOCATION
CAPACITY
(GAL)
RECOVERY
(GPH)
TEMP RISE
(°F)
POWER
DESIGN EQUIPMENT NOTESKW VOLT PHASE
HW-1 MECH RM 10 9 100 1.65 120 1 AO SMITH EJC-10 1, 2, 3, 4
PLUMBING EXPANSION TANK SCHEDULE
TAG LOCATION SERVICE
CAPACITY
(GAL)
DIAMETER
(IN)
HEIGHT
(IN) DESIGN EQUIPMENT NOTES
PET-1 MECH ROOM HW 2.1 8 11 WATTS - PLT-5 1
PLUMBING PUMP SCHEDULE
TAG LOCATION SERVICE GPM
HEAD FT
WATER
MOTOR
PUMP TYPE DESIGN EQUIPMENT NOTESHP VOLT PHASE RPM
HWRP-1 MECH ROOM HWR .5 10 1/6 115 1 3600 IN-LINE WATTS E3-6F/BSPRZ
60A0B3004 1, 2
SEQUENCE OF OPERATIONS - DOMESTIC HOT WATER PLANT
THE DOMESTIC WATER HEATER HW-1, SHALL BE SET AT A 140° STORAGE
TEMPERATURE.
140°F DOMESTIC HOT WATER SHALL MIX WITH DOMESTIC COLD WATER VIA THE
MASTER MIXING VALVE IN ORDER TO OBTAIN A 110°F DOMESTIC HOW WATER
LOOP TO SERVE THE BUILDING.
THE DOMESTIC HOT WATER RECIRCULATION PUMP SHALL BE CONTROLLED BY AN
AQUASTAT AND 7-DAY PROGRAMMABLE TIME CLOCK. THE TIME CLOCK SHALL
ALLOW THE PUMP TO TURN ON DURING THE BUILDING’S OCCUPIED HOURS.
COORDINATE OCCUPIED HOURS WITH OWNER’S REPRESENTATIVE. DURING
OCCUPIED HOURS, THE AQUASTAT SHALL TURN THE RECIRCULATION PUMP ON
WHEN THE LOOP IS DOWN TO 100°F (ADJ.) AND SHALL TURN ON THE PUMP OFF
WHEN THE LOOP IS UP TO 110°F (ADJ.).
NOTES:
1. EXPANSION TANK SHALL BE PRE-CHARGED TO STATIC PRESSURE OF BUILDINGS WATER SERIVE.
NOTES:
1. WATER HEATER SHALL HAVE ADJUSTABLE TEMPERATURE CONTROLS.
2. PROVIDE EVERBILT 24” IN PLASTIC DRAIN PAIN (MODEL #15021).
3. WALL MOUNTED EQUIPMENT PLATFORM - INSTALL AT 6'-0" AFF.
4. PROVIDE HEAT TRAPS.
NOTES:
1. PROVIDE AQUASTAT PER 2020 ENERGY CONSERVATION CODE OF NEW YORK STATE.
2. AUTOMATIC TIME SWITCHES SHALL BE INSTALLED PER THE 2020 ENERGY CONSERVATION CODE OF NEW YORK
TOWN CLERK
TO REMAIN
VAULT
TO REMAIN
HALL
BATH ROOM
KITCHEN
JUDGE'S
OFFICE
MEETING
ROOM
EXISTING HIGHWAY SHOP EXISTING OFFICE AREAEXISTING BAY HIGHWAY SHOP AREA
HW REF SINK
ST
PT
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
P-100
FLOOR PLAN - PLUMBING
DEMOLITION
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
N O
R T
H
1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - PLUMBING
P-100 PLUMBING DEMOLITION NOTES
1 DISCONNECT (E) G PIPING FROM (E) HVAC EQUIPMENT. REMOVE ALL (E) G PIPING BACK TO
MAIN AND CAP. REMOVE HANGERS AND ACCESSORIES IN TOTAL.
2 DISCONNECT AND REMOVE (E) HW. REMOVE (E) G PIPING BACK TO MAIN AND CAP. REMOVE
ALL H&C WATER PIPING, REMOVE HANGERS AND ACCESSORIES IN TOTAL. REMOVE (E) C MAIN
COMING INTO THE BUILDING AND CAP.
3 DISCONNECT AND REMOVE (E) SINK/LAV. REMOVE H&C AND VENT LINES BACK TO MAINS AND
CAP. REMOVE HANGERS AND ACCESSORIES IN TOTAL. REMOVE SAN PIPING TO BELOW
FLOOR AND CAP. PLUMBING CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR CUTTING AND PATCHING OF EXISTING SLAB. PATCH SHALL BE SMOOTH AND
LEVEL TO ACCEPT NEW FLOORING.
4 DISCONNECT AND REMOVE (E) PLUMBING FIXTURES IN (E) TOILET ROOM. REMOVE H&C AND
VENT LINES BACK TO SOURCE AND CAP, REMOVE HANGERS AND ACCESSORIES IN TOTAL.
REMOVE SAN PIPING TO BELOW FLOOR AND CAP. PLUMBING CONTRACTOR SHALL
COORDINATE WITH GENERAL CONTRACTOR CUTTING AND PATCHING OF EXISTING SLAB.
PATCH SHALL BE SMOOTH AND LEVEL TO ACCEPT NEW FLOORING.
5 (E) GAS METER IS ETR.
(E)SAN
4"SAN4"4"SAN4"3"SAN3"
3"SAN3"
3"SAN3"
4"SAN4"
3"SAN3"
3"SAN3"
3"SAN3"
4"SAN4"
(E)SAN
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
P-101
FOUNDATION FLOOR
PLAN - PLUMBING
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
N O
R T
H
1/4" = 1'-0"
FOUNDATION FLOOR PLAN - PLUMBING
P-101 PLUMBING DRAWING NOTES
1 PROVIDE 2” SAN UP FOR BACK-TO-BACK LAV-A. TRANSITION TO 3" SAN ON
HORIZONTAL RUN.
2 PROVIDE 3” SAN WITH P-TRAP UP TO FD-A.
3 PROVIDE 4” SAN UP FOR WC-A.
4 PROVIDE 3” SAN UP FOR DPCO.
5 PROVIDE 2” V UP.
6 PROVIDE 1 1/2” SAN UP TO SK-A. TRANSITION TO 3" SAN ON HORIZONTAL.
7 CONNECT (N) SAN TO (E) SAN MAIN.
EXISTING HIGHWAY SHOP PROPOSED OFFICE AREA EXISTING OFFICE AREA
REF
JUDGE
HALL
TLT.TLT.
MECH
KITCHEN
HIGHWAY
SUPERINTENDENT
HALL
VAULT
TOWN
CLERK
MEETING
ROOM
CODE
INSPECTOR
TOWN
SUPERVISOR
SK-A
FD-A
WC-A WC-A
LAV-ALAV-A
FD-A
FD-A
DPCO
HP-3
HP-1
HP-2
CO
CO 1"IW1"
1 1/2"IW1 1/2"
1 1/2"IW1 1/2"
1"IW1"
1 1/2"IW1 1/2"
P-102
ETR GAS METER
2"G2"
2"V2"
2"V2"
MECH
CO CO
FD-A
FD-A HW-1
HWR-1
MMV-1
1/2"C1/2"
1 1/2"V1 1/2"
1/2"H1/2"
1 1/2"IW1 1/2"
1/2"H1/2"
1/2"HWR1/2"
3/4"H3/4" 3/4"C3/4"
1/2"HWR1/2"
2"V2"
3/4"C3/4"
2"V2"
1 1/2"IW1 1/2"
2"V2"
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
P-102
FLOOR PLAN - PLUMBING
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
N O
R T
H
1/4" = 1'-0"
FIRST FLOOR PLAN - PLUMBING
1/2" = 1'-0"
ENLARGED MECH RM 6 - PLUMBING
P-102 PLUMBING DRAWING NOTES
1 PROVIDE 1/2” H&C, 1/2" HWR DOWN, 2” V UP, 2” SAN DOWN FOR BACK TO BACK LAV-A’S.
CONNECT 1/2" HWR WITHIN 18” OF WALL PENETRATION AT FIXTURE ISOLATION VAVLE.
PROVIDE LAV WITH TRAP WRAPS AS REQUIRED BY ADA COMPLIANCES.
2 PROVIDE 1” C DOWN AND 2” V UP FOR BACK-TO-BACK WC-A.
3 PROVIDE 1/2” H&C, 1 1/2” SAN DOWN, 1 1/2” V UP FOR SK-A. 1/2” H RUN OUT SHALL NOT
EXCEED 43 FEET IN LENGTH BETWEEN FIXTURE ISOLATION VALVE AND TEE FITTING OFF
DOMESTIC HOT WATER MAIN.
4 CONNECT 1" IW TO HVAC EQUIPMENT. COORDINATE WITH HVAC CONTRACTOR
5 REFER TO DETAILS #1 AND #2 ON DRAWING P-201 FOR HOT WATER PLANT.
6 PROVIDE 2" V UP AND 3" VTR.
7 PROVIDE 1 1/2" V UP.
8 PROVIDE 1 1/2” IW DOWN FROM HVAC EQUIPMENT TO FD WITH FUNNEL. TERMINATE IW WITH
4” AIR GAP AT FD-A.
10 NEW WATER LINE FROM EXISTING WELL ON PROPERTY. PROVIDE 1 1/2" C UP FROM
BELOW SLAB.
WALL MOUNTED
EQUIPMENT
PLATFORM,INSTALL
AT 6'-0" AFF.
UNION (TYP.)
THERMOMETER (TYP.)
DOMESTIC
WATER
HEATER
1"
1"
SHUT-OFF VALVE (TYP.)
T & P RELIEF VALVE,
PIPE TO MSS-A
PROVIDE DI-ELECTRIC FITTING
AT TANK INLET AND OUTLET AND
AT ALL HEATER CONNECTIONS
ELECTRIC WATER HEATER DETAIL
ELECTRICAL CONTRACTOR TO
PROVIDE WIRING AS REQUIRED
FD-A FINISHED FLOOR
WALL BRACKET
DRAIN PAN
EXPANSION TANK
1" C SUPPLY
1" C & H TO
MASTER MIXING
VALVE
DRAIN VALVE
AQUASTAT (TYP.)
SPRING CHECK VALVE
(TYP.)1/2" HWR
BALANCING VALVE
SET AT 0.5 GPM
(TYP.)
STRAINER WITH
BLOWDOWN VALVE
(TYP.)
HWRP-1
NOTES:
1. PROVIDE UNIONS ON ALL THREE CONNECTIONS TO MIXING VALVE.
THERMOMETER (TYP.)
SPRING LOADED
CHECK VALVE (TYP.)
BALL VALVE (TYP.)
3/4" - 110°F H TO BLDG. FIXTURES
3/4" C3/4" - 140°F H
FROM HEATER
TO MASTER
MIXING VALVE
MIXING VALVE POWERS
LFSH1432 (BASIS OF
DESIGN)
24" DEEP SEAL HEAT TRAP
STRAINER (TYP.)
MASTER MIXING VALVE DETAIL
1/2" HWR
3" SAN
HOT WATER RECIRCULATION BALANCE VALVE
BALL VALVE
CHECK VALVE
FLOW
SIZE AS NOTED
ON FLOOR PLANS
NOTES:
BALANCE VALVE
1. LOCATE THE VALVE 5 PIPE DIAMETERS DOWNSTREAM FROM A FITTING.
2. IF A BALANCING VALVE IS LOCATED DOWNSTREAM FROM A CIRCULATION PUMP, ALLOW
A DISTANCE OF 10 PIPE DIAMETERS BETWEEN THE PUMP AND BALANCING VALVES.
3. FOR VALVE SIZING, REFER TO MANUFACTURER'S RANGE CHART, WHICH SHOWS THE
RECOMMENDED OPERATION RANGE FOR EACH VALVE SIZE.
4. ALL VALVES SHALL BE FURNISHED WITH PROBE METERING PORTS.
5. INSTALL VALVE SUCH THAT PORTS DO NOT FACE DOWN.
6. PROVIDE THIS ARRANGEMENT ON ALL HOT WATER RECIRCULATION BRANCHES AND
WHERE NOTED ON PLANS.
P-TRAP
(SIZE PER PLANS)
FLOOR DRAIN DETAIL WITH TRAP GUARD
FLOOR DRAIN
TO
SANITARY
SET TOP OF GRATE FLUSH
WITH FIN. FLOOR
DRAIN, GRATE AND
BODY AS INDICATED
IN SPECIFICATIONS
CONCRETE FLOOR SLAB
AND FLOOR FINISH
BY OTHERS (SLOPED TO
DRAIN).
TRAP GUARD
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
P-201
PLUMBING DETAILS AND
SCHEDULES
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
NOT TO SCALE
PLUMBING WATER HEATER & MIXING VALVE
NOT TO SCALE
PLUMBING HWR BALANCE VALVE
1/8" = 1'-0"
PLUMBING SAN CLEAN OUTS / DRAIN
| Sheets |
| P-001 - PLUMBING GENERAL NOTES, LEGENDS, SPECIFICATIONS AND DESIGN CRITERIA Copy 1 |
| P-100 - FLOOR PLAN - PLUMBING DEMOLITION |
| P-101 - FOUNDATION FLOOR PLAN - PLUMBING |
| P-102 - FLOOR PLAN - PLUMBING |
| P-201 - PLUMBING DETAILS AND SCHEDULES |
File details come from the government source that posted it. Updated .