16_-_Map_4__EC_Values_Connectivity.pdf

PDF 4 MB Posted

Attached to
NV ASH MEADOWS NWR CRY SPRNGS RESTORE Federal contract opportunity
Solicitation number
140FGA25R0003
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is a map document showing planned visitor access improvements at the Ash Meadows National Wildlife Refuge in Nye County, Nevada, which is managed by the U.S. Fish & Wildlife Service. The map specifically focuses on visitor access improvement and interpretive enhancement related to an EC Strategic Plan Value of Connectivity.

The aerial map displays existing and planned infrastructure including new trails (marked in yellow dashed lines), existing trails and boardwalks (in pink), new parking areas, existing parking areas, new overlooks, roads, and road improvements. The improvements are centered around the Crystal Loop area of the refuge, with multiple parking areas and trail connections. The map includes a scale bar showing distances in miles and kilometers, uses NAD 83 datum, and was produced in November 2021. The imagery appears to show both wetland areas (in darker green) and arid terrain, typical of the Nevada landscape.

View the file

Other files for this federal contract opportunity

Other files attached to NV ASH MEADOWS NWR CRY SPRNGS RESTORE, newest first.
File Type Posted
EA__Guidance__508-Compliant__Jan2025_0002.pdf PDF
FONSI__Template__508-Compliant__Jan2025_0002.pdf PDF
24_-_AMNWR__Attachments_List__Crystal_Springs__01-08-2025_0002.pdf PDF
RFI-Questions_and_Responses__01-08-2025_0002.pdf PDF
FINAL__UCS__EA__8-15-2013__USFWS-Reviewed_0002.pdf PDF
EA__Template__508-Compliant__Jan2025_0002.pdf PDF
Sol_140FGA25R0003_Amd_0002.pdf PDF
Sol_140FGA25R0003_Amd_0001.pdf PDF
B08_-_Solicitation_(140FGA25R0003_Sections_B-M)_0001.pdf PDF
B08_-_Solicitation_Cover_Form_(140FGA25R0003)_0001.pdf PDF
Sol_140FGA25R0003.pdf PDF
24_-_AMNWR__Attachments_List__Crystal_Springs.pdf PDF
3_-_AMNWR__Statement_of_Work__Crystal_Springs__06-12-2024.pdf PDF
4_a__-_AMNWR__Project_Nomination__Crystal_Springs_Outflow__Edited.pdf PDF
4_d__-_AMNWR__Horseshoe_Dam_Report.pdf PDF
4_g__-_PFAS_Summary.pdf PDF
12_-_360_FW4__Construction_Management.pdf PDF
22_-_191210__Ash_Meadows__H_H_Report.pdf PDF
23_-_190102__Ash_Meadows_NWR__Inventory_Assessment_Memorandum.pdf PDF
19_-_Nevada_Dept__of_Wildlife__Letter_of_Support.pdf PDF
2_-_AMNWR__Subcontract_List__Crystal_Springs__06-12-2024.pdf PDF
1_-_AMNWR__Proposal_Schedule__Crystal_Springs__06-12-2024.pdf PDF
4_j__-_Crystal_Springs_Restoration_Plan.pdf PDF
9_-_Pre-Work_Safety_Checklist.pdf PDF
11_-_360_FW1__Summary_of_Construction_Permits.pdf PDF
13_-_Map_1__Location.pdf PDF
21_-_2018__Dam_Safety_Inspection_Letter_for_Crystal_Springs.pdf PDF
25_-_Davis_Bacon_Wage_Determination.pdf PDF
26_-_Past_Performance_Questionnaire).pdf PDF
4_e__-_AMNWR__Lower_Crystal_Dam_Report.pdf PDF
17_-_Map_5__EC_Values_Community.pdf PDF
4_c__-_AMNWR__Crystal_Springs_Dam_Report.pdf PDF
4_k__-_Crystal_Springs_Re-vegetation_Plan.pdf PDF
10_-_Safety_and_Design_Checklists_v_1_1.pdf PDF
B08_-_Solicitation_(140FGA25R0003).pdf PDF
14_-_Map_2__Agency_Management_Area.pdf PDF
15_-_Map_3__EC_Values_Sustainability.pdf PDF
18_-_Map_6__General_Overview.pdf PDF
4_f__-_Crystal_Reservoir_Dust_Hazard_Analysis_1.pdf PDF
4_h__-_240322__Death-Valley__Output.pdf PDF
4_i__-_Crystal_Reservoir_Rehabilitation_Plan_and_Construction_Sequence.pdf PDF
4_l__-_Crystal_Springs_Construction_Sequence.pdf PDF
6_-_AMNWR__Technical_Requirements__06-12-2024.pdf PDF
20_-_Crystal_Springs_Dam__Figure_4.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .