25-061-ITB_Certificates_of_Warranty.pdf

PDF 302 KB Posted

Attached to
Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3
Solicitation number
25-061-ITB
Issued by
Bell County, Kentucky

About this file

These documents are Certificates of Warranty for the Cincinnati/Northern Kentucky International Airport's Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3 project (Project Number: 25-061-ITB). The warranties cover multiple specifications and systems, including concrete repairs, door hardware, expansion joints, fluid applied roofing, high performance coatings, vehicular traffic membrane, miscellaneous metals, pavement markings, post-tensioned garage cable repairs, sealants, and glazed aluminum storefront. Each warranty certificate specifies different warranty periods ranging from two to twenty years after the date of Substantial Completion, with most warranties lasting either two or five years.

The warranty certificates are standardized forms that require completion by the contractor, including signatures, titles, and notarization. The warranties cover various technical aspects of the parking garage rehabilitation project, protecting the airport against potential defects in materials and workmanship. The variation in warranty lengths suggests different expected lifespans and critical nature of various construction components, with roofing and storefront systems receiving longer warranty periods compared to pavement markings and concrete repairs. Each warranty is contingent upon the date of Substantial Completion and requires the contractor to remedy any issues that arise during the specified warranty period.

View the file

Other files

File Type Posted
Terminal_2_&_3_Parking_Garage_Rehabilitation_-_Phase_3_(Addendum_#2_Revision).pdf PDF
25-061-ITB_T2_&_T3_Garage_Rehab-Ph_3-Dwgs_Addendum_2_10.22.25.pdf PDF
25-061-ITB_Pre-Bid_Sign_In_Sheets.pdf PDF
25-061-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
Terminal_2_&_3_Parking_Garage_Rehabilitation_-_Phase_3.pdf PDF
25-061-ITB_Bidders_List_2025.xlsx XLSX spreadsheet
25-061-ITB_T2_&_T3_Parking_Garage_Rehab-Phase_3_-_Ad.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
25-061-ITB_Terminal_2_&_3_Parking_Garage_Rehabilitation-Phase_3_-_Drawings.pdf PDF
25-061-ITB_Terminal_2_&_3_Parking_Garage_Rehabilitation-Phase_3_-_Technical_Specifications.pdf PDF
25-061-ITB_T2_&_T3_Parking_Garage_Rehab-Phase_3_-_Exhibit_B-Contract_&_Bonds.pdf PDF
25-061-ITB_T2_&_T3_Parking_Garage_Rehab-Phase_3_-_Exhibit_A-Proposal_Forms.pdf PDF
25-3_T2-T3_Parking_Garage_Rehabilition_-_Construction_Year_3_-_BC.pdf PDF
250923_CVG_Garages_Phase_3_THP_Cost_Estimate.xls XLS spreadsheet
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
EEO_Certification.docx DOCX document
Buy_American_Certification-Construction_Projects.docx DOCX document
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATE OF WARRANTY

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Concrete Repairs per Specification Section 030100 warranty called for in the Contract Specifications is now in force until after such time as two (2) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, in and for the County and State aforesaid by __________________________ duly authorized so to sign this ___________________day of _________________, 20____.

Notary Public

My commission expires:

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Door Hardware per Specification Section 087100 warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Expansion Joints Specification Section 079000 joint and several (contractor and manufacturer) warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Fluid Applied Roofing Specification Section 075600 contractor warranty called for in the Contract Specifications is now in force until after such time as two (2) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Fluid Applied Roofing Specification Section 075600 manufacturer warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the High Performance Coatings per Specification Section 099100 contractor warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the High Performance Coatings per Specification Section 099100 manufacturer warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the KEE Roofing Specification Section 075416 contractor warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the KEE Roofing Specification Section 075416 manufacturer warranty called for in the Contract Specifications is now in force until after such time as twenty (20) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Vehicular Traffic Membrane Specification Section 071800 joint and several (contractor and manufacturer) warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Miscellaneous Metals per Specification Section 055000 warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Pavement Markings per Specification Section 321723 warranty called for in the Contract Specifications is now in force until after such time as two (2) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Post Tensioned Garage Cable Repairs per Specification Section 033810 warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Sealants per Specification Section 079200 warranty called for in the Contract Specifications is now in force until after such time as five (5) years has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public, CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

Project Name: Terminal 2 & 3 Parking Garage Rehabilitation - Phase 3

Project Number: 25-061-ITB

Contractor: ______________________________________________

Date of Substantial Completion: ______________________________

I, , being the of do hereby certify that the Glazed Aluminum Storefront per Specification Section 084413 warranty called for in the Contract Specifications is now in force until after such time as five (5) years for the complete system and ten (10) years for the glass has passed after the date of Substantial Completion.

Signed:

Title:

STATE OF

COUNTY OF ___________________________

Subscribed and sworn to before me, a Notary Public,

File details come from the government source that posted it. Updated .