25-0070-Appendix_1-Permits.pdf
PDF 85 KB Posted
- Attached to
- FY 2026 Pavement Preservation Package 1-STEP 2
- Solicitation number
- 25-0070-ITB-C STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is an Appendix 1 Permits document for Pinellas County's FY 2026 Pavement Preservation Package 1, identified with Contract No. 25-0070. The document outlines the permit requirements for a pavement preservation project, with no specific agency permits currently listed as applicable. The County is responsible for obtaining known Federal and State permits for construction, while the awarded Contractor must secure and maintain additional permits, including dewatering and tree removal/relocation permits.
At the pre-construction meeting, the Contractor will receive a Pinellas County Habitat Management Permit application. Upon County approval, the Contractor must comply with all terms and conditions specified in the Pinellas County Code of Ordinances, specifically Part III, Land Development Code, Chapter 166, Article II, Division 2, Permits. The detailed permit requirements can be found at the provided municode.com website link, which contains the specific regulations governing the project's environmental and land development aspects.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1
PERMITS
FY 2026 PAVEMENT
PRESERVATION PACKAGE 1
Contract No. 25-0070
PERMIT INDEX
AGENCY PERMIT No. PAGE No.(s)
NOT APPLICABLE
Prior to issuance of work, the County shall obtain (and provide to the contractor) all known Federal and State permits required for construction. The Contractor shall secure and maintain all other permits required for construction, including (but not limited to), dewatering permits and permits required for tree removal or relocation.
The awarded Contractor will be provided with a Pinellas County Habitat Management Permit application at the pre-construction meeting. Upon County approval of said application, the Habitat Management Permit will be issued and the Contractor will be required to comply with all terms and conditions of the permit. For more information on the terms and conditions that may be required by the Habitat Management Permit, refer to the Pinellas County Code of Ordinances, Part III, Land Development Code, Chapter 166, Article II, Division 2, Permits located at http://www.municode.com/Library/FL/Pinellas_County.
http://www.municode.com/Library/FL/Pinellas_County
File details come from the government source that posted it. Updated .