24_-_AMNWR__Attachments_List__Crystal_Springs.pdf

PDF 83 KB Posted

Attached to
NV ASH MEADOWS NWR CRY SPRNGS RESTORE Federal contract opportunity
Solicitation number
140FGA25R0003
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is an attachments list document for a Design/Build services contract opportunity at Ash Meadows National Wildlife Refuge (AMNWR) for Crystal Springs Outflow Restoration project. The document provides a comprehensive listing of 26 separate files that comprise the complete solicitation package.

The attachments include key project documents such as the proposal schedule, statement of work, technical requirements, various dam reports (Crystal Springs, Horseshoe, and Lower Crystal), construction sequences, safety checklists, and environmental documentation. The package also contains multiple maps showing location, management areas, and environmental compliance values. Notable technical documents include a dust hazard analysis, PFAS summary, H&H Report, and dam safety inspection documentation. Required federal contracting forms like Davis Bacon Wage Determination and Past Performance Questionnaire are included. Most files are in PDF format, with a few in DOCX and XLSX formats, all dated June 12, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to NV ASH MEADOWS NWR CRY SPRNGS RESTORE, newest first.
File Type Posted
FINAL__UCS__EA__8-15-2013__USFWS-Reviewed_0002.pdf PDF
EA__Guidance__508-Compliant__Jan2025_0002.pdf PDF
FONSI__Template__508-Compliant__Jan2025_0002.pdf PDF
24_-_AMNWR__Attachments_List__Crystal_Springs__01-08-2025_0002.pdf PDF
RFI-Questions_and_Responses__01-08-2025_0002.pdf PDF
EA__Template__508-Compliant__Jan2025_0002.pdf PDF
Sol_140FGA25R0003_Amd_0002.pdf PDF
Sol_140FGA25R0003_Amd_0001.pdf PDF
B08_-_Solicitation_(140FGA25R0003_Sections_B-M)_0001.pdf PDF
B08_-_Solicitation_Cover_Form_(140FGA25R0003)_0001.pdf PDF
23_-_190102__Ash_Meadows_NWR__Inventory_Assessment_Memorandum.pdf PDF
16_-_Map_4__EC_Values_Connectivity.pdf PDF
19_-_Nevada_Dept__of_Wildlife__Letter_of_Support.pdf PDF
2_-_AMNWR__Subcontract_List__Crystal_Springs__06-12-2024.pdf PDF
1_-_AMNWR__Proposal_Schedule__Crystal_Springs__06-12-2024.pdf PDF
4_j__-_Crystal_Springs_Restoration_Plan.pdf PDF
9_-_Pre-Work_Safety_Checklist.pdf PDF
11_-_360_FW1__Summary_of_Construction_Permits.pdf PDF
13_-_Map_1__Location.pdf PDF
21_-_2018__Dam_Safety_Inspection_Letter_for_Crystal_Springs.pdf PDF
Sol_140FGA25R0003.pdf PDF
3_-_AMNWR__Statement_of_Work__Crystal_Springs__06-12-2024.pdf PDF
4_a__-_AMNWR__Project_Nomination__Crystal_Springs_Outflow__Edited.pdf PDF
4_d__-_AMNWR__Horseshoe_Dam_Report.pdf PDF
4_g__-_PFAS_Summary.pdf PDF
12_-_360_FW4__Construction_Management.pdf PDF
22_-_191210__Ash_Meadows__H_H_Report.pdf PDF
25_-_Davis_Bacon_Wage_Determination.pdf PDF
26_-_Past_Performance_Questionnaire).pdf PDF
4_e__-_AMNWR__Lower_Crystal_Dam_Report.pdf PDF
17_-_Map_5__EC_Values_Community.pdf PDF
4_c__-_AMNWR__Crystal_Springs_Dam_Report.pdf PDF
4_k__-_Crystal_Springs_Re-vegetation_Plan.pdf PDF
10_-_Safety_and_Design_Checklists_v_1_1.pdf PDF
B08_-_Solicitation_(140FGA25R0003).pdf PDF
14_-_Map_2__Agency_Management_Area.pdf PDF
15_-_Map_3__EC_Values_Sustainability.pdf PDF
18_-_Map_6__General_Overview.pdf PDF
4_f__-_Crystal_Reservoir_Dust_Hazard_Analysis_1.pdf PDF
4_h__-_240322__Death-Valley__Output.pdf PDF
4_i__-_Crystal_Reservoir_Rehabilitation_Plan_and_Construction_Sequence.pdf PDF
4_l__-_Crystal_Springs_Construction_Sequence.pdf PDF
6_-_AMNWR__Technical_Requirements__06-12-2024.pdf PDF
20_-_Crystal_Springs_Dam__Figure_4.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ash Meadows National Wildlife Refuge (AMNWR).

Design/Build Services For:

Crystal Springs Outflow Restoration and All Associated Appurtenances.

Attachments provided as Separate Files.

File Name File Extension

AMNWR – Project Documents.

1 - AMNWR. PPR Proposal Schedule. 06-12-2024. PDF, XLSX 2 - AMNWR. Subcontract List. Crystal Springs. 06-12-2024. DOCX 3 - AMNWR. Statement of Work. Crystal Springs. 06-12-2024. PDF 4.a. - AMNWR. Project Nomination. Crystal Springs Outflow Restoration. PDF 4.c. - AMNWR. Crystal Springs Dam Report. PDF 4.d. - AMNWR. Horseshoe Dam Report. PDF 4.e. - AMNWR. Lower Crystal Dam Report. PDF 4.f. - Crystal Reservoir Dust Hazard Analysis 1. PDF 4.g. - PFAS Summary. PDF / DOCX 4.h. - 240322. Death-Valley. Output. PDF / XLSX 4.i. - Crystal Reservoir Rehabilitation Plan and Construction Sequence. PDF 4.j. - Crystal Springs Restoration Plan. PDF 4.k. - Crystal Springs Re-vegetation Plan. PDF 4.l. - Crystal Springs Construction Sequence. PDF 6 - AMNWR. Technical Requirements. 06-12-2024. PDF 9 - Pre-Work Safety Checklist. PDF 10 - Safety and Design Checklists v.1.1. PDF 11 - 360 FW1. Summary of Construction Permits. PDF 12 - 360 FW4. Construction Management. PDF 13 - Map 1. Location. PDF 14 - Map 2. Agency Management Area. PDF 15 - Map 3. EC Values Sustainability. PDF 16 - Map 4. EC Values Connectivity. PDF 17 - Map 5. EC Values Community. PDF 18 - Map 6. General Overview. PDF 19 - Nevada Dept. of Wildlife. Letter of Support. PDF 20 - Crystal Springs Dam. Figure 4. PDF 21 - 2018. Dam Safety Inspection Letter for Crystal Springs. PDF 22 - 191210. Ash Meadows. H&H Report. PDF 23 - 190102. Ash Meadows NWR. Inventory Assessment Memo. PDF 24 - AMNWR. Attachments List. Crystal Springs. PDF 25 – Davis Bacon Wage Determination PDF 26 – Past Performance Questionnaire PDF

File details come from the government source that posted it. Updated .