25106 - Portage Geo and Solar - PLMB Bid Set 25-08-29.pdf

PDF 435 KB Posted

Attached to
Town of Portage Town hall renovation
Solicitation number
2130423
Issued by
Montgomery County, New York

About this file

This is a plumbing bid set document for the Town of Portage Town Hall Renovation project in Hunt, New York, prepared by Turner Engineering, PC. The project, identified as 25106, involves a comprehensive interior renovation and construction incorporating all new utilities within a net zero energy building design. The plumbing scope encompasses demolition of existing systems, installation of new domestic water and sanitary piping, hot water recirculation systems, and plumbing fixtures including water closets, lavatories, sinks, and floor drains distributed throughout multiple rooms including offices, bathrooms, kitchen, and mechanical spaces. The bid documents include detailed drawings (sheets P-001 through P-201), general notes, legends, specifications, design criteria, floor plans, demolition plans, foundation plans, and plumbing details. The project incorporates a 10-gallon electric water heater (AO Smith EJC-10) with master mixing valve to deliver 110°F domestic hot water, a hot water recirculation pump controlled by aquastat and programmable time clock, and expansion tank. All piping materials are specified, including Schedule 40 PVC for above-grade sanitary and waste piping and copper Type L for domestic water piping, with comprehensive requirements for excavation, bedding, backfill, support systems, fire-stopping, and flashing.

The bid documents establish strict specifications requiring all materials to meet federal, state, and local codes with current licensing and certification from contractors prior to work commencement. All work, materials, and labor are required to be included in the plumbing bid, encompassing excavation, equipment transportation, permits, inspections, taxes, temporary protection, scaffolding, and system operation instruction to owner personnel. Materials must be new, UL-listed or agency-approved, and meet AWWA standards for potable water systems and AGA regulations for gas-fired equipment. The contractor assumes full responsibility for construction safety, site cleanliness, equipment protection during construction, and winterization procedures. Lead-free materials compliant with NSF 61 are mandated for all domestic water system components. Specific valve requirements, insulation specifications (4 lb. density fiberglass), piping support and hanger requirements per 2020 New York Plumbing Code, and comprehensive testing and inspection protocols prior to concealment are detailed. No incumbent contractor information is provided, and no specific pricing terms, set-asides, funding sources, or contract award dates are included in the bid documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL DESCRIPTION

ABBREVIATIONS AND TAGSLINETYPE LEGEND

SYMBOL DESCRIPTION

MV MIXING VALVE

PD PUMP DISCHARGE

ESS EMERGENCY SAFETY SHOWER

BACKFLOW PREVENTERBFP

RPZ REDUCED PRESSURE ZONE

FDC FIRE DEPARTMENT CONNECTION

FIRE PROTECTION CONTRACTORFPC

VTR VENT THROUGH ROOF

AFF ABOVE FINISHED FLOOR

FS FLOOR SINK

WPCO WALL PLATE CLEANOUT

WMF WASHING MACHINE FITTING

TF TRUCK FILL

HR HOSE REEL

ERL EXISTING TO RELOCATE

EXISTING TO REMAINETR

PLUMBING CONTRACTORPC

(E) EXISTING

EC ELECTRICAL CONTRACTOR

GC GENERAL CONTRACTOR

NC NORMALLY CLOSED

NO NORMALLY OPEN

MC MECHANICAL CONTRACTOR

NTS NOT TO SCALE

POINT OF CONNECTION

POINT OF DISCONNECTION

REMOVAL KEYNOTE

INSTALLATION KEYNOTE

EEW EMERGENCY EYEWASH STATION

WH WALL HYDRANT

HB HOSE BIBB

BT BATHTUB

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

DCDA DOUBLE CHECK DETECTOR ASB

LAV LAVATORY

MSS MOP SERVICE SINK

PUMPP

SHR SHOWER

SK SINK

UR URINAL

WC WATER CLOSET

COLD WATER PIPING (C)

PIPING SYMBOLS

SYMBOL DESCRIPTION

* NOTE : THIS IS A STANDARD SYMBOLS LIST AND ALL ITEMS SHOWN MAY NOT BE USED.

RPDA REDUCED PRESSURE DETECTOR ASB

DCVA DOUBLE CHECK VALVE ASB

DPCO DECK PLATE CLEANOUT

CO CLEANOUT

DWH DOMESTIC WATER HEATER

COTG CLEANOUT TO GRADE

HOT WATER RECIRCULATION

PIPING - 140° (HWR 140)

HOT WATER PIPING - 140°

(HWS 140)

SANITARY OR WASTE PIPING

(SAN OR W)

HOT WATER PIPING (H)

HW RECIRCULATION PIPING

(HWR)

STORM PIPING (ST)

IW INDIRECT WASTE PIPING (IW)

DIRECTION OF FLOW

EXISTING PIPING

PIPING TO BE REMOVED

W WATER MAIN (EXTERIOR)

TW

TEMPERED WATER PIPING

(TW)

VENT PIPING (V)

DECK PLATE CLEANOUT (DPCO)

RUNNING TRAP

ROOF DRAIN (RD)

SHOWER HEAD

WH WALL HYDRANT

SA-_ SHOCK ABSORBER (SA)

ROLL DOWN

NEEDLE VALVE

BUTTERFLY VALVE

PLUG VALVE

RELIEF VALVE

REGULATOR

ANGLE VALVE

BALANCE VALVE

DROP CONNECTION

STRAINER

CLEANOUT (CO)

CAP OR PLUG

UNION

P-TRAP

THERMOMETER

PRESSURE GAGE

AQUASTAT

HB HOSE BIBB

FIRE HYDRANT

SHUT OFF VALVE

CHECK VALVE

PRESSURE REGULATING VALVE

TS VALVE WITH TAMPER SWITCH

FS FLOW SWITCH

ELBOW UP, ELBOW DOWN

FLOOR DRAIN (FD)

PUMP

MANUAL AIR VENT

TEE - BOTTOM CONNECTION

TEE - TOP CONNECTION

SPOOL PIECE

REDUCER

GATE VALVE

GLOBE VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

FLEXIBLE CONNECTION

MV

FC

TEMPERATURE SWITCHTS

PRESSURE SWITCHPS

AUTOMATIC AIR VENTAV

NO. PDI SYMBOL

SHOCK ABSORBER SCHEDULE

SIZE IN

INCHES

FIX. UNIT

RATING

F1"155-330SA-F

E1"114-154SA-E

D1"61-113SA-D

C1"33-60SA-C

B1"12-32SA-B

A1-11SA-A 3/4"

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

P-001

PLUMBING GENERAL

NOTES, LEGENDS,

SPECIFICATIONS AND

DESIGN CRITERIA Copy 1

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

PLUMBING GENERAL NOTES

A PLUMBING CONTRACTOR SHALL REQUEST A COMPLETE SET OF BID

DOCUMENTS (DRAWINGS AND SPECIFICATIONS) INCLUDING BUT NOT

LIMITED TO, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL,

CIVIL, FIRE PROTECTION, ETC. FOR BIDDING AND COORDINATION

PURPOSES.

B INCLUDE IN PLUMBING BID ALL LABOR, MATERIALS, TOOLS, PLANT,

TRANSPORTATION, EXCAVATION, EQUIPMENT, INSURANCE, TEMPORARY

PROTECTION, PERMITS, INSPECTIONS, TAXES AND ALL NECESSARY AND

RELATED ITEMS REQUIRED TO PROVIDE COMPLETE AND OPERATIONAL

PLUMBING SYSTEMS SHOWN AND DESCRIBED. PROVIDE ALL

SCAFFOLDING, RIGGING, HOISTING AND SERVICES NECESSARY FOR

ERECTION AND DELIVERY OF EQUIPMENT AND APPARATUS FURNISHED

INTO THE PREMISES. THESE ITEMS SHALL BE REMOVED FROM PREMISES

WHEN NO LONGER REQUIRED.

C REFERENCES TO CODES AND STANDARDS CALLED FOR IN THE

CONTRACT DOCUMENTS MEAN THE LATEST EDITION, AMENDMENT AND

REVISIONS TO THE CODES AND STANDARDS IN EFFECT ON THE DATE OF

THESE CONTRACT DOCUMENTS, UNLESS OTHERWISE NOTED.

D THE DRAWINGS ARE DIAGRAMMATIC. DRAWINGS SHOW APPROXIMATE

LOCATIONS OF EQUIPMENT, AND FIXTURES. COORDINATE ALL PLUMBING

AND SYSTEMS, EQUIPMENT, AND MATERIALS INSTALLATION WITH ALL

OTHER BUILDING COMPONENTS. PLUMBING CONTRACTOR SHALL BE

RESPONSIBLE FOR ANY CHANGES IN OPENINGS AND LOCATIONS

NECESSITATED BY THE EQUIPMENT INSTALLED. THE ARCHITECTURAL

DRAWINGS SHALL INDICATE THE PLACEMENT OF ALL WALL AND CEILING

MOUNTED PLUMBING EQUIPMENT AND DEVICES IN ALL ROOMS WITH THE

EXCEPTION OF MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS. EXACT

LOCATIONS ARE SUBJECT TO THE APPROVAL OF THE ENGINEER AND

OWNER'S REPRESENTATIVE.

E DUE TO SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO

INDICATE ALL OFFSETS, FITTINGS, CHANGES IN ELEVATION, ETC. VERIFY

FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH

THE EQUIPMENT BEING CONNECTED. VERIFY EXACT LOCATION AND

ELEVATIONS AT WORK SITE PRIOR TO ANY ROUGH IN WORK. DO NOT

SCALE PLANS. IF FIELD CONDITIONS, DETAILS, CHANGES IN EQUIPMENT OR

SUBMITTAL INFORMATION REQUIRE A SIGNIFICANT CHANGE TO THE

ORIGINAL DOCUMENTS, CONTACT THE ENGINEER AND OWNER'S

REPRESENTATIVE FOR APPROVAL BEFORE PROCEEDING. COORDINATE

WORK WITH OTHER TRADES AND DETERMINE EXACT ROUTING OF ALL

DUCT, PIPE, CONDUIT, ETC., BEFORE FABRICATION AND INSTALLATION.

ARRANGE FOR ALL CHASES, SLOTS AND OPENINGS IN OTHER BUILDING

COMPONENTS THAT ARE NOT INDICATED ON DRAWINGS, TO ALLOW FOR

PLUMBING INSTALLATIONS. COORDINATE WITH ARCHITECTURAL DRAWINGS.

VERIFY WITH ENGINEER AND OWNER'S REPRESENTATIVE EXACT LOCATION

OF ALL EQUIPMENT IN FINISHED AREAS, SUCH AS THERMOSTATS, FIXTURE

AND SWITCH MOUNTING HEIGHTS, AND EQUIPMENT MOUNTING HEIGHTS.

F PROVIDE ALL NECESSARY PIPING, CONNECTIONS, ACCESSORIES,

SUPPORTS, HANGERS, ANCHORS, WIRING AND CONTROLS FOR COMPLETE

AND FUNCTIONAL INSTALLATION OF ALL THE ITEMS PROVIDED UNDER THIS

CONTRACT.

G PROVIDE ALL REQUIRED EXCAVATION, BACKFILL AND COMPACTION FOR

UNDERGROUND AND UNDERSLAB WORK.

H SLEEVE ALL PENETRATIONS THROUGH OUTSIDE OR FOUNDATION WALLS

WATERTIGHT.

I UNLESS OTHERWISE NOTED, PITCH ALL SANITARY PIPING 2 1/2" AND

SMALLER AT 1/4” PER FOOT AND ALL SANITARY PIPING 3" AND LARGER

AT 1/8" PER FOOT.

J FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER

TO ARCHITECTRUAL DRAWINGS FOR LOCATIONS AND RATING OF ALL

FIRE RATED ASSEMBLIES.

K CEILING HEIGHTS WILL NOT BE ADJUSTED DUE TO LACK OF

COORDINATION BETWEEN TRADES PRIOR TO INSTALLATION.

L FIELD VERIFY EXACT LOCATION, COMPOSITION AND CONDITION OF ALL

SITE PIPING, VALVES AND SYSTEMS AS REQUIRED FOR WORK OF THE

CONTRACT.

M ALL WATER CLOSETS SUPPLY LINES TO BE ROUGHED AT 8" A.F.F. WHERE

6" FLOORING BASE IS USED. WATER CLOSET FLUSH LEVERS SHALL FACE

THE OPEN SIDE OF THE ROOM AT ALL LOCATIONS.

N PROVIDE SUBMITTALS FOR ALL ITEMS SPECIFIED ON THIS DRAWING.

PLUMBING SPECIFICATIONS

1 ALL WORK AND MATERIALS SHALL CONFORM TO AND BE INSTALLED, INSPECTED

AND TESTED IN ACCORDANCE WITH THE GOVERNING RULES AND ALL

REGULATIONS OF FEDERAL, STATE AND LOCAL GOVERNMENTAL AGENCIES.

2 EACH CONTRACTOR SHALL HOLD A LICENSE AND/OR CERTIFICATION TO

PERFORM THE WORK REQUIRED WITHIN THE CONTRACT DOCUMENTS. COPIES OF

CURRENT LICENSE AND/OR CERTIFICATION SHALL BE SUBMITTED TO ENGINEER

AND OWNER’S REPRESENTATIVE FOR APPROVAL PRIOR TO START OF WORK.

3 APPLY AND INSTALL MATERIALS, EQUIPMENT, AND SPECIALTIES IN ACCORDANCE

WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CONFLICTS BETWEEN THE

MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT DOCUMENTS SHALL BE

REFERRED TO THE ENGINEER AND OWNER'S REPRESENTATIVE FOR RESOLUTION.

4 ALL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER. ALL

METHODS OF CONSTRUCTION, DETAILS OF WORKMANSHIP, THAT ARE NOT

SPECIFICALLY DESCRIBED OR INDICATED IN THE CONTRACT DOCUMENTS, SHALL

BE SUBJECT TO THE CONTROL AND APPROVAL OF THE ENGINEER AND OWNER'S

REPRESENTATIVE. EQUIPMENT AND MATERIALS SHALL BE OF THE QUALITY AND

MANUFACTURE INDICATED. THE EQUIPMENT SPECIFIED IS BASED UPON THE

ACCEPTABLE MANUFACTURERS LISTED. WHERE "APPROVED EQUAL" IS STATED,

EQUIPMENT SHALL BE EQUIVALENT IN EVERY WAY TO THE EQUIPMENT SPECIFIED

AND WILL BE ALLOWED SUBJECT TO APPROVAL.

5 MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE

DEVELOPED RATING OF 50 OR LESS, IN ACCORDANCE WITH ASTM E84 AND UL

723. EQUIPMENT SHALL BEAR THE UNDERWRITER'S LABORATORIES (UL), OR OTHER

APPROVED AGENCY-LISTING/LABEL. THIS LISTING REQUIREMENT APPLIES TO THE

ENTIRE ASSEMBLY. ANY MODIFICATIONS TO EQUIPMENT TO SUIT THE INTENT OF THE

SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL

ELECTRIC CODE AND LISTED BY U.L. POTABLE WATER SYSTEMS AND EQUIPMENT

SHALL BE BUILT ACCORDING TO AWWA STANDARDS. GAS-FIRED EQUIPMENT AND

SYSTEM SHALL MEET AGA REGULATIONS AND SHALL HAVE AGA LABEL. ALL

MATERIALS, UNLESS OTHERWISE SPECIFIED, SHALL BE NEW AND BE THE

STANDARD PRODUCTS OF THE MANUFACTURER. USED EQUIPMENT OR DAMAGED

MATERIAL WILL BE REJECTED. CATALOG NUMBERS ARE SOMETIMES LISTED IN

THE SPECIFICATIONS TO AID SELECTION OF THE EQUIPMENT AND ARE FOR

REFERENCE ONLY. ALL EQUIPMENT MUST MEET THE WRITTEN DESCRIPTION OF THE

SPECIFICATION, INCLUDING ALL REQUIRED ACCESSORIES, POWER SUPPLIES,

HARDWARE, ETC., REGARDLESS OF THE LISTED CATALOG NUMBER. ERRORS IN

THE CATALOG NUMBER DO NOT ALLEVIATE THE RESPONSIBILITY OF PROVIDING

THE PROPER EQUIPMENT REQUIRED FOR THE INSTALLATION AND FIELD

CONDITIONS. THE MATERIALS, PRODUCTS AND EQUIPMENT DESCRIBED IN THE

CONTRACT DOCUMENTS ESTABLISH A STANDARD OF QUALITY, FUNCTION,

DIMENSIONS AND APPEARANCE THAT MUST BE MET BY ANY PROPOSED

SUBSTITUTION.

6 EACH CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CONSTRUCTION SAFETY

AT ALL TIMES AND PROVIDE, AS PART OF CONTRACT, ALL TRENCH OR BUILDING

SHORING, SCAFFOLDING, SHIELDING, DUST/FUME PROTECTION,

MECHANICAL/ELECTRICAL PROTECTION, SPECIAL GROUNDING, SAFETY RAILINGS,

BARRIERS, AND OTHER SAFETY FEATURE REQUIRED TO PROVIDE SAFE

CONDITIONS FOR ALL WORKMEN AND SITE VISITORS.

7 IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP CLEAN ALL EQUIPMENT AND

PLUMBING FIXTURES PROVIDED UNDER THIS CONTRACT FOR THE DURATION OF

THE PROJECT. EACH TRADE SHALL KEEP THE PREMISES FREE FROM AN

ACCUMULATION OF WASTE MATERIAL OR RUBBISH CAUSED BY THEIR OPERATIONS.

IN FACILITIES REQUIRING AN ENVIRONMENT OF EXTREME CLEANLINESS, AND IT IS

THE CONTRACTOR'S RESPONSIBILITY TO ADHERE TO THE STRICT REGULATIONS

REGARDING PROCEDURES ON THE EXISTING PREMISES. AFTER ALL TESTS ARE

MADE AND INSTALLATIONS COMPLETED SATISFACTORILY. THOROUGHLY CLEAN

ENTIRE INSTALLATION, BOTH EXPOSED SURFACES AND INTERIORS. REMOVE ALL

DEBRIS CAUSED BY WORK. REMOVE TOOLS, SURPLUS, MATERIALS, WHEN WORK

IS FINALLY ACCEPTED.

8 ALL FINISHED EQUIPMENT SURFACES DAMAGED DURING CONSTRUCTION SHALL BE

BROUGHT TO “AS NEW” CONDITION BY TOUCH UP OR REPAINTING. ANY RUST SHALL

BE REMOVED AND PRIMED PRIOR TO REPAINTING. TAKE ALL NECESSARY

PRECAUTIONS WITH EQUIPMENT, SYSTEMS AND BUILDING TO PREVENT DAMAGE

DUE TO FREEZING AND/OR WATER DAMAGE. REPAIR OR REPLACE, AT NO CHANGE

IN CONTRACT, ANY SUCH DAMAGE TO EQUIPMENT, SYSTEMS AND BUILDING.

PERFORM FIRST SEASONS WINTERIZING IN PRESENCE OF OWNER'S OPERATING

STAFF.

9 ALL PIPING AND FITTINGS USED ON THIS PROJECT SHALL BE NEW AND MARKED

WITH MANUFACTURER'S NAME; AND SHALL COMPLY WITH ALL APPLICABLE ASTM

AND ANSI STANDARDS. ALL PIPING SHALL BE LABELED AND INSULATED AS

NOTED.

10 NO PLUMBING EQUIPMENT SHALL BE HIDDEN OR COVERED UP PRIOR TO

INSPECTION BY THE ENGINEER AND OWNER'S REPRESENTATIVE. ALL WORK THAT IS

DETERMINED TO BE UNSATISFACTORY SHALL BE CORRECTED IMMEDIATELY AT NO

ADDITIONAL COST. CONCEAL ALL CONTRACT WORK ABOVE CEILINGS AND IN

WALLS, BELOW SLABS, AND ELSEWHERE THROUGHOUT BUILDING. IF CONCEALMENT

IS IMPOSSIBLE OR IMPRACTICAL, NOTIFY ENGINEER AND OWNER'S

REPRESENTATIVE BEFORE STARTING THAT PART OF THE WORK AND INSTALL

ONLY AFTER THEIR APPROVAL. IN AREAS WITH NO CEILINGS, INSTALL ONLY

AFTER ENGINEER AND OWNER'S REPRESENTATIVE REVIEWS AND COMMENTS ON

ARRANGEMENT AND APPEARANCE.

11 BEFORE ACCEPTANCE OF THE WORK, FURNISH NECESSARY SKILLED LABOR TO

OPERATE ALL SYSTEMS BY SEASONS. INSTRUCT THE OWNER'S DESIGNATED

PERSONNEL ON THE PROPER OPERATION AND MAINTENANCE OF SYSTEMS AND

EQUIPMENT. OBTAIN WRITTEN ACKNOWLEDGMENT FROM PERSON INSTRUCTED

PRIOR TO ACCEPTANCE REPEAT THE INSTRUCTIONS IF ASKED TO DO SO.

CONTRACTOR IS FULLY RESPONSIBLE FOR SYSTEMS UNTIL ACCEPTANCE, EVEN

THOUGH OPERATED BY OWNER'S PERSONNEL, UNLESS OTHERWISE AGREED IN

WRITING. PROVIDE OPERATING, MAINTENANCE AND STARTING PRECAUTIONS AND

PROCEDURES TO BE FOLLOWED BY THE OWNER FOR OPERATING SYSTEMS AND

EQUIPMENT. MOUNT THE INSTRUCTION IN CLEAR PLASTIC HOLDER ON OR

ADJACENT TO THE EQUIPMENT.

PLUMBING SPECIFICATIONS

12 OPENINGS THROUGH ROOFS SHALL BE FLASHED IN A MANNER NOT TO AFFECT

ROOF GUARANTEE OR BOND. ENGAGE QUALIFIED ROOFING CONTRACTOR

LICENSED BY THE ROOFING MANUFACTURER, AS PART OF CONTRACT. PROVIDE

NON-FERROUS FLASHING PIECES, SKIRTS, HOODS AND COLLARS AS REQUIRED TO

MAKE DUCTS, PIPES, CONDUITS, AND OTHER PENETRATIONS WATERTIGHT. WHERE

CURBS ARE CALLED FOR WITH RESPECT TO RECTANGULAR OPENINGS IN NEW

ROOFS, FLASHING WILL BE DONE BY OTHERS UNLESS SPECIFICALLY INDICATED

OTHERWISE. CAULK AND WATERPROOF WITH ADDITIONAL MATERIAL SO AS TO

SEAL AIRTIGHT AND WATERTIGHT.

13 FIRE-STOPPING FOR OPENINGS THROUGH FIRE AND SMOKE RATED WALL AND

FLOOR ASSEMBLIES: PROVIDE MATERIALS AND PRODUCTS LISTED OR

CLASSIFIED BY AN APPROVED INDEPENDENT TESTING LABORATORY FOR

"THROUGH-PENETRATION FIRE-STOP SYSTEMS." THE SYSTEM SHALL MEET THE

REQUIREMENTS OF "FIRE TESTS OF "THROUGH-PENETRATION FIRE-STOPS"

DESIGNATED ASTM E814. PROVIDE FIRE-STOP SYSTEM SEALS AT ALL LOCATIONS

WHERE PIPING, TUBING, CONDUIT, ELECTRICAL BUSWAYS/CABLES/WIRES,

DUCTWORK AND SIMILAR UTILITIES PASS THROUGH OR PENETRATE FIRE RATED

WALL OR FLOOR ASSEMBLY. PROVIDE FIRE-STOP SEAL BETWEEN SLEEVE AND

WALL FOR DRYWALL CONSTRUCTION. THE MINIMUM REQUIRED FIRE RESISTANCE

RATINGS OF THE WALL OR FLOOR ASSEMBLY SHALL BE MAINTAINED BY THE

FIRE-STOP SYSTEM. THE INSTALLATION SHALL PROVIDE AN AIR AND WATERTIGHT

SEAL. THE METHODS USED SHALL INCORPORATE QUALITIES, WHICH PERMIT THE

EASY REMOVAL OR ADDITION OF ELECTRICAL CONDUITS OR CABLES WITHOUT

DRILLING OR USE OF SPECIAL TOOLS. THE PRODUCT SHALL ADHERE TO ITSELF

TO ALLOW REPAIRS TO BE MADE WITH THE SAME MATERIAL AND PERMIT THE

VIBRATION, EXPANSION AND/OR CONTRACTION OF ANY ITEMS PASSING THROUGH

THE PENETRATION WITHOUT CRACKING, CRUMBLING AND RESULTING REDUCTION IN

FIRE RATING.

14 PROVIDE ALL REQUIRED SUPPORTS, BEAMS, ANGLES, HANGERS, RODS, BASES,

BRACES, AND OTHER ITEMS TO PROPERLY SUPPORT CONTRACT WORK.

SUPPORTS SHALL MEET THE APPROVAL OF THE ENGINEER AND OWNER'S

REPRESENTATIVE. MODIFY STUDS, ADD STUDS, ADD FRAMING, OR OTHERWISE

REINFORCE STUDS IN METAL STUD WALLS AND PARTITIONS AS REQUIRED TO SUIT

CONTRACT WORK. IF NECESSARY, IN STUD WALLS, PROVIDE SPECIAL SUPPORTS

FROM FLOOR TO STRUCTURE ABOVE. FOR PRECAST PANELS/PLANKS AND

METAL DECKS, SUPPORT MECHANICAL/ELECTRICAL WORK AS DETERMINED BY

MANUFACTURER, ENGINEER, AND OWNER'S REPRESENTATIVE. PROVIDE HEAVY

GAUGE STEEL MOUNTING PLATES FOR MOUNTING CONTRACT WORK. MOUNTING

PLATES SHALL SPAN TWO OR MORE STUDS. SIZE, GAUGE, AND STRENGTH OF

MOUNTING PLATES SHALL BE SUFFICIENT FOR EQUIPMENT SIZE, WEIGHT, AND

DESIRED RIGIDITY.

15 PIPING SHALL NOT BE SUPPORTED BY WIRES, BAND IRON, CHAINS, OR FROM

OTHER PIPING OR DUCT WORK, NOR BY VERTICAL EXPANSION BOLTS. SUPPORT

PIPING WITH INDIVIDUAL HANGERS FROM CONCRETE INSERTS, WELDED SUPPORTS,

OR BEAM CLAMPS OF PROPER CONFIGURATION AND LOADING DESIGN

REQUIREMENTS FOR EACH LOCATION; REPLACE IF NOT SUITABLE. FOLLOW

MANUFACTURER'S SAFE LOADING RECOMMENDATIONS. SUSPEND WITH RODS OF

SUFFICIENT LENGTH FOR SWING, USING PROPER DIAMETER ROD FOR PIPE SIZE.

PROVIDE ADDITIONAL STRUCTURAL STEEL MEMBERS, HAVING ONE COAT

RUSTPROOF PAINT, WHERE REQUIRED FOR PROPER SUPPORT. PROVIDE

OVERSIZED HANGERS WHERE INSULATION/SUPPORTS MUST PASS BETWEEN PIPE

AND HANGER. PROVIDE CONTINUOUS SUPPORT OR EXTRA SUPPORTS FOR

PLASTIC PIPE PER MANUFACTURER'S REQUIREMENTS. HANGERS, WHEN ATTACHED

TO JOISTS, SHALL ONLY BE PLACED AT THE TOP OR BOTTOM CHORD PANEL

POINT. ONLY CONCENTRIC TYPE HANGERS ARE PERMISSIBLE; "C" TYPE NOT

PERMITTED ON JOISTS. PROVIDE RISER CLAMPS FOR EACH RISER AT EACH

FLOOR. USE TRAPEZE HANGERS WHERE A GROUP OF PIPING CAN BE INSTALLED.

16 PROVIDE COMPLETE PLUMBING CONNECTIONS TO ALL PLUMBING FIXTURES AND

EQUIPMENT. PROVIDE CONTROL CONNECTIONS TO EQUIPMENT WHERE INDICATED

ON THE DRAWINGS. PROVIDE VALVES ON PIPING AHEAD OF EACH PIECE OF

EQUIPMENT. PROVIDE ALL PIPING, TRIM, ACCESSORIES AND CONNECTIONS AS

REQUIRED FOR PROPER EQUIPMENT OPERATION OF EQUIPMENT PROVIDED BY

THIS CONTRACT, OWNER-FURNISHED EQUIPMENT AND EQUIPMENT FURNISHED BY

OTHER CONTRACTS. REFER TO MANUFACTURER'S DRAWINGS/SPECIFICATIONS

FOR REQUIREMENTS OF SPECIAL EQUIPMENT. VERIFY CONNECTION REQUIREMENTS

BEFORE BIDDING AND CONFIRM PRIOR TO ROUGHING.

17 PROVIDE ALL EXCAVATION AND BACKFILL, ROCK AND DEBRIS REMOVAL AND

RELATED WORK REQUIRED FOR ALL PLUMBING WORK.

18 TRENCH EXCAVATION: BY OPEN CUT, TO PROPER DEPTH AND GRADE NO WIDER

THAN REQUIRED FOR PLACEMENT OF WORK AND NOT MORE THAN 50 FT. IN

ADVANCE OF UTILITY BEING INSTALLED. SHOULD TRENCH BOTTOM BE WET,

UNSTABLE, AND/OR OTHERWISE INCAPABLE OF SUPPORTING THE CONTRACT

WORK, IMMEDIATELY REPORT SAME TO OWNER'S REPRESENTATIVE. SHOULD IT BE

DEEMED UNSUITABLE, EXCAVATE TO DEPTH AS DIRECTED AND BACKFILL WITH

GRAVEL TO TRENCH DEPTH, OR PROVIDE CONCRETE CRADLING. IN ADDITION TO

GOVERNING CODES, PROTECT SIDES OF EXCAVATIONS WITH SHEETING AND

BRACING WHERE NECESSARY TO PREVENT SLIDING OR CAVING OF BANKS AND

TO PROTECT ADJACENT STRUCTURES. REMOVE AS BACKFILL IS PLACED.

PROVIDE AT LOCATIONS ADJACENT TO EXISTING MANHOLES, HYDRANTS, AND

SIMILAR ITEMS.

19 CUSHION AND BEDDING SAND: CLEAN, COARSE, FREE OF ORGANIC MATTER,

CONFORMING TO NEW YORK SATE DOT ITEM NO. 703-06. CRUSHED STONE:

CRUSHED STONE, GRADED, FREE OF ORGANIC MATERIALS, NO. 1 TO NO. 4 SIZE.

CONFORMING TO NEW YORK STATE DOT ITEM NO. 703-0201. GRAVEL FILL:

WELL-GRADED NATURAL INORGANIC SAND AND GRAVEL CONFORMING TO NEW

YORK STATE DOT ITEM NO. 703-0202.

20 BEDDING: PROVIDE AROUND ALL PIPING WITH COARSE SAND FROM 6 IN. BELOW

TO 8 IN. ABOVE. APPLY BY HAND AND COMPACT UNDER AND AT SIDES BY

MECHANICAL MEANS. PIPING, JACKETS AND SAND BED MUST BE INSPECTED AND

TESTED PRIOR TO BACKFILL OF ANY NATURE. PROVIDE NECESSARY ANCHORS,

THRUST BLOCKS, FOR TESTING. FILL REMAINDER OF TRENCH IN 12 IN. LAYERS,

USE ORDINARY FILL MATERIAL, EXCEPT AS OTHERWISE SPECIFIED. DO NOT USE

FROZEN MATERIAL. REMOVE BOULDERS, STONES, BROKEN ROCK, WOOD, BRICKS,

BLOCKS, AND DEBRIS FROM FILL MATERIAL BEFORE BACKFILL OPERATION.

PROVIDE FINAL COMPACTION FOR ALL TRENCHES BY MECHANICAL MEANS. USE

MECHANICAL TAMPING MACHINERY.

PLUMBING SPECIFICATIONS

21 ORDINARY FILL: WELL-GRADED, NATURAL SOIL, MEETING THE FOLLOWING

REQUIREMENTS. FREE OF ORGANIC AND OTHER COMPRESSIBLE MATERIALS,

DEBRIS AND FROZEN MATERIALS, AND OF STONES LARGER THAN 4 IN. MAXIMUM

DIMENSION. BE OF SUCH NATURE AND CHARACTER THAT IT CAN BE COMPACTED

TO THE SPECIFIED DENSITIES. FREE OF ANY CLAY, HIGHLY PLASTIC CLAYS, OF

MATERIALS SUBJECT TO DECAY, DECOMPOSITION, OR DISSOLUTION, AND OF

CINDERS, ASH AND OTHER CORROSIVE MATERIALS. FREE OF WOOD, STUMPS,

ROOTS, ETC. MAXIMUM DRY DENSITY OF NOT LESS THAN 115 LBS. PER CU. FT.

MATERIAL FROM EXCAVATION ON THE SITE MAY BE USED AS ORDINARY FILL IF IT

MEETS THE ABOVE REQUIREMENTS.

22 BUILD LINES TO GRADE AND ELEVATIONS SHOWN. PROVIDE STAKES, GRADE

BOARDS, CLEATS, NAILS, INSTRUMENTS. LOCATE AND STAKE EACH NEW RUN FOR

ITS ENTIRE LENGTH. VERIFY ELEVATIONS GIVEN. START EACH EXCAVATION AT

LOW POINT. NOTIFY ENGINEER OF ELEVATION DISCREPANCIES. PROTECT MARKS

AND STATIONS. BEFORE STARTING EXCAVATING WORK, COORDINATE WITH

OWNER'S SITE REPRESENTATIVE AND FURNISH SCHEDULE OF OPERATIONS TO

OWNER. REMOVE MATERIALS INCLUDING MASONRY WORK, RUBBLE, EARTH,

BRICKWORK, CONCRETE, SAND, DEBRIS, ABANDONED PIPE LINES, DRAINS AND

SEWERS, ROCKS, BOULDERS, AND CONCRETE, ALL OF WHICH IS CONSIDERED

"EARTH EXCAVATION." PROVIDE FOR LEGAL DISPOSITION OF EXCESS

EXCAVATED MATERIALS. MAKE ALLOWANCE FOR GRAVEL FILL, SAND BASES,

THRUST BLOCKS, SHEET PIPING, DRAINAGE PUMPS, AND WORK SPACE. START

EXCAVATION AT ROUGH GRADE AND PROVIDE FORM WORK AND SHEET PILING

WHERE REQUIRED.

23 UNDER SLABS: BACKFILL IN 6 INCH LAYERS WITH GRAVEL OR CRUSHED STONE,

FREE FROM ORGANIC OR OTHER UNSUITABLE MATERIAL, TO GRADE.

THOROUGHLY COMPACT EACH LAYER. PROVIDE FINAL COMPACTION FOR ALL

TRENCHES BY MECHANICAL MEANS. USE MECHANICAL TAMPING MACHINERY.

24 ABOVE GRADE SANITARY, WASTE AND VENT PIPING - SCHEDULE 40 PVC.

EXCEPTION: PVC NOT ALLOWED IN PLENUM RETURN SPACES ABOVE CEILINGS. USE

DWV COPPER OR NO HUB SERVICE WEIGHT CAST IRON IN THESE LOCATIONS.

BELOW GRADE SANITARY, WASTE, AND VENT PIPING – SCHEDULE 40 PVC OR

SERVICE WEIGHT, HUB, AND SPIGOT CAST IRON FOR SANITARY AND WASTE PIPING;

NO HUB SERVICE WEIGHT CAST IRON FOR VENT PIPING.

25 NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL, WELDED

CONNECTIONS AND FITTINGS FOR PIPE SIZES 2-1/2" AND LARGER, THREADED AND

SCREWED FITTINGS FOR PIPE SIZES 2'' AND SMALLER (USE TEFLON TAPE FOR ALL

THREADED CONNECTIONS). PROVIDE ALL NATURAL GAS SYSTEMS IN COMPLIANCE

WITH THE FUEL GAS CODE OF NEW YORK STATE AND NATIONAL FUEL

REQUIREMENTS.

26 ACCURATELY ESTABLISH GRADE AND ELEVATION OF PIPING BEFORE SETTING

SLEEVES. INSTALL PIPING WITHOUT SPRINGING OR FORCING (EXCEPT WHERE

SPECIFICALLY CALLED FOR), MAKING PROPER ALLOWANCE FOR EXPANSION AND

ANCHORING. ARRANGE PIPING AT EQUIPMENT WITH NECESSARY OFFSETS, UNIONS,

FLANGES, AND VALVES, TO ALLOW FOR EASY PART REMOVAL AND

MAINTENANCE. OFFSET PIPING AND CHANGE ELEVATION AS REQUIRED TO

COORDINATE WITH OTHER WORK. AVOID CONTACT WITH OTHER MECHANICAL OR

ELECTRICAL SYSTEMS. PROVIDE ADEQUATE MEANS OF DRAINING AND VENTING

UNITS, RISERS, CIRCUITS AND SYSTEMS. CONCEAL PIPING UNLESS OTHERWISE

CALLED FOR. REAM PIPES AFTER CUTTING AND CLEAN BEFORE INSTALLING. CAP

OR PLUG EQUIPMENT AND PIPE OPENINGS DURING CONSTRUCTION. INSTALL

PIPING PARALLEL WITH LINES OF BUILDING, PROPERLY SPACED TO PROVIDE

CLEARANCE FOR INSULATION. MAKE CHANGES IN DIRECTION AND BRANCH

CONNECTIONS WITH FITTINGS. DO NOT INSTALL VALVES, UNIONS AND FLANGES IN

INACCESSIBLE LOCATIONS. MATERIALS WITHIN A SYSTEM AND BETWEEN SYSTEMS

SHALL BE CONSISTENT. IF THIS IS NOT POSSIBLE, INSTALL DIELECTRIC FITTINGS.

27 PROVIDE ALL HANGERS AND SUPPORTS FOR PIPING IN ACCORDANCE WITH THE

2020 PLUMBING CODE OF NEW YORK STATE, UNLESS NOTED OTHERWISE.

28 PROVIDE PIPE SHIELDS ON ALL INSULATED PIPING BETWEEN INSULATION AND EACH

HANGER. MAKE: MICHIGAN, B-LINE OR APPROVED EQUAL.

29 PROVIDE POLISHED CHROME METAL ESCUTCHEON PLATES FOR ALL PIPING UNDER

EACH PLUMBING FIXTURE AT WALL, AND ALL EXPOSED PIPING PASSING THROUGH

FLOORS, WALLS OR CEILINGS, IN ALL ROOMS EXCEPT IN BOILER, FAN AND

MECHANICAL ROOMS.

30 VALVES SHALL HAVE FOLLOWING REQUIREMENTS: WORKING PRESSURE STAMPED

OR CAST ON BODIES PER MSS SP-25. STEM PACKING SERVICEABLE WITHOUT

REMOVING VALVE FROM LINE AND SHALL BE FREE OF ASBESTOS. CHECK

VALVES: HORIZONTAL TYPE, BRONZE, SWING CHECK, 125 PSI SWP, 200 PSI WOG.

SCREWED ENDS, WATTS CV. SOLDER ENDS, WATTS CVS. BACKWATER TYPE WHERE

CALLED FOR. BALL VALVES: BRASS BODY, TWO PIECE, 600 PSI (WOG) FULL

PORT, WATTS LFFBV, LFB6081G2 (SCREWED OR SOLDERED). NATURAL GAS

VALVES: BRONZE BODY, SCREWED ENDS, AGA APPROVED AND UL LISTED.

MILWAUKEE BB2-100. ALL VALVES LOCATED WITHIN THE DOMESTIC WATER

SYSTEM SHALL BE "LEAD FREE" IN COMPLIANCE WITH NSF 61.

31 PROVIDE 4 LB. DENSITY FIBERGLASS INSULATION WITH A CONDUCTIVITY NOT

EXCEEDING .27 BTU X IN / H X SQ FT X °F AND AN ALL SERVICE JACKET ON ALL

DOMESTIC WATER PIPING. PROVIDE VAPOR BARRIER ON ALL DOMESTIC COLD

WATER PIPING. DOMESTIC COLD PIPING LESS THAN 1-1/2” IN DIAMETER SHALL BE

PROVIDED WITH 1/2'' THICK INSULATION AND ALL OTHER DOMESTIC COLD PIPING

SHALL BE PROVIDED WITH 1” THICK INSULATION. ALL DOMESTIC HOT AND

RECIRCULATION WATER PIPING LESS THAN 1-1/2” IN DIAMETER SHALL BE

PROVIDED WITH 1'' THICK INSULATION AND ALL OTHER DOMESTIC HOT AND

RECIRCULATION PIPING SHALL BE PROVIDED WITH 1-1/2” THICK INSULATION.

PROVIDE SHIELDS AND HANGERS/SUPPORTS ON OUTSIDE OF ALL INSULATION.

32 LABEL ALL PLUMBING PIPING ON PROJECT WITH ACRYLIC WRAP-AROUND LABELS

WITH FLOW ARROWS. LABEL PIPING EVERY 20'-0'' O.C. AND ON BOTH SIDES OF

WALL AND FLOOR PENETRATIONS.

33 DOMESTIC WATER PIPING: PIPE - TYPE L COPPER. TEES, ELBOWS, REDUCERS:

CAST BRONZE ASTM B62, ANSI B16.22. UNIONS AND FLANGES: UNIONS FOR 2 IN.

AND SMALLER. BRAZED TYPE CAST BRONZE GROUND JOINT, 150 LB. SWP

FLANGE FOR 2-1/2 IN. AND LARGER, BRAZED TYPE, CAST BRONZE, COMPANION

TYPE, GASKETED AND BOLTED, ASME DRILLED 150 LB. SWP. SOLDER MATERIALS:

NO-LEAD SOLDER, USING ALLOYS MADE FROM TIN, COPPER, SILVER AND NICKEL.

MAKE: HARRIS "STAY-SAFE 50" AND "BRIGHT", ENGLEHART "SILVERBRIGHT 100",

WILLARD INDUSTRIES "SOLDER SAFE (SILVER BEARING), CANFIELD "WATERSAFE".

ALL FITTINGS LOCATED WITHIN THE DOMESTIC WATER SYSTEM SHALL BE "LEAD

FREE" IN COMPLIANCE WITH NSF 61.

PLUMBING FIXTURE SCHEDULE

TAG ITEM WASTE VENT CW HW FITTINGS/ACCESSORIES ITEM DESCRIPTION DESIGN EQUIPMENT

WC-A WATER CLOSET - FLOOR MOUNT 3" 2" 1" NA -- FLOOR MOUNT TANK TOILET FIXTURE, VITREOUS CHINA, ADA COMPLIANT, 1.28 GPF AMERICAN STANDARD CADET 215AA.104

LAV-A LAV - WALL HUNG 1 1/2" 1 1/2" 1/2" 1/2" CHICAGO MODEL 895-317FCABCP WALL HUNG; VITREOUS CHINA; ADA COMPLIANT; 0.5 GPM SLOAN SS-3003 SERIES 4" CENTERSET

SK-A SINK - BREAK ROOM 1 1/2" 1 1/2" 1/2" 1/2" CHICAGO MODEL 895-317FCABCP 18 GA, 304 SS, DROP-IN; ADA COMPLIANT; 4" CENTERS; 1.5 GPM ELKAY MODEL LRADQ222255

FD-A FLOOR DRAIN 3" SEE

PLANS

NA NA JAY R SMITH 2692 TRAP GUARD JAY R SMITH 2005YA

DCPO DECK PLATE CLEANOUT SEE

PLANS

NA NA NA -- JAY R SMITH 4023

WPCO WALL PLATE CLEANOUT SEE

PLANS

NA NA NA -- JAY R SMITH 4422C-U-PC

PLUMBING ELECTRIC WATER HEATER SCHEDULE

TAG LOCATION

CAPACITY

(GAL)

RECOVERY

(GPH)

TEMP RISE

(°F)

POWER

DESIGN EQUIPMENT NOTESKW VOLT PHASE

HW-1 MECH RM 10 9 100 1.65 120 1 AO SMITH EJC-10 1, 2, 3, 4

PLUMBING EXPANSION TANK SCHEDULE

TAG LOCATION SERVICE

CAPACITY

(GAL)

DIAMETER

(IN)

HEIGHT

(IN) DESIGN EQUIPMENT NOTES

PET-1 MECH ROOM HW 2.1 8 11 WATTS - PLT-5 1

PLUMBING PUMP SCHEDULE

TAG LOCATION SERVICE GPM

HEAD FT

WATER

MOTOR

PUMP TYPE DESIGN EQUIPMENT NOTESHP VOLT PHASE RPM

HWRP-1 MECH ROOM HWR .5 10 1/6 115 1 3600 IN-LINE WATTS E3-6F/BSPRZ

60A0B3004 1, 2

SEQUENCE OF OPERATIONS - DOMESTIC HOT WATER PLANT

THE DOMESTIC WATER HEATER HW-1, SHALL BE SET AT A 140° STORAGE

TEMPERATURE.

140°F DOMESTIC HOT WATER SHALL MIX WITH DOMESTIC COLD WATER VIA THE

MASTER MIXING VALVE IN ORDER TO OBTAIN A 110°F DOMESTIC HOW WATER

LOOP TO SERVE THE BUILDING.

THE DOMESTIC HOT WATER RECIRCULATION PUMP SHALL BE CONTROLLED BY AN

AQUASTAT AND 7-DAY PROGRAMMABLE TIME CLOCK. THE TIME CLOCK SHALL

ALLOW THE PUMP TO TURN ON DURING THE BUILDING’S OCCUPIED HOURS.

COORDINATE OCCUPIED HOURS WITH OWNER’S REPRESENTATIVE. DURING

OCCUPIED HOURS, THE AQUASTAT SHALL TURN THE RECIRCULATION PUMP ON

WHEN THE LOOP IS DOWN TO 100°F (ADJ.) AND SHALL TURN ON THE PUMP OFF

WHEN THE LOOP IS UP TO 110°F (ADJ.).

NOTES:

1. EXPANSION TANK SHALL BE PRE-CHARGED TO STATIC PRESSURE OF BUILDINGS WATER SERIVE.

NOTES:

1. WATER HEATER SHALL HAVE ADJUSTABLE TEMPERATURE CONTROLS.

2. PROVIDE EVERBILT 24” IN PLASTIC DRAIN PAIN (MODEL #15021).

3. WALL MOUNTED EQUIPMENT PLATFORM - INSTALL AT 6'-0" AFF.

4. PROVIDE HEAT TRAPS.

NOTES:

1. PROVIDE AQUASTAT PER 2020 ENERGY CONSERVATION CODE OF NEW YORK STATE.

2. AUTOMATIC TIME SWITCHES SHALL BE INSTALLED PER THE 2020 ENERGY CONSERVATION CODE OF NEW YORK

TOWN CLERK

TO REMAIN

VAULT

TO REMAIN

HALL

BATH ROOM

KITCHEN

JUDGE'S

OFFICE

MEETING

ROOM

EXISTING HIGHWAY SHOP EXISTING OFFICE AREAEXISTING BAY HIGHWAY SHOP AREA

HW REF SINK

ST

PT

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

P-100

FLOOR PLAN - PLUMBING

DEMOLITION

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

N O

R T

H

1/4" = 1'-0"

FIRST FLOOR DEMOLITION PLAN - PLUMBING

P-100 PLUMBING DEMOLITION NOTES

1 DISCONNECT (E) G PIPING FROM (E) HVAC EQUIPMENT. REMOVE ALL (E) G PIPING BACK TO

MAIN AND CAP. REMOVE HANGERS AND ACCESSORIES IN TOTAL.

2 DISCONNECT AND REMOVE (E) HW. REMOVE (E) G PIPING BACK TO MAIN AND CAP. REMOVE

ALL H&C WATER PIPING, REMOVE HANGERS AND ACCESSORIES IN TOTAL. REMOVE (E) C MAIN

COMING INTO THE BUILDING AND CAP.

3 DISCONNECT AND REMOVE (E) SINK/LAV. REMOVE H&C AND VENT LINES BACK TO MAINS AND

CAP. REMOVE HANGERS AND ACCESSORIES IN TOTAL. REMOVE SAN PIPING TO BELOW

FLOOR AND CAP. PLUMBING CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR CUTTING AND PATCHING OF EXISTING SLAB. PATCH SHALL BE SMOOTH AND

LEVEL TO ACCEPT NEW FLOORING.

4 DISCONNECT AND REMOVE (E) PLUMBING FIXTURES IN (E) TOILET ROOM. REMOVE H&C AND

VENT LINES BACK TO SOURCE AND CAP, REMOVE HANGERS AND ACCESSORIES IN TOTAL.

REMOVE SAN PIPING TO BELOW FLOOR AND CAP. PLUMBING CONTRACTOR SHALL

COORDINATE WITH GENERAL CONTRACTOR CUTTING AND PATCHING OF EXISTING SLAB.

PATCH SHALL BE SMOOTH AND LEVEL TO ACCEPT NEW FLOORING.

5 (E) GAS METER IS ETR.

(E)SAN

4"SAN4"4"SAN4"3"SAN3"

3"SAN3"

3"SAN3"

4"SAN4"

3"SAN3"

3"SAN3"

3"SAN3"

4"SAN4"

(E)SAN

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

P-101

FOUNDATION FLOOR

PLAN - PLUMBING

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

N O

R T

H

1/4" = 1'-0"

FOUNDATION FLOOR PLAN - PLUMBING

P-101 PLUMBING DRAWING NOTES

1 PROVIDE 2” SAN UP FOR BACK-TO-BACK LAV-A. TRANSITION TO 3" SAN ON

HORIZONTAL RUN.

2 PROVIDE 3” SAN WITH P-TRAP UP TO FD-A.

3 PROVIDE 4” SAN UP FOR WC-A.

4 PROVIDE 3” SAN UP FOR DPCO.

5 PROVIDE 2” V UP.

6 PROVIDE 1 1/2” SAN UP TO SK-A. TRANSITION TO 3" SAN ON HORIZONTAL.

7 CONNECT (N) SAN TO (E) SAN MAIN.

EXISTING HIGHWAY SHOP PROPOSED OFFICE AREA EXISTING OFFICE AREA

REF

JUDGE

HALL

TLT.TLT.

MECH

KITCHEN

HIGHWAY

SUPERINTENDENT

HALL

VAULT

TOWN

CLERK

MEETING

ROOM

CODE

INSPECTOR

TOWN

SUPERVISOR

SK-A

FD-A

WC-A WC-A

LAV-ALAV-A

FD-A

FD-A

DPCO

HP-3

HP-1

HP-2

CO

CO 1"IW1"

1 1/2"IW1 1/2"

1 1/2"IW1 1/2"

1"IW1"

1 1/2"IW1 1/2"

P-102

ETR GAS METER

2"G2"

2"V2"

2"V2"

MECH

CO CO

FD-A

FD-A HW-1

HWR-1

MMV-1

1/2"C1/2"

1 1/2"V1 1/2"

1/2"H1/2"

1 1/2"IW1 1/2"

1/2"H1/2"

1/2"HWR1/2"

3/4"H3/4" 3/4"C3/4"

1/2"HWR1/2"

2"V2"

3/4"C3/4"

2"V2"

1 1/2"IW1 1/2"

2"V2"

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

P-102

FLOOR PLAN - PLUMBING

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

N O

R T

H

1/4" = 1'-0"

FIRST FLOOR PLAN - PLUMBING

1/2" = 1'-0"

ENLARGED MECH RM 6 - PLUMBING

P-102 PLUMBING DRAWING NOTES

1 PROVIDE 1/2” H&C, 1/2" HWR DOWN, 2” V UP, 2” SAN DOWN FOR BACK TO BACK LAV-A’S.

CONNECT 1/2" HWR WITHIN 18” OF WALL PENETRATION AT FIXTURE ISOLATION VAVLE.

PROVIDE LAV WITH TRAP WRAPS AS REQUIRED BY ADA COMPLIANCES.

2 PROVIDE 1” C DOWN AND 2” V UP FOR BACK-TO-BACK WC-A.

3 PROVIDE 1/2” H&C, 1 1/2” SAN DOWN, 1 1/2” V UP FOR SK-A. 1/2” H RUN OUT SHALL NOT

EXCEED 43 FEET IN LENGTH BETWEEN FIXTURE ISOLATION VALVE AND TEE FITTING OFF

DOMESTIC HOT WATER MAIN.

4 CONNECT 1" IW TO HVAC EQUIPMENT. COORDINATE WITH HVAC CONTRACTOR

5 REFER TO DETAILS #1 AND #2 ON DRAWING P-201 FOR HOT WATER PLANT.

6 PROVIDE 2" V UP AND 3" VTR.

7 PROVIDE 1 1/2" V UP.

8 PROVIDE 1 1/2” IW DOWN FROM HVAC EQUIPMENT TO FD WITH FUNNEL. TERMINATE IW WITH

4” AIR GAP AT FD-A.

10 NEW WATER LINE FROM EXISTING WELL ON PROPERTY. PROVIDE 1 1/2" C UP FROM

BELOW SLAB.

WALL MOUNTED

EQUIPMENT

PLATFORM,INSTALL

AT 6'-0" AFF.

UNION (TYP.)

THERMOMETER (TYP.)

DOMESTIC

WATER

HEATER

1"

1"

SHUT-OFF VALVE (TYP.)

T & P RELIEF VALVE,

PIPE TO MSS-A

PROVIDE DI-ELECTRIC FITTING

AT TANK INLET AND OUTLET AND

AT ALL HEATER CONNECTIONS

ELECTRIC WATER HEATER DETAIL

ELECTRICAL CONTRACTOR TO

PROVIDE WIRING AS REQUIRED

FD-A FINISHED FLOOR

WALL BRACKET

DRAIN PAN

EXPANSION TANK

1" C SUPPLY

1" C & H TO

MASTER MIXING

VALVE

DRAIN VALVE

AQUASTAT (TYP.)

SPRING CHECK VALVE

(TYP.)1/2" HWR

BALANCING VALVE

SET AT 0.5 GPM

(TYP.)

STRAINER WITH

BLOWDOWN VALVE

(TYP.)

HWRP-1

NOTES:

1. PROVIDE UNIONS ON ALL THREE CONNECTIONS TO MIXING VALVE.

THERMOMETER (TYP.)

SPRING LOADED

CHECK VALVE (TYP.)

BALL VALVE (TYP.)

3/4" - 110°F H TO BLDG. FIXTURES

3/4" C3/4" - 140°F H

FROM HEATER

TO MASTER

MIXING VALVE

MIXING VALVE POWERS

LFSH1432 (BASIS OF

DESIGN)

24" DEEP SEAL HEAT TRAP

STRAINER (TYP.)

MASTER MIXING VALVE DETAIL

1/2" HWR

3" SAN

HOT WATER RECIRCULATION BALANCE VALVE

BALL VALVE

CHECK VALVE

FLOW

SIZE AS NOTED

ON FLOOR PLANS

NOTES:

BALANCE VALVE

1. LOCATE THE VALVE 5 PIPE DIAMETERS DOWNSTREAM FROM A FITTING.

2. IF A BALANCING VALVE IS LOCATED DOWNSTREAM FROM A CIRCULATION PUMP, ALLOW

A DISTANCE OF 10 PIPE DIAMETERS BETWEEN THE PUMP AND BALANCING VALVES.

3. FOR VALVE SIZING, REFER TO MANUFACTURER'S RANGE CHART, WHICH SHOWS THE

RECOMMENDED OPERATION RANGE FOR EACH VALVE SIZE.

4. ALL VALVES SHALL BE FURNISHED WITH PROBE METERING PORTS.

5. INSTALL VALVE SUCH THAT PORTS DO NOT FACE DOWN.

6. PROVIDE THIS ARRANGEMENT ON ALL HOT WATER RECIRCULATION BRANCHES AND

WHERE NOTED ON PLANS.

P-TRAP

(SIZE PER PLANS)

FLOOR DRAIN DETAIL WITH TRAP GUARD

FLOOR DRAIN

TO

SANITARY

SET TOP OF GRATE FLUSH

WITH FIN. FLOOR

DRAIN, GRATE AND

BODY AS INDICATED

IN SPECIFICATIONS

CONCRETE FLOOR SLAB

AND FLOOR FINISH

BY OTHERS (SLOPED TO

DRAIN).

TRAP GUARD

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

P-201

PLUMBING DETAILS AND

SCHEDULES

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

NOT TO SCALE

PLUMBING WATER HEATER & MIXING VALVE

NOT TO SCALE

PLUMBING HWR BALANCE VALVE

1/8" = 1'-0"

PLUMBING SAN CLEAN OUTS / DRAIN

Sheets
P-001 - PLUMBING GENERAL NOTES, LEGENDS, SPECIFICATIONS AND DESIGN CRITERIA Copy 1
P-100 - FLOOR PLAN - PLUMBING DEMOLITION
P-101 - FOUNDATION FLOOR PLAN - PLUMBING
P-102 - FLOOR PLAN - PLUMBING
P-201 - PLUMBING DETAILS AND SCHEDULES

File details come from the government source that posted it. Updated .