Gas Load Pressure Form Lawrence Haskell Indian Health Center 8992435310.pdf
PDF 104 KB Posted
- Solicitation number
- 246-26-Q-0004
About this file
This is a Natural Gas BTU Load & Pressure Form for the Haskell Indian Health Center located at 2413 Massachusetts St. in Lawrence, KS. The document details the natural gas requirements for various equipment types, including a 150kW Generator, multiple Roof Top Units (RTUs), hot water heaters, and a gas range. The total BTU load for the facility is 3,715,000 BTUs, with equipment quantities ranging from 1-3 units per type. The form indicates a requirement for 2 lbs. of elevated pressure and provides contact information for Larry Hutcheson (405-626-0369) and an email address for Brent Webb at Black Hills Energy for submission of the completed form.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natural Gas BTU Load & Pressure Form
Customer Name
Customer Address
Contact Name Phone Number
Equipment Type Quantity BTU Load Each BTU Load Total
Total BTU Load
Natural Gas Pressure Requirements:
1/4 lb. (Standard Pressure)
2 lbs. (Elevated Pressure) 5 lbs. (Elevated Pressure)
Please Email Completed Form To: Brent.Webb@blackhillscorp.com ebrau Highlight
| Customer Name: Haskell Indian Health Center, 8992435310 |
| Customer Address: 2413 Massachusetts St. Lawrence, KS |
| Contact Name: Larry Hutcheson |
| Phone Number: 405-626-0369 |
| Equipment TypeRow1: 150kW Generator |
| QuantityRow1: 1 |
| BTU Load EachRow1: 2,000,000 |
| BTU Load TotalRow1: 2,000,000 |
| Equipment TypeRow2: RTU 1 |
| QuantityRow2: 1 |
| BTU Load EachRow2: 130,000 |
| BTU Load TotalRow2: 130,000 |
| Equipment TypeRow3: RTU 2,3,4 |
| QuantityRow3: 3 |
| BTU Load EachRow3: 180,000 |
| BTU Load TotalRow3: 540,000 |
| Equipment TypeRow4: RTU 5 |
| QuantityRow4: 1 |
| BTU Load EachRow4: 105,000 |
| BTU Load TotalRow4: 105,000 |
| Equipment TypeRow5: RTU 6 |
| QuantityRow5: 1 |
| BTU Load EachRow5: 150,000 |
| BTU Load TotalRow5: 150,000 |
| Equipment TypeRow6: RTU 7 |
| QuantityRow6: 1 |
| BTU Load EachRow6: 360,000 |
| BTU Load TotalRow6: 360,000 |
| Equipment TypeRow7: RTU 8,9 |
| QuantityRow7: 2 |
| BTU Load EachRow7: 65,000 |
| BTU Load TotalRow7: 130,000 |
| Equipment TypeRow8: Hot Water 100 Gal |
| QuantityRow8: 1 |
| BTU Load EachRow8: 200,000 |
| BTU Load TotalRow8: 200,000 |
| Equipment TypeRow9: Hot Water 50 Gal |
| QuantityRow9: 1 |
| BTU Load EachRow9: 40,000 |
| BTU Load TotalRow9: 40,000 |
| Equipment TypeRow10: Gas Range |
| QuantityRow10: 1 |
| BTU Load EachRow10: 60,000 |
| BTU Load TotalRow10: 60,000 |
| Equipment TypeRow11: |
| QuantityRow11: |
| BTU Load EachRow11: |
| BTU Load TotalRow11: |
| Equipment TypeRow12: |
| QuantityRow12: |
| BTU Load EachRow12: |
| BTU Load TotalRow12: |
| Total BTU Load: 3,715,000 |
| 14 lb Standard Pressure: |
| 2 lbs Elevated Pressure: X |
| Other Please Specify: |
| undefined: |
File details come from the government source that posted it. Updated .