24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf

PDF 141 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a technical diagram for a Three Phase Six Bushing Padmounted Transformer (Loop Feed) dated August 2016. The diagram includes a detailed schematic showing the transformer's installation with compacted earth or gravel base, a comprehensive wiring diagram, and a materials list. Key technical specifications include:

Key installation notes specify that only wire-wye connections should be used, sufficient neutral pigtail and cable slack must be provided, and safety signs must be installed inside and outside the transformer enclosure. The materials list includes components such as connectors, jumpers, arresters, and terminations. The diagram provides specific instructions for transformer installation, grounding, and cable management, with additional notes about stabilizing non-metallic sweeps and potential variations in burial depths based on radius requirements.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
(Attachment 56) SABER Seed SOO Honor Guard Building 10250 Attachment 2- HAZMAT Results 10250 Restrooms part 2.pdf PDF
(Attachment 59) SABER Seed SOO Honor Guard Building 10250 Attachment 6 - Floorplan Conceptual.pdf PDF
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf PDF
(Attachment 62)SABER Seed SOO Honor Guard Building 10250Attachment 9 -Asbestos and Lead testing for installing air compressor.pdf PDF
(Attachment 64) SABER Seed SOO Honor Guard Building 10250 Attachment 11- Testing on exterior paint walls dated 6 November 2014.pdf PDF
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf PDF
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment FA486125R00030003 SF 30 .pdf PDF
Attachment 53 Gordian SABER Technical Specifications.pdf PDF
Solicitation Amendment FA486125R00030002 SF 30.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Solicitation Amendment - FA486125R00030001.pdf PDF
Atch 42 NV20250058 19Sep25 Hwy Clark.pdf PDF
Atch 50_RFI Log_General Solicitation.xlsx XLSX spreadsheet
Atch 51_RFI Log_ SABER Seed.xlsx XLSX spreadsheet
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
34 - Schedule of Values Template.xlsx XLSX spreadsheet
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .