Summary
This document is a set of bid-level engineering drawings prepared by Turner Engineering, PC for the Town of Portage's Town Hall Renovation project located at 9907 Church Street in Hunt, New York. The drawings specify the design and installation requirements for a geothermal heating and cooling system as part of a comprehensive net zero energy renovation that includes full interior renovation, new offices, and all new utilities (plumbing, HVAC, and electrical). The geothermal system design includes a vertical bore hole loop field extending 600 feet deep with 1.5-inch IPS HDPE piping, horizontal loop field trenches with manifold assemblies, and associated piping details for connection to the mechanical room. The project may incorporate either the specified geothermal heating and cooling system or an alternative natural gas heating and cooling system, with a solar array system also included subject to potential downsizing per town request.
The drawings provided (sheets LF-100 and LF-200) represent the detailed technical specifications for the geothermal loop field installation, including bore hole details, horizontal piping trench configurations, floor penetrations, valved manifold assemblies, and return header details. All work must be performed under the direction of licensed professional engineers, with specific requirements for thermal enhanced grout, detectable tape placement, sand bedding, and backfill restoration. No specific bid due dates, pricing terms, set-asides, incumbent information, or funding source details are included in these engineering drawings, which serve as supporting technical documentation for the overall town hall renovation procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION OF SOLAR PANEL ARRAY SHOWN
FOR COORDINATION PURPOSES
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
LF-100
GEOTHERMAL LOOP
FIELD PLAN
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
1" = 20'-0"
SITE PLAN - HVAC
N O
R T
H
# LF-100 DRAWING NOTES
1 PROVIDE MANIFOLD PER DETAIL # 4 ON LF-200. PROVIDE FLOOR
PENETRATIONS OF PIPING PER DETAIL # 3 ON LF-200. REFER TO
HVAC AND STRUCTURAL DRAWINGS.
2 APPROXIMATE LOCATION OF BORE, 600 FEET DEEP. INSTALL PIPING
PER DETAIL # 1 ON LF-200.
3 PROVIDE PIPE TRENCH PER DETAIL # 2 ON LF-200.
WIDTH AS REQUIRED TO MAINTAIN
SAFE WORKING CONDITIONS.
TOP OF PIPE SHALL BE MINIMUM
5'-0" BELOW FINISHED GRADE.
USE 90° ELBOWS UNLESS
APPROVED BY ENGINEER.
USE WELL CASING IF REQUIRED
TO STABILIZE THE HOLE AND
FACILITATE LOOP INSTALLATION.
TAKE ALL PRACTICAL
MEASURES TO REMOVE CASING.
LEFT IN PLACE TO MAINTAIN
MINIMUM OF 6" CLEARANCE TO
HORIZONTAL PIPING.
PROVIDE FLOWABLE FILL FOR A
MINIMUM OF 10' TO A MAXIMUM OF
20' BELOW THE TOP OF BORE.
GROUT ENTIRE BORE WITH
THERMAL ENHANCED GROUT
MIX AS SPECIFIED
BY MANUFACTURER.
MAXIMUM 6" DIAMETER BORE.
PROVIDE FACTORY ASSEMBLED
LOOP TO A DEPTH AS SPECIFIED
UTILIZING A U-BEND FITTING
DESIGN FOR GEOTHERMAL
APPLICATIONS.
UNDISTURBED DIRT (TYP.)
PROVIDE SUITABLE BACKFILL PER
SPECIFICATIONS BASED ON LOCATION
AND FINAL GRADE FINISH. RESTORE
TO ROUGH GRADE CONDITION
UNLESS SPECIFIED OTHERWISE.
PROVIDE DETECTABLE TAPE AT A
DEPTH OF 18" BELOW GRADE AND
SECOND LAYER WITHIN 18" OF
PIPE ON BOTH SIDES OF HORIZONTAL
TRENCHES. IF TRENCHES ARE WIDER
THEN 3' PROVIDE ADDITIONAL TAPE
DOWN MIDDLE OF THE TRENCH.
USE FUSION "T" FITTING FOR
HEADER PIPING (TYP.)
MAINTAIN 3" SEPARATION BETWEEN
ALL PIPES AND USE SAND AS
PROTECTIVE BEDDING WITH A
MINIMUM 3" ABOVE AND
BELOW ALL PIPES.
BACKFILL PER DIVISION 31
SPECIFICATIONS AS DETERMINED
BY SITE LOCATION AND FINAL
SURFACE REQUIREMENTS.
MAINTAIN MINIMUM OF
3" SAND/SPACING BETWEEN ALL
PIPES AND NON-SAND MATERIAL.
UNDISTURBED DIRT (TYP.)
SAND
GEOTHERMAL TRACER TAOE SHALL BE LOCATED
AT LEAST 18" BELOW SURFACE AND 18" ABOVE
PIPING, BOTH SIDES OF TRENCH AND AT LEAST
EVERY 18" ACROSS THE WIDTH OF THE TRENCH.
(M
IN
IM
U M
1'-0"
4"
MECH. RM FLOOR
3" PVC SLEEVE
1 1/2" IPS HDPE PIPE
MECHANICAL SEAL
PLAN VIEW
ELEVATION VIEW
12.0 in4.5 in
8.0 in
1 1/2" CIRCUITS WITH 1 1/2" UNION BALL VALVES.
18.0 in
P/T PORTS ON EACH MANIFOLD
BRASS THERMOWELL ON EACH MANIFOLD
3" LUG STYLE BUTTERFLY
VALVE & 3" HDPE MANIFOLD
1 1/2" PURGE PORT,
1 1/2" BALL VALVES WITH PVC PLUG.
NOT TO SCALE
1-1/2"
1-1/2"
VERTICAL BORE
WITH HDPE LOOP
FROM RETURN MANIFOLD
TO SUPPLY MANIFOLD
NOTE:
LAYOUT IS SCHEMATIC. LOCATION OF PIPING MAY VARY. NOT TO SCALE.
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Revisions
Proj. Status:
LF-200
LOOP FIELD DETAILS
Project No. 25106
TOWN OF PORTAGE GEO
AND SOLAR
TOWN OF PORTAGE
25106
08/29/2025
9907 CHURCH STREET
HUNT, NY 14846
BID DOCUMENTS
NO SCALE
BORE HOLE / LOOP DETAIL
NO SCALE
HORIZONTAL LOOP FIELD PIPING/TRENCH DETAIL
NO SCALE
FLOOR PENETRATION DETAIL
NO SCALE
VALVED MANIFOLD ASSEMBLY DETAIL
NO SCALE
REVERSE/RETURN HEADER DETAIL
| Sheets |
| H-001 - HVAC GENERAL NOTES, LEGENDS, AND DESIGN CRITERIA |
| H-002 - HVAC SPECIFICATIONS |
| H-100 - FLOOR PLAN - HVAC DEMOLITION |
| H-101 - FLOOR PLAN - HVAC DUCTWORK |
| H-102 - FLOOR PLAN - HVAC PIPING |
| H-200 - HVAC DUCTWORK DETAILS |
| H-201 - HVAC PIPING DETAILS |
| H-300 - HVAC SCHEDULES AND CONTROLS |
| LF-100 - GEOTHERMAL LOOP FIELD PLAN |
| LF-200 - LOOP FIELD DETAILS |
File details come from the government source that posted it. Updated .