25106 - Portage Geo and Solar - LF Bid Set 25-08-29.pdf

PDF 296 KB Posted

Attached to
Town of Portage Town hall renovation
Solicitation number
2130423
Issued by
Montgomery County, New York

About this file

Summary

This document is a set of bid-level engineering drawings prepared by Turner Engineering, PC for the Town of Portage's Town Hall Renovation project located at 9907 Church Street in Hunt, New York. The drawings specify the design and installation requirements for a geothermal heating and cooling system as part of a comprehensive net zero energy renovation that includes full interior renovation, new offices, and all new utilities (plumbing, HVAC, and electrical). The geothermal system design includes a vertical bore hole loop field extending 600 feet deep with 1.5-inch IPS HDPE piping, horizontal loop field trenches with manifold assemblies, and associated piping details for connection to the mechanical room. The project may incorporate either the specified geothermal heating and cooling system or an alternative natural gas heating and cooling system, with a solar array system also included subject to potential downsizing per town request.

The drawings provided (sheets LF-100 and LF-200) represent the detailed technical specifications for the geothermal loop field installation, including bore hole details, horizontal piping trench configurations, floor penetrations, valved manifold assemblies, and return header details. All work must be performed under the direction of licensed professional engineers, with specific requirements for thermal enhanced grout, detectable tape placement, sand bedding, and backfill restoration. No specific bid due dates, pricing terms, set-asides, incumbent information, or funding source details are included in these engineering drawings, which serve as supporting technical documentation for the overall town hall renovation procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION OF SOLAR PANEL ARRAY SHOWN

FOR COORDINATION PURPOSES

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

LF-100

GEOTHERMAL LOOP

FIELD PLAN

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

1" = 20'-0"

SITE PLAN - HVAC

N O

R T

H

# LF-100 DRAWING NOTES

1 PROVIDE MANIFOLD PER DETAIL # 4 ON LF-200. PROVIDE FLOOR

PENETRATIONS OF PIPING PER DETAIL # 3 ON LF-200. REFER TO

HVAC AND STRUCTURAL DRAWINGS.

2 APPROXIMATE LOCATION OF BORE, 600 FEET DEEP. INSTALL PIPING

PER DETAIL # 1 ON LF-200.

3 PROVIDE PIPE TRENCH PER DETAIL # 2 ON LF-200.

WIDTH AS REQUIRED TO MAINTAIN

SAFE WORKING CONDITIONS.

TOP OF PIPE SHALL BE MINIMUM

5'-0" BELOW FINISHED GRADE.

USE 90° ELBOWS UNLESS

APPROVED BY ENGINEER.

USE WELL CASING IF REQUIRED

TO STABILIZE THE HOLE AND

FACILITATE LOOP INSTALLATION.

TAKE ALL PRACTICAL

MEASURES TO REMOVE CASING.

LEFT IN PLACE TO MAINTAIN

MINIMUM OF 6" CLEARANCE TO

HORIZONTAL PIPING.

PROVIDE FLOWABLE FILL FOR A

MINIMUM OF 10' TO A MAXIMUM OF

20' BELOW THE TOP OF BORE.

GROUT ENTIRE BORE WITH

THERMAL ENHANCED GROUT

MIX AS SPECIFIED

BY MANUFACTURER.

MAXIMUM 6" DIAMETER BORE.

PROVIDE FACTORY ASSEMBLED

LOOP TO A DEPTH AS SPECIFIED

UTILIZING A U-BEND FITTING

DESIGN FOR GEOTHERMAL

APPLICATIONS.

UNDISTURBED DIRT (TYP.)

PROVIDE SUITABLE BACKFILL PER

SPECIFICATIONS BASED ON LOCATION

AND FINAL GRADE FINISH. RESTORE

TO ROUGH GRADE CONDITION

UNLESS SPECIFIED OTHERWISE.

PROVIDE DETECTABLE TAPE AT A

DEPTH OF 18" BELOW GRADE AND

SECOND LAYER WITHIN 18" OF

PIPE ON BOTH SIDES OF HORIZONTAL

TRENCHES. IF TRENCHES ARE WIDER

THEN 3' PROVIDE ADDITIONAL TAPE

DOWN MIDDLE OF THE TRENCH.

USE FUSION "T" FITTING FOR

HEADER PIPING (TYP.)

MAINTAIN 3" SEPARATION BETWEEN

ALL PIPES AND USE SAND AS

PROTECTIVE BEDDING WITH A

MINIMUM 3" ABOVE AND

BELOW ALL PIPES.

BACKFILL PER DIVISION 31

SPECIFICATIONS AS DETERMINED

BY SITE LOCATION AND FINAL

SURFACE REQUIREMENTS.

MAINTAIN MINIMUM OF

3" SAND/SPACING BETWEEN ALL

PIPES AND NON-SAND MATERIAL.

UNDISTURBED DIRT (TYP.)

SAND

GEOTHERMAL TRACER TAOE SHALL BE LOCATED

AT LEAST 18" BELOW SURFACE AND 18" ABOVE

PIPING, BOTH SIDES OF TRENCH AND AT LEAST

EVERY 18" ACROSS THE WIDTH OF THE TRENCH.

(M

IN

IM

U M

1'-0"

4"

MECH. RM FLOOR

3" PVC SLEEVE

1 1/2" IPS HDPE PIPE

MECHANICAL SEAL

PLAN VIEW

ELEVATION VIEW

12.0 in4.5 in

8.0 in

1 1/2" CIRCUITS WITH 1 1/2" UNION BALL VALVES.

18.0 in

P/T PORTS ON EACH MANIFOLD

BRASS THERMOWELL ON EACH MANIFOLD

3" LUG STYLE BUTTERFLY

VALVE & 3" HDPE MANIFOLD

1 1/2" PURGE PORT,

1 1/2" BALL VALVES WITH PVC PLUG.

NOT TO SCALE

1-1/2"

1-1/2"

VERTICAL BORE

WITH HDPE LOOP

FROM RETURN MANIFOLD

TO SUPPLY MANIFOLD

NOTE:

LAYOUT IS SCHEMATIC. LOCATION OF PIPING MAY VARY. NOT TO SCALE.

TURNER

E N G I N E E R I N G , P C

One Woodbury Boulevard Rochester, NY 14604

585.381.3360

IT IS A VIOLATION OF LAW FOR ANY PERSONS,

UNLESS ACTING UNDER THE DIRECTION OF A

LICENSED PROFESSIONAL ENGINEER, TO ALTER

ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY

LICENSEE WHO ALTERS THIS DOCUMENT IS

REQUIRED BY LAW TO AFFIX HIS OR HER SEAL

AND THE NOTATION "ALTERED BY", FOLLOWED

BY HIS OR HER SIGNATURE AND A SPECIFIC

DESCRIPTION OF THE ALTERATIONS.

Client

Project

Drawing

Issue Date:

Proj. No.

Sheet

Revisions

Proj. Status:

LF-200

LOOP FIELD DETAILS

Project No. 25106

TOWN OF PORTAGE GEO

AND SOLAR

TOWN OF PORTAGE

25106

08/29/2025

9907 CHURCH STREET

HUNT, NY 14846

BID DOCUMENTS

NO SCALE

BORE HOLE / LOOP DETAIL

NO SCALE

HORIZONTAL LOOP FIELD PIPING/TRENCH DETAIL

NO SCALE

FLOOR PENETRATION DETAIL

NO SCALE

VALVED MANIFOLD ASSEMBLY DETAIL

NO SCALE

REVERSE/RETURN HEADER DETAIL

Sheets
H-001 - HVAC GENERAL NOTES, LEGENDS, AND DESIGN CRITERIA
H-002 - HVAC SPECIFICATIONS
H-100 - FLOOR PLAN - HVAC DEMOLITION
H-101 - FLOOR PLAN - HVAC DUCTWORK
H-102 - FLOOR PLAN - HVAC PIPING
H-200 - HVAC DUCTWORK DETAILS
H-201 - HVAC PIPING DETAILS
H-300 - HVAC SCHEDULES AND CONTROLS
LF-100 - GEOTHERMAL LOOP FIELD PLAN
LF-200 - LOOP FIELD DETAILS

File details come from the government source that posted it. Updated .