25-0070-Plans-006310A-LG135-SS.pdf

PDF 40 MB Posted

Attached to
FY 2026 Pavement Preservation Package 1-STEP 2
Solicitation number
25-0070-ITB-C STEP 2
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a project plan for the Pinellas County FY2025-2026 Countywide Pavement Preservation Program, specifically Local Group 135, prepared by Professional Engineer Jeffrey S. Thompson. The project involves milling and resurfacing multiple roadways across various streets including Mulberry Way, Cypress Trail, 92nd Street N, 102nd Avenue N, and several other neighborhood streets. The total project scope covers approximately 40,200 linear feet, with a planned milling depth of 1.5 inches and resurfacing using Type SP 12.5 Structural Course (Traffic C) for a 1.5-inch overlay. The project is part of a larger FY26 Pavement Preservation Package 1 that includes five paving locations totaling approximately 34.98 lane miles of roadway.

The document indicates a 2% grade for the typical road sections (with potential engineer-directed adjustments up to 4%), and appears to be a comprehensive engineering plan with 35 sheets covering project details, typical sections, core location maps, and specific road segment plans. While specific pricing details are not explicitly outlined in this document, the project is clearly part of Pinellas County's ongoing infrastructure maintenance and improvement efforts, aimed at promoting traffic safety and roadway efficiency. The plan is dated February 18, 2025, and was prepared under the professional seal of Jeffrey S. Thompson, suggesting a structured, government-managed infrastructure investment initiative.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 25-0070-006310A

FY2025-2026 COUNTYWIDE

PAVEMENT PRESERVATION PROGRAM

LOCAL GROUP 135

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORI'A

93254

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

MULBERRY WAY, CYPRESS TRL, CYPRESS CIR, SHADY OAK LN,

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

92ND ST N, 102ND AVE N STA. 25+10.59 - STA. 36+57.50

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

102ND AVE N

106TH AVE LN, MYRTLE OAK LN, MAPLE CT, BIRCH DR, 92ND ST N,

BRYAN DAIRY RD, 107TH AVE N, 108TH AVE N, 109TH AVE N

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

TYPICAL SECTION

FRONTAGE RD,

Feet 40200 10

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES
3 TYPICAL SECTION
4 PW - Plan Only HOR20
5 PW - Plan Only HOR20 (2)
6 PW - Plan Only HOR20 (3)
7 PW - Plan Only HOR20 (4)
8 PW - Plan Only HOR20 (5)
9 PW - Plan Only HOR20 (6)
10 PW - Plan Only HOR20 (7)
11 PW - Plan Only HOR20 (8)
12 PW - Plan Only HOR20 (9)
13 PW - Plan Only HOR20 (10)
14 PW - Plan Only HOR20 (11)
15 PW - Plan Only HOR20 (12)
16 PW - Plan Only HOR20 (13)
17 PW - Plan Only HOR20 (14)
18 PW - Plan Only HOR20 (15)
19 PW - Plan Only HOR20 (16)
20 PW - Plan Only HOR20 (17)
21 PW - Plan Only HOR20 (18)
22 PW - Plan Only HOR20 (19)
23 PW - Plan Only HOR20 (20)
24 PW - Plan Only HOR20 (21)
25 PW - Plan Only HOR20 (22)
26 PW - Plan Only HOR20 (24)
27 PW - Plan Only HOR20 (25)
28 PW - Plan Only HOR20 (26)
29 PW - Plan Only HOR20 (27)
30 PW - Plan Only HOR20 (28)
31 PW - Plan Only HOR20 (29)
32 CORE LOCATION MAP
33 Typical Sections A_B
34 Typical Section C
35 LOOP DETAIL