25-8408_Exhibit_M-5_-_CCWRF_Bid_Alternate_Drawings.pdf

PDF 1 MB Posted

Attached to
Central County Water Reclamation Facility Expansion
Solicitation number
25-8408
Issued by
Collier County, Florida

About this file

These documents are engineering design drawings for the Central County Water Reclamation Facility Expansion project by Collier County Utilities, located in Estero, Florida. The drawings (specifically sheets D-108, D-109, and D-112) detail an enlarged yard piping plan for reclaimed water infrastructure, including two reclaimed water storage tanks, a reclaimed water pump station, and associated piping systems. The project includes multiple bid alternate components such as 20" and 24" reclaimed water (RCW) piping, duct banks, light pole and conduit installations, and various connections to existing water mains.

The drawings indicate a comprehensive water infrastructure expansion with specific technical details about pipe routing, tank locations, and connection points. The project appears to have multiple bid alternate sections that allow for phased or modular implementation, giving the county flexibility in project execution. The design includes provisions for future connections, such as 30" stub outs, and involves complex piping networks including potable water (PW), reclaimed water (RCW), drain lines (DR), and reject water systems. The design is prepared by Tetra Tech, with the project number 200-08486-20013, and is part of a bid set for engineering business.

View the file

Other files

File Type Posted
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8408_Exhibit_M-4_-_GGWWPT-SDPA-Site_(Dumpster_Enclosure)_S&S.pdf PDF
25-8408_Exhibit_I-1_-_Existing_Golden_Gate_WWTP_Drawings.pdf PDF
25-8408_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8408_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8408_Exhibit_M-2_–_Drawings_S&S_10.3.pdf PDF
25-8408_Exhibit_M-1_-_Civil_Plans_S&S_10.3.pdf PDF
25-8408_Exhibit_J_-_Technical_Specifications_S&S_10.3.pdf PDF
25-8408_Exhibit_I-1_-_Supplemental_Conditions_R1.pdf PDF
25-8408_Exhibit_M-2_–_Drawings_S&S_9.11.pdf PDF
25-8408_Exhibit_J_-_Technical_Specifications_S&S_9.26.pdf PDF
Exhibits_Combined.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
25-8408_Bid_Schedule_.xlsx XLSX spreadsheet
25-8408_Bid_Schedule_.xlsx XLSX spreadsheet
25-8408_Bid_Schedule_.xlsx XLSX spreadsheet
25-8408_Bid_Schedule_.xlsx XLSX spreadsheet
25-8408_Solicitation.pdf PDF
25-8408_-_Exhibit_M-3_-_Drawings_-_Drawing_Index.pdf PDF
25-8408_-_Exhibit_J-1_-_Technical_Specifications_-_Table_of_Contents.pdf PDF
25-8408_-_Pre-Bid_Sign-in_Sheets.pdf PDF
Construction_Bid_Instructions_Form_2025_Rev.2.pdf PDF
25-8408_Bid_Schedule_.xlsx XLSX spreadsheet
25-8408_-_Solicitation.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8408_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8408_-_Exhibit_M-2_-_Drawings_S&S_5.23.2025.pdf PDF
25-8408_-_Exhibit_M-1_-_Plans_S&S_5.23.2025.pdf PDF
25-8408_-_Exhibit_J_-_Technical_Specifications_S&S_6.10.pdf PDF
25-8408_-_Exhibit_I-1_-_Supplemental_Conditions.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10.87

RECLAIMED

WATER

STORAGE

TANK

NO.1

RECLAIMED

PUMP STATION

RECLAIMED

WATER

STORAGE

TANK

NO.2

295 LF 8" PVC @0.40%

SMH-9

4' MANHOLE

RIM EL.= 11.60 '

W. INV. = 4.36'

N:668766.03 E:425653.45

8" PW

6" D

R

6" D

R

8" R

C W

20" R

CW

8" NPW

30" RCW

" R

CW

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DB

DBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDBDB

DBDB

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DB DB DB DB

D B

DB

DB

DB

DB

DB

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DB

DB

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DB

DB

DB

DB

DB DB

445 446

Checked By:

Drawn By:

Project No.:

Designed By:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

5/

/2

2:

:2

PM

O

:\P R

O

JE

C

TS

\O R

LA

N

D O

\IE

R

\0

\2

-0

-2

\C

AD

\S

H

EE

TF

IL

ES

\M

BR

S

ET

\D

-1

-D -1

.D

W G

M

AT

TH

EW

S, R U

SS

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

C op yr ig ht : T et ra

T ec h

200-08486-20013

C

EN

TR

AL

C O

U N

TY

W

AT

ER

R

EC

LA

M

AT

IO

N

FA

C

IL

IT

Y

EX

PA

N

SI

O N

CO

LL

IE

R

CO

UN

TY

U

TI

LI

TI

ES

C

H

EV

R O

LE

T

W

AY

, S U

IT

E

ES

TE

R O

, F L

PH

O N

E:

(2

) 3

-1

FA

X:

(2

) 3

-1

BID SET

EN

G

IN

EE

R

IN

G B

U

SI

N

ES

S N

O . 2

D-108

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

N

SCALE:

5' 10' 20'

1'' = 10'

D-108

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

MATCHLINE SEE DRAWING D-112

M

AT

C H

LI

N

E

SE

E D

R

AW

IN

G

D -1

M

AT

C H

LI

N

E

SE

E D

R

AW

IN

G

D -1

NOTES:

1. SEE DRAWING D-601 AND

D-602 FOR PIPE FITTINGS

AND CROSSINGS TABLE.

20" RCW AND 8"

RCW PIPING

INCLUDED IN BID

ALTERNATE

RECLAIMED

WATER STORAGE

TANKS INCLUDED

IN BID

ALTERNATES

RECLAIMED

WATER PUMP

STATION,

CONCRETE

SLAB, AND

PIPING

INCLUDED IN BID

ALTERNATE

LIGHT POLE AND

CONDUIT

INCLUDED IN BID

ALTERNATE

DUCT BANK

INCLUDED IN BID

ALTERNATE

LIMITS OF

PAVING IN BID

ALTERNATE AT

DRIVEWAY

LIMITS OF DRAIN

LINE FOR BID

ALTERNATE -

INSTALL 6" MJ

CAP

LIMITS OF DRAIN

LINE FOR BID

ALTERNATE -

INSTALL 6" MJ

CAP

LIMITS OF 8"

NPW FOR BID

ALTERNATE -

INSTALL 8" MJ

CAP

LIMITS OF BID ALTERNATE

SHOWN IN CLOUDED

AREAS - THIS SHEET

11.81

10.86

11.15 xxxxxxxxxxxxxxxxxx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx

8" PW

24" RCW

CONNECT TO EXISTING 10" POTABLE WATER

MAIN WITH 10"x8" TAPPING SLEEVE AND VALVE.

CONTRACTOR TO FIELD LOCATE AND VERIFY

TYPE, LOCATION AND SIZE.

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DBDB

DBDB

DBDB

DB

DB

DB

DB

RIGHT-OF-WAY

TR

O

PI

C

AN

A

BL

VD

PAVEMENT RESTORATION 3

D-508

Checked By:

Drawn By:

Project No.:

Designed By:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

4/

/2

3:

:0

PM

O

:\P R

O

JE

C

TS

\O R

LA

N

D O

\IE

R

\0

\2

-0

-2

\C

AD

\S

H

EE

TF

IL

ES

\M

BR

S

ET

\D

-1

-D -1

.D

W G

M

AT

TH

EW

S, R U

SS

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

C op yr ig ht : T et ra

T ec h

200-08486-20013

C

EN

TR

AL

C O

U N

TY

W

AT

ER

R

EC

LA

M

AT

IO

N

FA

C

IL

IT

Y

EX

PA

N

SI

O N

CO

LL

IE

R

CO

UN

TY

U

TI

LI

TI

ES

C

H

EV

R O

LE

T

W

AY

, S U

IT

E

ES

TE

R O

, F L

PH

O N

E:

(2

) 3

-1

FA

X:

(2

) 3

-1

BID SET

EN

G

IN

EE

R

IN

G B

U

SI

N

ES

S N

O . 2

D-109

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

N

SCALE:

5' 10' 20'

1'' = 10'

D-109

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

M

AT

C H

LI

N

E

SE

E D

R

AW

IN

G

D -1

MATCHLINE SEE DRAWING D-113

NOTES:

1. SEE DRAWING D-601 AND

D-602 FOR PIPE FITTINGS

AND CROSSINGS TABLE.

LIMITS OF BID ALTERNATE

SHOWN IN CLOUDED

AREAS - THIS SHEET

24" RCW

INCLUDED IN BID

ALTERNATE

REJECT

WATER

STORAGE

TANK

NO.2

O

PE

R

AT

IO

N

S

BU

IL

D

IN

G

BLOWER

ROOM

TRANSFER/ REJECT

FLOW METER AND

CONTROL VALVE

ASSEMBLY

20" RW

" R

C W

6"

DR

20" REJ

18" INF

" R

EJ

6" DR

30" STUB OUT

FOR FUTURE

CONNECTION

30" STUB OUT

FOR FUTURE

CONNECTION

18" RJ

" I

N F

REJECT

WATER

STORAGE

TANK

NO.1

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

D B

DB DB DB DB DB

DB

DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB

D B

DB

D B

D B

D B

D B

D B

DBDBDBDBDBDBDB

DB

D B

DB

DB

DB

D B

D B

D B

D B

D B

DB

DB

DB

DB

DB

DB

DB

DB

DB

DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB DB

DB

DBDBDBDBDBDBDBDB

DB

DB

DB

DB

DB

DB

DB

D B

DB

238 241

256255

184 186

Checked By:

Drawn By:

Project No.:

Designed By:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

4/

/2

:5 1:

A

M

O :\P

R O

JE

C

TS

\O

R

LA

N D

O

\IE

R \0

\2

-0

-2

\C

AD

\S H

EE

TF

IL

ES

\M

BR

S

ET

\D -1

-D

-1

.D W

G

M

AT

TH

EW

S, R

U

SS

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

C op yr ig ht : T et ra

T ec h

200-08486-20013

C

EN

TR

AL

C O

U N

TY

W

AT

ER

R

EC

LA

M

AT

IO

N

FA

C

IL

IT

Y

EX

PA

N

SI

O N

CO

LL

IE

R

CO

UN

TY

U

TI

LI

TI

ES

C

H

EV

R O

LE

T

W

AY

, S U

IT

E

ES

TE

R O

, F L

PH

O N

E:

(2

) 3

-1

FA

X:

(2

) 3

-1

BID SET

EN

G

IN

EE

R

IN

G B

U

SI

N

ES

S N

O . 2

D-112

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

N

SCALE:

5' 10' 20'

1'' = 10'

D-112

EN

LA

R G

ED

YA

R D

P

IP

IN

G

P

LA

N

BLK

RLM

TW

M

AT

C H

LI

N

E

SE

E D

R

AW

IN

G

D -1

MATCHLINE SEE DRAWING D-108

MATCHLINE SEE DRAWING D-116

M

AT

C H

LI

N

E

SE

E D

R

AW

IN

G

D -1

NOTES:

1. SEE DRAWING D-601 AND

D-602 FOR PIPE FITTINGS

AND CROSSINGS TABLE.

DUCT BANK AND

CONDUCTORS

TO RECLAIMED

WATER HSPS

INCLUDED IN BID

ALTERNATE

20" RCW

INCLUDED IN BID

ALTERNATE

20" MJ CAP (TO

BE REMOVED IN

BID ALTERNATE)

LIMITS OF BID ALTERNATE

SHOWN IN CLOUDED

AREAS - THIS SHEET

2025-05-22T18:33:18-0400
Tyler C Wainright

File details come from the government source that posted it. Updated .